Loading...
HomeMy WebLinkAboutSW8890517_CURRENT PERMIT_19890619 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 c6g651. 1 DOC TYPE ® CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 101 8 °l O l01 `l YYYYMMDD „a SrAr' State of North Carolina Department of Natural Resources and Community Development Wilmington Regional Office James G. Martin, Governor Rob Jamieson William W. Cobey, Jr., Secretary Regonal Manager DIVISION OF ENVIRONMENTAL MANAGEMENT CC June 19 , 1989 �fv�Mr. Charles A. Rawls, R. L.S. I, nP ��� 11” Post Office Box 1126 U �iB Swansboro, North Carolina 28584 oo 1 �(fl Subject: Certification of Compliance with Stormwater Regulations Project No. 890517 Flea Market Carteret County Dear Mr. Rawls: The Wilmington Regional Office received the Stormwater , submittal for Bill Ennett Flea Market on May 10 , 1989 and final information on June 6, 1989 . Based on our review of the project plans and specifications, we have determined that the project meets the low density requirements and thereby complies with the Stormwater Regulations set forth in Title 15 NCAC 2H. 1003 (a) (3) . This certification shall be effective from the date of issuance until rescinded and the project shall be constructed in accordance with the plans and specifications subsequently filed with the Wilmington Regional Office. If you have any questions concerning this matter, please call Paul Rawls or me at (919) 256-4161. Sincerely, Original Signed By A: PRE`;TON HOWARD, iR A. Preston Howard, Jr. , P.E. Regional Supervisor APH: PER:trw cc: Bill Mills WiRVEnnett , CF 7225 Wrightsville Avenue, Wilmington, N.C. 28403-3696 • Telephone 919-2564161 An Equal opportunity Affirmative Action Employer DIVISION OF ENVIRONMENTAL MANAGEMENT _ Submittal Form for Projects Using Density Limits for Stormwater Control zIM65-17 PROJECT DATA Name of Project: __l�/loQcsk� irk n��eK*7 l2 II:« �uvF. r Location ( County, Township/Municipality, Address ) : r--1Rrr26T- CO✓A-J Y i ��fE onk r�sP. / t' 0 P J 14Wy 24 4cs2 ii�: .. Applic n Name : u1. 3 =i�sJFrT� 61aPiA ti" 114151 r Zafc B 4116tM I Mailing Address: 12,24 CEnAZ P/ 13i.ua- d,4dS90'40 4.0. d233-Wq Phone No. : 90 343 - 9124 Submittal Date: Brief Description ( include map and appropriate drawings ) : ?60,o ro FLF,a HIALI- i o 24F LO '/J-rrp ed /3 7 4ce-Cs ifs SADV_I.J 01) PLAT Water Body Receiving Stormwater Runoff : Name of Water Body: Classification of Water Body: Total Area of Proposed Project (acres) : 13,�7 4c, State/Federal Permits and Approvals Required: (Check Appropriate Blanks) CAMA Major Sedimendation and Erosion Control Y�_ ?; 404 Permit DEM/DHS Sewage Disposal Other ( specify) : CALCULATION OF BUILT-UPON AREA (Built-upon area means that portion of an individual development that is covered by impervious or partially pervious cover including buildings, pavement, recreation facilities, etc. but not including decking. ) a) Built-upon area: Q,39 Ac, b) Total project area: % built-upon = built-upon / total project area * 100 % built-upon area = /7.6 % If the water body receiving stormwater runoff is classified as SA, is the % built-upon area < 25%? Yes A No If the water body receiving stormwater runoff is classified other than SA, is the % built-upon area < 30%? Yes a No STORMWATER COLLECTION SYSTEM Is the only kind of stormwater collection system grass swales? Yes QC_ No (Grassed-line swales should have a side slope of 3 : 1 (H:V) or less. ) ` If no, please provide a detailed description. BUFFER AREA Is the . built-upon area at least 30 feet from mean high water of all surface waters? Yes )C No If no, please provide a detailed description. (Note: Only boat ramps, public roads, public bridges and walkways to water related facilities are allowed within 30 feet of mean high water if the project is intended to meet stormwater control requirements through density limits. ) DEED RESTRICTIONS AND PROTECTIVE COVENANTS Do the deed restrictions and protective covenants ensure that subdivisions maintain the development consistent with the plans and specifications approved by the division and include the State as a beneficiary of the restrictions? Yes No (Include a copy of the restrictions and covenants with this form. ) CERTIFICATION I , ez .,I�, 14. de, .._ Gam_, certify that the information included on this submittal form is correct, that the project will be constructed in conformance with this information, and that to the best of my knowledge, the proposed project complies with the requriement of 15 NCAC 2H. 1003 (b) . OG Agent ... Date rho. Bs�llµ� S�aysL�Ro ✓e z�s09( Address —' If agent, please list owner' s name and address below: DIVISION OF ENVIRONMENTAL MANAGEMENT SIGN-OFF Regional Office {1 Watts ' vEvalua in Forms/Plant Date (:eaioLnalWater QFuAXity Supervisor CC : Applicant/Region/Mills/CF Maintenance Plan a, 1. ,Al1, erosion and sediment control . pract ces will be checked for stability and operation following'r'every runoff producing• rainfall but in no"tase less than once every week. '?,Any 'needed. repairs will be mag,e immediately tp „maintain all practices designed. 2. The sediment basin will be cleans d out, wh"en the level _ of . sediment reaches 2. 0 feet below the top of the spill dam,. Gravel and rip-rap will be cleaned or replaced when. tfe sediment pool no longer drains properly. 3, Sediment will t,e rc'muved 'frum behind the sediment fence when it p fence will be re aired as necessar to maie. The sediment becomes about ��. :, feet des at the fence. P y n.tain: a bar,ri.er until the fill slopes are properly stabilized.. 4. All seeded areas will be fertilized, reseeded as necessary . and mulched according to specifications in the vegetative '. plan to maintain a vigorou_r, .densQ'vegetative- cover: "' , � r v: a..