Loading...
HomeMy WebLinkAboutSW8920215_COMPLIANCE_20150608 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 9 2. CU21 5 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ® COMPLIANCE EVALUATION INSPECTION DOC DATE 20I15-0\.o oa YYYYMMDD STATE OF NORTH CAROLINA Department of Environmental and Natural Resources 127 Cardinal Drive Extension Wilmington,North Carolina 28405 (910)796-7215 FILE ACCESS RECORD SECTION poi W TIMMATE a' j�' Pit fr NAME REPRESENTING Guidelines for Access: The staff of Wilmington Regional Office is dedicated to making public records in our custody readily available to the public for review and copying. We also have the responsibility to the public to safeguard these records and to carry out our day-to-day program obligations. Please read carefully the following guidelines signing the form: L Due to the large public demand for file access,we request that you call at least a day in advance to schedule an appointment to review the files. Aj�pmtments will be scheduled between 9:00am and 3:00ym. Viewing time ends at 4:45pm. Anyone arriving without an appointment may view the files to the extent that time and staff supervision is available. 2. You must specify files you want to review by facility name. The number of files that you may review at one time will-be limited to five. 3. You may make copies of a file when the copier is not in use by the staff and if time permits. Cost per copy is$.05 cents.Payment may be made by check money order,or cash at the reception desk Copies totaling$5 00 or more can be invoiced for Your convenience. 4. FILES MUST BE KEPT IN ORDER YOU FOUND THEM. Files may not be taken from the office. To remove,alter,deface,mutilate,or destroy material in one of these files is a misdemeanor for which you can be fined up to$500.00. No briefcases large totes,etc.are Remitted in the file review area. 5. In accordance with General Statue 25-3-512,a$25.00 processing fee will be charged and collected for checks on which payment has been refused. FACILITY NAME COUNTY 1. flA 0afi311 /01Dk Zfgln_7�.�_ OnIS 2 34. . I :ae� 3 VU Signature ma Name of Firm/Business Date Time In Time Out Please attach a business card to this form COPIES MADE PAID INVOICE S:AdminBe access n ysrnrt o,� Wt State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor DIVISION OF ENVIRONMENTAL MANAGEMENT Bob Jamieson Jonathan B. Howes, Secretary Regional Manager June 2, 1994 Mr. Disel Hinkle Commanding General-ATTN Base Maintenance Division Bin 8 Marine Corps Base DSC Box 20004 Camp Lejeune, North Carolina 28542-0004 Subject: COMPLIANCE INSPECTION Camp Lejeune Marine Corps Base Onslow County Dear Mr. Hinkle: Please find attached copies of the completed forms entitled "Stornwater Compliance Inspection Re;.ort". The reports summarize the findings of a recent inspection of the Base's stormwater control structures conducted on June 1, 1994 to determine compliance with Stormwater Certifications issued since 1988. A summary of the findings and comments are noted under Section 6 of the report. Appropriate action, if required, should be completed by July 2, 1994. Please inform this Office by letter when required action is completed. If you have any questions please contact me at the Wilmington Regional Office; telephone number (910) 395-3900. Sincerely, Linda Lewis Environmental Engineer cc: Central Files Bradley Bennett (2) Linda Lewis 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer STORMWATER COMPLIANCE INSPECTION REPORT 1. Project Name: P-804 Field Maintenance Complex Project Number: 920215 Control Measure: 90 Detention Water Body: Codgels Creek Classification: SC Directions to site, address: Camp Lejeune, unsure of street name. 2. Inspection Date: June 1, 1994 - Weather Conditions: Sunny, warm 3. Comparison of Approved plans vs. As-Built: Compared well. 4. Maintenance Problems: 5. PE Certification Received? YES Deed Restrictions Received? N/A 6. Comments: 1. It was noted during the inspection that the orifice was submerged and no flow was observed leaving the site. Upon review of the files, the entire outlet control system was raised 2'. Based on the comment by Mr. Hinkle that a survey shot taken recently indicated that the elevation of one corner of the concrete spillway was at 10. 10, the structure may not have been raised by the full 2'. The centerline of the 5" orifice was approved at invert 8.5, approximately 2.5' below the lowest part of the spillway. I would judge that to be the case at this pond, and it would appear that the pond is in conformance with the approved plans. You may wish to consider the possibility of providing positive drainage from the point the orifice becomes level with the concrete spillway down.to the edge of the spillway. Inspector: Linda Lewis Water Quality/Wilmington Regional Office/(910) 395-3900 DA/arl: S:\WQS\STORMWAT\INSPECT\920215.JUN