Loading...
HomeMy WebLinkAboutSW8110504_HISTORICAL FILE_20110519 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 \ \0 6 o;y; DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE ? 0 \ \ 0 5\ L) YYYYMMDD NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor . Director Secretary May 19, 2011 Clifford James Ray, Manager Ray Development and Consulting, LLC 310 Bretonshire Road Wilmington, NC 28405 Subject: State Stormwater Management Permit No. SW8110504 Miller-Motte College Facility High Density Commercial Wet Detention Pond Project Onslow County Dear Mr. Ray: The Wilmington Regional Office received a complete Stormwater Management Permit Application for Miller-Motte College Facility on May 17, 2011. Staff review of the plans and specifications has determined that the project,as proposed,will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 110504 dated May 13, 2011, for the construction,operation and maintenance of the BMP's and built-upon areas associated with the subject project. This permit shall be effective from the date of issuance until May 19, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable,you have the right to request an adjudicalory hearing by fling a petition with the Office of Administrative Hearings(OAH), The petition must conform to Chapter 150B of the North Carolina General Statutes,and must be filed with the OAH within thirty (30)days of receipt of this permit. A petition is considered filed when it is received in the Office of Administrative Hearings during normal office hours. The OAH accepts filings Monday through Friday between the hours of 8:00 a.m. and 5:00 p.m.,except for official state holidays. The petition may be fled by facsimile(fax)or electronic mail by an attached file(with restrictions)- provided the signed original,one(1)copy and a fling fee(if a fling fee is required by NCGS§150B-23.2) is received in the OAH within seven (7) business days following the faxed or electronic transmission. Unless such demands are made this permit shall be final and binding. You should contact the OAH with all questions regarding the filing fee and/or the details of the filing process. The mailing address, telephone and fax numbers for the Office of Administrative Hearings are: 6714 Mail Service Center, Raleigh, NC 27699-6714. Telephone 919-733-2698. FAX 919-733-3378. If you have any questions,or need additional information concerning this matter, please contact Chris Baker, at(910)796-7215. S,inccereelly, for Colleen SufYns, Director Division of Water Quality GDS/csb: S:IWQSIStormwaterlPermits& Projects12011\110504 HD12011 05 permit 110504 cc: David Newsom, P. E., Crystal Coast Engineering, P. A. John Pierce, P. L. S., John L. Pierce&Associates, P. A. Onslow County Building Inspections Division of Coastal Management Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension,Wilmington,North Carolina 28405 One Phone:910-796-721.51 FAX:910-350-20041 Customer Service:1-877 623-6748 North Caroli na Internet:vrvw.ncwaierquality.org An Equal Opportunity l Affirmative Action Employer NKll `LLtllClllly State Stormwater Management Systems Permit No. SW8 110504 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Ray Development and Consulting, LLC Miller-Motte College Facility 105 New Frontier Way, Jacksonville, Onslow County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until May 19, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 152,017 square feet of impervious area. 3. A 50' wide vegetative buffer must be provided adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. 4. The tract will be limited to the amount of built-upon area indicated on page 3 of this permit, and per approved plans. The built-upon area for the future development is limited to 70,006 square feet. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The runoff from all built-upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 110504 7. The following design criteria have been provided in.the wet detention pond and must be maintained at design condition: a. Drainage Area, Acres: 5.26 Onsite, ft : 202,177 Offsite, ftZ: 26,836 b. Total Impervioul Surfaces, ft2: 152,017 Onsite, ft : 152,017 Offsite, ftZ: N/A C. Design Storm, inches: 1.5 d. Average Pond Design Depth, feet: 4 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSI�: 42.5 g. Permanent Pool Surface Areq, ft : 13,419 h. Permitted Storage Volume, ft : 18,888 i. Temporary Storage Elevation, FMSL: 43.75 j. Pre-dev. 1 yr-24 hr. discharge rate, cfs: 0.12 k. Controlling Orifice: 2"0 pipe I. Orifice flowrate, cfs: 0.07 M. Permitted Forebay Volume, ft3: 11,205 n. Fountain Horsepower 1/6 o. Receiving Stream/River Basin: New River/White Oak P. Stream Index Number: 19-(1) q. Classification of Water Body: "C;NSW" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall, at all times, provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The signed and approved Operation and Maintenance Agreement must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re-vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 110504 6. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in this pond is 1/6 horsepower. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built-upon area, details, etc. b. Redesign or addition to the approved amount of built-upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 13. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 110504 III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the permittee or of the project, or a mailing address change, the permittee must submit a completed and signed Name/Ownership Change Form to the Division of Water Quality, accompanied by the supporting documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re-issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 19 day of May, 2011. N RTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION `forColeeWH. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 110504 Miller-Motte College Facility Stormwater Permit No. SW8 110504 Onslow Countv Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: SEAL Signature Registration Number Date Page 6 of 7 State Stormwater Management Systems Permit No. SW8 110504 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built-upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections Page 7 of 7 ' - - DWQ USE ONLY bill,1 Date Received Fee Paid Permit Number Appl ca e Rules: ❑ Coastal SW—19 5 ❑ Coastal SW—2008 ❑ Ph II-Post Construction (select all that apply) ❑ Non-Coastal SW-HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name(subdivision,facility, or establishment name-should be consistent with project name on plans, specifications,letters,operation and maintenance agreements,etc.): Miller-Motte College Facility 2. Location of Project(street address): 105 New Frontier Way City:lacksonville County:Onslow Zip:28540 3. Directions to project(from nearest major intersection): Approx.3 Miles from intersection of Western Boulevard wirth NC 17(Marine Boulevard),0.15 Miles left on Williamsburg Parkway 4. Latitude:34°47'51.8"N Longitude:77°25'57.2"W of the main entrance to the project. II. PERMIT INFORMATION: 1.a.Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit,list the existing permit number ,its issue date(if known) ,and the status of construction: ❑Not Started ❑Partially Completed* ❑Completed* *provide a designer's certification 2. Specify the type of project(check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number,if assigned, and the previous name of the project, if different than currently proposed, 4.a.Additional Project Requirements(check applicable blanks;information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control:2.38 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 7BY: CEIVED AY 1 7 2011 Form SWU-101 Version 07Jun2010 Page I of 6 1 � III. CONTACT INFORMATION 1.a.Print Applicant / Signing Official's name and title(specifically the developer,property owner, lessee, designated government official,individual,etc. who owns the nroiect): Applicant/Organization:Ray Development and Consulting.LLC Signing Official&Title:Clifford fames Ray,Manager b.Contact information for person listed in item la above: Street Address:310 Bretonshire Road City:Wilmington State:NC Zip:28405 Mailing Address(if applicable): City: State: Zip: Phone: (910 ) 547-9344 Fax: ( ) Email:cliff@raydeveloi2ment.com c.Please check the appropriate box.The applicant listed above is: ❑The property owner(Skip to Contact Information,item 3a) ❑ Lessee*(Attach a copy of the lease agreement and complete Contact Information,item 2a and 2b below) ❑Purchaser*(Attach a copy of the pending sales agreement and complete Contact Information,item 2a and 2b below) ®Developer*(Complete Contact Information, item 2a and 2b below.) 2,a.Print Property Owner's name and title below, if you are the lessee,purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:City of lacksonville Signing Official&Title:Ronald Massey,Assistant City Manager b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address(if applicable):P.O.Box 128 City:facksonville State:NC Zip:28541-0125 Phone: (910 ) 938-5220 Fax: ( ) Email:cctymanager@ci.jacksonv i lle.nc.us 3.a. (Optional)Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official&Title: b.Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: ( ) Fax: ( ) Email:4. Local jurisdiction for building permits: l l�l� d-/ c JQ cKSon y // l e- U PointofContact: allAcl /?2U04 Phone#: ( qlU ) 933---52-37 RECEIVED MAY 1 7 2011 Form SWU-101 Version 07Jun2010 Page 2 of 6 BY: 4. Local jurisdiction for building permits: Point of Contact: Phone#: ( ) IV. PROJECT INFORMATION 1. In the space provided below,briefly summarize how the stormwater runoff will be treated. Catch Basins,underground pipe network and stormwater pond. 2.a.If claiming vested rights,identify the supporting documents provided and the date they were approved: ❑Appproval of a Site Specific Development Plan or PUD Approval Date: ElVaIid Building Permit Issued Date: ❑Other: Date: b.If claiming vested rights,identify the regulation(s)the project has been designed in accordance with: ❑ Coastal SW—1995 ❑ Ph II—Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area:6.45 acres 5. Total Coastal Wetlands Area:-0- acres 6. Total Surface Water Area:-0- acres 7. Total Property Area (4)—Total Coastal Wetlands Area (5)—Total Surface Water Area (6) =Total Project Area*:6.45 acres Total project area shall be calculated to exclude the following the normal pool of imppounded structures, the area between the banks of streams and rivers, the area below the Normal Hi h Water(NHW)line or Mean High Water (MHW) line,and coastal wetlands landward from the NHW(or MHW)line. The resultant project area is used to calculate overall percent built upon area(BUA). Non-coastal wetlands landward of the NHW(or MHW)line may be included in the total project area. S. Project percent of impervious area: (Total Impervious Area / Total Project Area)X 100 =54.07% % 9. How many drainage areas does the project have?l (For high density,count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. asm Lntorrnation Drainage Area_ Drainage Area_ rama a Area_ Drainage Area_ eceivmg Stream Name __1Te_w__1Uver Stream Class Stream Index Number otal Drainage Area s s On-site Drainage Area s Off-site Drainage Area s s Proposed Impervious Area (sf) IJ2,U17st %Impervious Area (total) ImuSurface Area Drainage Area_ Drainage Area_ Drainage Area_ Drainage Area -site mgsLots s s On-site Streets s - site Farking s s On-site Sidewalks s s Other on-site s -0- Future s - Existing s s ota s s Stream Class and Index Number can be determined at: httpfZportal.ncdenr.org/web/eoq/ps/csu/classlfications Impervious area is defined as the built upon area including, but not limited to, buildings roads arkin areas, sidewalks,gravel areas,etc. RECEIVED Form SWU-101 Version 07Jun2010 Page 3 of 6 MAY 117 2011 RV. 11. How was the off-site impervious area listed above determined?Provide documentation.N/A Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened& Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B.0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from htt2://12ortaI.ncdenr.org/web/wq/ws/su/-bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from ham://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at htto://portal.ncdenr.org/web/wq/ws/so/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item.All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from htt ortal.ncdenr.or web w ws su statesw formf dots. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions&Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s)(sealed,signed and dated)and O&M agreement(s)for each BMP. 4. Permit application processing fee of$505 payable to NCDENR. (For an Express review, refer to htW://www.envhelp.org/12ages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative(one to two pages)describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information,item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the _ receiving stream drains to class SA waters within'fz mile of the site boundary,include the'fi mile radius on the map. 7. Sealed,signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed,signed,&dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures,the banks of streams and rivers,the MHW or NHW line of tidal waters,and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures,the banks of streams or rivers,and the MHW(or NHW)of tidal waters. i. Dimensioned property/project boundary with bearings &distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours,spot elevations, finished floor elevations. 1. Details of roads,drainage features,collection systems,and stormwater control measures. m.Wetlands delineated,or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage(including off-site),drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans,not as a separate documen )TRECEIVED p. Vegetated buffers(where required). MAY 1 7 2011 Form SWU-101 Version 07Jun2010 Page 4 of 6 BY: 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths)as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xlI"copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type,expected infiltration rate,and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO:Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed.Deed book: 1415 Page No: 1001 11. For corporations and limited liability corporations(LLC): Provide documentation from the NC Secretary of State or other official documentation,which supports the titles and positions held by the persons listed in Contact Information,item la,2a, and/or 3a per NCAC 21-1.1003(e).The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State,otherwise the application will be returned. htW://www.secretary.state.nc.usZCorporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions,outparcels,and future development,the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary,a table listing each lot number,lot size,and the allowable built-upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from htto://portal.nedenr.org/web/wq/ws/su/statesw/forms does.Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below,the permit holder(s) certify that the recorded property restrictions and protective covenants for this project,if required,shall include all the items required in the permit and listed on the forms available on the website,that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the NC DWQ,and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm)so that they may provide information on your behalf for this project(such as addressing requests for additional information). Consulting Engineer:Davind K. Newsom,PE Consulting Firm:Crystal Coast Engineering,PA Mailing Address:3817-3 Freedom Way City:Hubert State:NC Zip:28539 Phone: (910 ) 325-0006 Fax: (910 ) 325-0060 Email:crystalcoas teng®bizec.rr.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information,item 2 has been filled out,complete this section) 1,(print or type name of person listed in Contact Information, item 2a) Ronald Massey,Assist. City Mgr. ,certify that I own the property identified in this permit application, and thus give permission to(print or type name of person listed in Contact Information, item 1a) Clifford fames Ray with (print or type name of organization listed in Contact Information,item la)Rail Development&Consulting,LLC to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal,which indicates the party responsible for the operation and maintenance of the stormwater system. =BY: Form SWU-101 Version 07Jun2010 Page 5 of 6 As the legal property owner I acknowledge,understand,and agree by my signature below, that if my designated agent(entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement,or pending sale,responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days;otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assess rent of civil penalties of up to$25,000 per day,pursuant to NCGS 143-215.6. Signature. s Date: , // ��jJ r I, /` O /`/2 a Notar ublic for the State of NO/•/1�C Q1O/�w .County of d S 6r 60 do her by certify that RoWaIW F Sc / personally appeared P before me this day of z;�Y5P, 'aV// .and acknowledge the due e ecution of the application for a stormwater permit. Witness my hand and officials al -f oYSj* }�•. t':` �'r, SEAL y My commission expires <Ct N X. APPLICANT'S CERTIFICATION 1,(print or type name of person listed in Contact Information, item la)Clifford lames Rail Mgr. certify that the information included on this permit application form is,to the best of my knowledge,correct and that the project will be constructed in conformance with the approved plans,that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormw to rules undeer�r��15A NCACC/2H .1000,SL 2006-246 (Ph.II-Post Construction) or SL 2008-211. Signature:��//��x /e� Date: S -l(�i'-'2011 I, n A �`� a Notary Public for the State of ANYAl CL Wlf� 1C/ ,County of {7LS �4 L( do hereby certify that C '1 e;z-6cn &er . personally appeared before me this L6 day of and acknowledge the e execution of the application for a stormwater permit. Witness my hand and official seal, `.`e��..........��OC., SEAL OT N Aqy. ';c!'� '•. BLIC : V' My commission expires d %O •........• ' OOU00% RECEIVED MAY L7 2011 Form SWU-101 Version 07Jun2010 Page 6 of 6 BY:— - _ Permi[ W O (to be pro i by DWD) W AT�c ^�r� 02Of 9OG "- cm NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out,printed and submitted. The Required Items Checklist(Part III)must be printed,filled out and submitted along with all of the required information. L PROJECT INFORMATION Project name - Miller Mote College Facility Contact person David K.Newsom,PE Phone number 910.325-0006 Dale 5/1212011 Drainage area number 1 111. DESIGN INFORMATION: - - Site Characteristics Drainage area 229,013 ft' Impervious area,post-development 152,017 ftz %impervious 66.38% Design rainfall depth 1.5 in Storage Volume: Non•SA Waters Minimum volume required 18,533 ft3 OK Volume provided 18,888 ft3 OK,volume provided is equal to or in excess of volume required. Storage Volume: SAWaters 1.5'runoff volume ft3 Pre-development 1-yr,24-hr runoff ft3 Post-development 1-yr,24-hr runoff it, Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? Y (Y or N) 1-yr,24-hr rainfall depth 3.7 in Rational C,pre-development 0.15(unidess) Rational C,past-development 0.58 (unidess) Rainfall intensity:1-yr,24-hr storm 0.15 in/hr OK Pre-development 1-yr,24-hr peak flow 0.12 ft3lsec Post-development 1-yr,24-hr peak flow 0.46 ft3/sec Pre/Post 1-yr,24-hr peak flow control 0.34 ft3/sec Elevations Temporary pool elevation 43.75 first Permanent pool elevation 42.50 fmst SHWT elevation(approx.at the perm.pool elevation) fmsl Top of 1 Oft vegetated shelf elevation 43.00 fmsl Bottom of 1Oft vegetated shelf elevation 42.00 fmsl Data not needed for calculation option#1,but OK if provided. Sediment cleanout,top elevation(bottom of pond) 34.00 first Sediment cleanout bottom elevation 33.00 fmsl Data not needed for calculation option#1,but OK if provided. Sediment storage provided 1.00 If Is there additional volume stored above the state-required temp.pool? N (Y or N) Elevation of the top of the additional volume 43.8 fmsl OK RECEIVED Firm SW401-Wet Detention Basin-Rev.9-9117/09 Pads I.a II.Design Summary,Page 1 of 2 MAY 1. 7 2011 BY: Permit No. r . �q (to be pmmtled by DWO) II. DESIGN INFORMATION Surface Areas Area,temporary pool 16,802 fiz Area REQUIRED,permanent pool 13,283 ft SAIDA ratio 5.80(unitless) Area PROVIDED,permanent pool,Aye,, 13,419 fe OK Area,bottom of 1 Oft vegetated shelf,A._,, 8,393 W Area,sediment cleanout,top elevation(bottom of pond),A,.,a 941 fl Volumes Volume,temporary pool 18,888 it, OK Volume,permanent pool,Vo,,,,_pw 53,277 it' Volume,forebay(sum of forebays if more than one forebay) 11,205 ft' Forebay%of permanent pool volume 21.0% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? - Y (Y or N) MountainlPiedmont SAIDA Table Used? N (Y or N) SAIDA ratio 5,80 (unitless) Average depth(used in SAIDA table): Calculation option 1 used?(See Figure 10-2b) Y (Y or N) Volume,permanent pool.V._r, 53,277 ft' Area provided,permanent pool,A._p,,, 13,419 ft` Average depth calculated 3.97'ft OK Average depth used in SAIDA,d„,(Round to nearest 0.5ft) 4.0 ft OK Calculation option 2 used?(See Figure 10-2b) N (Y or N) Area provided,permanent pool,Ap, _p, 13,419 ft Area,bottom of 10ft vegetated shelf,Awe v,,, 8,393 ft` Area,sediment cleanout,lop elevation(bottom of pond),A._,. 941 ff 'Depth'(distance b/w bottom of 10ft shelf and top of sediment) 8.00 If Average depth calculated 3.93 it OK Average depth used in SAIDA,d„,(Round to nearest Mill 3.9 ft OK Drawdown Calculations Dawdown through orifice? Y (Y or N) Diameter of entice(if circular) 2.00 in Area of orifice(if-non-circular) in' Coefficient of discharge(Co) 0.03(unitless) Driving head(Ho) 0.43 it Dawdown through weirs N (Y or N) Weir type (unitless) Coefficient of discharge(C,.) (unitless) Length of weir(L) ft Driving head(H) ft Pre-development 1-yr,24-hr peak flow 0.12 ft'Isec Post-development 1-yr,24-hr peak flow 0.07 tt'Isec Storage volume discharge rate(through discharge onfice or weir) 0.07 ft'/sec Storage volume drawdown time 3.15 days OK,draws down in 2-5 days. Additional Information Vegetated side slopes 10 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpalh to width ratio 3 :1 OK Length to width ratio 3.0 :1 OK Trash rack for overflow&onfce? Y (Y or N) OK Freeboard provided Y If OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Pump Form SW401-Wet Detention Basin-Rev.B-9117M RECEIVED Parts I.a II.Design Summary,Page 2 of 2 MAY 1 7 2011 BY: Permit Now' 0 (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent,the agent may initial below. If a requirement has not been met,attach justification. Page/Plan Initials i Sheet No. 3/8-518-618 1. Plans(1"-50'or larger)of the entire site showing: -Design at ultimate build-out, -Off-site drainage(if applicable), -Delineated drainage basins(include Rational C coefficient per basin), -Basin dimensions, -Pretreatment system, -High Flow bypass system, -Maintenance access, -Proposed drainage easement and public right of way(ROW), -Overflow device,and -Boundaries of drainage easement. adz 5/8-6/8 2. Partial plan(1"=30'or larger)and details for the wet detention basin showing: -Outlet structure with trash rack or similar, -Maintenance access, -Permanent pool dimensions, -Forebay and main pond with hardened emergency spillway, -Basin cross-section, -Vegetation specification for planting shelf,and -Filter strip. 518-6/8 3. Section view of the wet detention basin(1"=20'or larger)showing: -Side slopes,3:1 or lower, -Pretreatment and treatment areas,and -Intel and outlet structures. 3/8-4/8 4. If the basin is used for sediment and erosion control dudng construction,clean out of the basin is specified on the plans prior to use as a wet detention basin. 518-6/8 5. A table of elevations,areas,incremental volumes&accumulated volumes for overall pond and for forebay, to verify volume provided. 318-4/8 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. LZI Spreadsheet 7. The supporting calculations. SW401 8. A copy of the signed and notarized operation and maintenance(O&M)agreement. NIA 9. A copy of the deed restrictions(if required). Supp. 10. A soils report that is based upon an actual field investigation,soil borings,and infiltration tests. County soil maps are not an acceptable source of soils information. RECEIVED MAY 1. 7 2011 Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III.Required Items Checklist,Page 1 of 1 BY: Permit Number: y (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMW. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully,and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. RECEIVED Form SW40I-Wet Detention Basin O&M-Rev.4 MAY 1. 7 2011 Page 1 of 4 BY:----- • Permit Number. vv0 (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils,hydrology,disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds,preferably by hand. If pesticide is used,wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails,phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide(do not spray). the basin surface. RECEIVED MAY 1.7 2011 Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 BY:_ Permit Number: JU (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office,or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 8.5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 77:5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM 6611 in the blanks) Permanent Pool Elevation 4250 Sediment Removal :. 3 Pe anen Pool- Volume Sediment Removal Elevation 34.00 7u�jeBottomEleva ftMin. --------j Sediment Bottom Elevation 33.00 Storage Sediment Storage FOREBAY MAIN POND RECEIVED Form SW401-Wet Detention Basin O&M-Rev.4 MAY 1 7 2111 Page 3 of 4 LBY-___ : Permit Numbers,-J w 0 I�.JV (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Miller Motte College Facility BMP drainage area number:I and only Print name:Clifford James Ray Title:Manager Address:310 Bretonshire Road - Wilmington, NC 28405 Phone:910-547-9344 Signature;i( Date: 2- -1G — 204 Note: The legally responsible parry should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. I, llzeL, a Notary Public for the State of Count f 01'6 AUcAD do hereby certify that ( personally appeared before me this L� t day of Mar _____,.// , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, BUQ .. ...... .. C 4 TAR), ; �2J •.pUBL\�. r � e. k'COON �/�JYYJJ�� SEAL r/ My commission expires RECEIVED MAY 17 2111 Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 LBY—___ : MEMORY TRANSMISSION REPORT TIME : 05-23-'ll 09:43 FAX NO.1 : 910-350-2018 NAME :DENR Wilmington FILE NO. 475 DATE 05.23 09:39 TO : IR919103465844 DOCUMENT PAGES 8 START TIME 05.23 09:39 END TIME 05.23 09:43 PAGES SENT 8 STATUS OR SUCCESSFUL TX NOTICE S tact of North Cnro line Department of no and Natural Resources W:nInd ngton a Rcuegional Office A¢verly Ea v¢s Perdue. Gover..or Dce Frecm a.+. Secrc�ary FAX COVER SHEET To: P� Fro �R FAX#; 91 O 3r.0 204 4 „�.-........ o......r. . „< � -,......o,oi...-goo. MEMORY TRANSMISSION REPORT TIME : 05-23- 11 09:18 FAX NO.1 : 910-350-2018 NAME :DENR Wilmington FILE NO. 474 DATE 05.23 09:16 TO R 919103250060 DOCUMENT PAGES 8 START TIME 05.23 09:16 END TIME 05.23 09:18 PAGES SENT 8 STATUS OK *** SUCCESSFUL TX NOTICE *** Statc of North Carolina Dcpurtmcut of E tssrwnt Natural Ae50 urc es W ilminstngton Regioonana l Office Beverly Snves Perdt.e, Governor Dee Fr¢emun, S¢c.em.y FAX COVER SHEET /��-7•�� Date. a No. Of ages: To: �( _ Fro. �+r� FAX FAX#: 910 350 2004 ' ey :ro c...a...:n.:..e. ....:...... :..a......� ��..•n v. oc ' nn K.r.u:Jrrn�....I.v♦T.n.n•..0 w t.....n P:u Y• 05-23-'11 09 40 FROM-DENS Wilmington 910-350-2018 T-276 P0001/0008 F-475 State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor Dee Freeman, Secretary FAX COVER SHEET Date: No. (excluding cover) To: eQ Fro Co: "I Phone: (Q a33 FAX #; 3 '> FAX#�- 910.350 2004 �� 117(..anlinal[lave F.wlensio n,Wil minglun,N.C.28405 Telephone(910)796-7215 Fnx(910)350-7004 An 6Qu9I 0pp0M,,Mp Ativmn(ive.Attion EmpIuyur JOHN L. PIERCE & ASSOCIATES, P.A. LAND SURVEYING—LAND PLANNING—MAPPING P.O. BOX 1685 JACKSONVILLE,NC 28541 OFFICE:(910)346-9800 FAX:(910)346-1210 Letter of Transmittal E-MAIL:bettvb@ilpnc.com Orbfian6@6li)nc.com DATE: May 17,2011 TO: Ms. Kelly Johnson ATTENTION: Department of Environment and Natural Kell Johnson N.C. De 11 Re: Resources—Department of Stormwater Miller-Motte Col1e a Facility-Ray Development and Consulting,LLC 127 Cardinal Drive Extension Wilmington, NC 28405 COPIES DATE NUMBER DESCRIPTION 2 Sets of plans 2 Stormwater applications with calculations 1 Check in the amount of$4,000.00 2 Narrative& Quad Ma 1 Copy of Deed of Record 1 Copy of Articles of Organization 1 Copy of Annual Report REMARKS: RECEIVED SIGNED: �� / r� MAY 1 7 2011 BY: C200926500386 SOSID: 1042657 Date Filed: 9/28/2009 11:59:00 AM Elaine F. Marshall STATE OF NORTH CAROLINA North Carolina Secretary of State Department of the Secretary of State C200926500386 AGENT'S STATEMENT OF CHANGE OF REGISTERED OFFICE ADDRESS Pursuant to§55D-31 of the General Statutes of North Carolina,the undersigned submits the following for the purpose of changing the address of the registered office in the State of North Carolina of the entity named below: l. The name of the entity is: Ray Development and Consulting,LLC Entity Type: ❑Corporation,❑Foreign Corporation,❑Nonprofit Corporation,❑Foreign Nonprofit Corporation ®Limited Liability Company,❑Foreign Limited Liability Company,❑Limited Partnership, ❑Foreign Limited Partnership,❑Limited Liability Partnership,❑Foreign Limited Liability Partnership 2. The street address and county of the current registered office of the entity is: Nmnber and Street: 5002 Hunters Trail,Unit 9 City,State,Zip Code: Wilmington,NC 28405 County:New Hanover 3. The mailing address if different from the street address of the current registered office is: Same 4. The street address and county of the new registered office of the entity is: Number and Street 310 Bretonshire Road City, State,Zip Code: Wilmington,NC 28405 County:New Hanover 5. The mailing address ifdWerent from the street address of the new registered office is: Same 6. The name of the current registered agent is: _Clifford J.Ray 7. The address of the entity's registered office and the address of the business office of its registered agent,as changed,will be identical. 8. The undersigned certifies that the entity has been notified in writing of the change of address of the business office of the registered agent. 9. This statement will be effective upon filing,unless a date and/or time is specified: This is the_17th_day of September.2010_ _Ray Devevveelopment and Consulting,LLC 11 gnali= _Clifford J.Ray (Type or Print Name and Title) Notes: Filing Fee is S5.00. One executed statement must be filed with the Secretary of State. CORPORATIONS DIVISION P.O.BOX 29622 RP-iCEIVEDIRALEIGH,NC 27626-0622 (Revised January2002) MAY 1 7 2011 (FormBE-i2) iBY:- C200913000106 SOSID: 1042657 Date Filed: 5/9/2008 12:27:00 PM Elaine F.Marshall North Carolina Secretary of State ARTICLES OF ORGANIZATION C200813000106 OF RAY DEVELOPMENT AND CONSULTING, LLC The undersigned, does hereby make and acknowledge these Articles of Organization for the purpose of forming a limited liability company under and by virtue of the laws of the State of North Carolina, as contained in Chapter 57C of the General Statutes of North Carolina, entitled, "North Carolina Limited Liability Company Act" and to that end does hereby set forth: 1. The name of the limited liability company is "RAY DEVELOPMENT AND CONSULTING, LLC'. 2. There shall be no limit on the duration of existence of the limited liability company, other than dissolution pursuant to the terms of its written operating agreement, the unanimous consent of its members or as otherwise provided by law. 3. The name and address of each organizer executing these Articles of Organization is as follows: J. Dewey Edwards,Jr. P.O. Box 1057 219 New Bridge Street Jacksonville, NC 28540 4. The street address and county of the initial registered office of the limited liability company is 5002 Hunters Trail, Unit 9,Wilmington, New Hanover County, North Carolina 28405; the mailing address of the initial registered office of the limited liability company is, 5002 Hunters Trail, Unit 9, Wilmington, North Carolina 28405; and the name of the initial registered agent of the limited liability company at such address is Clifford J. Ray. 5. Except as provided by NCCS Section 57C-3-20(a), the members of this limited liability company shall not be managers by virtue of their status as members. 6. These Articles of Organization shall be effective upon filing of same by the North Carolina Secretary of State. In Testimony Whereof, the undersigned has executed or caused this instrument to be properly executed in his name, this the 22"' day of April, 2008. L J. wey Edwards Jr., Organizer Prepared by and return to: J. Dewey Edwards,Jr. Gaylor Edwards& Vatcher, P.A. P.O. Box 1057 219 New Bridge Street Jacksonville, North Carolina 28540 a cmVED WPDOCSILLC/ARnLCE5.RAY DE1EL0PMENT.00N51LTNG MAY 1 7 2011 y:. Stormwater Treatment Narrative Miller-Motte College Facility The City of Jacksonville owns a 6.45 acre tract("Tract 1 Jacksonville Business Park") located on the corner of Williamsburg Parkway and New Frontier Way (near Western Boulevard Extension), within the city limits of Jacksonville, NC. The developer, Ray's Development and Consulting, LLC, wishes to construct a college facility (Miller-Motte) on a 3.20 acre portion of the tract (to be subdivided into a separate lot). The proposed college facility will include a single-story building and associated parking, sidewalks & dumpster pad. Future development in the remaining area of the parcel is expected, but specific plans are as yet unknown; the proposed stormwater treatment facilities have, however, been designed to accommodate "future" BUA for that area. (With the understanding that plan approval & permit revision / modification will be required before any additional development commences). The project site is located in the White Oak River basin, and is currently undeveloped. In general, the site area is flat to gently sloping (0 - 0.4%), and drains to an existing ditch along the northern property boundary and also to the rear(southern boundary) of the tract. A small portion of non-coastal wetlands is located to the south -outside the 3.20 acre area of currently proposed development. Runoff from the site drains ultimately to the southwest into an unnamed tributary of New River(C;NSW) The proposed development activities are high density (percent impervious > 24 therefore, stormwater treatment facilities are required. The attached Stormwater Plan includes a wet detention basin located near the northeastern boundary of the site. This pond has been designed to meet the NPDES Phase II Rules and is designed according to current BMP Manual Specifications. Runoff generated from impervious surfaces on site will be diverted to the forebay via sheet drainage, inlets and underground storm drain pipes. (The off-site drainage area includes one-half of the adjacent (existing) road, New Frontier Way.) Treated Stormwater will exit the main pond via the outlet structure and 18" outlet pipe into the existing drainage ditch along that property boundary. ^-��F CEIVEI� MAY 1 7 2011 ICY: y� l \ X \ 1 '/ t' �q > � I• / Jl" - /j' r( C � /"L/ r 4�6< l zs�l.� • //� I \J` a/ -.r/� '4� a C^ 1�_.r l 7/ J i . %i l _/ ( �� /fJt'J1��.' t //� "� � ���~ , ��j��t�`��\``��\`,�/��•�.� 1 l.� rr����,C/ _ / i- � t p tan t;t V �/ , v/�_' I�h '�� ,A � t- C�� � •��s�_ ) I' �� 1ty-t t_• •.�\�• \ ,� C,.• `. I`% � /�"J. �a�a avg4 �S� 1 1 �I, +- ,. _ /%-�i•\� III \ ��'-� (�` ,OIS�Sdsal� It Miller Motte ' nr I } /' r A� / ✓ A / '� 'r • �\. r:'- t -�_ _ tea � V � 6'< 1 , f ri'1 9eh v� Magnetic Declination 9 C 1 � subsh a _ v khw JY i t Name:JACKSONVILLE NORTH �.E ,EIVED Location: NAD 27 Date:5/12/2011 Scale: 1 inch equals 2000 feet MAY 1 7 2011 BY: Copyright(C)2 g5,Maptech,Inc. (Page 1 of r- 5) Doc ID: 007088840005 Type: CRP Recorded: 01/05/2009 at 03:01:52 PM Fee Amt: $26.00 Page 1 of 5 ( onslov county NC Rebecca L. Pollard Reg. of. Deeds BK3165 PG678-682 NORTH CAROLINA ONSLOW COUNTY AFFIDAVIT OF DEDICATION NOW COMES the undersigned, City of Jacksonville,and respectfully shows the following: 1. The City of Jacksonville is the owner of certain property located within the City recorded in Book 1415, Page 1001, Onslow' County Registry. 2. The City of Jacksonville does hereby dedicate a 15' utility easement running along the northeastern right-of-way line of New Frontier Way to be used for the City of Jacksonville's water system improvements in connection with the property herein referred to. 3. The easement herein dedicated is described in Exhibit "A" attached to this Affidavit and is shown on map entitled "Utility Easement for the City of Jacksonville Water System Improvements" prepared by Joseph T. Chance,P.L.S., on October 7, 2008, said map being attached hereto as Exhibit"B", "C"and"D". CITY Oy JACKSONVILLE By: Ostoff V. Q uer, City Manager SWOR�TO AND UBSCRBED before me /thigD day, of 2009. O�t�`A Fpn�4,�. Notary Public got t My Commission Expires: / � ?/ 2e e ' ° t :.. ,, , vIVco\U 1` ii MAY 1 7 2011 QY: Hook 3165, Pace 678. File Number (Page 2 of 5) Utility Easement for the City of Jacksonville (C-02) Beginning at an intersection point of the southeastern right-of-way (R/W) of Williamsburg Parkway (80' R./W) with the northeastern R/W of New Frontier Way (60' R/W) from this point of beginning and parallel to the northeastern R/W of New Frontier Way is proposed a 15' utility easement on the property now or formerly in the name of the City of Jacksonville Deed Book 1415 Page 1001; running from said point of beginning in a southerly direction parallel, and adjacent to said New Frontier Way for a distance of 1,690.79' to the point where said property ends along New Frontier Way. DNA 's9 L-3666 osws t ti L v'•,O Date r-r-Z'F'CEIVE� MAY 1 7 2011 BY:--- -- '— Book 3165. Paae 678. File x er (Pago 3 of 5)' /i '^II NOTES: 1, 9. I. ALL DISTANCES ARE HORIZONTAL GROUND U.S. SURVEY FEET UNLESS OTHERWISE w NOTED. SITE 2. THE SOURCE OF TITLE OF THIS PROPERTY IS DEED BOOK 1415, PAGE 1001. ONSLOW COUNTY REGISTRY. 3. THIS SURVEY IS OF ANOTHER CATEGORY, AN UTILITY EASEMENT SURVEY. 4. PROPERTY LINES SHOWN AS DASHED WERE NOT SURVEYED. 5. ALL BEARINGS ARE BASED ON N.C. GRID NAD 83. VICINITY MAP CURVE TABLE CURVE RADIUS LENGT CHORD DELTA LEGEND Cl 648.27 183.90H TANGEN BEARING 92.57 N 4'4B'35"E 183.29 16'15'14" A PK NAIL FOUND C4 1 729.99 1 591.39 1 313.01 N19'14'30"W 575.35 6'25'03 IRON PIPE FOUND MBL MINIMUM BUILDING LINE I R/V: RIGHT of WAY i BC BACK of CURB / \ Q UNNONUMENTEO POINT ¢ / F l NOW OR FORMERLY \ DAVID M. CHOATE & HEATHER L. CHOATE \ MB 50, PC 56 DEED BOOK 2602, PAGE 135 Y A o i NOW ORJACKSONVILLE FORMERLY D B OF1415, AGE1 \ \ k \ \ DEED BOOK 1415, PAGE IW1 9y • / � \\ �G�1CL \ \s I, JOSEPH T. CHANCE, PLS L-3665, CERTIFY THAT MIS PLAT WAS DRAWN UNDER MY SUPERVISION FROM AN swy \ ACTUAL SURVEY MADE UNDER MY SUPERVISION (DEED DESCRIPTION RECORDED IN BOOK a5--PAGE/A2[); \ �• F, THAT BWNDARIES NOT SURVEYED ARE CLEARLY \ \ VM INDICATED AS DRAWN FROM ME INFORMATION FOUND IN BOD( PAGE THAT THAT ME RATIO OF '\ PR N AS CALCULATED IS 1:10.000+; MAT MIS P i S PREPARED IN ACCORDANCE WITH G.S. 47-30 FO• \ k . W IVIES Y GINAL SIGNATUREry NU AN20 AL MIS MET.L DAYA LAND Ar`'44V{CAR 'n UTILITYFORSEMENT -,- x*.'FCE1 V 1ilJ �`pQS r......A4'•,� THE CITY OF JACKSONVILLE 2;QOF �y9? WATER SYSTEM IMPROVEMENTS MAY 1 7 2011 ¢ S r� CITY of JACKSONVILLE - ONSLOW COUNTY - NORTH CAROLINA SEAL •T L EAL O J DATE: OCT08ER 7, 2008 JOB N 00348-0012C-02 Y 0 AS/UN ddP SCALE: 1" 100'. . YrVCrnCM �— ,,"�•n mC 44,A•AA eeKI , ane a Kr Owl�111��'mwt 00 50 0 700 20 • � - �`ITu1 e>}SEG1 took 3165, Pace 678. File Number (Page 4 of 51 E b.I „C NOTES: �- 1. ALL DISTANCES ARE HORIZONTAL GROUND U.S. SURVEY FEET UNLESS OTHERWISE ras�0°1^D"�v.m NOTED. SITE 2 THE SOURCE OF TITLE OF THIS PROPERTY IS DEED BOOK 1415, PAGE 1001. ONSLOW COUNTY REGISTRY. 3. THIS SURVEY IS OF ANOTHER CATEGORY, AN UTILITY EASEMENT SURVEY. 4. PROPERTY LINES SHOWN AS DASHED WERE NOT SURVEYED. 5. ALL BEARINGS ARE BASED ON N.C. GRID NAD 83. VICINITY MAP CURVE TABLE CURVE RADIUS LENGTH ANGEN BEARING CHORD DELTA LEGEND Ct 64B.27 1B3.90 92.57 N34.48'35"E 183.29 1615'14' A PK NAIL FOUND C4 1 729.99 1 591.39 313.01 N19'14'30•W 575.35 6'25'D3 O IRON PIPE FOUND MEIL MINIMUM BUILDING LINE R/W RIGHT of WAY BC BACK Df CURB UNMONUMENTED POINT NOW OR FORMERLY \ \�' CITY OF JACKSONVILLE DEED BOOK 1415, PAGE 10D1 p \ I, JOSEPH T. CHANCE. PLS L-3666, CERTIFY THAT THIS PLAT WAS DRAM UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUP VISION (DEED DESCRIPTION RECORDED IN BOOK ).YLJPAGE/00n: n� THAT BOUNDARIES NOT SURVEYED ARE CLEARLY >� INDICATED AS DRAWN FROM THE INFORMATION FOUND IN B00 PAGE_: THAT THAT THE RATIO OF P SI AS CALCULATED IS 1:IO,000t; THAT THIS T 1m P AT WA PREPARED IN ACCORDANCE WITH G.S. 47-30 S AMEN B WITNESS MY GINAL SIGNATURE ST GI$$7R ��ff{{ UM E TI- THE-- DAY 6n- __ A. 2 B. I 1 MATCH LINE PROF N L-3666 1 ', s,,,psrrnrrrlrrrry UTILITY EASEMENT �OP�•i.ES Rd't��9� FOR THE CITY OF JACKSONVILLE RR faQ 9r. WATER SYSTEM IMPROVEMENTS CEIVE]D F SFAL i C CITY of JACKSONVILLE - ONSLOW COUNTY - NORTH CAROLINA •<' L.,;886;p - DATE: OCTOBER 7, 2008 JOB III00348-0012C-02 Mly 1 12111 'gi p\SF UP,NP2G;` 4 LMCKavl&l.Rcri:ID SCALE: 1" = 100' M1r1•Nrrr�� w 14UY wz MM s lBy--. e[Tn.Wx �A M21 100 SO 0 100 200 •�• - '(}at1°11-_sew Book 3165. Paae 678. File Nimiben (Page 5 of Sr .. .. ._.. f.. f NOTES: f� 1. ALL DISTANCES ARE HORIZONTAL GROUND U.S. SURVEY FEET UNLESS OTHERWISE on^" vHm NOTED. 2. THE SOURCE OF TITLE OF THIS PROPERTY IS DEED BOOK 1415, PAGE 1001. ONSLOW COUNTY REGISTRY, 3. THIS SURVEY IS OF ANOTHER CATEGORY, AN UTILITY EASEMENT SURVEY. SITE 4. PROPERTY LINES SHOWN AS DASHED WERE NOT SURVEYED. 5. ALL BEARINGS ARE BASED ON N.C. GRID NAO 83. VICINITY MAP CURVE TABLE LEGEND CURVE RADIUS LENGTH TANGEN BEARING CHORD DELTA C1 648,27 183.90 92.57 N34'48'35'E 183.29 I 1 TI 4" 0 PK NAIL FOUND C4 1 729.99 1 591.39 1 313.01 NI974'3O"W 575.35 6'25'OJ IRON PIPE FOUND MOL MINIMUM BUILDING LINE R/W RIGHT of WAY BC BACK of CURB UNMDNUMENTED POINT .Af m MATCH LfNE 1 15' 1� �I 1 NOW OR FORMERLY CITY OF JACKSONVILLE 31 DEED BOOK 1415, PAGE 1001 15.0' I, JOSEPH T. CHANCE, PLS L-3666, CERTIFY THAT IRIS PLAT WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY P�FBMSION (DEED P OESCRIPnON RECORDED IN BOOK !H/ti PAGFI&y[); THAT BOUNDARIES NOS SURVEYED ARE CLEARLY I N 89'29'14" E 651.04' "DI AS DRAVM FRON THE INFORMATON FOUND IN BO — PAGE THAT THAT THE RATIO OF PR gSI0 AS CALCUUTED IS L10,000+; THAT 7H15 P i W PPEPARED IN ACCORDANCE WIIH G.S. 47-30 f A AM OEO. WINE" MY 0 N IGN"'4 R CIS QM TH THE DAY 0 2 PR E L-3666 UTILITY EASEMENT F-CEIVED `,,�auumnrrq• FOR �Y{vARO�Y''•, THE CITY OF JACKSONVILLE MAY 1 7 2011 ``�OP••'rFssro•�'y :2:eoF 4%'•. WATER SYSTEM IMPROVEMENTS •G 9f; I_ CITY of JACKSONVILLE - ONSLOW COUNTY - NORTH CAROLINA �j $EAL DATE: OCTOBER 7, 7008 JOB p 00348-0012C-02 1JY•---�--'— L-3666;0 yy *,� ?�SUR`!``•'2p�a �11V1'I�I(�i QZM SCALE: 1" = 100' sF?Nr7.r� o� xL:W7 no R.W. Gca,�M 5 ME 1m)slus 100 50 0 100 260 • n Hook 3165, Paae 678. File Nurzlber PRELIMINARY Design Calculations Stormwater Treatment Facilities for Tract 1 Jacksonville Business Park (Phase 1 & Phase 2) located in Onslow County 1. PROJECT DESCRIPTION The Project consists of a proposed college facility. 2. COMPUTE POND AREA REQUIRED a. Compute Percent Impervious: Impervious Areas: Phase 1 Future Total On-Site Buildings 13.65,2 :,� 652 27,304 SF ......... 1 On-Site Streets 0 SF On-Site Parking 44,128 43,728 87,856 SF On-Site Sidewalks 7,375 8,626 16,001 SF Other on-site 0 0 0 Off-site 0 Sub-Total 65,155 66,006 131,161 SF Existing 6,856 SF FUTURE(reserved) 0 4,000 4,000 Total 82,011 70,006 152,017 SF Total Area Drainage to Pond: FE9,013 SF Percent Impervious= 0.664 or 66.4 % b.Compute Pond Surface Area Using Surface Area to Drainage Area Ratio Chart for 90% TSS Removal (copy attached)and assuming 397 foot pond depth: SA/DA = 5.80 % (interpolated-Select from Highlighted Cell in SA/DA) Therefore: Surface Area = SA/DA x Drainage Area 13,283 SF *!WSF o. must bev , 13,283 SF �7CF 1VED MAY 1 7 2011 -3 Y: c. Compute Minimum Pond Dimensions Assume rectangular shape with 3:1 Length (L)to Width (VV) Ratio: Min Length 199.62foe8 Min Width= 00.54feet Site conditions, however, dictate irregular shaped pond: Hydr. Length= feet so, Hydr. Width (aN 00.0 feet(avg) Actual L/YV= 3.0 (irregular shape) 3. DETERMINE REQUIRED STORAGE VOLUME Design Rainfall Depth = inches Using Schuler"Simple Method": Rv= 0.05 +0.009(|) where| = percent impervious Rv= 0.047in/in Control Vo|umo= Design Rainfall xRvx Drainage Area Control Volume 10,533CF nay CF Must be> 10'533 SF 4. DETERMINE REQUIRED STORAGE DEPTH Assume: O1 side slopes solving for depth (d) hy trial& error. U = 1.29 5. DETERMINE ORIFICE SIZE Control Volume must hn drawn down over a2 day'5 day period. Using orifice equation,solve for Diameter(D)that results in 3-1/2 day period: D = (C\/0.V26(h)')o Where: 8 =(Control Volume / 3.5dayu x 06'400sec/day) = 0.0V2dt h= D/3 = 0.43 Solving for D: D = 1.81 Use " pipo Actual Drawdown with actual drawdown pipe diameter(using orifice equation): Q= 0.068 cfs Draw Down Period days OK , <5.0 6.SELECT OUTLET STRUCTURE SIZE Size outlet structure such that depth of Q10 flow<or+to 1.5 Feet Using Rational Formula (Q=CIA)where: Cimper 0.8 Cpery Ccum= 0.58 110 7, s in/hr A= 5.26 ac Q10= 21.89 cfs Using Francis Formula (Q=3.OLH"5)to solve for L such that H = 1.5 Feet Min L= 3.971 Linear Feet Use OLinear Foot Weir Use 5 Square Precast Structure 7. DETERMINE Q10 STAGE Q10= 21.89 cfs From Routing Analysis, H10 8.DETERMINE Q100 STAGE (ELEV. OF EMERGENCY SPILLWAY) Using Rational Formula (Q=CIA)where: Cimper= 0.8 Cpery= 0.2 Ccum = 0.58 1100 9.50 in/hr A = 5.26 ac Q100= 29.04 cfs From Routing Analysis, 1-1100 :?7 IVED MAY 1 9 2011 9. DETERMINE Q100 STAGE OVER EMERGENCY SPILLWAY(TOP BERM ELEV.) Assume primary spillway blocked (i.e., emergency spillway to accommodate Q100) Emergency spillway shall be a broad crested earthem weir designed to pass 100 year storm. Using broad crested weir equation H = (Q/(Cw x L))y3 where: Q= Q100 29.04 cfs Cw= 3.0 Length 30 feet H = 0.47 feet 10. FOREBAY SIZING Compute Actual Pond Volumes (using average end method): Avg Incr. Incr. Cum. Main Bay Volume 7 evatio a S Area(SE Depth(FT) VolF Vol (CF1 Pond Bottom Bottom Veg Shelf 42 00 8,393 4,667 8.00 37,336 37,336 Normal Pond A256 ..10'S51i 9,472 0.50 4,736 42,072 Main Bay Volume= 42,072 CF Forebay Volume Elevation AreaArea (SF l th Vol(CF l Vol (CF) Pond Bottom 35 00 "120 Normal Pond 42.50 1,494 7.50 11,205 11,205 Forebay Volume= 11,205 CF Total Pond Volume= 53,277 CF Total Pond Area = 13,419 SF Forebay Volume equates to 2i.l % of Total Volume Must be> 18% and <22% Average Pond Depth= 3.97 feet Compare to assumed Depth 3;97: : :;'''feet Temp Storage Volume Elevation Area (SF 1 SF Depth VolC Vol (CFl Normal Pond 42.50 13,419 Temp. Pond Level 43.75 16,802 15,111 1.25 18,888 18,888 Temporary Level should be 43.79 or greater Temp. Pool Volume= 18,888 CF RECEIVED MAY 1 7 2011 BY: 11. SUMMARY Pond Elevations: e ativ Actual Top Berm(minimum) 11.73 44.48 H= 0.47 100-Yr. Storm 11.26 44.01 (emerg. weir elev) H100= 1,51 10-Yr. Stone 11.00 43.75 H10= 1.25 1-inch Storage 9.75 43.75 (primary weir elev) storage depth= 1.25 Permanent Pool 8.50 42.50 (invert out elev) pond depth= 8.50 Pond Bottom 0 34.00 12.WET DETENTION BASIN SUPPLEMENT Site Characteristics Drainage Area 229,013 sf Impervious Area 152,017 sf % Impervious 66.4 % Design Rainfall Depth 1.5 in Storage Volume Min. Volume Required 18,533 cf Volume Provided 18,888 cf Peak Flow Calculations 1-yr, 24 hour rainfall depth 3,65 in Rational C, predevelopment I 015 Rational C, post development 0.58 Rainfall Intensity 1 yr 24 hr 0.15 in/hr Pre Dev Q1(24 hour) 0.12 cfs Post Dev Q1 (24 hour) 0.46 cfs Pre/Post Flow Control 0.34 cfs Basin Elevations Basin Bottom Elevation 33.00 feet(Elev) Sediment Cleanout Elevation 34.00 feet(Elev) Permanent Pool Elevation 42.50 feet(Elev) Temporary Pool Elevation 43.75 feel(Elev) Volume and Surface Area Calculations SA/DA ratio 5.80 Surface Area Required 13,283 sf Surface Area Provided 13,419 sf Permanent Pool Volume 53,277 cf Average Depth 3.97 feet Forebay Volume 11,205 cf Forebay% of Total Volume 21.0 % Temporary pool Area 16,802 sf 7BYMC VEDY 1 7 2011_ --- Drawdown Calculations Drawdown Time 3.15 days Discharge Rate 0.068 cfs Pre Dev Q1(24 hour) 0.12 cfs Post Dev Q1 (24 hour) 0.07 cfs Additional Information Diameter of orifice 2.00 in Design TSS Removal 90 % Basin Side Slopes 3 :1 Vegetated Shelf Slope 10 :1 Vegetated Shelf Width 10 ft Length to Width Ratio 3 :1 Trash Rack? Yes Freeboard Provided? Yes Vegetated Filter Provided? No Recorded Easement? Yes Captures all Runoff? Yes Drain Mechanism Pump zKPCEIVED MAY 1 7 2011 `f: Simplified Routing Procedure r Project: [sT ar ct 1 Jadksoni I'e Business' 3Pafk�a10 Year Storm Date: 3/31/2011 Kw:�� Increment t minutes (Must be < 10 minutes) Orifice Weir Pump Total Total Time Time Inflow(cfs) Inflow Stored Volume Stage Water Surface Outflow Outflow Outflow Outflow Outflow min days) cfs) (ccf (Cf) n Elevation cfs) (cfs) (cfs) (cfs LCn 0 0.0 0.00 0.00 0 0.00 42.50 0.00 0.00 0.00 0.00 0 1 0.0 0.44 26.35 26 0.00 42.50 0.01 0.00 0.00 0.01 0 2 0.0 1.71 102.89 129 0.02 42.52 0.01 0.00 0.00 0.01 1 3 0.0 3.71 222.39 350 0.04 42.54 0.02 0.00 0.00 0.02 1 4 0.0 6.23 373.53 723 0.08 42.58 0.03 0.00 0.00 0.03 2 5 0.0 9.03 542.02 1263 0.13 42.63 0.04 0.00 0.00 0.04 2 6 0.0 11.86 711.90 1972 0.20 42.70 0.05 0.00 0.00 0.05 3 7 0.0 14.45 867.09 2837 0.28 42:78 0.06 0.00 0.00 0.06 3 8 0.0 16.55 992.92 3826 0.36 42.86 0.06 0.00 0.00 0.06 4 9 0.0 17.96 1077.47 4900 0.45 42.95 0.07 0.00 0.00 0.07 4 10 0.0 18.55 1112.74 6009 0.54 43.04 0.08 0.00 0.00 0.08 5 11 0.0 18.26 1095.39 7099 0.63 43.13 0.08 0.00 0.00 0.08 5 12 0.0 17.12 1027.07 8121 0.71 43.21 0.09 0.00 0.00 0.09 5 13 0.0 15.28 916.89 9033 0.78 43.28 0.09 0.00 0.00 0.09 6 14 0.0 13.45 806.84 9834 0.84 43.34 0.10 0.00 0.00 0.10 6 15 0.0 11.83 710.00 10539 0.89 43.39 0.10 0.00 0.00 0.10 6 16 0.0 10.41 624.78 11157 0.94 43.44 0.10 0.00 0.00 0.10 6 17 0.0 9.16 549.80 11701 0.98 43.48 0.10 0.00 0.00 0.10 6 18 0.0 8.06 483.81 12179 1.01 43.51 0.11 0.00 0.00 0.11 6 19 0.0 7.10 425.74 12598 1.05 43.55 0.11 0.00 0.00 0.11 6 20 0.0 6.24 374.64 12966 1.07 43.57 0.11 0.00 0.00 0.11 7 21 0.0 5.49 329.68 13289 1.10 43.60 0.11 0.00 0.00 0.11 7 1 22 0.0 4.84 290.11 13573 1.12 43.62 0.11 0.00 0.00 0.11 7 M23 0.0 4.25 255.29 13822 1.14 43.64 0.11 0.00 0.00 0.11 7 ► . ,I 24 0.0 3.74 224.65 14039 1.15 43.65 0.11 0.00 0.00 0.11 7 25 0.0 3.29 197.68 14230 1.17 43.67 0.11 0.00 0.00 0.11 7 26 0.0 2.90 173.96 14398 1.18 43.68 0.11 0.00 0.00 0.11 7 27 0.0 2.55 153.08 14544 1.19 43.69 0.11 0.00 0.00 0.11 7 28 0.0 2.25 134.71 14672 1.20 43.70 0.11 0.00 0.00 0.11 7 29 0.0 1.98 118.54 14783 1.21 43.71 0.12 0.00 0.00 0.12 7 30 0.0 1.74 104.31 14881 1.21 43.71 0.12 0.00 0.00 0.12 7 31 0.0 1.53 91.79 14966 1.22 43.72 0.12 0.00 0.00 0.12 7 32 0.0 1.35 80.77 15039 1.23 43.73 0.12 0.00 0.00 0.12 7 33 0.0 1.18 71.08 15103 1.23 43.73 0.12 0.00 0.00 0.12 7 34 0.0 1.04 62.55 15159 1.23 43.73 0.12 0.00 0.00 0.12 7 35 0.0 0.92 55.04 15207 1.24 43.74 0.12 0.00 0.00 0.12 7 36 0.0 0.81 48.43 15248 1.24 43.74 0.12 0.00 0.00 0.12 7 37 0.0 0.71 42.62 15284 1.24 43.74 0.12 0.00 0.00 0.12 7 38 0.0 0.63 37.51 15315 1.25 43.75 0.12 0.00 0.00 0.12 7 39 0.0 0.55 33.00 15341 1.25 43.75 0.12 0.00 0.00 0.12 7 40 0.0 0.48 29.04 15363 1.25 43.75 0.12 0.00 0.00 0.12 7 41 0.0 0.43 25.56 15381 1.25 43.75 0.12 0.00 0.00 0.12 7 42 0.0 0.37 22.49 15396 1.25 43.75 0.12 0.00 0.00 0.12 7 43 0.0 0.33 19.79 15409 1.25 43.75 0.12 0.00 0.00 0.12 7 44 0.0 0.29 17.42 15419 1.25 43.75 0.12 0.00 0.00 0.12 7 45 0.0 0.26 15.32 15428 1.25 43.75 0.12 0.00 0.00 0.12 7 46 0.0 0.22 13.49 15434 1.25 43.75 0.12 0.00 0.00 0.12 7 47 0.0 0.20 11.87 15438 1.25 43.75 0.12 0.00 0.00 0.12 7 48 0.0 0.17 10.44 15442 1.25 43.75 0.12 0.00 0.00 0.12 7 49 0.0 0.15 9.19 15444 1.25 43.75 0.12 0.00 0.00 0.12 7 50 0.0 0.13 8.09 15444 1.25 43.75 0.12 0.00 0.00 0.12 7 51 0.0 0.12 7.12 15444 1.25 43.75 0.12 0.00 0.00 0.12 7 52 0.0 0.10 6.26 15443 1.25 43.75 0.12 0.00 0.00 0.12 7 53 0.0 0.09 5.51 15441 1.25 43.75 0.12 0.00 0.00 0.12 7 54 0.0 0.08 4.85 15439 1.25 43.75 0.12 0.00 0.00 0.12 7 55 0.0 0.07 4.27 15436 1.25 43.75 0.12 0.00 0.00 0.12 7 56 0.0 0.06 3.75 15432 1.25 43.75 0.12 0.00 0.00 0.12 7 57 0.0 0.06 3.30 15428 1.25 43.75 0.12 0.00 0.00 0.12 7 58 0.0 0.05 2.91 15424 1.25 43.75 0.12 0.00 0.00 0.12 7 59 0.0 0.04 2.56 15419 1.25 43.75 0.12 0.00 0.00 0.12 7 LLJ 60 0.0 0.04 2.25 15414 1.25 43.75 0.12 0.00 0.00 0.12 7 << 61 0.0 0.03 1.98 15409 1.25 43.75 0.12 0.00 0.00 0.12 7 r \'l 62 0.0 0.03 1.74 15404 1.25 43.75 0.12 0.00 0.00 0.12 7 .a 63 0.0 0.03 1.53 15398 1.25 43.75 0.12 0.00 0.00 0.12 7 N O 64 0.0 0.02 1.35 15393 1.25 43.75 0.12 0.00 0.00 0.12 7 65 0.0 0.02 1.19 15387 1.25 43.75 0.12 0.00 0.00 0.12 7 66 0.0 0.02 1.05 15381 1.25 43.75 0.12 0.00 0.00 0.12 7 67 0.0 0.02 0.92 15375 1.25 43.75 0.12 0.00 0.00 0.12 7 68 0.0 0.01 0.81 15368 1.25 43.75 0.12 0.00 0.00 0.12 7 69 0.0 0.01 0.71 15362 1.25 43.75 0.12 0.00 0.00 0.12 7 70 0.0 0.01 0.63 15356 1.25 43.75 0.12 0.00 0.00 0.12 7 71 0.0 0.01 0.55 15349 1.25 43.75 0.12 0.00 0.00 0.12 7 72 0.1 0.01 0.49 15343 1.25 43.75 0.12 0.00 0.00 0.12 7 73 0.1 0.01 0.43 15336 1.25 43.75 0.12 0.00 0.00 0.12 7 74 0.1 0.01 0.38 15329 1.25 43.75 0.12 0.00 0.00 0.12 7 75 0.1 0.01 0.33 15323 1.25 43.75 0.12 0.00 0.00 0.12 7 76 0.1 0.00 0.29 15316 1.25 43.75 0.12 0.00 0.00 0.12 7 77 0.1 0.00 0.26 15309 1.25 43.75 0.12 0.00 0.00 0.12 7 78 0.1 0.00 0.23 15302 1.24 43.74 0.12 0.00 0.00 0.12 7 79 0.1 0.00 0.20 15295 1.24 43.74 0.12 0.00 0.00 0.12 7 80 0.1 0.00 0.17 15289 1.24 43.74 0.12 0.00 0.00 0.12 7 81 0.1 0.00 0.15 15282 1.24 43.74 0.12 0.00 0.00 0.12 7 82 0.1 0.00 0.14 15275 1.24 43.74 0.12 0.00 0.00 0.12 7 83 0.1 0.00 0.12 15268 1.24 43.74 0.12 0.00 0.00 0.12 7 84 0.1 0.00 0.10 15261 1.24 43.74 0.12 0.00 0.00 0.12 7 85 0.1 0.00 0.09 15254 1.24 43.74 0.12 0.00 0.00 0.12 7 86 0.1 0.00 0.08 15247 1.24 43.74 0.12 0.00 0.00 0.12 7 87 0.1 0.00 0.07 15240 1.24 43.74 0.12 0.00 0.00 0.12 7 88 0.1 0.00 0.06 15233 1.24 43.74 0.12 0.00 0.00 0.12 7 89 0.1 0.00 0.06 15226 1.24 43.74 0.12 0.00 0.00 0.12 7 90 0.1 0.00 0.05 15219 1.24 43.74 0.12 0.00 0.00 0.12 7 91 0.1 0.00 0.04 15212 1.24 43.74 0.12 0.00 0.00 0.12 7 92 0.1 0.00 0.04 15205 1.24 43.74 0.12 0.00 0.00 0.12 7 93 0.1 0.00 0.03 15198 1.24 43.74 0.12 0.00 0.00 0.12 7 94 0.1 0.00 0.03 15191 1.24 43.74 0.12 0.00 0.00 0.12 7 95 0.1 0.00 0.03 15184 1.24 43.74 0.12 0.00 0.00 0.12 7 96 0.1 0.00 0.02 15177 1.24 43.74 0.12 0.00 0.00 0.12 7 97 0.1 0.00 0.02 15170 1.24 43.74 0.12 0.00 0.00 0.12 7 98 -0.1 0.00 0.02 15163 1.23 43.73 0.12 0.00 0.00 0.12 7 99 0.1 0.00 0.02 15157 1.23 43.73 0.12 0.00 0.00 0.12 7 1 100 0.1 0.00 0.01 15150 1.23 43.73 0.12 0.00 0.00 0.12 7 101 0.1 0.00 0.01 15143 1.23 43.73 0.12 0.00 0.00 0.12 7 102 0.1 0.00 0.01 15136 1.23 43.73 0.12 0.00 0.00 0.12 7 103 0.1 0.00 0.01 15129 1.23 43.73 0.12 0.00 0.00 0.12 7 104 0.1 0.00 0.01 15122 1.23 43.73 0.12 0.00 0.00 0.12 7 105 0.1 0.00 0.01 15115 1.23 43.73 0.12 0.00 0.00 0.12 7 106 0.1 0.00 0.01 15108 1.23 43.73 0.12 0.00 0.00 0.12 7 107 0.1 0.00 0.01 15101 1.23 43.73 0.12 0.00 0.00 0.12 7 108 0.1 0.00 0.00 15094 1.23 43.73 0.12 0.00 0.00 0.12 7 109 0.1 0.00 0.00 15087 1.23 43.73 0.12 0.00 0.00 0.12 7 110 0.1 0.00 0.00 15080 1.23 43.73 0.12 0.00 0.00 0.12 7 111 0.1 0.00 0.00 15073 1.23 43.73 0.12 0.00 0.00 0.12 7 112 0.1 0.00 0.00 15066 1.23 43.73 0.12 0.00 0.00 0.12 7 113 0.1 0.00 0.00 15059 1.23 43.73 0.12 0.00 0.00 0.12 7 114 0.1 0.00 0.00 15052 1.23 43.73 0.12 0.00 0.00 0.12 7 115 0.1 0.00 0.00 15045 1.23 43.73 0.12 0.00 0.00 0.12 7 116 0.1 0.00 0.00 15038 1.23 43.73 0.12 0.00 0.00 0.12 7 117 0.1 0.00 0.00 15031 1.22 43.72 0.12 0.00 0.00 0.12 7 118 0.1 0.00 0.00 15024 1.22 43.72 0.12 0.00 0.00 0.12 7 119 0.1 0.00 0.00 15017 1.22 43.72 0.12 0.00 0.00 0.12 7 120 0.1 0.00 0.00 15010 1.22 43.72 0.12 0.00 0.00 0.12 7 i CEIV ED MAY 1 7 2011 BY:��- Inflow Hydrograph C= fir,•- f 81 Length W'shed *t k 8501 (Using Malcolm Step Function) I = p z 7`96j in/hr Height W'shed rF W?,-4 A"5i A= jVaZ' 3'24)ac Qpeak 18.6 cfs tc= 10 tp = 10 minutes Time Flow(Q) (min) (cfs) 0 0.00 1 0.44 2 1.71 3 3.71 4 6.23 5 9.03 6 11.86 7 14.45 8 16.55 9 17.96 10 18.55 11 18.26 12 17.12 13 15.28 14 13.45 15 11.83 16 10.41 17 9.16 18 8.06 19 7.10 20 6.24 21 5.49 22 4.84 23 4.25 24 3.74 25 3.29 26 2.90 27 2.55 28 2.25 29 1.98 30 1.74 31 1.53 32 1.35 33 1.18 34 1.04 35 0.92 36 0.81 37 0.71 38 0.63 39 0.55 Nt, 40 0.48 41 0.43 42 0.37 43 0.33 44 0.29 45 0.26 46 0.22 47 0.20 48 0.17 49 0.15 50 0.13 51 0.12 52 0.10 53 0.09 54 0.08 55 0.07 56 0.06 57 0.06 58 0.05 59 0.04 60 0.04 61 0.03 62 0.03 63 0.03 64 0.02 65 0.02 66 0.02 67 0.02 68 0.01 69 0.01 70 0.01 71 0.01 72 0.01 73 0.01 74 0.01 75 0.01 76 0.00 77 0.00 78 0.00 79 0.00 80 0.00 81 0.00 82 0.00 83 0.00 84 0.00 85 0.00 86 0.00 87 0.00 88 0.00 89 0.00 90 0.00 91 0.00 92 0.00 93 0.00 RECEIVEID MAY 1 7 2011 BY: 94 0.00 95 0.00 96 0.00 97 0.00 98 0.00 99 0.00 100 0.00 101 0.00 102 0.00 103 0.00 104 0.00 105 0.00 106 0.00 107 0.00 108 0.00 109 0.00 110 0.00 111 0.00 112 0.00 113 0.00 114 0.00 115 0.00 116 0.00 117 0.00 118 0.00 119 0.00 120 0.00 ' CEIVED MAY 1 7 2011 Accum Z Volume Stape In S In Z Zest Comment 0 0 Contour at Normal Pond (wet pond) or Basin Bottc 5575 0.5 8 626048 R O'.693147y 0.503881 18533 115 49 827308 ' 0 405465� 1.477558 4= 33090 2 5=..10 40699 ,'0 916291 2.483154 49315.5 3.5 F10:80599 . r1�,252763 3.549709 67279 4.5 11.1166 1.504077 4.688143 87050.5 5.5 11.37424 1.704748 5.904824 Contour at Berm Top b= 1.116615 Ks= 11984.77 w " Regression Analysis Y Data Range Regression Analysis X Data Range SUMMARY OUTPUT Regression Statistics Multiple R 0.999877 R Square 0.999755 Adjusted R 0.999632 Standard E 0.018205 Observatio 4 ANOVA df SS MS F ignificance F Regressior 1 2.704336 2.704335667 8159.589 0.000123 Residual 2 0.000663 0.00033143 Total 3 2.704999 CoefficienWandard Ern t Stat P-value Lower 95%Upper 95% Intercept 9.391392 0.010801 869.4928064 1.32E-06 9.344919 9.437865 X Variable 1.116615 0.012361 90.33044328 0.000123 1.063428 1.169802 RECEIVED MAY 1 7 2011 BY: >m (infiltration) .ower 95.0 1pper 95.0% 9.344919 9.437865 1.063428 1.169802 �F 'FIVFD MAY 1 7 2011 IBY:__--- Outlet Device 1 (Orifice) Diameter of Orifice = },;� in Cross Sectional Area = 0.021806 sf g = 32.2 fUsec2 Stage Head Q feet ifeen cfs 0.00 0.00 0.00 0.01 0.00 0.00 0.02 0.00 0.00 0.03 0.00 0.00 0.04 0.00 0.00 0.05 0.00 0.00 0.06 0.00 0.00 0.07 0.00 0.00 0.08 0.00 0.00 0.09 0.01 0.01 0.10 0.02 0.01 0.11 0.03 0.02 0.12 0.04 0.02 0.13 0.05 0.02 0.14 0.06 0.02 0.15 0.07 0.03 0.16 0.08 0.03 0.17 0.09 0.03 0.18 0.10 0.03 0.19 0.11 0.03 0.20 0.12 0.04 0.21 0.13 0.04 0.22 0.14 0.04 0.23 0.15 0.04 0.24 0.16 0.04 0.25 0.17 0.04 0.26 0.18 0.04 RECEIVED MAY 1 7 2011 BY:_- Outlet Device 2 (Weir) Weir Length = ��¢+j :-'4 feet Cw= P--Z F'i36 Use 3.33 for Sharp, 3,00 for Broad or Free s,. Weir Elevations feet Stage Head Q feet feet cfs 0.00 -1.25 0.00 0.01 -1.24 0.00 0.02 -1.23 0.00 0.03 -1.22 0.00 0.04 -1.21 0.00 0.05 -1.20 0.00 0.06 -1.19 0.00 0.07 -1.18 0.00 0.08 -1.17 0.00 0.09 -1.16 0.00 0.10 -1.15 0.00 0.11 -1.14 0.00 0.12 -1.13 0.00 0.13 -1.12 0.00 0.14 -1.11 0.00 0.15 -1.10 0.00 0.16 -1.09 0.00 0.17 -1.08 0.00 0.18 -1.07 0.00 0.19 -1.06 0.00 0.20 -1.05 0.00 0.21 -1.04 0.00 0.22 -1.03 0.00 0.23 -1.02 0.00 0.24 -1.01 0.00 0.25 -1.00 0.00 0.26 -0.99 0.00 0.27 -0.98 0.00 0.28 -0.97 0.00 0.29 -0.96 0.00 0.30 -0.95 0.00 0.31 -0.94 0.00 0.32 -0.93 0.00 0.33 -0.92 0.00 � 1ZECEIVEI� MAY 1 7 2011 !BY: 0.34 -0.91 0.00 0.35 -0.90 0.00 0.36 -0.89 0.00 0.37 -0.88 0.00 0.38 -0.87 0.00 0.39 -0.86 0.00 0.40 -0.85 0.00 0.41 -0.84 0.00 r�:ECEIVEY� MAY 1 7 2011 �BY:._�__ Outlet Device 3 (Pump) Pump Rate= {MW T"b gpm Pump On Elevation na r?3;'£' feet Pumping Rate 0 cfs MAY 1 201 � o N rH (sainuiw) awil Q 6Zl 666 �M 66 �2 6L 69 19 6'l 4£ l,Z 11 1 w II I� II ......IIIIIIII ......I 11 II II IIIII II oo O 00 Z 00 Y � . ..e �#. `f'wait qe a,� �€v het ' "S.-,^.r' 8 .s"g �++5. v :1n1 ¢ a ax 3 to *Y s g s ' Salida § 00,9 moillno— Z•` �vr'+.T��tGxt-e3ft`' `i��.i9,'+[.�'«.eI MOU ra '+^rr .> ',..k s �5"i x' "- '` 4Tr^Sxym+,' �y `H"` I 3'�*.,,�S,,,an° .,x?, G' `S' 00,0 1� I3 I � �` N .W>v s= �ro-y�a v ✓ + 1'.aK�€`3i'�t •t z%"".'.Xt� �" �� xFY'i�� �2t.E�a� "q``».z sig.'r �,Y"" 4,'FkS asR r ''Mv�,. h{,'*' " °"`�^w•' m" 'y„F '3 ,.,,.� arm; 00 Z � v mwv%e ,. w1 ,WN", �. ,'1�` r +,� ` F�' 'ru ✓,r.T�"� :.d,' .wY,a. -" t. :J" „�, i {" yy 00 9 e'J�. �x� �� Md 4l� `� �`'�1"vZ,�'{ ����IY'-,� � a �a 1.q l�-+� $�r•� mar 00,21 a~ 00 0Z Simplified Routing Procedure Project: �Tract�lrJackso ville:usiness Pa 1k f 00 Year Storm Date: 13/31/2011 &,Q r � � • •Y Increment `wr wlminutes (Must be < 10minutes) Orifice Weir Pump Total Total Time Time Inflow(cfs) Inflow Stored Volume Stage Water Surface Outflow Outflow Outflow Outflow Outflow min days cfs (cif cuf M Elevation cfs) (cfs) (cfs) (cfs cif 0 0.0 0.00 0.00 0 0.00 42.50 0.00 0.00 0.00 0.00 0 1 0.0 0.58 34.96 35 0.01 42.51 0.01 0.00 0.00 0.01 0 2 0.0 2.28 136.52 171 0.02 42.52 0.02 0.00 0.00 0.02 1 3 0.0 4.92 295.07 465 0.05 42.55 0.02 0.00 0.00 0.02 1 4 0.0 8.26 495.61 959 0.10 42.60 0.03 0.00 0.00 0.03 2 5 0.0 11.99 719.16 1676 0.17 42.67 0.04 0.00 0.00 0.04 3 6 0.0 15.74 944.55 2618 0.26 42.76 0.05 0.00 0.00 0.05 3 7 0.0 19.17 1150.47 3766 0.35 42.85 0.06 0.00 0.00 0.06 4 8 0.0 21.96 1317.42 5079 0.46 42.96 0.07 0.00 0.00 0.07 4 9 0.0 23.83 1429.61 6505 0.58 43.08 0.08 0.00 0.00 0.08 5 10 0.0 24.61 1476.40 7976 0.69 43.19 0.09 0.00 0.00 0.09 5 11 0.0 24.22 1453.39 9424 0.81 43.31 0.09 0.00 0.00 0.09 6 12 0.0 22.71 1362.73 10781 0.91 43.41 0.10 0.00 0.00 0.10 6 13 0.0 20.28 1216.54 11992 1.00 43.50 0.11 0.00 0.00 0.11 6 14 0.0 17.84 1070.53 13056 1.08 43.58 0.11 0.00 0.00 0.11 7 15 0.0 15.70 942.04 13992 1.15 43.65 0.11 0.00 0.00 0.11 7 16 0.0 13.82 828.97 14814 1.21 43.71 0.12 0.00 0.00 0.12 7 17 0.0 12.16 729.48 15536 1.26 43.76 0.12 0.02 0.00 0.13 8 18 0.0 10.70 641.92 16170 1.31 43.81 0.12 0.17 0.00 0.29 17 19 0.0 9.41 564.88 16718 1.35 43.85 0.12 0.36 0.00 0.49 29 'G1 1 20 0.0 8.28 497.08 17186 1.38 43.88 0.12 0.57 0.00 0.69 42 Tf 21 0.0 7.29 437.42 17582 1.41 43.91 0.12 0.76 0.00 0.89 53 22 0.0 6.42 384.92 17913 1.43 43.93 0.13 0.94 0.00 1.07 64 r rai 23 0.0 5.65 338.72 18188 1.45 43.95 0.13 1.10 0.00 1.22 73 rr 24 0.0 4.97 298.07 18413 1.47 43.97 0.13 1.23 0.00 1.36 81 �+ C 25 0.0 4.37 262.29 18594 1.48 43.98 0.13 1.34 0.00 1.47 88 o 26 0.0 3.85 230.81 18736 1.49 43.99 0.13 1.43 0.00 1.56 93 27 0.0 3.39 203.11 18846 1.50 44.00 0.13 1.50 0.00 1.63 98 28 0.0 2.98 178.73 18927 1.51 44.01 0.13 1.55 0.00 1.68 101 29 0.0 2.62 157.28 18984 1.51 44.01 0.13 1.59 0.00 1.72 103 30 0.0 2.31 138.40 19019 1.51 44.01 0.13 1.61 0.00 1.74 104 31 0.0 2.03 121.79 19036 1.51 44.01 0.13 1.62 0.00 1.75 105 32 0.0 1.79 107.17 19038 1.51 44.01 0.13 1.62 0.00 1.75 105 33 0.0 1.57 94.31 19028 1.51 44.01 0.13 1.62 0.00 1.75 105 34 0.0 1.38 82.99 19006 1.51 44.01 0.13 1.60 0.00 1.73 104 35 0.0 1.22 73.03 18975 1.51 44.01 0.13 1.58 0.00 1.71 103 36 0.0 1.07 64.26 18937 1.51 44.01 0.13 1.56 0.00 1.69 101 37 0.0 0.94 56.55 18892 1.50 44.00 0.13 1.53 0.00 1.66 99 38 0.0 0.83 49.76 18842 1.50 44.00 0.13 1.50 0.00 1.63 98 39 0.0 0.73 43.79 18789 1.50 44.00 0.13 1.46 0.00 1.59 95 40 0.0 0.64 38.53 18732 1.49 43.99 0.13 1.43 0.00 1.55 93 41 0.0 0.57 33.91 18672 1.49 43.99 0.13 1.39 0.00 1.52 91 42 0.0 0.50 29.84 18611 1.48 43.98 0.13 1.35 0.00 1.48 89 43 0.0 0.44 26.26 18549 1.48 43.98 0.13 1.31 0.00 1.44 86 44 0.0 0.39 23.11 18485 1.47 43.97 0.13 1.27 0.00 1.40 84 45 0.0 0.34 20.33 18422 1.47 43.97 0.13 1.23 0.00 1.36 82 46 0.0 0.30 17.89 18358 1.47 43.97 0.13 1.20 0.00 1.32 79 47 0.0 0.26 15.75 18294 1.46 43.96 0.13 1.16 0.00 1.29 77 48 0.0 0.23 13.86 18231 1.46 43.96 0.13 1.12 0.00 1.25 75 49 0.0 0.20 12.19 18168 1.45 43.95 0.13 1.09 0.00 1.21 73 50 0.0 0.18 10.73 18106 1.45 43.95 0.13 1.05 0.00 1.18 71 51 0.0 0.16 9.44 18045 1.44 43.94 0.13 1.01 0.00 1.14 . 68 52 0.0 0.14 8.31 17985 1.44 43.94 0.13 0.98 0.00 1.11 66 53 0.0 0.12 7.31 17926 1.43 43.93 0.13 0.95 0.00 1.07 64 54 0.0 0.11 6.43 17868 1.43 43.93 0.13 0.92 0.00 1.04 63 55 0.0 0.09 5.66 17811 1.43 43.93 0.13 0.89 0.00 1.01 61 _ 56 0.0 0.08 4.98 17755 1.42 43.92 0.13 0.86 0.00 0.98 59 57 0.0 0.07 4.38 17701 1.42 43.92 0.13 0.83 0.00 0.95 57 rt 58 0.0 0.06 3.86 17648 1.41 43.91 0.12 0.80 0.00 0.92 55 y 59 0.0 0.06 3.39 17596 1.41 43.91 0.12 0.77 0.00 0.90 54 M60 0.0 0.05 2.99 17545 1.41 43.91 0.12 0.75 0.00 0.87 52 61 0.0 0.04 2.63 17495 1.40 43.90 0.12 0.72 0.00 0.84 51 'a 62 0.0 0.04 2.31 17447 1.40 43.90 0.12 0.70 0.00 0.82 49 M 63 0.0 0.03 2.04 17400 1.40 43.90 0.12 0.67 0.00 0.80 48 64 0.0 0.03 1.79 17354 1.39 43.89 0.12 0.65 0.00 0.77 46 65 0.0 0.03 1.58 17309 1.39 43.89 0.12 0.63 0.00 0.75 45 66 0.0 0.02 1.39 17265 1.39 43.89 0.12 0.61 0.00 0.73 44 67 0.0 0.02 1.22 17223 1.38 43.88 0.12 0.59 0.00 0.71 43 68 0.0 0.02 1.07 17181 1.38 43.88 0.12 0.57 0.00 0.69 41 69 0.0 0.02 0.95 17141 1.38 43.88 0.12 0.55 0.00 0.67 40 70 0.0 0.01 0.83 17101 1.37 43.87 0.12 0.53 0.00 0.65 39 71 0.0 0.01 0.73 17063 1.37 43.87 0.12 0.51 0.00 0.64 38 72 0.1 0.01 0.64 17025 1.37 43.87 0.12 0.50 0.00 0.62 37 73 0.1 0.01 0.57 16989 1.37 43.87 0.12 0.48 0.00 0.60 36 74 0.1 0.01 0.50 16953 1.36 43.86 0.12 0.46 0.00 0.59 35 75 0.1 0.01 0.44 16919 1.36 43.86 0.12 0.45 0.00 0.57 34 76 0.1 0.01 0.39 16885 1.36 43.86 0.12 0.43 0.00 0.56 33 77 0.1 0.01 0.34 16852 1.36 43.86 0.12 0.42 0.00 0.54 33 78 0.1 0.00 0.30 16819 1.35 43.85 0.12 0.41 0.00 0.53 32 79 0.1 0.00 0.26 16788 1.35 43.85 0.12 0.39 0.00 0.51 31 80 0.1 0.00 0.23 16757 1.35 43.85 0.12 0.38 0.00 0.50 30 81 0.1 0.00 0.20 16727 1.35 43.85 0.12 0.37 0.00 0.49 29 82 0.1 0.00 0.18 16698 1.35 43.85 0.12 0.36 0.00 0.48 29 83 0.1 0.00 0.16 16670 1.34 43.84 0.12 0.34 0.00 0.47 28 84 0.1 0.00 0.14 16642 1.34 43.84 0.12 0.33 0.00 0.46 27 85 0.1 0.00 0.12 16615 1.34 43.84 0.12 0.32 0.00 0.44 27 86 0.1 0.00 0.11 16588 1.34 43.84 0.12 0.31 0.00 0.43 26 87 0.1 0.00 0.09 16562 1.34 43.84 0.12 0.30 0.00 0.42 25 88 0.1 0.00 0.08 16537 1.33 43.83 0.12 0.29 0.00 0.41 25 89 0.1 0.00 0.07 16512 1.33 43.83 0.12 0.28 0.00 0.41 24 90 0.1 0.00 0.06 16488 1.33 43.83 0.12 0.27 0.00 0.40 24 91 0.1 0.00 0.06 16464 1.33 43.83 0.12 0.27 0.00 0.39 23 92 0.1 0.00 0.05 16441 1.33 43.83 0.12 0.26 0.00 0.38 23 93 0.1 0.00 0.04 16418 1.33 43.83 0.12 0.25 0.00 0.37 22 94 0.1 0.00 0.04 16396 1.32 43.82 0.12 0.24 0.00 0.36 22 ---------___. _ 95 0.1 0.00 0.03 16374 1.32 43.82 0.12 0.23 0.00 0.35 21 OD 96 0.1 0.00 0.03 16353 1.32 43.82 0.12 0.23 0.00 0.35 21 97 0.1 0.00 0.03 16332 1.32 43.82 0.12 0.22 0.00 0.34 20 D 98 0.1 0.00 0.02 16312 1.32 43.82 0.12 0.21 0.00 0.33 20 .r 99 0.1 0.00 0.02 16292 1.32 43.82 0.12 0.21 0.00 0.33 20 100 0.1 0.00 0.02 16272 1.32 43.82 0.12 0.20 0.00 0.32 19 N C O 101 0.1 0.00 0.02 16253 1.31 43.81 0.12 0.19 0.00 0.31 19 102 0.1 0.00 0.01 16234 1.31 43.81 0.12 0.19 0.00 0.31 18 103 0.1 0.00 0.01 16216 1.31 43.81 0.12 0.18 0.00 0.30 18 104 0.1 0.00 0.01 16198 1.31 43.81 0.12 0.17 0.00 0.30 18 105 0.1 0.00 0.01 16180 1.31 43.81 0.12 0.17 0.00 0.29 17 106 0.1 0.00 0.01 16163 1.31 43.81 0.12 0.16 0.00 0.28 17 107 0.1 0.00 0.01 16146 1.31 43.81 0.12 0.16 0.00 0.28 17 108 0.1 0.00 0.01 16129 1.30 43.80 0.12 0.15 0.00 0.27 16 109 0.1 0.00 0.01 16113 1.30 43.80 0.12 0.15 0.00 0.27 16 110 0.1 0.00 0.00 16097 1.30 43.80 0.12 0.14 0.00 0.26 16 111 0.1 0.00 0.00 16081 1.30 43.80 0.12 0.14 0.00 0.26 16 112 0.1 0.00 0.00 16065 1.30 43.80 0.12 0.13 0.00 0.25 15 113 0.1 0.00 0.00 16050 1.30 43.80 0.12 0.13 0.00 0.25 15 114 0.1 0.00 0.00 16035 1.30 43.80 0.12 0.13 0.00 0.25 15 115 0.1 0.00 0.00 16020 1.30 43.80 0.12 0.12 0.00 0.24 14 116 0.1 0.00 0.00 16006 1.30 43.80 0.12 0.12 0.00 0.24 14 117 0.1 0.00 0.00 15992 1.29 43.79 0.12 0.11 0.00 0.23 14 118 0.1 0.00 0.00 15978 1.29 43.79 0.12 0.11 0.00 0.23 14 119 0.1 0.00 0.00 15964 1.29 43.79 0.12 0.11 0.00 0.23 14 120 0.1 0.00 0.00 15950 1.29 43.79 0.12 0.10 0.00 0.22 13 N O Inflow Hydrograph C= i ; ;; , ;;0.81 Length W'shed `v+ 850j (Using Malcolm Step Function) I = tl';R. ,_9T5i inlhr Height W'shed A= ?r%1-tiT3.241ac Qpeak 24.6 cfs tc= 10 tp = 10 minutes Time Flow(Q) (min) (cfs) 0 0.00 1 0.58 2 2.28 3 4.92 4 8.26 5 11.99 6 15.74 7 19.17 8 21.96 9 23.83 10 24.61 11 24.22 12 22.71 13 20.28 14 17.84 15 15.70 16 13.82 17 12.16 18 10.70 19 9.41 20 8.28 21 7.29 22 6.42 23 5.65 24 4.97 25 4.37 26 3.85 27 3.39 28 2.98 29 2.62 30 2.31 31 2.03 32 1.79 33 1.57 34 1.38 35 1.22 36 1.07 37 0.94 38 0.83 39 0.73 40 0.64 41 0.57 DECEIVED MAY 1 7 2011 'BY: 42 0.50 43 0.44 44 0.39 45 0.34 46 0.30 47 0.26 48 0.23 49 0.20 50 0.18 51 0.16 52 0.14 53 0.12 54 0.11 55 0.09 56 0.08 57 0.07 58 0.06 59 0.06 60 0.05 61 0.04 62 0.04 63 0.03 64 0.03 65 0.03 66 0.02 67 0.02 68 0.02 69 0.02 70 0.01 71 0.01 72 0.01 73 0.01 74 0.01 75 0.01 76 0.01 77 0.01 78 0.00 79 0.00 80 0.00 81 0.00 82 0.00 83 0.00 84 0.00 85 0.00 86 0.00 87 0.00 88 0.00 89 0.00 90 0.00 91 0.00 92 0.00 93 0.00 IR-ECEIVED MAY 1 7 2011 f3Y: 94 0.00 95 0.00 96 0.00 97 0.00 98 0.00 99 0.00 100 0.00 101 0.00 102 0.00 103 0.00 104 0.00 105 0.00 106 0.00 107 0.00 108 0.00 109 0.00 110 0.00 111 0.00 112 0.00 113 0.00 114 0.00 115 0.00 116 0.00 117 0.00 118 0.00 119 0.00 120 0.00 I?F-CEIVED MAY 1 7 2011 I'3`-: Accum Z Volume Staqe In S In Z Zest Comment 0 0 Contour at Normal Pond (wet pond) or Basin Bott( 5575 0 5 8 628048 O'693 T 0.503881 18533 1.5 r9 827308 0 405465i 1.477558 33090 2.5 10 40699 r 0 916291� 2.483154 49315.5 3.5 10 80599x .1 25276,3j 3.549709 67279 4.5 11.1166 1.504077 4.688143 87050.5 5.5 11.37424 1.704748 5.904824 Contour at Berm Top b = 1.116615 Ks = 11984.77 Regression Analysis Y Data Range Regression Analysis X Data Range SUMMARY OUTPUT Regression Statistics Multiple R 0.999877 R Square 0.999755 Adjusted R 0.999632 Standard E 0.018205 Observatio 4 ANOVA of SS MS F ignificance F Regressior 1 2.704336 2.704335667 8159.589 0.000123 Residual 2 0.000663 0.00033143 Total 3 2.704999 CoefficienWandard Ern t Stat P-value Lower 95%Upper 95% Intercept 9.391392 0.010801 869.4928064 1.32E-06 9.344919 9.437865 X Variable 1.116615 0.012361 90.33044328 0.000123 1.063428 1.169802 P rCEIVED MAY 1 7 2011 �Y:_--- )m (infiltration) .ower 95.Mpper 95.0 9.344919 9.437865 1.063428 1.169802 &ZECEIVED MAY 1 7 2011 BY: Outlet Device 1 (Orifice) Diameter of Orifice in Cd Cross Sectional Area = 0.021806 sf g = 32.2 ft/sec2 Stage Head Q jeeq feet cfs 0.00 0.00 0.00 0.01 0.00 0.00 0.02 0.00 0.00 0.03 0.00 0.00 0.04 0.00 0.00 0.05 0.00 0.00 0.06 0.00 0.00 0.07 0.00 0.00 0.08 0.00 0.00 0.09 0.01 0.01 0.10 0.02 0.01 0.11 0.03 0.02 0.12 0.04 0.02 0.13 0.05 0.02 0.14 0.06 0.02 0.15 0.07 0.03 0.16 0.08 0.03 0.17 0.09 0.03 0.18 0.10 0.03 0.19 0.11 0.03 0.20 0.12 0.04 0.21 0.13 0.04 0.22 0.14 0.04 0.23 0.15 0.04 0.24 0.16 0.04 0.25 0.17 0.04 0.26 0.18 0.04 MAY 1 7 2011 ^�r. Outlet Device 2 (Weir) Weir Length = kRhe 3 4)feet Cw= ; *_ '; ,g 3) Use 3.33 for Sharp, 3,00 for Broad or Free Weir Elevations = P�ea'43 75ffeet Stage Head Q feet jfpeU cfs 0.00 -1.25 0.00 0.01 -1.24 0.00 0.02 -1.23 0.00 0.03 -1.22 0.00 0.04 -1.21 0.00 0.05 -1.20 0.00 0.06 -1.19 0.00 0.07 -1.18 0.00 0.08 -1.17 0.00 0.09 -1.16 0.00 0.10 -1.15 0.00 0.11 -1.14 0.00 0.12 -1.13 0.00 0.13 -1.12 0.00 0.14 -1.11 0.00 0.15 -1.10 0.00 0.16 -1.09 0.00 0.17 -1.08 0.00 0.18 -1.07 0.00 0.19 -1.06 0.00 0.20 -1.05 0.00 0.21 -1.04 0.00 0.22 -1.03 0.00 0.23 -1.02 0.00 0.24 -1.01 0.00 0.25 -1.00 0.00 0.26 -0.99 0.00 0.27 -0.98 0.00 0.28 -0.97 0.00 0.29 -0.96 0.00 0.30 -0.95 0.00 0.31 -0.94 0.00 0.32 -0.93 0.00 0.33 -0.92 0.00 RE EJVI ED MAY 1 7 2011 BY:�_ 0.34 -0.91 0.00 0.35 -0.90 0.00 0.36 -0.89 0.00 0.37 -0.88 0.00 0.38 -0.87 0.00 0.39 -0.86 0.00 0.40 -0.85 0.00 0.41 -0.84 0.00 MAY 1 7 2011 Outlet Device 3 (Pump) Pump Rate= 4 0 m x t 9P Pump On Elevation tna� t:, feet Pumping Rate 0 cfs :«FCEIVED MAY 1 7 2011 IBY: 30.00 a1-1 g.—19gmx g c`4 lr a Ft•s', `w. �',k�+s r+,+�•,t bA f 5;- ' r` `trs'A` ', x zv'n. vx,. � geit 25.00 t f ,p4 R ♦ >{, � �' Y bR tl�9 f& Y <�. rktu" .,{ / " }�b "k- V"i .�` Y � ` t ra��,;!� � P �F� ��-0�4,•b(`�a`$�f �}yi��•S� xF �`a'.,@ e�"�' � �t � ,��,�o-�"t' IN ' F -.1{yy, �*s =•e. ,Y,& t9� f ' '�r'�".x� s y 'C. ,t'Y.Y ...o- P.+�ik � � x.a T�S1�� ����SSi. (n "'g�.x`"^hY��'�"',} �4,`^x¢ ° ix�nf"' 9yy"�`�k i`�.{�,��"w a��...C� $ �Cv�"r'k�eh �y"�`E�r' ur " � vc•n •�'�tjr"` � k ����� ��.��"� �F'�� ��� �"�i�n' ++- -�..ets- �� r.S' ��x •"2.�y 15.00 n Inflow 3 d s a � — • _ � it � � ewe of �s Outflow Fex 'S`E •e. Nx � APIN 4 ��� y� d s aFa..-'•,� Zi .,l,tom r K ,s-�-`., l �1� ,a .y+i 'c f. ♦ r t 10.00 �y. a} � L-� -i�yn ��"�`K'+,�'; R'�gF� r.= -ia-"`h t.�,�G•a,�w.z 3. --*,. G r4z .�>x. #�-» �< ,� a'{`"�'•xt"•� a T$S2 r xli� '3 d •' 2 5.00 xx�¢ry -�df , �, 0.00 1 1 11 21 31 41 51 61 71 81 91 101 111 121 Time (minutes) MAY 1 7 2011 BY: PRELIMINARY Design Calculations Stormwater Treatment Facilities for Tract 1 Jacksonville Business Park (Phase 1 & Phase 2) located in Onslow County 1. PROJECT DESCRIPTION The Project consists of a proposed college facility. 2.COMPUTE POND AREA REQUIRED a.Compute Percent Impervious: Impervious Areas: Phase I Future Total On-Site Buildings 13,652 13,652:: 27,304 SF On-Site Streets '0 0 SF On-Site Parking 87,856 SF On-Site Sidewalks 7,375 8,626 16,001 SF Other on-site 0 Off-site 'O 0 Sub-Total 65,155 66,006 131,161 SF Existing 16856 Q 16,856 SF FUTURE(reserved) 0 4,000 4,000 Total 82,011 70,006 152,017 SF Total Area Drainage to Pond: 229,013 1SF Percent Impervious= 0.664 or 66.4 % b.Compute Pond Surface Area Using Surface Area to DralnA Ratio Chart for 90% TSS Removal(copy attached)and assuming F_77­35977 foot pond depth: SA/DA= 5.80 % (interpolated-Select from Highlighted Cell in SA/DA) Therefore: Surface Area = SA/DA x Drainage Area 13,283 SF say _-7."SF must be> 13,283 SF RECEIVED MAY 1- 7 2011 BY ^ o.Compute Minimum Pond Dimensions Assume rectangular shape with 3:1 Length (L)tn Width(VV) Ratio: Min Length 199.02foo1 Min Width = 00.54feet Site conditions, however, dictate irregular shaped pond: Hydr. Length = feet so, Uydr.Width (m 0O.9 feet(avg) Actual L8N= 3.0 (irregular shape) 3. DETERMINE REQUIRED STORAGE VOLUME Design Rainfall Depth= inches Using Schuler"Simple Method": Rv= 0.V5 +V.009(|) where| = percent impervious Rv= 0.647in/in Control Volume= Design Rainfall xRvx Drainage Area Control Volume= 10.533CF say CF Must bo> 18.530 8F 4. DETERMINE REQUIRED STORAGE DEPTH Assume: %1 side slopes solving for depth(d)by trial & error: U = 1.29 5. DETGRM|NE ORIFICE SIZE Control Volume must be drawn down over a2 day'5 day period. Using orifice equation, solve for Diameter(D)that results in 3-1/2 day period: D= (O/0.V25(h)o)» Where: U= (Control Volume / 3.5 days x06.4VVsec1day) = 0.062cfs h = D/3 = 0+43 Solving for D: D 1,91 Use "pipe Actual Drawdown with actual drawdown pipe diameter(using orifice equation): Q= 0.068 cfs Draw Down Period = & 3, �� days OK , <5.0 6. SELECT OUTLET STRUCTURE SIZE Size outlet structure such that depth of Q10 flow< or+to 1 5 Feet Using Rational Formula (Q=CIA)where: Cimper=F77777578 Cpery 0.2 Ccum = 0.58 110= 7.78 in/hr A = 5.26 ac Q10= 21.89 cfs Using Francis Formula (Q=3.OLH"')to solve for L such that H = 1.5 Feet Min L= 3.971 Linear Feet Use Linear Foot Weir Use 5 Square Precast Structure 7. DETERMINE 010 STAGE Q10= 21.89 cfs From Routing Analysis, H10= 1 25 B. DETERMINE Q100 STAGE(ELEV. OF EMERGENCY SPILLWAY) Using Rational Formula (Q=CIA)where: Cimper= 0.8 Cpery= 0.2 Ccum = 0.58 1100 = in/hr A = 5.26 ac Q100= 29.04 cfs From Routing Analysis, H100= 1 51 RECEIVED MAY 1 7 2011 BY: 9. DETERMINE Q100 STAGE OVER EMERGENCY SPILLWAY(TOP BERM ELEV.) Assume primary spillway blocked (i.e., emergency spillway to accommodate Q100) Emergency spillway shall be a broad crested earthem weir designed to pass 100 year storm. Using broad crested weir equation H = (Q/(Cw x L))?3 where: Q= Q100 29.04 cfs Cw= 3.0 Length 30 feet H = 0.47 feet 10. FOREBAY SIZING Compute Actual Pond Volumes (using average end method): Avg Incr. Incr. Cum. Main Bay Volume: ELev i Area (SF l Depth (FT) Vol (CF l Vol (CFl Pond Bottom 34.00 94] Bottom Veg Shelf 42 00 1 8,393 4,667 8.00 37,336 37,336 Normal Pond 42.50 10,551 9,472 0.50 4,736 42,072 Main Bay Volume= 42,072 CF Forebay Volume ; Elevatio Area SF, Area (SF l De Vol(CFI VolC Pond Bottom 35.00 120 Normal Pond 42.50 ; 21"868 1,494 7.50 11,205 11,205 Forebay Volume 11,205 CF Total Pond Volume= 53,277 CF Total Pond Area= 13,419 SF Forebay Volume equates to F 21>S% of Total Volume Must be> 18% and <22% Average Pond Depth = 3.97 feet Compare to assumed Depth „' y$7,._ ;,;;feet Temp Storage VolumeElevation Area (SF 1 Area (SF) Depth (FT l VolC Vol(CF1 Normal Pond 42.50 13,419 Temp. Pond Level 43.75 16802 15,111 1.25 8,888 18,888 Temporary Level should be 43.79 or greater Temp. Pool Volume= 18,888 CF RECEIVED MAY 1 7 2011 BY:--- ---- 11. SUMMARY Pond Elevations: RelativeActual Top Berm (minimum) 11.73 44.48 H= 0.47 100-Yr. Storm 11.26 44.01 (emerg,weir elev) H100= 1.51 10-Yr. Storm 11.00 43.75 H10= 1.25 1-inch Storage 9.75 43.75 (primary weir elev) storage depth= 1.25 Permanent Pool 8.50 42.50 (invert out elev) pond depth= 8.50 Pond Bottom 0 34.00 12.WET DETENTION BASIN SUPPLEMENT Site Characteristics Drainage Area 229,013 sf Impervious Area 152,017 sf % Impervious 66.4 % Design Rainfall Depth 1.5 in Storage Volume Min,Volume Required 18,533 cf Volume Provided 18,888 cf Peak Flow Calculations 1-yr, 24 hour rainfall depth F7773.65 in Rational C, predevelopment F777777TT5 Rational C, post development 0.58 Rainfall Intensity 1 yr24 hr 0.15 in/hr Pre Dev Q1(24 hour) 0.12 cfs Post Dev Q1 (24 hour) 0.46 cfs Pre/Post Flow Control 0.34 cfs Basin Elevations Basin Bottom Elevation 33.00 feet(Elev) Sediment Cleanout Elevation 34.00 feet(Elev) Permanent Pool Elevation 42.50 feet(Elev) Temporary Pool Elevation 43.75 feet(Elev) Volume and Surface Area Calculations SA/DA ratio 5.80 Surface Area Required 13,283 sf Surface Area Provided 13,419 sf Permanent Pool Volume 53,277 cf Average Depth 3.97 feet Forebay Volume 11,205 cf Forebay% of Total Volume 21.0 % Temporary pool Area 16,802 sf .RECEIVED MAY 1 7 2011 BY: -- Drawdown Calculations Drawdown Time 3.15 days Discharge Rate 0.068 cfs Pre Dev Q1(24 hour) 0.12 cfs Post Dev Q1 (24 hour) 0.07 cfs Additional Information Diameter of orifice 2.00 in Design TSS Removal 90 % Basin Side Slopes 3 :1 Vegetated Shelf Slope 10 :1 Vegetated Shelf Width loft Length to Width Ratio 3 :1 Trash Rack? Yes Freeboard Provided? Yes Vegetated Filter Provided? No Recorded Easement? Yes Captures all Runoff? Yes Drain Mechanism Pump MAY 77 2011 I �_. C200926500386 -- SOSID: 1042657 Date Filed: 9/28/2009 11:59:00 AM Elaine F.Marshall STATE OF NORTH CAROLINA North Carolina Secretary of State Department of the Secretary of State C200926500386 AGENT'S STATEMENT OF CHANGE OF REGISTERED OFFICE ADDRESS Pursuant to §55D-31 of the General Statutes of North Carolina,the undersigned submits the following for the purpose of changing the address of the registered office in the State of North Carolina of the entity named below: 1. The name of the entity is: Ray Development and Consulting,LLC Entity Type: ❑Corporation,❑Foreign Corporation,❑Nonprofit Corporation,[]Foreign Nonprofit Corporation ®Limited Liability Company,❑Foreign Limited Liability Company,❑Limited Partnership, ❑Foreign Limited Partnership,[]Limited Liability Partnership,❑Foreign Limited Liability Partnership 2. The street address and county of the current registered office of the entity is: Number and Street: 5002 Hunters Trail,Unit 9 City,State,Zip Code:Wilmington,NC 28405 County:New Hanover 3. The mailing address if different from the street address of the current registered office is: Same 4. The street address and county of the new registered office of the entity is: Number and Street 310 Bretonshire Road City,State,Zip Code:Wilmington,NC 28405 County:New Hanover 5. The mailing address Y'dWerent from the stred address of the new registered office is: Same 6. The name of the current registered agent is: _Clifford J.Ray 7. The address of the entity's registered office and the address of the business office of its registered agent,as changed,will be identical. 8. The undersigned certifies that the entity has been notified in writing of the change of address of the business office of the registered agent. 9. This statement will be effective upon filing,unless a date and/or time is specified: This is the_17th_day of September 2010_ _Ray Development and Consulting,LLC of 4—�'/ gnature� /L _Clifford J. Ray (Type or Print Name and Title) Notes: Filing Fee is$5.00. One executed statement must be filed with the Secretary of State. CORPORATIONS DIVISION P.O.BOX 29622 RECEIVE EIGH,NC 27626-0622 (Revised January 2002) (Form B1r12) MAY 1 . 7 2011 BY: C200813000106 SOSID: 1042657 Date Filed:5/9/2008 12:27:00 PM Elaine F. Marshall North Carolina Secretary of State ARTICLES OF ORGANIZATION C200813000106 OF RAY DEVELOPMENT AND CONSULTING, LLC The undersigned, does hereby make and acknowledge these Articles of Organization for the purpose of forming a limited liability company under and by virtue of the laws of the State of North Carolina, as contained in Chapter 57C of the General Statutes of North Carolina, entitled, "North Carolina Limited Liability Company Act' and to that end does hereby set forth: 1. The name of the limited liability company is "RAY DEVELOPMENT AND CONSULTING, LLC". 2. There shall be no limit on the duration of existence of the limited liability company, other than dissolution pursuant to the terms of its written operating agreement, the unanimous consent of its members or as otherwise provided by law. 3. The name and address of each organizer executing these Articles of Organization is as follows: J. Dewey Edwards,Jr. P.O. Box 1057 219 New Bridge Street Jacksonville, NC 28540 4. The street address and county of the initial registered office of the limited liability company is 5002 Hunters Trail, Unit 9,Wilmington, New Hanover County, North Carolina 28405; the mailing address of the initial registered office of the limited liability company is, 5002 Hunters Trail, Unit 9, Wilmington, North Carolina 28405; and the name of the initial registered agent of the limited liability company at such address is Clifford J. Ray. 5. Except as provided by NCGS Section 57C-3-20(a), the members of this limited liability company shall not be managers by virtue of their status as members. 6. These Articles of Organization shall be effective upon filing of same by the North Carolina Secretary of State. In Testimony Whereof, the undersigned has executed or caused this instrument to be properly executed in his name, this the 22n° day of April, 2008. J. wey Edwards t, r., Organizer Prepared by and return to: J. Dewey Edwards,Jr. Gaylor Edwards & Vatcher, P.A. P.O. Box 1057 219 New Bridge Street Jacksonville, North Carolina 28540 RECEIVED WPDOCSILLCIARTILCE&MY DEVELOPMENT.CONSULTINC MAY 1 7 2011 BY: Stormwater Treatment Narrative Miller-Motte College Facility The City of Jacksonville owns a 6.45 acre tract ("Tract 1 Jacksonville Business Park") located on the corner of Williamsburg Parkway and New Frontier Way (near Western Boulevard Extension), within the city limits of Jacksonville, NC. The developer, Ray's Development and Consulting, LLC, wishes to construct a college facility (Miller-Motte) on a 3.20 acre portion of the tract (to be subdivided into a separate lot). The proposed college facility will include a single-story building and associated parking, sidewalks & dumpster pad. Future development in the remaining area of the parcel is expected, but specific plans are as yet unknown; the proposed stormwater treatment facilities have, however, been designed to accommodate "future" BUA for that area. (With the understanding that plan approval & permit revision / modification will be required before any additional development commences). The project site is located in the White Oak River basin, and is currently undeveloped. In general, the site area is flat to gently sloping (0 - 0.4%), and drains to an existing ditch along the northern property boundary and also to the rear(southern boundary) of the tract. A small portion of non-coastal wetlands is located to the south - outside the 3.20 acre area of currently proposed development. Runoff from the site drains ultimately to the southwest into an unnamed tributary of New River (C;NSW) The proposed development activities are high density (percent impervious > 24 %); therefore, stormwater treatment facilities are required. The attached Stormwater Plan includes a wet detention basin located near the northeastern boundary of the site. This pond has been designed to meet the NPDES Phase II Rules and is designed according to current BMP Manual Specifications. Runoff generated from impervious surfaces on site will be diverted to the forebay via sheet drainage, inlets and underground storm drain pipes. (The off-site drainage area includes one-half of the adjacent (existing) road, New Frontier Way.) Treated Stormwater will exit the main pond via the outlet structure and 18" outlet pipe into the existing drainage ditch along that property boundary. RECEIVED MAY 1 7 2011 BY:__ (Page 1 of 5) CP ��4I',_^1� Illlll�nl�llll�lllglll�llll�l�lf�l�ll�lllllll�lfdll�l�l CI 11/ Doc ID: 007088840005 Type: CRP Recorded: 01/05/2009 at 03:01:52 PM (�Cl�' Fee Amt: $26.00 Pape 1 of 5 ( onslov County NC Rebecca L. Pollard Req. of Deeds OK3165 PD678-682 NORTH CAROLINA ONSLOW COUNTY AFFIDAVIT OF DEDICATION NOW COMES the undersigned, City of Jacksonville, and respectfully shows the following: 1. The City of Jacksonville is the owner of certain property located within the City recorded in Book 1415, Page 1001, Onslow County Registry. 2. The City of Jacksonville does hereby dedicate a 15' utility easement running along the northeastern right-of-way line of New Frontier Way to be used for the City of Jacksonville's water system improvements in connection with the property herein referred to. 3. The easement herein dedicated is described in Exhibit"A" attached to this Affidavit and is shown on map entitled "Utility Easement for the City of Jacksonville Water System Improvements" prepared by Joseph T. Chance, P.L.S., on October 7, 2008, said map being attached hereto as Exhibit`B", "C"and"D". CITY Oy JACKSONVILLE By: Ostoff,v. B uer, City Manager SWO14 TO AND eUBSCRIBED before me s,thi day, of 12009. /�. c�. A FOB Notary Public �pYA 'y My Commission Expires: c A�B,�c•�E R�_�IVED 0If'C3�1t1v" MAY 1 7 2011 Book 3165, Paae 678, File Number (Page 2 'of 5) A Utility Easement for the City of Jacksonville (C-02) Beginning at an intersection point of the southeastern right-of-way(RIW) of Williamsburg Parkway (80' IM) with the northeastern R/W of New Frontier Way (60' R/W) from this point of beginning and parallel to the northeastern R/W of New Frontier Way is proposed a 15' utility easement on the property now or formerly in the name of the City of Jacksonville Deed Book 1415 Page 1001; running from said point of beginning in a southerly direction parallel,and adjacent to said New Frontier Way for a distance of 1.690.79' to the point where said property ends along New Frontier Way. ��tCARO b �0 0 s SEAL t 9 L 3886 ' PM 4�sFPH•T•Ckp���.`� Date RECEIVED MAY 1 7 2011 RV. -- Book 3165. Paae 678, File N=bec (Page 3 0: 5) c NOTES: 1. ALL DISTANCES ARE HORIZONTAL GROUND U.S. SURVEY FEET UNLESS OTHERWISE NOTED. 2. THE SOURCE OF TITLE OF THIS PROPERTY IS DEED BOOK 1415, PAGE 1001. ONSLOW COUNTY REGISTRY. 3. THIS SURVEY IS OF ANOTHER CATEGORY, AN UTIUTY EASEMENT SURVEY. 4. PROPERTY LINES SHOWN AS DASHED WERE NOT SURVEYED. S. ALL BEARINGS ARE BASED ON N.C. GRID NAD 83. VICINITY MAP CURVE TABLE CURVE RADIUS LENGTH ANGEN BEARING CHORD DELTA LEGEND C1 640.27 183 90 92.57 N 4'48'35"E 183.29 1 '15'14" A PK NAIL FOUND C4 729.99 591.39 313.01 N19'14'30'W 575.35 6'25'03 IRON PIPE FOUND I MBL MINIMUM BUILDING LINE I •�• / / \ R/V, RIGHT of WAY / Q \ BC BACK o1 CURB O UNMONOtaENTE7 POINT 4 / / / NOW OR FORMERLY \ / .y DAVID M. CHOATE k z A2' HEATHER L. CHOATE \ MB 50, PG 56 / 9 DEED BOOK 2602. PAGE 135 V i \ \ \ NOW ORFORMERLY JACKSONVILLE CITY OF DEED BOOK 1415, PAGE 1001 9` I, JOSEPH T. CHANCE, PLS L-3666, CERTIFY THAT THIS PLAT WAS DRAWN UNDER MY SUPERVISION FROM AN ley \ ACTUAL SURVEY MADE UNDER MY SUPERVISION (DEED \ J• \ DESCRIPPON RECORDED IN BOOK jLW9'PAGEI00/)I \S�• E. THAT BOUNDARIES NOT SURVEYED ARE CLEARLY \ /F' \ V� INDICATED AS DRAWN FROM THE INFORMATION FOUND IN \ t" BOOK PAGE _-_: THAT THAT THE RATIO OF \ \O�� \ PSG PR N AS CALCULATED IS 1:10.000+: THAT THIS \ P T S PREPARED IN ACCORDANCE WITH G.S. 47-30 FO' AM DEO.?A1 Y0IGINALSIGNAUREGIS qi ONANAL THIS 7HE(To .D. 20 P SICNAN - 6 \ `' 0�a44u4n///MIA ,', UTILITY FOR EASEMENT :'pP�HE...0 4/ � THE CITY OF JACKSONVILLE RECEIVED WATER SYSTEM IMPROVEMENTS CITY of JACKSONVILLE - ONSLOW COUNTY - NORTH CAROLINA MAY 1 7 Z011 r L-, 8 ¢_ DATE: OCTOBER 7, 2008 JOB III00348-0012C-02 oseusa!E ��;' NFIQIVIFyCREED SCALE: 1" = 100' BY: xF2807 tGAI:awwan+o 5 4 l TEL(2n)y5yy oo so D 10o zO ook 3165. Paae 678. File Number (Page 4 o: 5) E �,:b, NOTES: �. 1. ALL DISTANCES ARE HORIZONTAL GROUND U.S. SURVEY FEET UNLESS OTHERWISE µ �yNo NOTED. SITE 2. THE SOURCE OF TITLE OF THIS PROPERTY IS DEED BOOK 1415, PAGE 1001. ONSLOW COUNTY REGISTRY. 3. THIS SURVEY IS OF ANOTHER CATEGORY, AN UTILITY EASEMENT SURVEY, 4. PROPERTY LINES SHOWN AS DASHED WERE NOT SURVEYED. 5. ALL BEARINGS ARE BASED ON N.C. GRID NAD 83. VICINITY MAP CURVE TABLE CURVE I RADIUS I LENGTH ANGEN BEARING CHORD DELTA LEGEND C1 648.27 183.90 92.57 N 4'48' S'E 183.29 16'15'14 A PK NAIL FOUND C4 729.99 591.39 313.01 Ni9'14'SO'W 575.35 6'25'03 IRON PIPE FOUND MBL MINIMUM BUILDING LINE R/W RIGHT of WAY BC BACK of CURB UNMONUMENTED POINT f \ � \°99. � O• NOW OR FORMERLY \ \ \ CITY OF JACKSONVILLE •p '\ DEED BOOK 1415, PAGE 1001 P \ I, JOSEPH T. CHANCE. PLS L-3666, CERTIFY THAT THIS PLAT WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPFFRRMSION (DEED DESCRIPTION RECORDED IN BDOK /�[SPAGEA.LL2n; THAT BOUNDARIES NOT SURVEYED ARE CLEARLY ism INDICATED AS DRAWN FROM THE INFORMATION FOUND IN \ `y 800 PAGE THAT THAT THE RATIO OF \ P CISI AS CALCULATED 15 1:10,000+; THAT THIS t `m P AT WA PREPARED IN ACCORDANCE WITH C.S. 47-30 S AMEN ED. WITNESS MY IGINAL SIGNATURRE)� OI TR UM E THI THE �1__ DAY 1 MATCH LINE PflOF N L-3666 1 'I .gyp F��ARO'a� UTILITY EASEMENT .•Qt •........�i,�•. FOR O .••FesBfd' 9�'; THE CITY OF JACKSONVILLE . =;Qo ti•; RECEIVED WATER SYSTEM IMPROVEMENTS gEAL CITY of JACKSONVILLE - ONSLOW COUNTY - NORTH CAROLINA 1..3568 i0� DATE: OCTOBER 7, 2008 JOB p 0034 6-00 1 2C-02 MAY 1 7 2011 �: • '��BUP,E:V��: �,ya`�, 7L,��F7�,ttG��'�pp�C•T1 SOS 'P2'. _Vl1.VrJlvtT/ C7\.•l�C.a+i.J SCALE: 1" = 100' BY:'t►�AA'(Ppts'T�GN� =wm mw. mx 5 _ �°mitt xmM uTa1xF Tew1 100 50 0 100 200 1F>F: axi eu-sre5 •�. • � - Book 3165. Paae 678. File Number (Page 5 of 5) _- f NOTES: 1. ALL DISTANCES ARE HORIZONTAL GROUND U.S. SURVEY FEET UNLESS OTHERWISE w NOTED. fyNxeM�° 2. THE SOURCE OF TITLE OF THIS PROPERTY IS DEED BOOK 1415, PAGE 1001. ONSLOW COUNTY REGISTRY. 3. THIS SURVEY IS OF ANOTHER CATEGORY, AN UTILITY EASEMENT SURVEY. SITE 4. PROPERTY LINES SHOWN AS DASHED WERE NOT SURVEYED. 5. ALL BEARINGS ARE BASED ON N.C. GRID NAO 83. VICINITY MAP CURVE TABLE LEGEND CURVE RADIUS LENGTH TANGEN BEARING CHORD DELTA C7 648.27 183.90 92.57 N34'a8'3 "E 183.29 1615.14" A PK NAIL FOUND C4 729.99 591.39 313.01 NI '14'3 -W 575.35 6'25'O3 • IRON PIPE FOUND MEL MINIMUM BUILDING LINE R/W RIGHT of WAY 8C BACK of CURB UNMONUMENTED POINT Cl 1 I MATCH LINE 1 1 II � I NOW OR FORMERLY CITY OF JACKSONMLLE QI i DEED BOOK 1415, PAGE 1001 15.0' 1, JOSEPH T. CHANCE. PLS L-3666, CERTIFY THAT THIS PLAT WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MYP�FBV�SION (DEED I� DESCRIPTION RECORDED IN BOOK F PAG6/QT,L); _ THAT BOUNDARIES NOS SURVEYID RE CLEARLY I N 89.29'14" E 651.04' INDI AS DRAWN FROM THE INFORMATION FOUND IN BO _ PAGE THAT MAT THE RATIO OF PR a I 'AS CALCULATED IS 1:10.000+; THAT THIS P T W PREPARED IN ACCORDANCE WITH G.S. 47-30 I f AM CEO. WITNESS MY 0 N GNAIIIRE R GIS (IV S TH THE��DAY 0 2 PR E L-366fi CARTfp , UTILITYFOR EASEMENT 0Q ,. ssio ti9 THE CITY OF JACKSONVILLE RECEIVED . 2;Qo 4".. WATER SYSTEM IMPROVEMENTS MAY 1 7 2011 Q -4. ~<: _ CITY of JACKSONVILLE - ONSLOW COUNTY - NORTH CAROLINA p SEAL DATE: OCTOBER 7, 2008 JOB M 00348-OOIZC-02 v L-3l66 6 2 0 � � WOysufk � SCALE: 1" = 100' BY: bF *q � GLpp� PHY.G`k w" 2W7 IJ9 Mo. win 5 xL n. 10D 50 0 100 2me fT21 ao-aew 00 Book 3165. Paae 676. File Number Simplified Routing Procedure Project: ITract 1 Jacksoniville Business Park- 10 Year Storm Date: 13/31/2011 1 Increment F fl minutes (Must be < 10 minutes) Orifice Weir Pump Total Total Time Time Inflow(cfs) Inflow Stored Volume Stage Water Surface Outflow Outflow Outflow Outflow Outflow min days cfs (cfj c(cf) jft) Elevation cfs) (cfs) (cfs) (cfs cfcf 0 0.0 0.00 0.00 0 0.00 42.50 0.00 0.00 0.00 0.00 0 1 0.0 0.44 26.35 26 0.00 42.50 0.01 0.00 0.00 0.01 0 2 0.0 1.71 102.89 129 0.02 , 42.52 0.01 0.00 0.00 0.01 1 3 0.0 3.71 222.39 350 0.04 42.54 0.02 0.00 0.00 0.02 1 4 0.0 6.23 373.53 723 0.08 42.58 0.03 0.00 0.00 0.03 2 5 0.0 9.03 542.02 1263 0.13 42.63 0.04 0.00 0.00 0.04 2 6 0.0 11.86 711.90 1972 0.20 42.70 0.05 0.00 0.00 0.05 3 7 0.0 14.45 867.09 2837 0.28 42.78 0.06 0.00 0.00 0.06 3 8 0.0 16.55 992.92 3826 0.36 42.86 0.06 0.00 0.00 0.06 4 9 0.0 17.96 1077.47 4900 0.45 42.95 0.07 0.00 0.00 0.07 4 10 0.0 18.55 1112.74 6009 0.54 43.04 0.08 0.00 0.00 0.08 5 11 0.0 18.26 1095.39 7099 0.63 43.13 0.08 0.00 0.00 0.08 5 12 0.0 17.12 1027.07 8121 0.71 43.21 0.09 0.00 0.00 0.09 5 13 0.0 15.28 916.89 9033 0.78 43.28 0.09 0.00 0.00 0.09 6 14 0.0 13.45 806.84 9834 0.84 43.34 0.10 0.00 0.00 0.10 6 15 0.0 11.83 710.00 10539 0.89 43.39 0.10 0.00 0.00 0.10 6 16 0.0 10.41 624.78 11157 0.94 43.44 0.10 0.00 0.00 0.10 6 17 0.0 9.16 549.80 11701 0.98 43.48 0.10 0.00 0.00 0.10 6 18 0.0 8.06 483.81 12179 1.01 43.51 0.11 0.00 0.00 0.11 6 19 0.0 7.10 425.74 12598 1.05 43.55 0.11 0.00 0.00 0.11 6 < 20 0.0 6.24 374.64 12966 1.07 43.57 0.11 0.00 0.00 0.11 7 ' 21 0.0 5.49 329.68 13289 1.10 43.60 0.11 0.00 0.00 0.11 7 22 0.0 4.84 290.11 13573 1.12 43.62 0.11 0.00 0.00 0.11 7 N C 23 0.0 4.25 255.29 13822 1.14 43.64 0.11 0.00 0.00 0.11 7 o M 24 0.0 3.74 224.65 14039 1.15 43.65 0.11 0.00 0.00 0.11 7 25 0.0 3.29 197.68 14230 1.17 43.67 0.11 0.00 0.00 0.11 7 J 26 0.0 2.90 173.96 14398 1.18 43.68 0.11 0.00 0.00 0.11 7 27 0.0 2.55 153.08 14544 1.19 43.69 0.11 0.00 0.00 0.11 7 28 0.0 2.25 134.71 14672 1.20 43.70 0.11 0.00 0.00 0.11 7 29 0.0 1.98 118.54 14783 1.21 43.71 0.12 0.00 0.00 0.12 7 30 0.0 1.74 104.31 14881 1.21 43.71 0.12 0.00 0.00 0.12 7 31 0.0 1.53 91.79 14966 1.22 43.72 0.12 0.00 0.00 0.12 7 32 0.0 1.35 80.77 15039 1.23 43.73 0.12 0.00 0.00 0.12 7 33 0.0 1.18 71.08 15103 1.23 43.73 0.12 0.00 0.00 0.12 7 34 0.0 1.04 62.55 15159 1.23 43.73 0.12 0.00 0.00 0.12 7 35 0.0 0.92 55.04 15207 1.24 43.74 0.12 0.00 0.00 0.12 7 36 0.0 0.81 48.43 15248 1.24 43.74 0.12 0.00 0.00 0.12 7 37 0.0 0.71 42.62 15284 1.24 43.74 0.12 0.00 0.00 0.12 7 38 0.0 0.63 37.51 15315 1.25 43.75 0.12 0.00 0.00 0.12 7 39 0.0 0.55 33.00 15341 1.25 43.75 0.12 0.00 0.00 0.12 7 40 0.0 0.48 29.04 15363 1.25 43.75 0.12 0.00 0.00 0.12 7 41 0.0 0.43 25.56 15381 1.25 43.75 0.12 0.00 0.00 0.12 7 42 0.0 0.37 22.49 15396 1.25 43.75 0.12 0.00 0.00 0.12 7 43 0.0 0.33 19.79 15409 1.25 43.75 0.12 0.00 0.00 0.12 7 44 0.0 0.29 17.42 15419 1.25 43.75 0.12 0.00 0.00 0.12 7 45 0.0 0.26 15.32 15428 1.25 43.75 0.12 0.00 0.00 0.12 7 46 0.0 0.22 13.49 15434 1.25 43.75 0.12 0.00 0.00 0.12 7 47 0.0 0.20 11.87 15438 1.25 43.75 0.12 0.00 0.00 0.12 7 48 0.0 0.17 10.44 15442 1.25 43.75 0.12 0.00 0.00 0.12 7 49 0.0 0.15 9.19 15444 1.25 43.75 0.12 0.00 0.00 0.12 7 50 0.0 0.13 8.09 15444 1.25 43.75 0.12 0.00 0.00 0.12 7 51 0.0 0.12 7.12 15444 1.25 43.75 0.12 0.00 0.00 0.12 7 52 0.0 0.10 6.26 15443 1.25 43.75 0.12 0.00 0.00 0.12 7 53 0.0 0.09 5.51 15441 1.25 43.75 0.12 0.00 0.00 0.12 7 54 0.0 0.08 4.85 15439 1.25 43.75 0.12 0.00 0.00 0.12 7 55 0.0 0.07 4.27 15436 1.25 43.75 0.12 0.00 0.00 0.12 7 56 0.0 0.06 3.75 15432 1.25. 43.75 0.12 0.00 0.00 0.12 7 57 0.0 0.06 3.30 15428 1.25 43.75 0.12 0.00 0.00 0.12 7 58 0.0 0.05 2.91 15424 1.25 43.75 0.12 0.00 0.00 0.12 7 59 0.0 0.04 2.56 15419 1.25 43.75 0.12 0.00 0.00 0.12 7 Dc 60 0.0 0.04 2.25 15414 1.25 43.75 0.12 0.00 0.00 0.12 7 M 61 0.0 0.03 1.98 15409 1.25 43.75 0.12 0.00 0.00 0.12 7 1H, 62 0.0 0.03 1.74 15404 1.25 43.75 0.12 0.00 0.00 0.12 7 No C 63 0.0 0.03 1.53 15398 1.25 43.75 0.12 0.00 0.00 0.12 7 64 0.0 0.02 1.35 15393 1.25 43.75 0.12 0.00 0.00 0.12 7 65 0.0 0.02 1.19 15387 1.25 43.75 0.12 0.00 0.00 0.12 7 66 0.0 0.02 1.05 15381 1.25 43.75 0.12 0.00 0.00 0.12 7 67 0.0 0.02 0.92 15375 1.25 43.75 0.12 0.00 0.00 0.12 7 68 0.0 0.01 0.81 15368 1.25 43.75 0.12 0.00 0.00 0.12 7 69 0.0 0.01 0.71 15362 1.25 43.75 0.12 0.00 0.00 0.12 7 70 0.0 0.01 0.63 15356 1.25 43.75 0.12 0.00 0.00 0.12 7 71 0.0 0.01 0.55 15349 1.25 43.75 0.12 0.00 0.00 0.12 7 72 0.1 0.01 0.49 15343 1.25 43.75 0.12 0.00 0.00 0.12 7 73 0.1 0.01 0.43 15336 1.25 43.75 0.12 0.00 0.00 0.12 7 74 0.1 0.01 0.38 15329 1.25 43.75 0.12 0.00 0.00 0.12 7 75 0.1 0.01 0.33 15323 1.25 43.75 0.12 0.00 0.00 0.12 7 76 0.1 0.00 0.29 15316 1.25 43.75 0.12 0.00 0.00 0.12 7 77 0.1 0.00 0.26 15309 1.25 43.75 0.12 0.00 0.00 0.12 7 78 0.1 0.00 0.23 15302 1.24 43.74 0.12 &00 0.00 0.12 7 79 0.1 0.00 0.20 15295 1.24 43.74 0.12 0.00 0.00 0.12 7 80 0.1 0.00 0.17 15289 1.24 43.74 0.12 0.00 0.00 0.12 7 81 0.1 0.00 0.15 15282 1.24 43.74 0.12 0.00 0.00 0.12 7 82 0.1 0.00 0.14 15275 1.24 43.74 0.12 0.00 0.00 0.12 7 83 0.1 0.00 0.12 15268 1.24 43.74 0.12 0.00 0.00 0.12 7 84 0.1 0.00 0.10 15261 1.24 43.74 0.12 0.00 0.00 0.12 7 85 0.1 0.00 0.09 15254 1.24 43.74 0.12 0.00 0.00 0.12 7 86 0.1 0.00 0.08 15247 1.24 43.74 0.12 0.00 0.00 0.12 7 87 0.1 0.00 0.07 15240 1.24 43.74 0.12 0.00 0.00 0.12 7 88 0.1 0.00 0.06 15233 1.24 43.74 0.12 0.00 0.00 0.12 7 89 0.1 0.00 0.06 15226 1.24 43.74 0.12 0.00 0.00 0.12 7 90 0.1 0.00 0.05 15219 1.24 43.74 0.12 0.00 0.00 0.12 7 91 0.1 0.00 0.04 15212 1.24 43.74 0.12 0.00 0.00 0.12 7 92 0.1 0.00 0.04 15205 1.24 43.74 0.12 0.00 0.00 0.12 7 93 0.1 0.00 0.03 15198 1.24 43.74 0.12 0.00 0.00 0.12 7 aL' 94 0.1 0.00 0.03 15191 1.24 43.74 0.12 0.00 0.00 0.12 7 95 0.1 0.00 0.03 15184 1.24 43.74 0.12 0.00 0.00 0.12 7 (� 96 0.1 0.00 0.02 15177 1.24 43.74 0.12 0.00 0.00 0.12 7 !" 97 0.1 0.00 0.02 15170 1.24 43.74 0.12 0.00 0.00 0.12 7 -� 98 0.1 0.00 0.02 15163 1.23 43.73 0.12 0.00 0.00 0.12 7 o M 99 0.1 0.00 0.02 15157 1.23 43.73 0.12 0.00 0.00 0.12 7 "q 100 0.1 0.00 0.01 15150 1.23 43.73 0.12 0.00 0.00 0.12 7 V 101 0.1 0.00 0.01 15143 1.23 43.73 0.12 0.00 0.00 0.12 7 102 0.1 0.00 0.01 15136 1.23 43.73 0.12 0.00 0.00 0.12 7 103 0.1 0.00 0.01 15129 1.23 43.73 0.12 0.00 0.00 0.12 7 104 0.1 0.00 0.01 15122 1.23 43.73 0.12 0.00 0.00 0.12 7 105 0.1 0.00 0.01 15115 1.23 43.73 0.12 0.00 0.00 0.12 7 106 0.1 0.00 0.01 15108 1.23 43.73 0.12 0.00 0.00 0.12 7 107 0.1 0.00 0.01 15101 1.23 43.73 0.12 0.00 0.00 0.12 7 108 0.1 0.00 0.00 15094 1.23 43.73 0.12 0.00 0.00 0.12 7 109 0.1 0.00 0.00 15087 1.23 43.73 0.12 0.00 0.00 0.12 7 110 0.1 0.00 0.00 15080 1.23 43.73 0.12 0.00 0.00 0.12 7 111 0.1 0.00 0.00 15073 1.23 43.73 0.12 0.00 0.00 0.12 7 112 0.1 0.00 0.00 15066 1.23 43.73 0.12 0.00 0.00 0.12 7 113 0.1 0.00 0.00 15059 1.23 43.73 0.12 0.00 0.00 0.12 7 114 0.1 0.00 0.00 15052 1.23 43.73 0.12 0.00 0.00 0.12 7 115 0.1 0.00 0.00 15045 1.23 43.73 0.12 0.00 0.00 0.12 7 116 0.1 0.00 0.00 15038 1.23 43.73 0.12 0.00 0.00 0.12 7 117 0.1 0.00 0.00 15031 1.22 43.72 0.12 0.00 0.00 0.12 7 118 0.1 0.00 0.00 15024 1.22 43.72 0.12 0.00 0.00 0.12 7 119 0.1 0.00 0.00 15017 1.22 43.72 0.12 0.00 0.00 0.12 7 120 0.1 0.00 0.00 15010 1.22 43.72 0.12 0.00 0.00 0.12 7 i r+ M N V Inflow Hydrograph C= 0.8 Length W'shed= 850 (Using Malcolm Step Function) I = 1 7.161 in/hr Height W'shed= 1 51 A= 1 3.241 ac Qpeak 18.6 cfs tc= 10 tp = 10 minutes Time Flow(Q) (min) (cfs) 0 0.00 1 0.44 2 1.71 3 3.71 4 6.23 5 9.03 6 11.86 7 14.45 8 16.55 9 17.96 10 18.55 11 18.26 12 17.12 13 15.28 14 13.45 15 11.83 16 10.41 17 9.16 18 8.06 19 7.10 20 6.24 21 5.49 22 4.84 23 4.25 24 3.74 25 3.29 26 2.90 27 2.55 28 2.25 29 1.98 30 1.74 31 1.53 32 1.35 33 1.18 34 1.04 35 0.92 36 0.81 37 0.71 38 0.63 39 0.55 40 0.48 41 0.43 RECEIVED MAY 1. 7 2011 BY:-� _ 42 0.37 43 0.33 44 0.29 45 0.26 46 0.22 47 0.20 48 0.17 49 0.15 50 0.13 51 0.12 52 0.10 53 0.09 54 0.08 55 0.07 56 0.06 57 0.06 58 0.05 59 0.04 60 0.04 61 0.03 62 0.03 63 0.03 64 0.02 65 0.02 66 0.02 67 0.02 68 0.01 69 0.01 70 0.01 71 0.01 72 0.01 73 0.01 74 0.01 75 0.01 76 0.00 77 0.00 78 0.00 79 0.00 80 0.00 81 0.00 82 0.00 83 0.00 84 0.00 85 0.00 86 0.00 87 0.00 88 0.00 89 0.00 90 0.00 91 0.00 92 0.00 93 0.00 RECEIVED MAY 1 7 2011 BY: 94 0.00 95 0.00 96 0.00 97 0.00 98 0.00 99 0.00 100 0.00 101 0.00 102 0.00 103 0.00 104 0.00 105 0.00 106 0.00 107 0.00 108 0.00 109 0.00 110 0.00 111 0.00 112 0.00 113 0.00 114 0.00 115 0.00 116 0.00 117 0.00 118 0.00 119 0.00 120 0.00 RECEIVED MAY 1. 7 2011 BY: Accum Z Volume Staqe In S In Z Zest Comment 0 0 Contour at Normal Pond (wet pond) or Basin Bott( 5575 0.5 8.626048 -0.693147 0.503881 18533 1.5 9.827308 0.405465 1.477558 33090 2.5 10.40699 0.916291 2.483154 49315.5 3.5 10.80599 1.252763 3.549709 67279 4.5 11.1166 1.504077 4.688143 87050.5 5.5 11.37424 1.704748 5.904824 Contour at Berm Top b = 1.116615 Ks = 11984.77 Regression Analysis Y Data Range Regression Analysis X Data Range SUMMARY OUTPUT Regression Statistics Multiple R 0.999877 R Square 0.999755 Adjusted R 0.999632 Standard E 0.018205 Observatio 4 ANOVA df SS MS F ignificance F Regressior 1 2.704336 2.704335667 8159.589 0.000123 Residual 2 0.000663 0.00033143 Total 3 2.704999 Coefficients!andard Ern t Stat P-value Lower 95%Upper 95% Intercept 9.391392 0,010801 869.4928064 1.32E-06 9.344919 9.437865 X Variable 1.116615 0.012361 90.33044328 0.000123 1.063428 1.169802 R-P,CEIVED MAY 1 7 2011 BY: )m (infiltration) .ower 95.0°rlpper 95.0 9.344919 9.437865 1.063428 1.169802 R--F- 'IVED MAY 1 7 2011 iiBY._---- Outlet Device 1 (Orifice) Diameter of Orifice = Cd = 1 0.61 Cross Sectional Area= 0.021806 sf g = 32.2 ft/sec2 Stage Head Q feet feet cfs 0.00 0.00 0.00 0.01 0.00 0.00 0.02 0.00 0.00 0.03 0.00 0.00 0.04 0.00 0.00 0.05 0.00 0.00 0.06 0.00 0.00 0.07 0.00 0.00 0.08 0.00 0.00 0.09 0.01 0.01 0.10 0.02 0.01 0.11 0.03 0.02 0.12 0.04 0.02 0.13 0.05 0.02 0.14 0.06 0.02 0.15 0.07 0.03 0.16 0.08 0.03 0.17 0.09 0.03 0.18 0.10 0.03 0.19 0.11 0.03 0.20 0.12 0.04 0.21 0.13 0.04 0.22 0.14 0.04 0.23 0.15 0.04 0.24 0.16 0.04 0.25 0.17 0.04 0.26 0.18 0.04 z�"FCEIVED MAY 1 7 2011 I sY:_--- Outlet Device 2 (Weir) Weir Length = r- --4�feet Cw= I 31 Use 3.33 for Sharp, 3.00 for Broad or Free Weir Elevations = I 43.751feet Stage Head Q feet feet cfs 0.00 -1.25 0.00 0.01 -1.24 0.00 0.02 -1.23 0.00 0.03 -1.22 0.00 0.04 -1.21 0.00 0.05 -1.20 0.00 0.06 -1.19 0.00 0.07 -1.18 0.00 0.08 -1.17 0.00 0.09 -1.16 0.00 0.10 -1.15 0.00 0.11 -1.14 0.00 0.12 -1.13 0.00 0.13 -1.12 0.00 0.14 -1.11 0.00 0.15 -1.10 0.00 0.16 -1.09 0.00 0.17 -1.08 0.00 0.18 -1.07 0.00 0.19 -1.06 0.00 0.20 -1.05 0.00 0.21 -1.04 0.00 0.22 -1.03 0.00 0.23 -1.02 0.00 0.24 -1.01 0.00 0.25 -1.00 0.00 0.26 -0.99 0.00 0.27 -0.98 0.00 0.28 -0.97 0.00 0.29 -0.96 0.00 0.30 -0.95 0.00 0.31 -0.94 0.00 0.32 -0.93 0.00 0.33 -0.92 0.00 ?ter FIVEID MAY 1 7 2011 13Y:------ 0.34 -0.91 0.00 0.35 -0.90 0.00 0.36 -0.89 0.00 0.37 -0.88 0.00 0.38 -0.87 0.00 0.39 -0.86 0.00 0.40 -0.85 0.00 0.41 -0.84 0.00 RECEIVED MAY 1 9 2011 I BY: Outlet Device 3 (Pump) Pump Rate= Igpm Pump On Elevation Ina feet Pumping Rate 0 cfs . . EIVED MAY 1 7 2011 jB-Y: 20.00 18.00 16.00 14.00 �. 12.00 —Inflow 3 10.00 —Outflow 8.00 -- 6.00 4.00 - 2.00 0.00777 f,I I I 1 1 I I I I I I I 1 111111111111 I 111111111111 1111 1 11 1 1 11 21 31 41 51 61 71 81 91 101 111 121 Time (minutes) CEIVED MAY 1 7 2011 BY:�_ Simplified Routing Procedure Project: ITract 1 Jacksoniville Business Park- 100 Year Storm Date: 1 3/31/2011 1 Increment ( -------1lminutes (Must be < 10minutes) Orifice Weir Pump Total Total Time Time Inflow(cfs) Inflow Stored Volume Stage Water Surface Outflow Outflow Outflow Outflow Outflow min da s cfs (cif ccf u Elevation cfs) (cfs) (cfs) (cfs LC 0 0.0 0.00 0.00 0 0.00 42.50 0.00 0.00 0.00 0.00 0 1 0.0 0.58 34.96 35 0.01 42.51 0.01 0.00 0.00 0.01 0 2 0.0 2.28 136.52 171 0.02 42.52 0.02 0.00 0.00 0.02 1 3 0.0 4.92 295.07 465 0.05 42.55 0.02 0.00 0.00 0.02 1 4 0.0 8.26 495.61 959 0.10 42.60 0.03 0.00 0.00 0.03 2 5 0.0 11.99 719.16 1676 0.17 42.67 0.04 0.00 0.00 0.04 3 6 0.0 15.74 944.55 2618 0.26 42.76 0.05 0.00 0.00 0.05 3 7 0.0 19.17 1150.47 3766 0.35 42.85 0.06 0.00 0.00 0.06 4 8 0.0 21.96 1317.42 5079 0.46 42.96 0.07 0.00 0.00 0.07 4 9 0.0 23.83 1429.61 6505 0.58 43.08 0.08 0.00 0.00 0.08 5 10 0.0 24.61 1476.40 7976 0.69 43.19 0.09 0.00 0.00 0.09 5 11 0.0 24.22 1453.39 9424 0.81 43.31 0.09 0.00 0.00 0.09 6 12 0.0 22.71 1362.73 10781 0.91 43.41 0.10 0.00 0.00 0.10 6 13 0.0 20.28 1216.54 11992 1.00 43.50 0.11 0.00 0.00 0.11 6 14 0.0 17.84 1070.53 13056 1.08 43.58 0.11 0.00 0.00 0.11 7 15 0.0 15.70 942.04 13992 1.15 43.65 0.11 0.00 0.00 0.11 7 16 0.0 13.82 828.97 14814 1.21 43.71 0.12 0.00 0.00 0.12 7 17 0.0 12.16 729.48 15536 1.26 43.76 0.12 0.02 0.00 0.13 8 18 0.0 10.70 641.92 16170 1.31 43.81 0.12 0.17 0.00 0.29 17 19 0.0 9.41 564.88 16718 1.35 43.85 0.12 0.36 0.00 0.49 29 20 0.0 8.28 497.08 17186 1.38 43.88 0.12 0.57 0.00 0.69 42 21 0.0 7.29 437.42 17582 1.41 43.91 0.12 0.76 0.00 0.89 53 22 0.0 6.42 384.92 17913 1.43 43.93 0.13 0.94 0.00 1.07 64 23 0.0 5.65 338.72 18188 1.45 43.95 0.13 1.10 0.00 1.22 73 24 0.0 4.97 298.07 18413 1.47 43.97 0.13 1.23 0.00 1.36 81 25 0.0 4.37 262.29 18594 1.48 43.98 0.13 1.34 0.00 1.47 88 26 0.0 3.85 230.81 18736 1.49 43.99 0.13 1.43 0.00 1.56 93 REGEI 1-D MAY 1 7 2011 BY: 27 0.0 3.39 203.11 18846 1.50 44.00 0.13 1.50 0.00 1.63 98 28 0.0 2.98 178.73 18927 1.51 44.01 0.13 1.55 0.00 1.68 101 29 0.0 2.62 157.28 18984 1.51 44.01 0.13 1.59 0.00 1.72 103 30 0.0 2.31 138.40 19019 1.51 44.01 0.13 1.61 0.00 1.74 104 31 0.0 2.03 121.79 19036 1.51 44.01 0.13 1.62 0.00 1.75 105 32 0.0 1.79 107.17 19038 1.51 44.01 0.13 1.62 0.00 1.75 105 33 0.0 1.57 94.31 19028 1.51 44.01 0.13 1.62 0.00 1.75 105 34 0.0 1.38 82.99 19006 1.51 44.01 0.13 1.60 0.00 1.73 104 35 0.0 1.22 73.03 18975 1.51 44.01 0.13 1.58 0.00 1.71 103 36 0.0 1.07 64.26 18937 1.51 44.01 0.13 1.56 0.00 1.69 101 37 0.0 0.94 56.55 18892 1.50 44.00 0.13 1.53 0.00 1.66 99 38 0.0 0.83 49.76 18842 1.50 44.00 0.13 1.50 0.00 1.63 98 39 0.0 0.73 43.79 18789 1.50 44.00 0.13 1.46 0.00 1.59 95 40 0.0 0.64 38.53 18732 1.49 43.99 0.13 1.43 0.00 1.55 93 41 0.0 0.57 33.91 18672 1.49 43.99 0.13 1.39 0.00 1.52 91 42 0.0 0.50 29.84 18611 1.48 43.98 0.13 1.35 0.00 1.48 89 43 0.0 0.44 26.26 18549 1.48 43.98 0.13 1.31 0.00 1.44 86 44 0.0 0.39 23.11 18485 1.47 43.97 0.13 1.27 0.00 1.40 84 45 0.0 0.34 20.33 18422 1.47 43.97 0.13 1.23 0.00 1.36 82 46 0.0 0.30 17.89 18358 1.47 43.97 0.13 1.20 0.00 1.32 79 47 0.0 0.26 15.75 18294 1.46 43.96 0.13 1.16 0.00 1.29 77 48 0.0 0.23 13.86 18231 1.46 43.96 0.13 1.12 0.00 1.25 75 49 0.0 0.20 12.19 18168 1.45 43.95 0.13 1.09 0.00 1.21 73 50 0.0 0.18 10.73 18106 1.45 43.95 0.13 1.05 0.00 1.18 71 51 0.0 0.16 9.44 18045 1.44 43.94 0.13 1.01 0.00 1.14 68 52 0.0 0.14 8.31 17985 1.44 43.94 0.13 0.98 0.00 1.11 66 53 0.0 0.12 7.31 17926 1.43 43.93 0.13 0.95 0.00 1.07 64 54 0.0 0.11 6.43 17868 1.43 43.93 0.13 0.92 0.00 1.04 63 55 0.0 0.09 5.66 17811 1.43 43.93 0.13 0.89 0.00 1.01 61 56 0.0 0.08 4.98 17755 1.42 43.92 0.13 0.86 0.00 0.98 59 57 0.0 0.07 4.38 17701 1.42 43.92 0.13 0.83 0.00 0.95 57 58 0.0 0.06 3.86 17648 1.41 43.91 0.12 0.80 0.00 0.92 55 59 0.0 0.06 3.39 17596 1.41 43.91 0.12 0.77 0.00 0.90 54 60 0.0 0.05 2.99 17545 1.41 43.91 0.12 0.75 0.00 0.87 52 61 0.0 0.04 2.63 17495 1.40 43.90 0.12 0.72 0.00 0.84 51 62 0.0 0.04 2.31 17447 1.40 43.90 0.12 0.70 0.00 0.82 49 63 0.0 0.03 2.04 17400 1.40 43.90 0.12 0.67 0.00 0.80 48 RECEIVED MAY 1 7 2011 BY: 64 0.0 0.03 1.79 17354 1.39 43.89 0.12 0.65 0.00 0.77 46 65 0.0 0.03 1.58 17309 1.39 43.89 0.12 0.63 0.00 0.75 45 66 0.0 0.02 1.39 17265 1.39 43.89 0.12 0.61 0.00 0.73 44 67 0.0 0.02 1.22 17223 1.38 43.88 0.12 0.59 0.00 0.71 43 68 0.0 0.02 1.07 17181 1.38 43.88 0.12 0.57 0.00 0.69 41 69 0.0 0.02 0.95 17141 1.38 43.88 0.12 0.55 0.00 0.67 40 70 0.0 0.01 0.83 17101 1.37 43.87 0.12 0.53 0.00 0.65 39 71 0.0 0.01 0.73 17063 1.37 43.87 0.12 0.51 0.00 0.64 38 72 0.1 0.01 0.64 17025 1.37 43.87 0.12 0.50 0.00 0.62 37 73 0.1 0.01 0.57 16989 1.37 43.87 0.12 0.48 0.00 0.60 36 74 0.1 0.01 0.50 16953 1.36 43.86 0.12 0.46 0.00 0.59 35 75 0.1 0.01 0.44 16919 1.36 43.86 0.12 0.45 0.00 0.57 34 76 0.1 0.01 0.39 16885 1.36 43.86 0.12 0.43 0.00 0.56 33 77 0.1 0.01 0.34 16852 1.36 43.86 0.12 0.42 0.00 0.54 33 78 0.1 0.00 0.30 16819 1.35 43.85 0.12 0.41 0.00 0.53 32 79 0.1 0.00 0.26 16788 1.35 43.85 0.12 0.39 0.00 0.51 31 80 0.1 0.00 0.23 16757 1.35 43.85 0.12 0.38 0.00 0.50 30 81 0.1 0.00 0.20 16727 1.35 43.85 0.12 0.37 0.00 0.49 29 82 0.1 0.00 0.18 16698 1.35 43.85 0.12 0.36 0.00 0.48 29 83 0.1 0.00 0.16 16670 1.34 43.84 0.12 0.34 0.00 0.47 28 84 0.1 0.00 0.14 16642 1.34 43.84 0.12 0.33 0.00 0.46 27 85 0.1 0.00 0.12 16615 1.34 43.84 0.12 0.32 0.00 0.44 27 86 0.1 0.00 0.11 16588 1.34 43.84 0.12 0.31 0.00 0.43 26 87 0.1 0.00 0.09 16562 1.34 43.84 0.12 0.30 0.00 0.42 25 88 0.1 0.00 0.08 16537 1.33 43.83 0.12 0.29 0.00 0.41 25 89 0.1 0.00 0.07 16512 1.33 43.83 0.12 0.28 0.00 0.41 24 90 0.1 0.00 0.06 16488 1.33 43.83 0.12 0.27 0.00 0.40 24 91 0.1 0.00 0.06 16464 1.33 43.83 0.12 0.27 0.00 0.39 23 92 0.1 0.00 0.05 16441 1.33 43.83 0.12 0.26 0.00 0.38 23 93 0.1 0.00 0.04 16418 1.33 43.83 0.12 0.25 0.00 0.37 22 94 0.1 0.00 0.04 16396 1.32 43.82 0.12 0.24 0.00 0.36 22 95 0.1 0.00 0.03 16374 1.32 43.82 0.12 0.23 0.00 0.35 21 96 0.1 0.00 0.03 16353 1.32 43.82 0.12 0.23 0.00 0.35 21 97 0.1 0.00 0.03 16332 1.32 43.82 0.12 0.22 0.00 0.34 20 98 0.1 0.00 0.02 16312 1.32 43.82 0.12 0.21 0.00 0.33 20 99 0.1 0.00 0.02 16292 1.32 43.82 0.12 0.21 0.00 0.33 20 100 0.1 0.00 0.02 16272 1.32 43.82 0.12 0.20 0.00 0.32 19 RECEIVED MAY 1 7 2011 BY:- 101 0.1 0.00 0.02 16253 1.31 43.81 0.12 0.19 0.00 0.31 19 102 0.1 0.00 0.01 16234 1.31 43.81 0.12 0.19 0.00 0.31 18 103 0.1 0.00 0.01 16216 1.31 43.81 0.12 0.18 &00 0.30 18 104 0.1 0.00 0.01 16198 1.31 43.81 0.12 0.17 0.00 0.30 18 105 0.1 0.00 0.01 16180 1.31 43.81 0.12 0.17 0.00 0.29 17 106 0.1 0.00 0.01 16163 1.31 43.81 0.12 0.16 0.00 0.28 17 107 0.1 0.00 0.01 16146 1.31 43.81 0.12 0.16 0.00 0.28 17 108 0.1 0.00 0.01 16129 1.30 43.80 0.12 0.15 0.00 0.27 16 109 0.1 0.00 0.01 16113 1.30 43.80 0.12 0.15 0.00 0.27 16 110 0.1 0.00 0.00 16097 1.30 43.80 0.12 0.14 0.00 0.26 16 111 0.1 0.00 0.00 16081 1.30 43.80 0.12 0.14 0.00 0.26 16 112 0.1 0.00 0.00 16065 1.30 43.80 0.12 0.13 0.00 0.25 15 113 0.1 0.00 0.00 16050 1.30 43.80 0.12 0.13 0.00 0.25 15 114 0.1 0.00 0.00 16035 1.30 43.80 0.12 0.13 0.00 0.25 15 115 0.1 0.00 0.00 16020 1.30 43.80 0.12 0.12 0.00 0.24 14 116 0.1 0.00 0.00 16006 1.30 43.80 0.12 0.12 0.00 0.24 14 117 0.1 0.00 0.00 15992 1.29 43.79 0.12 0.11 0.00 0.23 14 118 0.1 0.00 0.00 15978 1.29 43.79 0.12 0.11 0.00 0.23 14 119 0.1 0.00 0.00 15964 1.29 43.79 0.12 0.11 0.00 0.23 14 120 0.1 0.00 0.00 15950 1.29 43.79 0.12 0.10 0.00 0.22 13 RECEIVED MAY 1 7 2011 BY: Inflow Hydrograph C= 0.8 Length W'shed= 850 (Using Malcolm Step Function) I = 1 9.51 in/hr Height W'shed= 1 51 A= 1 3.241 ac Qpeak 24.6 cfs tc= 10 tp= 10 minutes Time Flow(Q) (min) (cfs) 0 0.00 1 0.58 2 2.28 3 4.92 4 8.26 5 11.99 6 15.74 7 19.17 8 21.96 9 23.83 10 24.61 11 24.22 12 22.71 13 20.28 14 17.84 15 15.70 16 13.82 17 12.16 18 10.70 19 9.41 20 8.28 21 7.29 22 6.42 23 5.65 24 4.97 25 4.37 26 3.85 27 3.39 28 2.98 29 2.62 30 2.31 31 2.03 32 1.79 33 1.57 34 1.38 35 1.22 36 1.07 37 0.94 38 0.83 39 0.73 40 0.64 41 0.57 IFCEIVED MAY 1 7 Z011 IQY: 42 0.50 43 0.44 44 0.39 45 0.34 46 0.30 47 0.26 48 0.23 49 0.20 50 0.18 51 0.16 52 0.14 53 0.12 54 0.11 55 0.09 56 0.08 57 0.07 58 0.06 59 0.06 60 0.05 61 0.04 62 0.04 63 0.03 64 0.03 65 0.03 66 0.02 67 0.02 68 0.02 69 0.02 70 0.01 71 0.01 72 0.01 73 0.01 74 0.01 75 0.01 76 0.01 77 0.01 78 0.00 79 0.00 80 0.00 81 0.00 82 0.00 83 0.00 84 0.00 85 0.00 86 0.00 87 0.00 88 0.00 89 0.00 90 0.00 91 0.00 92 0.00 93 0.00 ���=IVED MAY 1 7 2011 94 0.00 95 0.00 96 0.00 97 0.00 98 0.00 99 0.00 100 0.00 101 0.00 102 0.00 103 0.00 104 0.00 105 0.00 106 0.00 107 0.00 108 0.00 109 0.00 110 0.00 111 0.00 112 0.00 113 0.00 114 0.00 115 0.00 116 0.00 117 0.00 118 0.00 119 0.00 120 0.00 �7 CEIVED I MAY 1 7 2011 IB Y: Accum Z Volume Stage In S In Z Zest Comment 0 0 Contour at Normal Pond (wet pond) or Basin Bott< 5575 0.5 8.626048 -0.693147 0.503881 18533 1.5 9.827308 0.405465 1.477558 33090 2.5 10.40699 0.916291 2.483154 49315.5 3.5 10.80599 1.252763 3.549709 67279 4.5 11.1166 1.504077 4.688143 87050.5 5.5 11.37424 1.704748 5.904824 Contour at Berm Top b = 1.116615 Ks = 11984.77 Regression Analysis Y Data Range Regression Analysis X Data Range SUMMARY OUTPUT Regression Statistics Multiple R 0.999877 R Square 0.999755 Adjusted R 0.999632 Standard E 0.018205 Observatio 4 ANOVA df SS MS F ignificance F Regressior 1 2.704336 2.704335667 8159.589 0.000123 Residual 2 0.000663 0.00033143 Total 3 2.704999 Coefficients andard Ern t Stat P-value Lower 95%Upper 95% Intercept 9.391392 0.010801 869.4928064 1.32E-06 9.344919 9.437865 X Variable 1.116615 0.012361 90.33044328 0.000123 1.063428 1.169802 C"FCEIVEID MAY 1 7 2011 13v. )m (infiltration) .ower 95.01pper 95.0 9.344919 9.437865 1.063428 1.169802 ED MAY 1 .7 Z011 Outlet Device 1 (Orifice) Diameter of Orifice in Cd = 0.61 Cross Sectional Area = 0.021806 sf g = 32.2 ft/sec2 Stage Head O ffegil feet cfs 0.00 0.00 0.00 0.01 0.00 0.00 0.02 0.00 0.00 0.03 0.00 0.00 0.04 0.00 0.00 0.05 0.00 0.00 0.06 0.00 0.00 0.07 0.00 0.00 0.08 0.00 0.00 0.09 0.01 0.01 0.10 0.02 0.01 0.11 0.03 0.02 0.12 0.04 0.02 0.13 0.05 0.02 0.14 0.06 0.02 0.15 0.07 0.03 0.16 0.08 0.03 0.17 0.09 0.03 0.18 0.10 0.03 0.19 0.11 0.03 0.20 0.12 0.04 0.21 0.13 0.04 0.22 0.14 0.04 0.23 0.15 0.04 0.24 0.16 0.04 0.25 0.17 0.04 0.26 0.18 0.04 '" DIVED MAY 7 2011 J 1 . Outlet Device 2 (Weir) Weir Length = feet Cw= 1 31 Use 3.33 for Sharp, 3,00 for Broad or Free Weir Elevations = I 43.751feet Stage Head Q feet feet cfs 0.00 -1.25 0.00 0.01 -1.24 0.00 0.02 -1.23 0.00 0.03 -1.22 0.00 0.04 -1.21 0.00 0.05 -1.20 0.00 0.06 -1.19 0.00 0.07 -1.18 0.00 0.08 -1.17 0.00 0.09 -1.16 0.00 0.10 -1.15 0.00 0.11 -1.14 0.00 0.12 -1.13 0.00 0.13 -1.12 0.00 0.14 -1.11 0.00 0.15 -1.10 0.00 0.16 -1.09 0.00 0.17 -1.08 0.00 0.18 -1.07 0.00 0.19 -1.06 0.00 0.20 -1.05 0.00 0.21 -1.04 0.00 0.22 -1.03 0.00 0.23 -1.02 0.00 0.24 -1.01 0.00 0.25 -1.00 0.00 0.26 -0.99 0.00 0.27 -0.98 0.00 0.28 -0.97 0.00 0.29 -0.96 0.00 0.30 -0.95 0.00 0.31 -0.94 0.00 0.32 -0.93 0.00 0.33 -0.92 0.00 EIVED MAY 1 7 Z011 0.34 -0.91 0.00 0.35 -0.90 0.00 0.36 -0.89 0.00 0.37 -0.88 0.00 0.38 -0.87 0.00 0.39 -0.86 0.00 0.40 -0.85 0.00 0.41 -0.84 0.00 ZT;.CEIVED MAY 1 7 2011 Outlet Device 3 (Pump) Pump Rate= 0 gpm Pump On Elevation Ilna Ilfeet Pumping Rate 0 cfs MAY 1 7 2011 I 30.00 25.00 20.00 — N —Inflow 3 15.00 —Outflow 10.00 5.00 0.00 1 11 21 31 41 51 61 71 81 91 101 111 121 Time (minutes) RECEIVED MAY 1 7 2011 BY: ' 5�t.6 (ti', 44-R I For DENR Use ONLY Reviewer. �-J_ f , � RIM North Carolina Department of Environment and sebmn: 5'1'7 R �A 1� V I Natural Resources NC®ENR Request for Express Permit Review Time r comim,, FILL-IN all the information below and CHECK the Permit(s)you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative,site plan IPDF file)and vicinity map(same items expected in the application package of the project location.Please include this form in the application package. • Asheville Region-Alison Davidson 828.296-4698;alison.davidson(a. Enter Related SW enr.gov Permits of request • Fayetteville or Raleigh Region-David Lee 919-791-4203;david.lee(aDnccienrctov • Mooresville&-Patrick Grogan 704-663.3772 or patrick.rtrogan(olncdenr.gov SW • Washington Region-Lyn Hardison 252-946.9215 or Ivn.hardison(a)ncdenr.gov SW • Wilmington Region-Janet Russell 910-350.2004 or janet.russell gnncdenr.gov SW NOTE:Project application received after 12 noon will be stamped in the following work day. SW Project Name:MILLER MOTTE COLLEGE FACILITY County:ONSLOW Applicant:CLIFFORD JAMES RAY,MGR.Company:RAY DEVELOPMENT AND CONSULTING,LLC Address:310 BRETONSHIRE ROAD City:WILMINGTON,State:NC Zip:28405-_ Phone:910-547-9344, Fax:__ Email:cliff@ravdeveloomentcom Physical Location:105 NEW FRONTIER WAY-JACKSONVILLE,NC 28540 Project Drains into C waters—Water classification NSW(for classification see-hffp:Hh2o.enr.state.nc.us/bims/reports/reportsWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters?N,within Y.mile and draining to class SA waters N or within 1 mile and draining to class HOW waters?N Engineer/Consultant:DAVID K NEWSOM Company:CRYSTAL COAST ENGINEERING,PA Address:3817-3 FREEDOM WAY City:HUBERT,State:NC Zip:28539-_ REC7:7VED Phone:910-325-0006,Fax:910-325-0060,Email:crvstalcoasteng@bizec.rroom SECTION ONE: REQUESTING A SCOPING MEETING ONLY MAY 2 2 011 ❑ Scoping Meeting ONLY ®DWO,❑DCM, ❑DLR,❑OTHER:_ BY: SECTION TWO: CHECK ONLY THE PROGRAM (S)YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑401 Unit ❑Stream Or gin Determination:_#of stream calls—Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination:_#of stream calls—Please attach TOPO map marking the areas in questions ❑401 Water Quality Certification ❑ Isolated Wetland(_linear It or_acres) ❑Riparian Buffer Authorization ❑Minor Variance ❑Major General Variance ®State Stormwater ❑General ❑SFR, ❑SFR< 1 ac. ❑Bkhd&Bt Rmp, ❑ Clear&Grub, ❑Utility ❑Other ❑ Low Density ❑Low Density-Curb&Gutter.—#Curb Outlet Swales ❑Off-site[SW (Provide permit#)J ® High Density-Detention Pond _#Treatment Systems' ElHigh Density-Infiltration _#Treatment Systems ElHigh Density-Bio-Retention _#Treatment Systems El High Density—SW Wetlands _#Treatment Systems El High Density-Other _#Treatment Systems /❑MOD:❑Major❑Minor❑Plan Revision❑ Redev.Exclusion SW (Provide permits) ❑Coastal Management ❑ Excavation&Fill ❑Bridges&Culverts ❑Structures Information ❑Upland Development ❑Marina Development ❑Urban Waterfront ❑Land Quality ❑Erosion and Sedimentation Control Plan with_acres to be disturbed.(CK# (for DENR use)) SECTION THREE—PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT(for both scoping and express meeting request) Wetlands on Site®Yes❑ No Buffer Impacts:®No❑YES: —acre(s) Wetlands Delineation has been completed:®Yes❑ No Isolated wetland on Property❑Yes®No US ACOE Approval of Delineation completed: ®Yes❑No 404 Application in Process wl US ACOE: ❑Yes ❑ No Permit Received from US ACOE❑Yes❑No For DIiNR use only Fees lit for multiplepermits: Checkll Total Fee Amount $ SUBMITTAL DATES Fee I I SUBMITTAL DATES Fee CAMA1 $ 1 Variance(❑Maj;❑Min) $ SW(❑HD,❑LD,❑Gen) $ Los $ Stream Deter,_ $ � r o yz-r- 1 r Srile or 1c)e„�- l -vscC/ t NCDENR EXPRESS March 2009 l O^O J prr—\— R b O rA J ft_►'1 a t✓i r ,1,C-"cD r\U Page I of I Stormwater Treatment Narrative Miller-Motte College Facility The City of Jacksonville owns a 6.45 acre tract ("Tract 1 Jacksonville Business Park") located on the corner of Williamsburg Parkway and New Frontier Way (near Western Boulevard Extension), within the city limits of Jacksonville, NC. The developer, Ray's Development and Consulting, LLC, wishes to construct a college facility (Miller-Motte) on a 3.20 acre portion of the tract (to be subdivided into a separate lot). The proposed college facility will include a single-story building and associated parking, sidewalks & dumpster pad. Future development in the remaining area of the parcel is expected, but specific plans are as yet unknown; the proposed stormwater treatment facilities have, however, been designed to accommodate "future" BUA for that area. (With the understanding that plan approval & permit revision / modification will be required before any additional development commences). The project site is located in the White Oak River basin, and is currently undeveloped. In general, the site area is flat to gently sloping (0- 0.4%), and drains to an existing ditch along the northern property boundary and also to the rear(southern boundary) of the tract. A small portion of non-coastal wetlands is located to the south - outside the 3.20 acre area of currently proposed development. Runoff from the site drains ultimately to the southwest into an unnamed tributary of New River (C;NSW) The proposed development activities are high density (percent impervious > 24 %); therefore, stormwater treatment facilities are required. The attached Stormwater Plan includes a wet detention basin located near the northeastern boundary of the site. This pond has been designed to meet the NPDES Phase II Rules and is designed according to current BMP Manual Specifications. Runoff generated from impervious surfaces on site will be diverted to the forebay via sheet drainage, inlets and underground storm. drain pipes. Treated S4ormwater will exit the main pond via the outlet structure and 18" outlet pipe into the existing drainage ditch along that property boundary. FW - Co �U,' I � ys oWso,el fi .r an Milier-Motte '�.. i ce 36 r. y s- — I I Sch1pn ""4 21 Magnetic Declination '-+ 5-1 '%Sob Sue- 1k I s•w �. I Name:JACKSONVILLE NORTH Location: NAD 27 Sate: 5/12/2011 MAY 1 7 2011 Scale: 1 inch equals 2000 feet 2005,Maptech,Inc. ■ 1 ., 11 1 11 11 1 11 11 1 11 11 1 1 11 11 now LN � NO _ 1-00 JI �a6 rE Al0115iV �•" RO 2-al All MEN No 4w 'A �w in .ram �� c �:: � ► ,1 ��' VAS _ 1 11 1I . II II 1 11 .. , - 1 iiq�gpgi I'll m2i � , 51 A 9 yl 1 rl Y1I1 I s✓ stal Coast Englnening,P.A. 1 W fm'Irp,nn01 famlP.p P�.v, �+�rm DMIIL Xawsn.OE twM���..eM��V-®V�nmw— . Fa+