Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8920215_CURRENT PERMIT_20220823
STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 92OZ15 DOC TYPE © CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2o220g23 YYYYMMDD V y Km� ROY COOPER r Governor l ELIZABETH S.BISER .� . Secretary . BRIAN WRENN NORTH CAROLINA Director Environmental Quality August 23, 2022 Marine Corps Base Camp Lejeune Attn: Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejeune,NC 28547 Subject: Permit Renewal Post-Construction Stormwater Management Permit No. SW8 920215 FC286 Field maintenance Complex SWP 57 Onslow County Dear Mr. Paul: The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on August 10,2022. The Division is hereby notifying you that permit SW8920215 has been renewed, updated,and re-issued on August 23, 2022, as attached. Please be aware that the renewal and re- issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until August 25, 2029 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty(30)days of receipt of this permit. You should contact the OA14 with all questions regarding the filing fee (if a filing fee is required)and/or the details of the filing process at 6714 Mail Service Center, Raleigh,NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional Office, at(910) 796-7215 or ashleym.smith@ncdenr.gov. �Sincerel��y,}}'Lt'JI./'c,��7c,� Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Attachment A—Designer's Certification Form Attachment C—Permitting History Renewal Application Documents DES/ams: \\\Stormwater\Permits&Projects\1992\920215 HD\2022 08 permit 920215 cc: Wilmington Regional Office Stormwater File r ft J/ North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington.North Carolina 28405 910.796.7215 Post-Construction Stormwater Management Permit No. SW8 920215 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST-CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Marine Corps Base Camp Lejeune FC286 Field Maintenance Complex SWP 57 Near the intersection of Gonzalez Boulevard and McHugh Boulevard, Onslow County FOR THE construction, operation and maintenance of one (1) wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter referred to as the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy. Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until August 25, 2029 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 of this permit. The runoff from all built-upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control measure. The permitted stormwater control measure has been designed to handle the runoff from 1,570,799 square feet of impervious area. 3. The 41.0 acre drainage area will be limited to the amount of built-upon area indicated in Sections 1.2 and 1.5 of this permit, and per approved plans. The built-upon area for the future development is limited to 0 square feet. Page 1 of 7 Post-Construction Stormwater Management Permit No. SW8 920215 4. The wet pond is designed for 85% TSS removal, therefore, the discharge from the wet detention pond must be directed into a 30-foot vegetated filter strip designed to pass the peak flow from the 10 year storm in a diffuse, non-erosive manner. 5. The following design criteria have been permitted for the wet detention pond and it must be provided and maintained at the design condition: a. Drainage Area, acres: 41.0 Onsite, ftz: 1,785,960 Offsite, ftz: 0 b. Total Impervious Surfaces, ftz: 1,570,799 Onsite, ftz: 1,570,799 Offsite, ftz: 0 C. Pond Design Depth, feet: 5.0 (1988 rules) d. TSS removal efficiency: 85% e. Design Storm, inches: 1,570,338 sf @1" /461 sf @1.5" f. Permanent Pool Elevation: 94.15 (relative) g. Permitted Surface Area @PP, ftz: 107119 h. Permitted Temporary Storage Volume, ft3: 132.790 i. Temporary Storage Elevation: 95.28 (relative) j. Predevelopment 1 yr-24 hr discharge rate, cfs: n/a k. Controlling Orifice: 5"0 pipe I. Orifice Flowrate, cfs : 0.45 M. Permanent Pool Volume, ft3: 383,183 n. Forebay Volume, ft3: 40,592 o. Maximum Fountain Horsepower: 1.0 P. Receiving Stream / River Basin: Cogdels Creek/WOK02 q. Stream Index Number: 19-23 r. Classification of Water Body: "SC NSW" If. SCHEDULE OF COMPLIANCE 1. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 2. The stormwater management system shall be entirely constructed, vegetated and operational for its permitted use prior to the construction of any built-upon surface. 3. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. If the stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 4. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. 5. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, the permittee shall cause a certification from an appropriate designer for the system installed to be submitted, certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. Page 2 of 7 Post-Construction Stormwater Management Permit No. SW8 920215 7. Decorative spray fountains are allowed in the pond, subject to the following criteria: a. The minimum permanent pool volume is 30,000 cubic feet. b. The fountain must draw its water from less than 2' below the permanent pool surface. C. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. d. The fountain may not be placed into the forebay. e. The falling water from the fountain must be centered in the main pond, away from the shoreline. f. The maximum horsepower for a fountain in this pond is 1 horsepower. 8. All stormwater collection and treatment systems must be located in either public rights-of-way, dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such rights-of-way, common areas and easements, in accordance with the approved plans. Access to the stormwater facilities for inspection and maintenance shall be maintained at all times. 9. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 10. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. III. GENERAL CONDITIONS 1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on-site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). Page 3 of 7 Post-Construction Stormwater Management Permit No. SW8 920215 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur v. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on-site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions Page 4 of 7 Post-Construction Stormwater Management Permit No. SW8 920215 e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit renewed, updated and reissued this the 23rd day of August 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION a-di-' . m .�, ri�enrP, uirector Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 920215 Page 5 of 7 Post-Construction Stormwater Management Permit No. SW8 920215 FC286 Field Maintenance Complex SWP 57 Stormwater Permit No. SW8 920215 Onslow County Attachment A Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: SEAL Signature Registration Number Date Page 6 of 7 Post-Construction Stormwater Management Permit No. SW8 920215 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built- upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDEQ-DEMLR Wilmington Regional Office Page 7 of 7 Attachment C- Permitting History FC286 Field Maintenance Complex SWP 57 Permit No. SW8 920215 Approval Permit BIMS Description of the Changes Date Action Version 4/23/1992 Original 1.0 Not on G drive Approval well graded aggregate to stabilize the eroding soil to descrease 8/25/1999 Modification 1.1 the amount of sediment leaving the site; existing pond will be expanded by added approximately 1 acre to the 1.5 acre existing pond. Also: updated project name: FC 286 Field Maintenance 12/16/2015 Renewal 2.0 Complex, SWP 57 (formerly P-804 Field Maintenance Complex) An additional 814 sf building is being added within the existing drainage area in support of the on-going Steam Decentralization 2/13/2016 Modification 2.1 project. A portion of this building(353 sf) will be built over existing BUA, resulting in a net increase in BUA of 461 sf. The existing pond can accommodate the increased surface area and volume requirements as is. 8/23/2022 Renewal 3.0 Expires August 25, 2029 Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the` O maximum extent practical. GIGEI V E - Once a year, a dam safety expert should inspect the embankme JAN 2 7 20ro After the wet detention pond is established, it should be inspected once onth and within 24 hours after every storm event greater than 1.0 inches (or 1.5 iiste-alf_in-a-1 Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully,and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead,diseased or Determine the source of the dying. problem: soils,hydrology,disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide(do not spray). the basin surface. rJAN CEJVE 21 209� Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 BY:___------- ` Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs re air. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office,or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 3.90 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3.90 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) V Permanent Pool Elevation 94.15 Sediment Removal . 9025 35� -------------- -- Volume Sediment Removal Elevation 90.25 Volume Bottom Elevatio 89 ------------------------------ Sedieier+t Bottom Elevation 89 Staragr �6ecfirteHt 25/ A FOREBAY vowme MAIN POND 25y, e ECEIVE . VoWM£ JAN 2 7 2010 Form S W401-Wet Detention Basin O&M-Rev.4 BY:_----- Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:P-804 Field Maintenance Complex BMP drainage area number:I Print name:Thomas Bradshaw, PE Title:Civil Engineer, Public Works Department Address:1005 Michael Rd Camp Leielme, NC 28542 Phone:910-451-3238 xt3285 Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. ��Q, , a Notary Public for the State of Noah Clat 1L r1G , County of Z"6tO , do hereby certify that � rtiY &Aas , PLO personally appeared before me this l �_ day of a �(( p_, and acknowledge the due execution of the forgoing lyet detention basin maintenance requirements. Witness my hand and official seal � SA41,611 Olt` ! '4 Notory Public = Onslow county _My commission Expires_ 05/26/2019 V. y°R 0C Alt '' ECEIVE �ll11111111111\\ JAN 2 7 2016 SEAL BY:_------ My commission expires cJ Irk o��Q Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 UEMLH USE ONLY Date Rec ive Fee Paid Permit Number D a W0 Scoff q 6 a(5 NC DEG Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 920215 2. Project name: FC286 Field Maintenance Complex SWP 57 3. Project street address: XXX City: MCB Camp Leieune County: Onslow ZIP : 28542 4. What, if any, changes have been made to the project as permitted? N/A If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at:httl)s:Hdeg.nc.gov/abouUdivisions/energy- m i neral-land-resou rces/ene rgy-m ine ral-land-ru les/stormwate r-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at:https://deg.nc.gov/about/divisions/energV-mineral-land- resources/energV-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. . 1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune 2. Signing Official's Name: Neal Paul 3. Signing Official's Title: Deputy Public Works Division 4. Mailing Address: MCB Camp Leieune 1005 Michael Rd. City: MCB Camp Leieune State: NC ZIP : 28547-2521 5. Street Address: City: State: ZIP 6. Phone: (910) 451-2213 Email: neal.paul@usmc.mil AUG 10 2022 BY: ' Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non-Coastal HOW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: MCT 1. A permit application processing fee of $505.00 payable to NCDEO. MCT 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation—a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC)—a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity—a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership—the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a— e above authorizing the signature of another entity. MCT 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. MCT 4. O&M Agreements, Please select one: ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. MCT 5. Designer Certifications, Please select one: ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. MCT 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE]When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). httos://www.sosnc.gov/online services/search/by title/ Business Registration AUG 10 2022 BY: Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PE TTEE''S(�CERTIFICATION I, i 17 • the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built-upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs ownership. formation provided on this permit renewal application is, to the best of my knowledge, rre nd com lete. Q Signature: Date: NOTARIZATION: f a Notary Public for the State of lV&irk�) CmoL County of oY cS'Ioy� , do hereby certify that • L-DP( ove, personally appeared before me this the l day of q(AS'r I 2012�, and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, iiit11111111 (Notary Seal) IV �Q-t•IOTAi� Notary Signature: o•' PUBLIC ' v; My commission expires � �2d+' ���r/llti tii` AUG 10 2022 BY: Slormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 Permit No.S6>l 9 7-�;),��U7/ no be provided by DWp) W A Lz9 y r NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out,printed and submitted. The Required Items Checklist(Part III)must be printed,filled out and submitted along with all of the required information. I:APROJECTONFORMATION`= Project name P-804 Field Maintenance Complex Pond Contact person Jennifer Williams,PE Phone number 910-383-1044 Date 27-Jan-16 Drainage area number 1 II.{DESIGN iINFORMATION ,atcc.. .° .+,`utM`v' - Site Characteristics Drainage area 1,785,960 H Impervious area,post-development 1,570,799 flz %impervious 87.95% Design rainfall depth 1.011.5 in Storage Volume: Non-SA Waters Minimum volume required 125,272 0 Volume provided 132,790 ff' OK,volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5'runoff volume ft' Pre-development l-yr,24-hr runoff ffs Post-development 1-yr,24-hr runoff to Minimum volume required ft3 Volume provided ffs Peak Flow Calculations Is the prelposl control of the 1yr 24hr starm peak flow required? NIA (Y or N) 1-yr,24-hr rainfall depth NIA in Rational C,pre-development NIA(unitless) Ralianal C,post-development NIA(unitless) Rainfall intensity:1-yr,24-hr stone NIA iNhr #VALUE! Pre-development 1-yr,24-hr peak flow NIA ff3lsec Post-development 1-yr,24-hr peak flow f /sec PrelPost 1-yr,24-hr peak flow control ff115ec Elevations Temporary pool elevation 95.28 fmsl Permanent pool elevation 94.15 fmsl SHWT elevation(approx.at the perm.pool elevation) NIA fmsl Top of4BN vegetated shelf elevation (GIFT) 94.15 fmsl Bottom of 49fFvegetated shelf elevation(BFT) 93.15 fmsl Sediment deanoul,top elevation(bottom of pond) 90.25 fmsl x C `,C Sediment cleanout,bottom elevation 89.00 fmsl C C , �I' C Sediment storage provided 1.251t JAN 2 ) 2016 Is there additional volume stored above the state-required temp.pool? Y (Y or N) Elevation of the top of the additional volume 95.3 fmsl OK BY- Form SW401-Wet Detention Basin-Rev.9-4l1e112 Parts I.b It.Design Summary,Page 1 of Permit No. no be provided by DWO) JIDESIGIN INF_ORIAATION77' ""`,,:�`°,�'iv� 'i, . . x r'z i3: ° _ ? 4, _ , Surface Areas Area,temporary pool 127,908 flz Area REQUIRED,permanent pool 83,504 It' SAIDA ratio 4.68(unitless) Area PROVIDED,permanent pool,A.. 107,119 ft OK Area,bottom of 10ft vegetated shelf,A,,. UNKNOWN ffz Area,sediment cleanout,top elevation(bottom of pond),Aw,� UNKNOWN ff° Volumes Volume,temporary pool 132,790 ft3 OK Volume,permanent pool,V°,,,pw 383,183 ft3 Volume,forebay(sum of forebays if more than one forebay) 40,592 ft3 Forebay%of permanent pool volume 10.6%°k NO CHANGE TO PERMITTED FOREBAY SAIDA Table Data Design TSS removal 85% Coastal SAIDA Table Used? Y (Y or N) MountairdPiedmont SAIDA Table Used? N (Y or N) SAIDA ratio 4.68 limitless) Average depth(used in SAIDA table): Calculation option 1 used?(See Figure 10-2b) NIA (Y or N) Volume,permanent pool,V,,,,,�, 383,183 ft3 Area provided,permanent pool,A°,,,y„1 107,119 ftz Average depth calculated ft Need 3 fit min. Average depth used in SAIDA,d,,,(Round to nearest 0.5ft) It Calculation option 2 used?(See Figure 10-2b) NA/ (Y or N) Area provided,permanent pool,A,,,,y 107,119 ffz Area,bottom of 10ft vegetated shelf,A,-, UNKNOWN ft3 Area,sediment cleanout,top elevation(bottom of pond),Aya°„a UNKNOWN ft2 'Depth'(distance blw bottom of 10ft shelf and top of sediment) 2.90 If -Avemijadepth calculated 5.00 If OK A vaRge•depth used in SAIDA,d,,,(Round to down to nearest 0.5ft) 5.0 If OK Drawdown Calculations Drawdown through odfice? Y (Y or N) Diameter of orifice(if circular) 5.00 in Area of orifice(it-noncimular) Ins Coefficient of discharge(CD) (unitless) Driving head(H,) 0.46 it Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge(C„) (unitless) Length of weir(L) It Driving head(H) If Pre-development 1-yr,24-hr peak flaw NIA ft3lsec Post-development 1-yr,24-hr peak flaw NIA ft3/sec Storage volume discharge rate(through discharge orifice or weir) 0.45 ft°Isec Storage volume drwdown time 3.40 days OK,draws down in 2-5 days. G C EV I G Additional Information Vegetated side slopes 3:1 OK JAN 2 7 2016 Vegetated shelf slope 6:1 Insufficient shelf slope. Vegetated shelf width 6.0 ft Insufficient shelf length. Length of flowpath to width ratio 3:1 OK BY: Length to width ratio 3.0:1 OK Trash rack for overflow&orifice? UNKNOWN (Y or N) OK Freeboard provided It Vegetated filter provided? UNKNOWN (Y or N) OK Recorded drainage easement provided? NIA (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: PORTABLE PUMP Form SW401-Wet Detention Basin-Rev.9-4118112 Pars I.&II.Design Summary,Page 2 of 2