Loading...
HomeMy WebLinkAboutSW8110702_CURRENT PERMIT_20220907 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 110�02 DOC TYPE 0 CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2021 oq 0-1 YYYYMMDD SLA7Za ROY COOPER Coyerrtar ELIZABETH S.B1SEP Secretary BRIAN WRENN NORTH CAROLINA Director Envtronmental Quality September 7,2022 Marine Corps Base Camp Lejeune Attu: Neal Paul, Deputy Public Works Officer IQ05 Michael Road Camp Lejeune,NC 28547 Subject: Permit Renewal Post-Construction Stormwater Management Permit No. SW8 110702 Gonzalez Boulevard Extension Onslow County Dear Mr. Paul: The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on August 18,2022. The Division is hereby notifying you that permit SW81 10702 has been renewed, updated, and re-issued on September 7, 2022,as attached. Please be aware that the renewal and re- issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until August 2,2029 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased Stormwater control requirements; it clarifies the rules and requirements of this program to provide you with abetter understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings(OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30)days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee(if a filing fee is required)and/or the details of the filing process at 6714 Mail Service Center, Raleigh,NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional Office, at(910) 796-7215 or ashleym.smith@nedenr.gov. Sincerely, C1 A00 Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Attachment A—Designer's Certification Form Attachment C—Permitting History copy of the Renewal Application Documents DES/ams: \\\Stormwater\Permits& Projects\201 1\1 10702 HD\2022 09 permit 110702 cc: Wilmington Regional Office Stormwater File 0-1 ®���� North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington,North Carolina 28405 �� / 910,796.7215 Post-Construction Stormwater Management Permit No. SW8 110702 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST-CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune Gonzalez Boulevard Extension Gonzalez Boulevard, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of two (2) infiltration basin in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until August 2, 2029 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This permit covers the construction of a total of 1,567,364 square feet of built-upon area. 3. This stormwater system is overall low density with two pockets of high density. The permit covers a total of 1,567,364 square feet of BUA of which 1,512,152 square feet is the untreated low density area, 12,913 square feet is treated in infiltration basin #1, and 42,229 square feet is treated in basin #2. 4. The overall tract built-upon area percentage for the project must be maintained at no more than 24%, as required by the stormwater rules. 5. The excess design storm overflow from the infiltration basin must be directed into a 30' vegetated filter strip and level spreader, designed per Section .1008 (f) of the stormwater rules. Page 1 of 7 Post-Construction Stormwater Management Permit No. SW8 110702 6. The tract will be limited to the amount of built-upon area indicated in Section 1.8 of this permit, and as shown on the approved plans. 7. The runoff from all built-upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 8. The following design criteria have been permitted for the infiltration basin and must be provided and maintained at design condition: Infiltration Basin #1 Infiltration Basin #2 Drainage Area "B" Drainage Area "C" a. Drainage Area, acres: 1.0 2.1 Onsite, ft2: 43,639 91,722 Offsite, ft2 N/A N/A b. Total Impervious Surfaces, ft2: 12,913 42,299 Onsite, ft2: 12,913 42,299 Offsite, ft2 N/A N/A C. Design Storm, inches: 1.5 1.5 d. Basin Depth, feet: 3 2 e. Bottom Elevation, FMSL: 7 11 f. Bottom Surface Area, ft2: 900 4,550 g. Bypass Weir Elevation, FMLS: 10 13 h. Permitted Storage Volume, ft3: 4,806 10,864 1. Type of Soil: Baymeade Marvyn j. Expected Infiltration rate: 2.06 5.37 k. Seasonal High Water Table, FMSL: 5 8.5 I. Time to Draw Down, hours 31 5.3 M. Receiving Stream/River Basin: Cogdels Creek/White Oak n. Stream Index Number: 19-23 o. Classification of Water Body: SC;NSW II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. If the stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 3. The permittee shall follow the approved Operation and Maintenance Agreement in its entirety, and shall provide and perform the listed operation and maintenance procedures at the specified intervals to assure the permitted stormwater system functions at the design condition. 4. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 6. All stormwater collection and treatment systems must be located in public rights-of-way, common areas or easements. The final plats for the project will be recorded showing all such required rights-of-way, common areas and easements, in accordance with the approved plans. Access to the stormwater facilities shall be maintained via appropriate easements at all times Page 2 of 7 Post-Construction Stormwater Management Permit No. SW8 110702 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 9. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification.\ a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. III. GENERAL CONDITIONS 1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on-site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any of these changes. Page 3 of 7 Post-Construction Stormwater Management Permit No. SW8 110702 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved, iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2), b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on-site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Page 4 of 7 Post-Construction Stormwater Management Permit No. SW8 110702 Permit renewed, updated and reissued this the 7th day of September 2022. NORTH CCARROLINA /ENVIRONMENTAL MANAGEMENT COMMISSION Yx.-.Brian Wrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 110702 Page 5 of 7 Post-Construction Stormwater Management Permit No. SW8 110702 Gonzalez Boulevard Extension Stormwater Permit No. SW8 110702 Onslow County Attachment A Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature Registration Number Date Page 6 of 7 Post-Construction Stormwater Management Permit No. SW8 110702 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built- upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDEQ-DEMLR Wilmington Regional Office Page 7 of 7 Attachment C- Permitting History Gonzalez Boulecard Extension Permit No. SW8 110702 Approval permit BIMS Description of the Changes Date Action Version construction, operation and maintenance of 2 infiltration basins Original in compliance with the provisions of Session Law 2008-21 1 and 8/2/201 1 Approval 1.0 15A NCAC 2H .1000; The stormwater control has been designed to handle the runoff from 48,861 square feet of impervious area permit covers the construction of a total of 1,561,013 square feet of built-upon area; Drainage area "A" consists of 147.48 12/16/201 1 Modification 1.1 acres and is allowed 34.71 acres of BUA. 17.5 acres of BUA is currently proposed or existing with 20.21 acres of BUA reserved for future development. overall low density with two pockets of high density. The permit covers a total of 1,567,364 square feet of BUA of which 10/28/2014 Modification 1.2 1,512,152 square feet is the untreated low density area, 12,913 square feet is treated in infiltration basin #1, and 42,229 square feet is treated in basin #2. 9/7/2022 Renewal 2.0 Expires August 2, 2029 ' Permit Number: (to be provided by DWQf Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected,repaired or replaced immediately. These deficiencies can affect the integrity of structures,safety of the public,and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully,and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the Swale applicable). sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to Swale(if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. JUL 2 g 2011 Form SW401-Infiltration Basin O&M-Rev.3 Page I of 3 1- BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used,wipe them on the plants rather than Brain . The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event. media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide(do not treatment area. spray). The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. `JUL 2 S 2011 Fonn SW401-Infiltration Basin O&M-Rev.3 - —I Page 2 of 3 Permit Number: (m be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:USMCB Camp Lcieune, Gonzalez Road LIMP drainage area number:2 Print name:Carl Baker Title:Deputy Public Works Officer Address:Blda. 1005 Michael Rd., Camp Leieune NC 28547-2521 Phone:910-45 W213 Signature: Irl Date: -5 a(0 - Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. n1`, S1YUyi V I tt�.N 0 Fr is a Notary Public for the State of IV�f't�CwcA 6yaj , County of Q a1 S( 6 W do hereby certify that C c-C( LO0.Ke-4— personally appeared before me this �26 day of , aw--, and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SYLVIA NORRIS NOTARY PUBLIC ONSLOW COUNTY, MY COMMISSION EXPIRES 3 cK SEAL A JUL 2 S 2011 My commission expires 3 L 4i lnz 4� 0 Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 ` Permit Number: " /2 7 (to be provided by DW& - Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected,repaired or replaced immediately. These deficiencies can affect the integrity of structures,safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established,it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully,and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the Swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. G�7 1 1 2014 Form SW401-Infiltration Basin O&M-Rev.3 ) Pagell of 3 BY: BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or _ the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to revent future erosion problems. Weeds are present. Remove the weeds,preferably by hand. If pesticides are used,wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event. media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair.The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. rnT 2 1 2014 BY:— Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 Permit Number: (to be provided by DWQ) 1 acknowledge and agree by my signature below that 1 am responsible for the performance of the maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Gonzalez Boulevard Extension (Cogedels Creek Pump Station #2) B1v1P drainage area number:C Print name:Neal Paul Title:Marine Corps Base. Camp Leieune Designated Government Offical Address:1005 Michael Road. Camp Lejeune.NC 28542 Phone: 910 451-3 4 Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50%of �Q� the lots have �been n�sold (�annd a,resident �o�f/the subdivision has been named the president. 1, I "\ V WSJ V`�V��V ' C/�,�allotary Public for the State of County of D ►W , do hereby certify that r - v personally appeared before me this day of �/� �� , and acknowledge the due execution of the forgoing infiltration basin maintenance requirement tness my hand and official seal, KELLEY VANDEGO VERING NOTARY PUBLIC ONSLOW COUNTY gTATE 1,)F ut)RTH CAROLINA SEAL My commission expires nCT 2 12014 Form SW401-Infiltration Basin 0&M-Rev'3 Page 3 of UEMLH USE UNLY Date P;deved Fee Paid Permit Number a� lrJFu)o�y (2 — SLUS NC DEO Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3). the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398(SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 110702 2. Project name: Gonzalez Boulevard Extension 3. Project street address: XXX City: MCB Camp Leieune County: Onslow ZIP : 2 542 4. What, if any, changes have been made to the project as permitted? N/A ll the project has changed from the original approved plans,please complete SWU-101 for a Major Modification or Minor Modification Application form available at:hilps://dea.nc.aov/abouVdivisions/energv- m ineral-land-resources/ene ray-mineral-land-ruleststormwater-proaram/oust-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made,please complete either the Permit Update form or the Permit Transfer form available at:https://deg.nc.gov/abouYdivisions/energy-mineral-land- resources/enera*mineral-land-ruleststormwater-oroaramfoost-construction:. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune 2. Signing Official's Name: Neal Paul 3. Signing Official's Title: Deputy Public Works Division 4. Mailing Address: MCB Camp Leieune 1005 Michael Rd. City: MCB Leieune State: NC ZIP: 28547-2521 5. Street Address: City: State: —ZIP : _ 6. Phone: (910)451.2213 Email: neal.paul@usmc.mil AUG 18 2022 , BY: �1► Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 7- C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR ReaionaLoffice (Coastal, SA Waters)or DEMLR Central Office(Urbanizing Areas Ph 2, USMP, Non-Coastal HOW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to Indicate that the required information Is provided In the application package: MCT 1. A permit application processing fee of$505.00 payable to NCDEO. MCT 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation—a principle executive officer of at least the level of vice-president; b. Limited Liability Company(LLC)—a manager or company official as those terms are defined in G.S. 57D"North Carolina Limited Liability Company Act;" c. Public Entity—a principal executive officer, ranking official,or other duly authorized employee; d. Partnership or limited partnership—the general partner; e. Sole proprietor;or I. Letter of authorization signed by one of the signatories noted in a—e above authorizing the signature of another entity. MCT 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. MCT 4. O&M Agreements, Please select one: ® I have a copy of the current recorded 0&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. MCT 5. Designer Certifications, Please select one: ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s)confirming that the project was built in accordance with the approved plans are enclosed;or ❑ The project has not yet been built. MCT 6. [IF APPLICABLE] 1f the project has been built, one original hard copy and one electronic copy of a signed,sealed,and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. (IF APPLICABLE)When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation,which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). httos://www.sosnc.00v/online_services/search/bv_title/_Business_Reaistration AUG 18 2012 Stormwater Permit Renewal Application Form Page 2 of 3 May 11,2018 t D. PERMITTEE''SS (C,E,�RI.TIFICATIO I, f-0WI Y A. �� , the person legally responsible for the permit,certify that I have a copy of the Permit and 0&M Agreement on site(or I will obtain a copy and it will be kept on site),that I am responsible for the performance of the maintenance procedures,and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built-upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, Sl ownership. formation provided on this permit renewal application is,to the best of my knowledge corr I nd com fete. Signature: l Date: Ld L� NOTARIZATION: , I, /erin 10 9 7(g�n a Notary Public for the State of �nY �sxro�ana_. County of D1n( do hereby certify that L—O"JA-e- personally appeared before me this the rZ.o day of J ds.�_,20 ZrL, and acknowledge the due exejkgiawisijpp forgoing instrument.Witness my hand and official seal, \V ''. ER = Is '= natqrg� . Myt r �(k pires e�fi Qo2s ti tti' s.0 .l AUG 18 2022 4 BY.•-_ Stormwater Permit Renewal Application Form Page 3 of 3 May 11,2018 Iri.T i cC) : D _ s«�... 51 4��'• C,. .yfE r c -;�-K__..—�--��_rhr^„ "1 S�.y�. f.. Permit No-�//l/D (to be provided by DWQ) ®�A �f WnTFN NCD/'+ STORMWATER MANAGEMENT PERMIT APPLICATION FORM c ENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out,printed and submitted. The Required Items Checklist(Part 111)must be printed,filled out and submitted along with all of the required information. I.113.ROJECTi NF-ORMATION Project Name Gonzalez Road-Basin 1 Contact Person Andrew B.Wilson,EIT Phone Number 919-854-6252 Date 41512011 Drainage Area Number Basin 1 ILIDESIGNUIFORMATION. Site Characteristics Drainage area 24,000.00 ftz Impervious area 12,913.00 ftz Percent Impervious 0.54 % Design rainfall depth - 1.50 in Peak Flow Calculations 1-yr,24-hr rainfall depth 3.70 in 1-yr,24-hr intensity 0.90 inmr Pre-development 1-yr,24-hr discharge 0.01 ft'/sec Post-development 1-yr,24-hr discharge 0.96 ft'Isec Pre/Post 1-yr,24-hr peak flow control 0.95 ft'Isec Storage Volume:NonSA Waters Minimum design volume required 1,603.00 ft' Design volume provided 4,806.00 ft' OK for non-SA waters Storage Volume: SA Waters 1.5"runoff volume ft' Pre-development 1-yr,24-hr runoff volume ft' Post-development 1-yr,24-hr runoff volume It, Minimum required volume ft' Volume provided 'ft3 Soils Report Summary Soil type Baymeade-Urban land Complex Infiltration rate 2.06 inlhr SHWT elevation 5.00 fmsl Basin Design Parameters Drawdown time 1.29 days OK Basin side slopes 3.00 :1 OK Basin bottom elevation 7.00 fmsl OK Storage elevation 10.00 fmsl Storage Surface Area 2,304.00 ftz Top elevation 10.00 fmsl Basin Bottom Dimensions J U L 2 8 2011 j Basin length 30.00 ft Basin width 30.00 R Bottom Surface Area 900.00 ftz Form SW401-Infiltration Basin-RevA Pans 1.8 11.Design summary,Page 1 of 2 f Permit No. (to be provided by DWO) Additional Information Maximum mnoff to each inlet to the basin? 0.44 ac-in OK Length of vegetative filer for overflow 30.00 ft OK Distance to structure 100.00 ft OK Distance from surface waters 554.00 ft OK Distance from water supply well(s) more than 100 ft OK Separation from impervious soil layer NA ft OK Naturally occuring soil above shwt 5.00 ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Bypass provided for larger storms? NA (Y or N) OK Pretreatment device provided Grassed Swales JUL 2 S 2011 Form SW401-Infiltration Basin-Rev,A Pans 1.811.Design Summary,Page 2 of 2 • Permit No. (to be provided by DWQ) III. R IJIREDDITEMSTICNECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found.An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent,the agent may initial below.lf a requirement has not been met,attach justification. Pagel Plan Initiallq Sheet No. 001 1. Plans(1"-50'or larger)of the entire site showing: -Design at ultimate build-out, -Off-site drainage(if applicable), -Delineated drainage basins(include Rational C coefficient per basin), -Basin dimensions, -Pretreatment system, -High Flow bypass system, -Maintenance access, -Proposed drainage easement and public right of way(ROW), -Overflow device,and -Boundaries of drainage easement. d/O S W 102- f p3 2. Partial plan(1"=30'or larger)and details for the infiltration basin showing: -Bypass structure, -Maintenance access, -Basin bottom dimensions, -Basin cross-section with benchmark for sediment cleanout, -Flow distribution detail for inflow, -Vegetated filter,and 6 ^ -Pretreatment device. (NI CD509 3. Section view of the infiltration basin(1"=20'or larger)showing: -Pretreatment and treatment areas,and -Inlet and outlet structures. GP G 4.A table of elevations,areas,incremental volumes&accumulated volumes to verify the volume provided. ate' 5.A soils report that is based upon an actual field investigation,soil borings,and infiltration tests. The results of the soils report must be verified in the field by DWQ,by completing&submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. CG 101-I d$ 6.A construction sequence that shows how the infiltration basin will be protected from sediment until the entire drainage area is stabilized. AAT 7.The supporting calculations. /90 NIT B.A copy of the signed and notarized operation and maintenance(08M)agreement. 4'4 NA 9.A copy of the deed restrictions(if required). JUL 28 2011 Form SW401-Infiltration Basin-Rev.4 Page 1 of 1 Part III.Required Items Checklist,Page 1 of 1 ' Permit No. �//✓ //�w (to be provided by DWQ) °F W ATEq STORMWATER MANAGEMENT PERMIT APPLICATION FORM o� NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be(lied out,printed and submitted. The Required Items Checklist(Part llp must be printed,Tilled out and submitted along with all of the required information. G'PROJECTINF.ORMATION ,+e Project Name Cogdels Creek Pump Station q2 Contact Person ,Neal Paul Phone Number 910.451.3034 Date 30-Sep-14 Drainage Area Number Infiltration Basin 2 ILIDESIGN INFORMATION; '' Site Characteristics `�� Drainage area 91,722.00 it' �`��.•�gs/p •�ti�� Impervious area 42,299.00 RZ O•' Q 9 Percent impervious 46.12 % -2 Design rainfall depth 1.50 in Peak Flow Calculations 1-yr,24-hr rainfall depth 3.70 in ic9•• NG 1104 • `g\�� 1-yr,24-hr intensity 0.90 -in/hr Pre-development 1-yr,24-hr discharge 0.27 ft3/sec Post-development 1-yr,24-hr discharge 4.70 ft3/sec Pre/Post 1-yr,24-hr peak flow control 4.43 ft3/sec Storage Volume:Non-SA Waters Minimum design volume required 5,331.90 h3 Design volume provided 13,329.80 ft3 OK for non-SA waters Storage Volume: SA Waters 1.5"runoff volume fi3 Pre-development 1-yr,24-hr runoff volume fi3 Post-development 1-yr,24-hr runoff volume fin Minimum required volume It, Volume provided fi3 Soils Report Summary Soil type Irvyn loamy fine sand Infiltration rate 5.37 in/hr SHWT elevation 8.50 fmsl Basin Design Parameters Drawdown time 0.58 days OK Basin side slopes 3.00 :1 OK Basin bottom elevation 10.50 fmsl OK Storage elevation 13.00 fmsl Storage Surface Area 8,867.00 ff3 $t 'FGEIVEO Top elevation 13.00 fmsl t Basin Bottom Dimensions 'u" OCT 2 12014 1 Basin length 70.00 ft � Basin width 60.00 It BY: Bottom Surface Area 4,309.00 ft2 Form SW401-Infiltration Basin-Rev.S 11Apr2011 Parts I.&11.Design Summary,Page 1 of 2 • Permit No. (to be provided by DWQ) Additional Information Maximum runoff to each inlet to the basin? ac-in Length of vegetative filter for overflow NIA Tt OK Distance to structure 60.00 ft OK Distance from surface waters 393.00 ft OK Distance from water supply well(s) more than 100 Yl OK Separation from impervious soil layer NIA -R OK Naturally occuring soil above shwt 4.50 it OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Bypass provided for larger storms? NIA (Y or N) OK Pretreatment device provided Grassed Swale OCT 1 2 1 2014 Foon SW401-Infiltration Basin-Rev.S 11Apr2011 Parts I.8 II.Design Summary,Page 2 of 2