HomeMy WebLinkAboutSW8110702_HISTORICAL FILE_20220907 STORMWATER DIVISION CODING SHEET
POST-CONSTRUCTION PERMITS
PERMIT NO. SW8 110-102
DOC TYPE ❑ CURRENT PERMIT
❑ APPROVED PLANS
❑� HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE 2022 ogo-i
YYYYMMDD
Burd, Tina J
From: Burd, Tina J
Sent: Thursday, August 18, 2022 3:20 PM
To: Barraco CIV Talia M
Subject: SW8 110702 - Gonzalez Boulevard Extension
The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section)accepted
the Stormwater Permit Renewal Application and $505.00 fee for the subject project on August 10, 2022. The project has
been assigned to Ashley Smith and you will be notified if additional information is needed.
Best Regards,
Tina Burd
Administrative Associate II
Wilmington Regional Office
Division of Environmental Assistance& Customer Service
Phone 910-796-7215
NCDEQ
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Website: http://deg.nc.goy/about/divisions/energy-mineral-land-resources/stormwater
Based on the current guidance to mini mice the spread of COVID-to, the Department of Environmental Quality has adjusted operations to
protect the health and,safety of the staffand public. Many employees we wm king remotely mare on staggered shifts. To accommodate these
staffing changes,all DF'Q-WIce locations are limiting public access to appointments wily. Please check with the appropriate staff before
visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the
public during this challenging time.
1
Non-Transfer Application Completeness Review Checklist
Project Name: (f_'7V1)7-QLEy ;DLV-b EfTEP)SrO,N Date Delivered to WIRO: Zl Zo
Project County/Location: O rJ5�0_'3 _$ RIMS Received/Accepted Date: Q, /O zoo
Date Given to Admin:
Permit Action: New New Permit M': RIMS Acknowledged Date': ( �'
❑Not located in the ETJ of the following delegated
and functionin¢programs:
NHC:Carolina Beach/Kure Beach/Wilmington/Wrightsville Beach
Bruns: Leland/Navassa(?)/Oak Island
Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City Major Mod / Minor Mod / enewa t'Listing Permit p: J Lz S 16 7D Z
Applicant&Permittee are the same?3 Expiration Date°: Z ZO Z
Permit Type: HD D/LD Overall/HD&LD Combo
General Permit/Offsite/Exempt + Redevelopment �Offsite to SWB:
Development Type: Commercial/Residential Other Ells Offsite Lot approved in Master Permit?s
Subdivided?: Subdivision or Inge Lot
Rule(s): E12017 Coastal L,-:5F008 Coastal F_�1995 Coastal
Phase II El Universal E-11988 Coastal
Permittee Type&Documents Needed:
Property Owner(s) ED13urchaser Lessee =HOA Developer
Viable? =Viable? Viable? =Viable? =Viable?
=Deed =Purchase ARmt =Lease =Election Minutes
Paperwork
Application
H6e: =$505(within 6mo) Checktt(s): (�I P.F—'P =No Fee
Supplement'(1 new form or for older forms:1 original per SCM)
�O&M2
=Soils Report(Infil or PP)
Calculations(signed/sealed)
Deed Restrictions,if subdivided
Project Narrative
QUSGS Map(or on file?) Subject to SA?: Y / N Subject to ORW?: Y / N
Plans(2 Sets)
NOTES:
tEnter RIMS Acknowledged Date on this Sheet
2For New Projects-Enter New Permit N on Supplements&Deed Restriction Templates.
3 If permittee is different,STOP. Needs to be transferred first.
°If w/in 6 months and they are requesting a mod,STOP. Needs a renewal first.
slf Lot not approved in master permit,STOP. Master permit needs mod.
EMAILED ENGINEER DATE: Comments:
REVIEWER NAME: 74-54
G:WQ\\\Reference Library\Procedures\Checklists\Completeness Review Checklist_2021 09 08