Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8061216_CURRENT PERMIT_20230421
STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 ylg\21�n DOC TYPE © CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE Zo23 04 Z► YYYYMMDD I i �.. srnrr-o w n ROY COOPER = Governor - ELIZABETH,S.BISER Secretary DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality April 21, 2023 CF Sports Medicine, LLC Attn:Dale Boyd Jr.,Manager 6019 Oleander Drive, Suite 200 Wilmington,NC 28403 Subject: Permit Correction and Renewal Post-Construction Stormwater Management Permit No. SW8061216 Cape Fear Sports Medicine New Hanover County Dear Mr. Boyd: Effective August 1, 2013 the Post-Construction Stormwater Management Program has been transferred from the Division of Water Quality("DWQ")to the Division of Energy, Mineral and Land Resources("DEMLR"). All previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit. On August 5,2009, the Governor signed Session Law 2009-406. This law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current and valid at any point between January 1,2008, and December 31,2010. The law extended the effective period of any permit that was set to expire during this time frame to three (3)years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177,which granted an extra year for a total of four(4)years extension. Correction: The Wilmington Regional Office issued the subject permit on June 8, 2007 and recently discovered it contained an error. This permit correction is necessary to correct the permit ownership from Cape Fear Sports Medicine, P.A.to CF Sports Medicine, LLC. Please replace the previously issued permit with the enclosed correct permit. Renewal: The Division of Energy,Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on April 17, 2023. The Division is hereby notifying you that permit SW8061216 has been renewed, updated, and re-issued on April 21,20023,as attached. As requested, a copy of the current operation and maintenance agreement is also enclosed. Please be aware that the renewal and re-issuance of this stortriwater permit does not imply that the site is currently in compliance. This permit shall be effective until June 8,2029,which includes all available extensions, and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements,or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings(OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty(30)days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee(if a filing fee is required)and/or the details of the filing process at 6714 Mail Service Center, Raleigh,NC 27699-6714,or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. �Dg North Carolina Department of Environmental Quality I Division of Energy,Mineral and land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington,North Carolina 28405 910.796.7215 State Stormwater Permit No. SW8061216 Page 2 of 2 If you have any questions concerning this permit, please contact Aisia Freeman in the Wilmington Regional Office, at phone #(910) 796-7318 or Aisia.freeman@ncdenr.gov. Sincerely, Cnay �Xat Douglas R. Ansel, Interim Director Division of Energy, Mineral and Land Resources Enclosures: Attachment A—Designer's Certification Form Attachment C—Permitting History Copy of the Renewal Application Documents Copy of the current operation and maintenance agreement DES/af: %Stormwater\Permits&Projects\2006\061216 HD\2023 04 permit 061216 cc: Wilmington Regional Office Stormwater File ®��, North Carolina Department of Environmental Quality I Division of Energy.bfineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington.North Carolina 28405 910.796.7215 Post construction Stormwater Management Permit No. SW8061216 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST-CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO CF Sports Medicine, LLC Cape Fear Sports Medicine 6019 Oleander Drive, Wilmington, New Hanover County FOR THE construction, operation and maintenance of an underground infiltration trench in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or"DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until June 8, 2029 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission, however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 2 of this permit. The stormwater control has been designed to handle the runoff from 38,175 square feet of impervious area. The infiltration trench must be operated with a 30 foot vegetated filter. 3. The tract will be limited to the amount of built-upon area indicated on page 2 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 1 of 5 Post construction Stormwater Management Permit No. SW8061216 5. The runoff from all built-upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The following design criteria have been provided in the infiltration trench and must be maintained at design condition: a. Drainage Area, acres: 1.10 Onsite, ft2: 47,877 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 38,175 C. Design Storm, inches: 1 d. Trench Bottom Surface Area, ft2: 4,100 e. Perforated Pipe Diameter/Length: 15"/ 1,638 (ADS N-12 H-25) f. Bottom Elevation, FMSL: 19.5 g. Bypass Weir Elevation, FMSL: 21.49 h. Permitted Storage Volume, ft3: 4,171 i. Type of Soil: Leon j. Expected Infiltration Rate, in/hr: 6 k. Seasonal High Water Table, FMSL: 17.5 I. Time to Draw Down, hours: <3 M. Receiving Stream/River Basin: Bradley Creek/CPF24 n. Stream Index Number: 18-87-24-4-(1) o. Classification of Water Body: "SC HQW#" It. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, filter media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of the division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 6. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 2 of 5 Post construction Stormwater Management Permit No. SW8061216 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 10, No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. III. GENERAL CONDITIONS 1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on-site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. Page 3 of 5 Post construction Stormwater Management Permit No. SW8061216 a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased, ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved, iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, except in the case of an individual residential lot sale that is made subject to the recorded deed restrictions and protective covenants; V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on-site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. c. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local. State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Page 4 of 5 Post construction Stormwater Management Permit No. SW8061216 Permit renewed, updated and reissued this the 215'day of April 2023. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION CAS Douglas R. Ansel, Interim Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Post construction Stormwater Management Permit No. SW8061216 Attachment A Cape Fear Sports Medicine Stormwater Permit No. SW8 061216 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature Registration Number Date Page 1 of 2 Post construction Stormwater Management Permit No. SW8061216 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built-upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure elevations are per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DEMLR Regional Office Page 2 of 2 Attachment C-Permitting History Cape Fear Sports Medicine Permit No.SW8 061216 Approval permit Action BIMS Description of the Changes Modified Plan Sheets Date Version High Density Project-construction,operation and maintenance of an underground infiltration trench in compliance with the provisions of 15A NCAC 214.1000,The 6/82007 Original Approval 1.0 stormwater control has been designed to handle the runoff from 3$175 square Feet of C-I-S,C-9-I0 impervious area.The infiltration trench must be operated with a 30 foot vegetated filter. 'this permit correction is necessary to correct the permit ownership from Cape Fear Renewal/ Sports Medicine,P.A.to CF Sports Medicine,LLC. Please replace the previously 4/21/2023 Correction 2.0 issued permit with the enclosed correct permit. This permit shall be effective until June 8,2029 Page 1 of 1 Perm it No. 56'JS OCv/Zl(P (to be provided by DWQ) State ol'North Carolina Department of Environment and Natural Resources Division of Water Quality STORM WATER MANAGEMENT PERMIT APPLICATION FORM UNDERGROUND INI-ILTRATION 'fRENCH SUPPLEMENT This frnrrn may be photo copied fin- use as an original DWQ Stormwater Mana,ement Plan Review: A complete storinwater management plan submittal includes a Stormwater management permit application, an underground infiltration trench supplement for each system, design calculations, and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name: Cane Fear SpQas Medicine Contact Pcrsow Garry S. Papc. P.E. Phone Number: (910) 256-9277 For projects with multiple infiltration systems, a supplement form must be completed for each system. This worksheet applies to: Trench I in Drainage Area I (from plans) (from Form SWU-101) 11. DESIGN INFORMATION (attach supporting calculations/documentation): Soils Report Summary (based upon an actual field investigation and.coil borings) Soil Type Leon Infiltration Rate 5.9 in/h or et%hr/sf(circle appropriate units) SH WT Elevation 17.5 finsl (Seasonal 1-ligh Water'fable elevation) Trench Design Parameters Design Volume 3,060 c.f. Design Storm 1.0 inch event (1.5-inch vent for SA waters, I inch for others) Drawdown Time 0.11 days Perforated Pipe Size 15" inch diameter Perforated Pipe Length 1638 ft. No. Observation Wells N/A (may be required on a case-by-case basis) Stone Type(if used) #57 Washed Stone Stone Void Ratio 40 % Trench Elevations (in feet mean sea level) Bottom Elevation 19.5 fins[ Storage/Overflow Elevation 21.49 fmsl PorinSWU-107 R60.99 Page I of Ttreuch Dimensions Height �5• ft. Length *4-2— ft surfa�e*ea Width �i4-2 4��x� ft. Volume Provided 4rF97 171 cu. ft. III. REQUIRED ITEMS CHECKLIST - The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 21-1.1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attachjustification if a requirement has not been met. Applicants Initials �a. System is located 50 feet firom class SA waters and 30 feet from other surface waters. �n4b. System is located at least 100 feet from water supply wells. c. Bottom of system is at least 2 feet above the seasonal high water table. vs-Qd. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. e. Off-line system, runoff in excess of the design volume bypasses the system (bypass detail provided) IZA f. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days based upon infiltration through the bottom only(a phydrogeologic evaluation may be required). )`g. Soils have a minimum hydraulic conductivity of 0.52 inches per hour. � It. System is not sited on or in fill material or DWQ approval has been obtained. �i. Plans ensure that the installed system will meet design specifications(constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. System is sized to take into account the runoff at the ultimate built-out potential from all surfaces draining to the system, including any off-site drainage. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. 1. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters). in. Drainage area for the device is less than 5 acres. n. A pretreatment device (filter strip, grassed swale, sediment trap, etc.) is provided. We. Trench bottom is covered with a layer of clean sand to an average depth of 4 inches. ForinSWU-107 R60.99 Page 2 of p. Sides ofthe infiltration trench are lined with geotextile fabric. q. Rock used is free of fines (washed stone) and has a large void ratio. b}�r. Side to bottom area ratio is less than 4: I. As. Observation well(s) are provided (case-by-case basis). t. Vegetated filter is provided for overflow (50 feet for SA waters, 30 feet for other waters) and detail is shown on plans. u. A benchmark for checking sediment accumulation is provided. IV. UNDERGROUND INFILTRATION TRENCH OPERATION AND MAINTENANCE AGREEMENT I . After every runoff producing rainfall event and at least monthly inspect the bypass/overflow structure for blockage and deterioration and the infiltration system for erosion, trash accumulation, grass cover, and general condition. 2. Repair eroded areas immediately, re-seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash and blockages as needed to maintain system performance. 3. Remove accumulated sediment annually or when depth is reduced to 75%of the original design depth. Restore depth to original design depth without over-excavating. Over-excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. 4. The water level in any monitoring wells will be recorded after a I-inch rainfall event and at least once a month. Chronic high water table elevations (within I foot of the bottom of the system for a period of three months) shall be reported to DWQ immediately. 5. II'DWQ determines that the system is failing, the system will immediately be repaired or replaced to original design specifications. I f the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 21-1.1000 must be designed, approved and constructed. 6. Remove accumulated sediment from the infiltration system annually or when depth in the unit is reduced to 75%ofthe original design depth. The system shall be restored to the original design depth without over-excavating. Over-excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the infiltration system. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. Each drop inlet structure has a sump that sits one foot below the infiltration system. When the depth of the structures reaches 0.90 feet the accumulated sediment shall be removed from the system. ForinSWU-107 R6v3.99 Page 3 of I acknowledge and agree by my signature below that I am responsible for maintaining the stormwater collection system in accordance with the six maintenance procedures listed above. I agree to notify D WQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: Dr. Dale Boyd, Owner Address: 5710 Oleander Drive, Suite 108, Wilmington,NC 28403 Phone: 910-790-9 4 Date: Signature: Note: The legally responsible party should not be ar homeou,neia associalion unless more than 50'%of the dots have been sold and a resident of the subdivision has been named the president. I, P1 Ce G ran , a Notary Public for the State of 'h�i COunty of K)elI-)J4Wode ' do hereby certify that l dJe- ,J personally appeared before me this ILI day of and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, ;Al My commission expires I Ilrch J r�y 9 REBECCA A. GREEN NOTARY PUBLIC NEW HANOVER COUNTY,N.C. My Commission Expires 3-3-2009 FOrinSWU-107 R6v3.99 Page 4 of CAPE FEAR SPORTS MEDICINE OPERATION AND MAINTENANCE AGREEMENT FOR PERMEABLE PAVEMENT Per Table 3.10-1 of the NCDWQ Policy on Use of Permeable Pavement Systems I. Initial inspection to be performed monthly for 3 months after installation 2. Ensure that permeable pavement surface is free of sediment to be performed monthly. 3. Ensure that the contributing and adjacent area is stabilized and mowed, with clippings removed to be performed as needed, based on inspection. 4. Vacuum sweep permeable pavement surface to be performed annually. 5. Inspect the surface for deterioration to be performed annually. 6. Verify that the permeable pavement system dewaters between storms to be performed annually. 7. Not Applicable. 8. Substantial repairs of permeable pavements must be performed with permeable material to be performed as needed, based on inspection. 9. Material in green spaces to be inspected periodically to insure that the material is not being compacted and the water is continually infiltrating. This material will need to be loosened and replaced as needed. RECEIVED MAR 19 2007 DWQ PROJ# I acknowledge and agree by my signature below that 1 am responsible for the performance of the eight maintenance procedures listed above. print name: Dr. Dale Boyd Title: Owner Address: 5710 Oleander Drive, Suite 108, Wilmington, NC 28403 phone: 910-790-9714 Date: Signature: 11 gehPptf� �eIn a Notary public for the State of �bdhdaroIinA County of NP il 4A-mV2✓ do hereby certify that -Ew�e- 1b14Gl personally appeared before me this 3p day of NDyernb-,l and acknowledge the due execution of the forgoing permeable pavement maintenance requirements. Witness my hand and official seal, I±LNEWHANOVER REEN LIC NTY,N.C. 3-3-2009 SEAL My commission expires Ay� 3� e9 20 � � DEMLR USE ONLY Date R ceiv d Fee Paid Permit Number 7 a� Soy — lil 2/ NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 21-1.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION ' 1. State Stormwater Permit Number: � 2. Project name: 3. Project street address: (0 0 1 C?I P 0.r)lcy City: t ry County: Gt -e ZIP : J�Lctp3 4. What, if any, changes haveiieen made to the project as permitted? In D n e If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at:https://deg.nc.gov/about/divisions/energy- m i neral-land-resources/energv-min era l-land-rules/stormwater-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at:https://deg.nc.gov/about/divisions/energv-mineral-land- resources/energv-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holders Company Name/Organization: ( { J�poYtS I"sPrP i UY�k, LLC 2. Signing Official's Name: -0 a(e G�,60( ,I r' 3. Signing Official's Title: Ow h Py- 4. Mailing Address: f I (�bl ll r'I PGn�Y PY A City: W" I mo4 State: ,nl_zip : 2-JL /Df 5. Street Address, I SI 'Z 2 iG,4 n City: ! 1 rn� JUn /1 /�, � KL/C) State: ZIP : 6. Phone (,3 iI 'Email: 1721d I S)Z 60 Ma I •CT; r2023 Y'---_— I\ Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office(Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non-Coastal HQW/ORIM. Only applications packages that include all required items listed below will be accepted and reviewed. ti Initial each item below to indicate that the required information is provided in the application package: 1. A permit application processing fee of$505.00 payable to NCDEQ. • _ 2. One original signed hard copy and one electronic copy of this completed form.: The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation—a principle executive officer of at least the level of vice-president; b. Limited Liability Company(LLC)—a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity—a principal executive officer, ranking official, or other duly authorized employee; d.,Partnership or limited partnership—the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a—e above authorizing the signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, , condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA_has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. O&M Agreements, Please select one: ❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or -- `- ❑d I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ❑ A copy of the certification(s)confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s)confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. /'�, r _V. l rf- Ieflt, ',{, . v(:L;L � 6. [IF APPLICABLE] If the project has been built;one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the'permit. ' '. 1 7. [IF APPLICABLE]When the permittee is a corporation of a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation,which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). httl)s://www.sosnc.gov/online services/search/by title/ Business Registration . r Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION I, _T� (e (uoetW?hI Jh• , the person legally responsible for the permit, certify that I have a copy of the Permit an O&M Agreement on site(or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built-upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is,to the best of my knowledge, correct and complet Signature: ""v Date: I �14� 2,01 NOTARIZATION: I, h yl CFu Itt�/��7 a Notary Public for the State of L County of /i/Ck- 'do hereby certify that personally appeared before me this the /4/•/-A day of 4/L 20-2 3 , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, G. VICTOR ALLEN (Notary Seal) Notary Public North Carolina New Hanover County Notary Signature: ( ' _ My commission expires d o� APR 11 2023 Storrnwater Permit Renewal Application Form Page 3 of 3 May 11. 2018