Loading...
HomeMy WebLinkAboutSW8061115_CURRENT PERMIT_20231101 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 DOC TYPE Eg CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD • tR SLA4 MY COOPER s Govemor 'v�, ELIZABETH S.BISEP Secretary WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality November 1,2023 McDonald's Real Estate Company Attn:Angela Steele, US Vice President, US General Counsel and Secretary c/o Padraic Molloy, Senior Counsel Atten: Legal Dept. 110 N.Carpenter Street Chicago, 1160607 Subject: Permit Renewal Post-Construction Stormwater Management Permit No. SW8 061115 McDonald's Market Street New Hanover County Dear Mr. Molloy: Effective August 1, 2013 the Post-Construction Stormwater Management Program has been transferred from the Division of Water Quality("DWQ")to the Division of Energy, Mineral and Land Resources("DEMLR"). All previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current and valid at any point between January 1,2008, and December 31, 2010. The law extended the effective period of any permit that was set to expire during this time frame to three (3)years from its current expiration date. On August 2, 2010,the Governor signed Session Law 2010-177,which granted an extra year for a total of four(4)years extension. The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on September 29,2023. The Division is hereby notifying you that permit S W80611 15 has been renewed, updated, and re-issued on November 1, 2023, as attached. A copy of the current operation and maintenance agreement is also enclosed. Please be aware that the renewal and re-issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until October 22,2029,which includes all available extensions; and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings(OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30)days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee(if a filing fee is required)and/or the details of the filing process at 6714 Mail Service Center, Raleigh,NC 27699-6714,or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources E Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington,North Carolina 28405 noam rsnaxa r �a �\ s 910,796.7215 ♦ State Stormwater Permit No. SW8 061115 Page 2 of 2 If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional Office, at(910) 796-7215 or ashleym.smith@deq.nc.gov. Sincerely, C :WIR 9;;William E. Toby Vinson, Jr., PE, CPM, Interim Director Division of Energy, Mineral and Land Resources Enclosures: Attachment A—Designer's Certification Form Attachment C—Permitting History copy of the Renewal Application Documents Copy of the current operation and maintenance agreement DES/ams: \\\Stormwater\Permits&Projects\2006\061115 HD\2023 11 permit 061115 Cc: McDonalds USA,LLC;Jami Hayes,Real Estate Portfolio Supervisor;644 Holly Springs Road 4420; Holly Springs,NC 27540 Wilmington Regional Office Stotmwater File �, North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources _ �'-'JjJg Wilmington Regional Office 1 127 Cardinal Drive Extension I \'vlhnington.North Carolina 28405 �� .�® 910.796.7215 Post-Construction Stormwater Management Permit No. SW8 061115 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST-CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO McDonald's Real Estate Company McDonald's, Wilmington, NC Market Street at Princess Place Drive, Wilmington, New Hanover County FOR THE construction, operation and maintenance of an infiltration basin in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or"DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until October 22, 2029 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 2 of this permit. The stormwater control has been designed to handle the runoff from 43,914 square feet of impervious area. 3. The tract will be limited to the amount of built-upon area indicated on page 2 of this permit, and per approved plans. There is no allotment for future built-upon area at the site. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built-upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 1 of 5 Post-Construction Stormwater Management Permit No. SW8 061115 6. The following design criteria have been provided in the infiltration basin and must be maintained at design conditions: a. Drainage Area, acres: 1.39 Onsite, ft2: 60,459 Offsite, ft2: None b. Total Impervious Surfaces, ft2. 43,914 Onsite Buildings, ft2: 6,358 Onsite Parking, ft2: 35,621 Onsite Sidewalks, ft2: 1,935 C. Design Storm, inches: 1.0 d. Basin Depth, feet: 3.5 e. Bottom Elevation, FMSL: 39.5 f. Bottom Surface Area, ft2: 1,243 g. Bypass Weir Elevation, FMSL: Not Required (2X volume provided & very high infiltration rate) h. Permitted Storage Volume, ft3: 7,157 i. Type of Soil: Sand J. Expected Infiltration Rate, in/hr: 16.6 k. Seasonal High Water Table, FMSL: 37.5 I. Time to Draw Down, hours: 6.1 M. Receiving Stream/River Basin: Smith Creek/ Cape Fear n. Stream Index Number: 18-74-63 o. Classification of Water Body: "C. Sw" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of the outlet structure, infiltration media, flow spreader, catch basins, concrete flumes, and piping. g. A clear access path to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. Page 2 of 5 Post-Construction Stormwater Management Permit No. SW8 061115 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 10. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. III. GENERAL CONDITIONS 1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on-site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. Page 3 of 5 Post-Construction Stormwater Management Permit No. SW8 061115 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on-site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. c. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. Page 4 of 5 Post-Construction Stormwater Management Permit No. SW8 061115 f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit renewed, updated and reissued this the 1st day of November 2023. NORTH CAAROLyIN(AENVIRONMENTAL MANAGEMENT COMMISSION William E. Toby Vinson, Jr., PE, CPM, Interim.Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 061115 Page 5 of 5 Post-Construction Stormwater Management Permit No. SW8 061115 Attachment A Page 1 of 2 McDonald's, Wilmington, NC Stormwater Permit No. SW8 061115 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature Registration Number Date Page 1 of 2 Post-Construction Stormwater Management Permit No. SW8 061115 Page 2 of 2 McDonald's, Wilmington, NC Stormwater Permit No. SW8 061115 New Hanover County Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built- upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. N/A 5. The bypass structure weir elevation is per the approved plan. N/A 6. The bypass structure is located per the approved plans. N/A 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDEQ-DEMLR Wilmington Regional Office New Hanover County Building Inspections Page 2 of 2 Attachment C-Permitting History McDonald's Market Street Permit No.SW8061115 Approval Perm it Action VersionBS Description of the Changes Modified Plan Sheets Original High Density Project-construction,operation and maintenance of an infiltration basin in compliance with I/17/2007 Approval 1.0 the provisions of 15A NCAC 2H.1000.The storrrmwater control has been designed to handle the runoff from 43,533 square feet of impervious area. High Density Project-construction,operation and maintenance of an infiltration basin in compliance with the provisions of 15A NCAC 2H.1000.The stormwater control has been designed to handle the runoff from 42,910 square fect of impervious area.This permit modification revises Permit No.SW8 061115, issued January 17,2007 as follows: (.Reduces permitted built-upon area from 43,533 to 42,910 square feet; Major LRevises permitted stormwater conveyancepiping and infiltration basin configurations to protect 3/12007 Modification 1A the existing 42-inchlive oak at the southeastern corner ofthe basin; 3.Reduces permitted infiltration basin volume at the 42 ft storage elevation from 7,046 to 7,007 eu 6 and reduces the permitted basin bottom surface area at the 39.5-ft elevation from 1,223 to 1,030 sq ; 4.increases basin depth from 3.0 Off to 3.5 ft by increasing the basin top elevation from 42.5 to 43.0 4 and S.Revises the permit expiration date to March 1,2017. High Density Project-construction,operation and maintenance of an infiltration basin in compliance with the provisions of 15A NCAC 2H.1000.The stormwater control has been designed to handle the runoff Gam 43,914 square feet of impervious area.This permit modification revises Permit:vo.SOW 061115, Major issued:North 1,2007 as follows: I0222007 Modification 12 /.Increases permitted built-upon areafrom 42,910 to 43,914squarefeett C-14,C-6-7,C-11 2.lncreases permitted infiltration basin volume at the 42-ft storage elevation from 7,007 cu ft to 7.157,and increases the permitted basin bottom surface area at the 39.5 ft elevation from 1,030 to 1,243 sq ft;and 3.Revises the permit expiration date to October 22,1017. 11/10023 Renewal 20 Expiration Date:October 22,2029 Page 1 of 1 DEMLR USE ONLY ,o Date Received Fee Paid Permit Number 2"l z 5 0 505 S 8 o�o�ttS NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398(SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8061115 2. Project name: McDonald's Market Street 3. Project street address: 4301 Market Street City: Wilmington County: New Hanover ZIP : 28403 4. What, if any, changes have been made to the project as permitted? None If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at., https:Hdeg.nc.gov/about/divisions/energy- mineral-land-resourceslenergv-mineral-land-ru Ies/stormwater-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/enerqv-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: McDonald's Real Estate Company 2. Signing Official's Name: Padraic G. Molloy 3. Signing Official's Title: Senior Counsel 4. Mailing Address: 110 N. Carpenter Street, Attn: Legal Dew City: Chicago State: IL ZIP : 60607 5. Street Address: Same City: State: ZIP : _ 6. Phone: (630)62341247 Email: pad raic.molloy(a)us.mcd.com ECEIVE SEP 2 9 2023 ft Stormwater Permit Renewal Form Page 1 of 3 May 11,2018 is C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non-Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: 1. A permit application processing fee of$505.00 payable to NCDEQ. 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation —a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) —a manager or company official as those terms are defined in G.S. 57D"North Carolina Limited Liability Company Act;" c. Public Entity—a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership—the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a—e above authorizing the n signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. O&M Agreements, Please select one: ❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ 1 do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ❑ A copy of the certification(s)confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s)confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. AOL 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE)When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/by title/ Business Registration EGEIVE SEP 2 9 2023 BW Stormwater Permit Renewal Application Form Page 2 of 3 May 11,2018 �l D. PERMITTEE'S CERTIFICATION I, pod rQ ;G 6- M411znA the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agree ent on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built-upon area and tosubmit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, corre,t ad c mplete. Signature: l Date: �''V12��3 Oad ra ;if, 6 . llev, e n%Zfy­ zl�' z eC NOTARIZAT�QN: I, /1 Q4 n a Notary Public for the State of County of do hereby certify �7 that QCL/L1 r( 0, / 1 /I 014 personally appeared before me this the day of S�/LL(L 20135-1 and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) CAROLYN A BRODERSEN OFFICIAL SEAL �,,/'� Notary Public,state of Illinois 0/ ✓C(.L�� \ My Commission Expires J ulY 31,2026 Notary Signature: /, n My commission expires ECEIVE SEP 2 9 2023 BY:------ Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 Permit No.stt/p 06 M 60 (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : McDonald's R 4301 Market Street, Wilmington,NC Contact Person: Leo Van Burren Phone Number: ( 919 ) 876-9716 This worksheet applies to: Basin No. 1 in Drainage Area 1 (as identified on plans) (from Form SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (find). Soils Report Summary Soil Type Sand Infiltration Rate 16.6 in/hr or cf/hr/sf (circle appropriate units) SIfWT Elevation 37.64 fmsl (Seasonal High Water Table elevation) Basin Design Parameters Design Storm 1 inch (1.5 inch eventforSA waters, 1 inch eventforothers) Design Volume 3546 c.f. Drawdown Time <1 days Basin Dimensions Basin Size (irregular) ft. x ft. = 1,243 sq ft. nq EL. 39.5 (bottom dimensions) Basin Volume Provided 7,157 c.f. (Volume provided is 2 times the required design volume) Basin Elevations Bottom Elevation 39.50 fmsl Storage Elevation 42.00 fmsl Top Elevation 43.00 fmsl Form SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form,the agent may initial below. Attach just cation if a requirement has not been met. Applicants Initials BS a. System is located 50 feet from class SA waters and 30 feet from other surface waters. BS b. System is located at least 100 feet from water supply wells. N/A C. Bottom of system is at least 2 feet above the seasonal high water table. BS d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. BS e. System is not sited on or in fill material or DWQ approval has been obtained. N/A f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. BS g. 'Drainage area for the device is less than 5 acres. BS h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. BS i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. BS j. System is sized to take into account the runoff at the ultimate built-out potential from all surfaces draining to the system, including any off-site drainage. Calculations attached. _ BS k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). N/A 1. A pretreatment device such as a catch basin, grease trap, filter strip,-grassed swale or sediment trap is provided. BS m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. BS n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). BS o. Flow distribution mechanism within the basin is provided. N/A p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. N/A q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). BS (Note: Volume provided by basin is 2 times the required design volume; system is an on-line system.) BS r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw-down calculations are attached. BS s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-]03 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion,:.,; trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re-seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 1 .. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over-excavating. Over-excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stonnwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original , design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads— ment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H A000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: McDonald's Real Estate Company Address: 2915 Jorie Blvd. oak Brook TL 60523 Phone: (�630-623-5600"�-� Date: February 23, 2007 Signature:\ a erine- n--vice-President Note: The legally responsible party should'not.b ,alb!omeowners association unless more than 50%of the lots have been sold and a ` resident of the subdivision has been named the president. t, Gwen E. Nakutis_,a Notary Public for the State of 111inois County of DuPaae ,do hereby certify that rarhe�jn, A r:rj fain. vice PFesiient personally appeared before me this 23_:: day of February , 2007 ,and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, S L OFFICIAL SEAL My commission expires 04/18/10 GWEN E NAKLITIS NOTARY PUBLIC-STATE OF ILLINOIS _ MY COMMISSION EXPIRES:04118110 Form SWU-103 Rev 3.99 Page 3 of 3 State Slormwater Management Systems Permit No. SW8 061115 Modification Page 1 of 2 McDonald's, Wilmington, NC Stormwater Permit No. SW8.061115 Modification - October 22, 2007 New Hanover Countv �'• ' i Designer's Certification I, Va1NBI R. $royin as a duly registered PS in the State of North Carolina, having been authorized to observe eriodicall /weekly/ full time) the construction of the project, MCb,0r\4-V510 W11M1,44n, NC SINS 06 (05 (Project) for M(Donalb USA , LLC. (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. , The checklist of items on page 2 of this.form is included in the.Certification. Noted deviations from approved plans and specification: pyan:IF �N c 0 Signature Registration Number 020 SEAL ��•` t . )20400 Date b- ►8- 2sb8eso'; F �°~., ` S,y.;Nc i N ELF.,•�a`,r' 5-CEIVE MAR 13 2023 By:_---- Page 6 of 7 State Stormwater Management Systems Permit No. SW8 0611.15 Modification Page 2,of 2 McDonald's, Wilmington, NC Stormwater Permit No. SW8 061115°Motlificabon`.''F October 22, 2007 New Hanover Count i Certification Requirements: " D(� 1. The drainage area to the system contains approximately,the permitted acreage. D$ 2. The drainage area to the system contains no more than ahe permitted amount of built-upon area. 4Q 3 All the built-upon area associated with the"project is graded such that the runoff drains to the system. " TA4. All roof drains are located such that the runoff,is directed into the'system. N/A 5 The bypass structure wei-elevation is,per the approved plan N/A . 6. The bypass structure is.located per the`ap proved'plans N/A 7. A Trash-Rack"is p'rovided.on`tne b ' ass structure' yP '09 8. All slopes are grassed with permanent vegetation " _DR 9. Vegetated slopes are no steeper than 3:1. Vq 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. t�> 11. The permitted amounts of surface area and/or volume have been"provided. _D12. All required design depths are provided,' 13. All required parts ofthe system are provided 14 The required system dimensions are provided per the approved plans cc: NCDENR-D1NORegionatOffice . •' `. ' " ' .Tony Roberts, New-Hanover:County Building;Inspections - FIAR 13 2023 BY:-------- Page 7 of 7 �' 1 �� � u�w