Loading...
HomeMy WebLinkAboutSW8040733_HISTORICAL FILE_20050404 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 04 D3 3S DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ® HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2oo504OL} YYYYMMDD �0F W ATF- Q Michael F. Easley, Governor �O G William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources O < Alan W. Klimek, P.E. Director Division of Water Quality April 4, 2005 John Koenig 6432 Yadkin Road Fayetteville, NC 28303 Subject: Stormwater Permit No. SW8 040733 Huntington Park at Williamsburg Plantation High Density Subdivision Project Onslow County Dear Mr. Koenig: The Wilmington Regional Office received a complete Stormwater Management Permit Application for Huntington Park at Williamsburg Plantation on March 21, 2005. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000. We are forwarding Permit No. SW8 040733, dated April 4, 2005, for the construction of the project, Huntington Park at Williamsburg Plantation. This permit shall be effective from the date of issuance until April 4, 2015, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Rhonda Hall, or me at (910) 395-3900. Sincerely, Ed Beck Acting Regional Supervisor Surface Water Protection Section ENB/rbh: S:\WQS\STORMWAT\PERMIT\040733.apr05 cc: David K. Newsom, Crystal Coast Engineering, P.A. Onslow County Inspections Rhonda Hall Wilmington Regional Office Central Files North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone(910)395-3900 Customer Services-877-623-6748 One Wilmington Regional Office Wilmington,NC 28405-3845 FAX (919)733-2496 Internet: h2o.enr.state.nc.us North Carolina An Equal Opportunity/Affirmative rmative Action Employer—50%Recycled110%Post Consumer Paper Nati 1 a l// State Stormwater Management Systems Permit No. SW8 040733 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO John Koenig Huntington Park at Williamsburg Plantation Onslow County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until April 4, 2015 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 on page 3 of this permit. The subdivision is permitted for 85 lots, each allowed 3,480 square feet of built-upon area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 2 of 9 State Stormwater Management Systems Permit No. SW8 040733 5. The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times. a. Drainage Area, acres: 72.56 Onsite, ft2: 3,160,569 Offsite, ft2: None b. Total Impervious Surfaces, ft2: 583,393 Lots at 3,480 ft2: 295,800 Roads/Parking, ft2: 245,828 Other, ft2: 41,765 Offsite, ft2: None c. Pond Depth, feet: 6 d. TSS removal efficiency: 90% e. Design Storm: 1" f. Permanent Pool Elevation, FMSL: 25.0 g. Permitted Surface Area @PP, ft2: 34,901 h. Permitted Storage Volume, ft3: 72,238 i. Storage Elevation, FMSL: 26.88 j. Controlling Orifice: 3.0"0 pipe k. Permanent Pool Volume, ft3: 126,016 I. Forebay Volume, ft3: 24,345 m. Maximum Fountain Horsepower: 1/2 n. Receiving Stream/River Basin: New River/White Oak o. Stream Index Number: 19-(1) p. Classification of Water Body: "C; NSW" II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built-upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built-upon area. Once the lot transfer is complete, the built-upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built-upon area limit is transferred to the individual property owner. Page 3 of 9 State Stormwater Management Systems Permit No. SW8 040733 3. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built-upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. 4. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built-upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 5. The Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 7. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface. 8. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 10. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 11. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 12. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 040733, as issued by the Division of Water Quality under NCAC 2H.1000. Page 4 of 9 State Stormwater Management Systems Permit No. SW8 040733 b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built-upon area per lot is 3,480 square feet. This allotted amount includes any built-upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. Lots within CAMA's Area of Environmental Concern may be subject to a reduction in their allowable built-upon area due to CAMA regulations. h. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. i. Built-upon area in excess of the permitted amount will require a permit modification. j. Each lot within the subdivision whose ownership is not retained by the permittee, must submit a separate Offsite Stormwater Management Permit application package to the Division of Water Quality and receive a permit prior to any construction on the lot. 13. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 14. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in this pond is 1/2 horsepower Page 5 of 9 State Stormwater Management Systems Permit No. SW8 040733 15. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 16. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 17. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 18. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 19. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved. This may include, but is not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a signed Operation and Maintenance plan. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. Page 6 of 9 State Stormwater Management Systems Permit No. SW8 040733 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Permit issued this the 4th day of April, 2005. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 040733 Page 7 of 9 State Stormwater Management Systems Permit No. SW8 040733 Huntington Park at Williamsburg Plantation Page 1 of 2 Stormwater Permit No. SW8 040733 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: SEAL Signature Registration Number Date Page 8 of 9 State Stormwater Management Systems Permit No. SW8 040733 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built-upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections Page 9 of 9 OFFICE USE ONLY Daty Received Fee Paid Permit Number 0 0� SwBo 073 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This Jorni ina.v be photocopied.for use as an original t RECEIVED 1. GENERAL INFORMATION JUL ? 0 za% I. Applicants name(specify the name of the corporation, individual, etc. who owns the p John Koenig 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): John Koenig 3. Mailing Address for person listed in item 2 above: 6432 Yadkin Rd. City:Fayetteville State: 2�30ZJ Telephone Number: L_910 ) 864-1978 4. Project Name (subdivision, facility, or establishment name- should be consistent with project name on plans, specifications, letters, operation and maintenance agreements. etc.): Huntington Park at Williamsburg Plantation 5. Location of Project (street address): Williamsburg Parkway between Richmond Dr. and Gum Branch Rd. City:Jacksonville County:Onslow 6. Directions to project(from nearest major intersection): From intersection of Western Blvd. &Gum Branch Rd. in Jacksonville,go approx. 0.1 mile southeast on Gum Branch Rd. to Williamsburg Pkwy. Right on Williamsburg Pkwy. Site is approx. 0.1 mile on right. 7. Latitude: 340477 Longitude: 77026.4' of project 8. Contact person who can answer questions about the project: Nattte:John L. Pierce&Associates P.A.) 'telephone Number: ( 910 ) 346-9800 H. PERMIT INFORMATION: 1. Specify whether project is ('check one): X New Renewal Modification Form SWU-101 Version 3.99 Page 1 01,4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project(check one): _Low Density X High Density _Redevelop _General Permit _Other 4. Additional Project Requirements(check applicable blanks): _CAMA Major X Sedimentation/Erosion Control _404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. Ill. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing Stormwater management for the project. Wet Detention Basin 2. Stormwater runoff from t ip,o ect drains to the White Oak River basin. 3. Total Project Area: a 0 �es 4. Project Built Upon Area: % 5. How many drainage areas does the project have? 3 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name UT to New River UT to New River Receiving Stream Class C;NSW C;NSW Drainage Area 1,570,077 sf (36.04 ac) 490,022 sf (11.25 ac) Existing Impervious* Area -0- -0-sf Proposed Impervious*Area 521,561 sf (11.97 ac) 49,246 sf (1.13 ac) % Impervious* Area(total) 33.22% 10.05% Impervious* Surface Area Drainage Area I Drainage Area 2 On-site Buildings 295,800 sf (6.79 ac) -0- On-site Streets 183,996 sf (4.22 ac) 49,246 sf (1.13 ac) On-site Parking -0- -0- On-site Sidewalks 41,765 sf (0.96 ac) -0- Other on-site _0-Off-site 0- 0- Total: 521,561 sf (11.97 ac) Total: 49,246 sf (1.13 ac) *Impervious area is defined as the built upon area including, but not limited to, buildings, roads,parking areas, sidewalks,gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 2. if this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project(check one): Low Density X High Density Redevelop _General Permit _Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major X Sedimentation /Erosion Control _404/401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III, PROJECT INFORMATION I. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages)describing stormwater management for the project. Wet Detention Basin 2. Stormwater runoff from this r jec / o the White Oak River basin. 3. Total Project Area: �N30 I� 4. Project Built Upon Area: l� V % 5. How many drainage areas does the project have? 3 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 3 Drainage Area 4 Receiving Stream Name UT to New River Receiving Stream Class C;NSW Drainage Area 1,100,470 sf (25.26 ac) Existing Impervious* Area 12,586 sf (0.29 ac) Proposed Im pervious*Area -0- % Impervious* Area(total) 1.14% Impervious* Surface Area Drainage Area 3 Drainage Area 4 On-site Buildings _0_ On-site Streets 0_ On-site Parking _0_ On-site Sidewalks Other on-site 0_ Off-site 12,586 sf (0.29 ac) Total: 12,586 sf (0.29 ac) Total: *Impervious area is defined as the built upon area including, but not limited to, buildings, roads,parking areas. sideiralks,gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 7. How was the off-site impeivious area listed above derived? Planimeter IV. DEED RESTRICTIONS AND PROTECTIVE, COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number,size and the allowable built-upon area for each lot must be provided as an attachment. 1. The fallowing COrendtt5 are intended to ensure ongoing compliance with state stormwater management permit number N/A as issued by the Division of Water Quality. These covenants may not he changed or deleted without the consent of the Slate. 2. No more than N/A square feet of am:lot.shall he covered by structures or impervious materials. impervious materials include asphalt, gravel, concrete. brick, stone. slate or similar material but do not include wood decking at'the venter smJace gfswimming pools. 3. Sri ale.s shall na+be filled in, piper.. or altered except as necessary to provide drivewav crossings. a. Baill-upon area in evc,ess of the permitted amounl requires a slate stormwater management permit modification prior to construction. J. All permitter/ruaoJ)from onrpareels or future rlerelopmenl shall he directed into the pernotled stormwater control syslem. These connections to the stormwater control syslem shall be perl-ormed in a manner that maintains llte integral, and performance of the snstent as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above,that the covenants will be binding on all parties and persons claiming under them-that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMEN-r FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at(919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWLJ-103 Infiltration Basin Supplement form SWU-104 Low Density Supplement 17onn SWU-105 Curb Outlet System Supplement Form SWU-106 Off-Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SW'U-108 Neuse River Basin Supplement For in SWLJ-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Paee 3 of VI. SUBMITTAL. REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Witter Quality(DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. I. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Im Is • Original and one copy of the Stormwater Management Permit Application Fornt • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of$420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number& date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features. collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage(including off-site),drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers(where required) V11. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent(individual or f irm):John L. Pierce&Associates P.A.) Mailing Address:P.O. Box 1685 Cilv:Jacksonville State:NC Zip:28540 Phone: [ 910 ) 346-9800 Fax: { 910 ) 346-1210 Vlll. APPLICANT'S CERTIFICATION I. (print or i*Me name gfperson listed in General L7fortnalion, item 2) John Koenig certify that the infmrmat' tr m his permit application form is, to the best of my knowledge, correct and 'ormance with the approved plans, that the required deed restrictions that the project wi J-Ge constructed in co i and protective rvenants w tat the proposed project complies with the requirements of 15A NCAC 21-1,1 0. — Sienature: Date: Form SVU-101 Version 3.99 Page 4 of Permit No. - w�o¢U733 (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWA7TR MANAGEMI:,;N1' 1'Ef2Ml'I' APPI,ICA'fION FORM WET DETENTION BASIN SUPPLEMENT This,lornt inaY be photocopied for use as an original I_WQ Storrmvater Manag nient Plan Review: A complete storniwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJECT INFORMATION project Name: Huntington Park at Williamsburg Plantation Contact Person: John L. Pierce&Associates P.A.) Phone Number: ( 910 ) 346-9800 For projects with multiple basins, specify which basin this worksheet applies to: l and only elevations Basin Bottom Elevation 19.00 R, (floor of the hasin) Permanent Pool Elevation 25.00 ft. (elevation of the orrice) Temporary Pool Elevation 26.88 ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 34,901 sq. ft. (water surface area at the orifice elevation) Drainage Area 72.56 ac. (on-,cite and off-site drainage to the basin) Impervious Area 13.39 ac. ton-site and off-silo drainasge to the basin) volumes Permanent Pool Volume 126,016 cu. ft. (combined volaune o/'main basin an({fbrebav) Temporary Pool Volume 72,238 cit. ft. (volume (retained above the permanent pool) Forebay Volume 24,345 cu. li. (approximale1v 20% of total volume) Other parameters SA/[)A r 1.077 (surface area to drainage area ratio from DWO table) Diameter of Orifice 3.00 in. (2 to J duv temporary pool draiv-down required) Design Rainfall 1 in. Design TSS Removal 2 90 %, (minirnurn 85% required) Penn SWll-102 Rey 3.99 Pagc I oF4 Footnotes: I When using the Division SA/DA tables.the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious'tu and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In lie 20 coastal counties.the requirement for a vegetative filter may be Nvaived if the wet detention basin is designed to provide 90Y4)'I'SS removal. The NCDBNR BMP manual provides design tables for both 8590 TSS removal and 900N, 1 SS removal. If. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 214 .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applican Initials a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). I It'll b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non-erosive flow calculations) f. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerg c 1 and vegetated perimeter shell'with a slope of 6:1 or less (Show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage casement is provided for each basin including access to nearest right- of'way. I. If the basin is used for sediment and erosion control during construction, clean out oi'the basin is specified prior to use as a wet detention basin. in. A mechanism is specified which will drain the Basin for maintenance or an emergency. 111. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment nt including farebays and the vegetated filter if one is provided. This system (check one) 0 does 0 does not incorporate a vegetated filter at the outlet. This system (check one) 0 does 0 does not incorporate pretreatment other than a forebay. Form SWU-102 Re% 3.99 Page 2 ur4 Maintenance activities shall be performed as follows: I. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove wash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in aft appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4.5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3.75 feet in the forebay, the sediment shall be removed. 13ASIN DIAGRAM (fill in the blanks) V Permanent Pool Flevadnn 25.00 r— Scdimcm Itenxrv'ul Iil. 21.25 75010 \- ——— -- Sediment Removal Elevation 20.5 75% _ Bottom lilcvation. 20.00 1595, —————————————— Bottom Flevation 19.00 25% PORFBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 1'onnSWU-102 Rcv399 Page 3or4 7. All components of the wet detention basin system shall be maintained in good working order. 1 acknowledge and agree by my signature below that I ant responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: John Koenig Title: NSA Address:6432 Yadkin Rd. Fayetteville, Phone:910-864-1978 Signature: Date: • v Note: "I lie legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of tho subdiv ision has been named the president. —2 a Notary public for the State of ��/t J/1. County of z J�D S )UL do hereby certify that personally appeared before me this day of and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, ��pnnuuunnir�i�i TAgy o JG4//OW COON 111 l 111 My commission expires Form SWU-IO2 Rev 3.99 I'aee 4 oI'4 12/14/2004 15_06 -910-346-1210 JOHN L PIERCE PAGE 02 . •• _�� uo-stun-;:[n CORE LEGAL CLINIC PAGE 02/07 i Prepared by sad rerum to: L.Robert Coxe,Ill,Anomey at Law,3984 Henderson Drive Extauslon,Jacksonville,NC 28546 I NORTH CAROLINA RESTRICTIVE COVENANTS Section ,Huntington Park of ONSLOW Williamsburg Plantation KNOW ALL MEN BY THESE PRESENTS,that WHEREAS,JOHN KOENIG,INC-,herein sometimes rolled"Owner"or"Developer', .' is the owner of all that lard designated as Section ,Huntington Park of Williamsburg Plantation.as shown on that certain plat recorded in Book L Page_,in the Office of the Register of Deeds of Onalow Counry,North Carolina;and, WHEREAS,Owner desires w provide stability and appeal in the development of said land; t NOW,THEREFORE,Owner hereby covenants and agrees to end with all peraona,firms, and corporations now owning or bereaflcr acquiring any of the numbered lots included on said plat,that all of said numbered lots shall be and sate now are,to the extent hereinafter defined and described,subject to the tbllowing restrictions as to the use thereof,naming with the said land by whomsoever owned,to-wit: .. 1. LAND USE AND BUILIZING TY?F: No numbered lot shall be used except for residential purposes. No structure shall be erected,placed,altered or permitted to remain on any such lot other than one detached single-family dwelling nor to exceed two and our-half stories in height,a private garage for not moss than three(3)care,with a minimum of one(1)ear garage with a parking apron,which garage may contain living quarters for occupancy by domestic servants of the lot owom only,and such other outbuildings as may be reasonably appurtenant to the dwelling provided that the same are constucted In line with the general architectural design and construction standards used in the dwelling itself. 2. . DWP7 I INC COST QUALITY AND SIZE: No single-family attached or detached dwelling unit shall be permitted on any such lot or lots which shall give to the improved lot or lots on which the said single-family attached or detached dwelling unit is constructed an appraised valuation of less tban One Hundred Twenty Thousand and No/100 ($120,000.00)Dollars;such valuation to be based upon coat levels prevailing at the date these covenants are recorded;it being die intention and purpose of this eovenam to provide that all dwellings shell be of quality and workmanship substantially the sane or better than that which can be produced on the date these covenants are recorded for the minimum value herein stated for the minimum permitted dwelling sire. No single-story residence or dwelling unit shall be constructed which shall have a heated area living space of less than 1500 square feet. No two-story residence or dwelling unit shall be . constructed which shall have a heated area living space of less than 1500 square feet of which a minimum of 800 square feet shall be The first floor of said two-story dwelling. Heated area living spar,6 shell men the ordinary,living epme in a house which is designated and constructed to be eapable of being heated for regular living use in cold weather,.In the compuration of floor space,furnace room and exterior storage me",garage end pomhes aball not be.,.anted. No residence may be constructed without a garage. Any plan for construction of a dcmehed gnragc 12/14/2004 15:06 910-346-1210 JOHN L PIERCE PAGE 03 .�w� s u sitl-sin-1/19 CORE LEGAL CLINIC PAGE 03/07 must have the prior approval of the Developer,as set one in Paragraph 21 of these Restrictive Covenants. 3. PROVISIONS RELATING TO WETLANDS: All of the properties subject to these declarations,conditions,covenants And restrictions shall also be subject to the following Special Provisions Relating to Wetlands. In developing the property,the Developer has agreed with the State of North Carolina and the Department of the Army Corps of M%gineors(pursuant to a permit issued by the State of North Carolina and the Corps of Eogineers)to restrict and probibit any future filling or other detrimental activities in the wetlands areas which presently exist within the identified area of the property. Accordingly,all wetlands shown and delineated on the wedandisurvey plat dated December 9. 1999,and verified by the Corps of Engineers of March 4,2003,shall be maintained in perpetuity in their natural or mitigated condition. No person or entity shall fill,grade,excavate,or perform any other land disturbing activities;mar cut;remove,of harm any vegetation;nor construct any,structures,not allow animal grazing err watering or any other agricultural use on such conservation area. Benign structures,such as pile- supported walkways,may be permissible only after reviewed and written consent is provided by the U.S.Army Corps of Engineers. This covenant is intended In erlam'e continued compliance . with the mitigation condition of authorizations issued by the United States of America,U.S. Army Corps of Engineers,Wilmington District,Action ID 200001107,and therefore may be enforced by the United States of America. This covenant is to nun with the land,and shall be binding on the Owner,and all patties claiming under it. 4. .BUILDING LOCATION: The building line of any dwelling house of the buildings appurtenant thereto shall not be less than 35 feet from the lot line which time dwelling house fronts. Interior lot litre and side yard set-back rcquiremetits Shall be as provided in the City of,lackson.ville and/or Onslow County Subdivision Regulations governing residential developments. In the event that the regulatory boards for the City of Jacksonville and/or Onslow County Commissioners,at a later rime adopt a-zero lot lino"ect back for the develcln t than that ordinance shall apply to this development. Where a garage or outer permitted accessory building is located within 30 feet of the rear property line,then there shall be a five That side yard requirement for the rea 30 feet of the lot. A rear yard Set-back requirement of 35 feet shall be maintained for those lots abutting other properties outside this subdivision. With respect to corner lots,the building line of any dwelling house or unit of the building appurtenant thereto shall not be less that 35 feet from the street one which the dwelling house or unit fronts. The provisions of the City of Jacksonville and/or Onslow County Subdivision Regulations governing residential developments shall be complied with in determining that set back from the side street property line and the required rear yard,if any. For the purposes of these covenants.eaves and steps shall not be considered As a party of the building:provided,however,that this shall not be construed to permit any portion of a building to encroach upon another lot. Open fire escapes,outside stairways,the ordinary projections of chimneys and flues,swimming pools,flag poles,decorative foumauss and otba similar items are not subject to the building lines so long As the do not obstruct light end ventilation necessary for the structure on the adjoining lot. A variance no more than l0s/o of the set-back requirements of this covenant shall be deemed to be in compliance with the requirements stated herein. 5. T�ORMWATER MANAGEMENT: The following covenatta we intended to ensure ongoing compliance with State Stormwater Management Permit Number as issued by the Division of Water Quality under NChC 214.1000. The State of North Carolina is made a beneficiary of these covenants to the exhmt necessary to maintain compliance with the storruwater management permit. These covenants we to mn with the land and be binding on all persons and parties claiming ruder them. The covenants pertaining to stormwpter may not be altered or rescinded without the capreas written consent of the State of North Carolina,Division of Water Quality. 12/14/2004 15:06 910-346-1210 JOHN L PIERCE PAGE 04 - --- --•-• �.o-cue-1 ley G4KE LEGAL CLINIC PA( 09/97 The maximum allowable built-upon area per lot is limited to a maximum of 3,480 square feet. This allotted amount includes any built-upon area constructed within the lot property boundaries,and,that portion of the right-of way betwow the from Iot line and the edge of the pavement. Built upon area includes,but is not limited W.structures,asphalt,concrete,gravel, brick stone,slate,coquina and parking areas,but does net include raised,open wood decking,or the water surface of swimming pools. All rtuwff from the built-upon areas on the lot mint drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street,grading The lot to drain toward the atreeI,or grading perimeter awales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. Swales shall not be filled in,piped,or Altered,except as necessary to provide driveway crossings. 6. :ERECTION OF FENCES AND SIGNS: No fence shall be erected on Any Ira closer to the front of the lot than the house's tear corner. No fence shall be buih within the easement for utilities as set forth in Paragraph 5(a)of these covenants. A minimum three-foot wide gate most be constructed if Elie fencing is across the-maimemmoc area"desetibed is Paragraph 5(b)bereo£ Fencing traversing a lot shall be parallel with the front line. Provided however,that with respect to cotter lots,no fencing shall be erected or maintained any closer than forty-five(45)feat from the ftoot property line,not to exceed a ten-foot extension from the back comer of the house(extended from the back line of the house);and In the a col a house has already been established on the lot adjacent to the Comer Ira,no fencing shall be erected on the Comer lot my closer to the from of the lot that the distance the from comer of the adjacent structure is from its front property line:in any event,fmdng shall be rio closer then the house's rear comer. Solid privacy fences over three(3)feet in height shall rot be built within twenty- five(25)fed of a public right-of-way. Chain link fences of any typo are not parnittod. No fences,including decorative split-rail fences,ere permitted to the front)'and of a lot. 7, FASEMEN_: (a) FQr Utilities and )jgLmee: Easements for installation and maintenance of utilities and drainage facilities ere reserved es shown on the recorded plat. Within these eascmrnU,no stroeture,planting or other material shall be placed or permitted to remaam which may interfere with the installation and maintenanue of utilities,or which may change the direction or flow or drainage,or which may obstruct or retard the flow of water. All sreas indicated as streats and easemems on the recorded plat are hereby dedicated to public use for such uses forever; (b) For Reveirs Md- Maintenance: The lot owner having an abutting wall or a wall within five(5)feat of his Imline shall have a five-foot easement along said lot line on adjacent Im owner's property for the purpose of=pairs and maintenance of said abutting wall or wall within five feet of the lot line where such repairs and maintenance cannot be accompliabed otherwise. (e) For C ahanr_ E t.ins and Projections: As to lot owners of adjeceut lots winch have an abutting wall,easements are reserved over those portions of the adjacent lot owner's property that may be necessary,or required to accommodate drainage and utilities and overhanging eaves or other cmtllcvcrcd construction which may encroach upon the adjacent lot owner's property or the air and light space above such lot owner's property. (d) For Under - t d Cables on ,-manation of 9uect ti aht' : The Developer or their Assigns resemas the right In subject the real property,in this subdivision to a contract with Carolina Power and Light Company or any other utility company for the installation of underground electric cables md/or the installation of street lighting either or both of which may require an initial payment and/or continuing monthly paYmcm to Carolina Power and Light Company or Any other utility Company by the owner of each building. Also the County of Onslow may levy special tax assessments against each lot to install street lighting. 8. ' ILLEGAL ACTIVITY: No illegal,noxious or offensive activity shall be permitted or carried on any party of said land,neither shall anything be permitted or done which is or may become a nuisance or a source of embarrassment,discomfort or annoyance to the 12/14/2oe4 15: 06 910_-346-1210 +JOHN L PIERCE PAGE 05 _ --- oio-sue-n%sy CNI:.LEGAL CLINIC PAGE BS/B7 neighborhood. No trash,garbage,rubbish,debris,waste material or other refuse shall be deposited or allowed to accumulate or remain on airy part of said land,or upon any land or lands contiguous thereto. No fires or burning of trash,leaves,clippings or other debris or refuse shall be permitted on any part of said land without the required permits issued by the appropriate authority. 9, AJUESTAN WEI LSt No artesian wells may be drilled or maintained on any building lot without first obtaining the consent of the Developer. The camtral water supply system provided for the service of said land shall be used as the sole source of water for all water spigots and outlets located within all buildings and improvements located on each building lot. No individual water supply system or well shall be permitted on the building lot except to supply water for air-conditioning or heating installation,irrigation purposes.swimming pools or other exterior use. All lots shall be subject to service charges and fees and my and all easesstnents levied in connection with the central water supply system service to the respective subject lots. 10. ANINdALS&Np LIVESTOCK: No animals,livestock or poultry of any land shall be raised,bred or kept on the property,except cats,dogs,and other common household pets and they shall not exceed three(3)of each,provided that they are not kept,bred or maintained . for any commercial purposes. Household pots shall nor[Darn freely,they must remain in the yard or.if not in the yard,on a leash. 11. AUTOMOBILES.ETC: No automobilcq boats,campers or any other motor vehicle may be dismantled on said property. No mechanically defective automobile or currently unlicensed automobile shall be placed or allowed to remain on said property over ten(10)days. No junked cars shall be placed or allowed to remain on the property. No trailer,mobile home, camper or like recreational vehicle shall be permitted to remain upon any lot unless it is located so as not to be visible from any street or road within the subdivision. 12. OBSTRUCTIONS: The Developer shall have the right,bat rot the obligation,to remove or require the removal of any fence,wall hedge,shrub,bush,true or other object,wastrel or artificial,placed or located on any building plot,if the location of the aamc will,in the sole judgmem and opinion of the Developer,obstruct the vision of a motorist upon any of the access ways . . e 13. RPGUJ-ATE TRAXFlr—: The Developer shall have the right,but not the obligation,from the time to time to control and regulate all types Of anise oo said access ways, Including the right to prohibit use of said access ways by traffic which,in the sole discretion of the Developer,would or might resat in damage to said access ways or pavements or other Improvements thereon,and the right,but not the obligation to control and prohibit Parking on all or any part of said access ways. - 14. TYPE OF CONSTRUCIION: No building or other improvement may be constructed with exterior wall finish of material of concrete or cinder block type construction . or shall be finished in asbestos siding shingle, 15. WINDOW AIR CONDTCIONERS: No window air conditioning units shall be installed in a building visible from the read which the building faces. 16, UTIL : All telephone,electric and Other utility lines and connections between the main utility lines and the residence and ether buildings located on each building plot shall be located underground. 17. t 7TIL.f1Y C�-ANY: The Developer reserves the right to subject the reel property in this entire subdivision to a contract with the Carolina Power and Light and/or City of Jacksonville or any other utility company,for the installation of underground electric cables and/or the installation of street lighting,either or both,of which may require a continuing monthly payment from the owner of the lot. 18. TYPE OF RESIDENCE: No trailer,basement,garage of any outbuilding of any . kind,other then a guest house or servant's quarters,even if otherwise permitted hercuuder to be or remain on a building lot shall be used as a residence either temporarily or permanamly. 1 r i 12/14/2004 15: 06 910-346-1210 JOHN'L PIERCE PAGE 06 •- ++ «�� seer yiu_ja6-7729 COXF LEGAL CLINIC Pat;E 06/07 l A DFtrFLpPFR SIGNS: Nothing contained in these covenants and restrictions ! &ball prevent the Developer,approved Builder,or any person degignmed by the Developer,eom erecting or maintaining such commercial or display signs and such temporary dwelling,model house and other structures as the Developer may deem advisable for development purposes. 20. SIGNS: No sign or signs other than a"For Sale"or"For R.V'sigh shell be displayed on The property,and these signs shall not exceed five(5)square feet total area. j 21. SWM04INIQ ZOOd-fl: No swimming pool ahall be constructed on any lot unless The proposed location shall have been first approved in writing by the Developer and said pool, with required fence,shall be built in accordance with all applicable City of Jacksonville and/or Onslow County Zoning Ordinances and Regulations. Alm! to,1 Is ax no permitted. 22. MALL DQXR-S: No mail box or paper box or other receptacle of any kind for use in the delivery of mail or newspapers or magazines or similar material shall be erected or located,on any building lot unless the size,location and design and type of material for said boxes or receptacles shall have been approved by the Developer. To Insure tatifomtity,the Build"does hereby agree to provide the original mail box post' if on my flaunt time the Post becomes damaged or has to be replmed for some other reason,it will be replaced with a post of the same size and material at the owner's expense. 23. APPROV_�_�e r�-OF PN.ANS: No construction shall begin on any lot,neither shall any building or other improvement be erected,placed or altered on my lot until the construction plans and specifications and plans showing location of the structure on the individual lot have been approved in writing by the Developer,its sueeassors or assigns.This approval shall be"to the quality of workmamsdup and materials.harmony of external design with existing strucmtea. and as to the location with respect to topography and finiahad grade elevation. The Developer may delegate its duties under this paragraph to an mchitectuml committee created for this purpose. Such assignment will be by a document recorded in the office of the Register of Deeds for Omiow,County,North Carolina 24. RADIO OR TELEVISION AERIALS: Except as provided below,no radio or television aerial,antenna or satellite dish,or any other exterior electronic or electronic equipment or devices of any toad shall be installed or maintained on the exterior of my structure located n a building lot or any other portion of my building lot. A satellite dish to greater than eighteen (18)inches in diameter may be installed,as long as it is not visible tkom the street 25. cq[vPMENT OF COVENANTS: These covenants are to con with the land and shall be binding on all parties and all persons claiming under them for a period of twenty-fine (25)years from the date these caveomts are recorded,after which time said covenants shall be automatically extended for successive periods of tea(10)years unless an instrument signed by a majority of the then owners of the lop has been recorded,agreeing to change said covenems in whole or in pan. During the first twemy-flve(25)year period,these covenants may be amended in fldl or in part by an amendment,signed by not less than eighty(80%)pero mt of the ownem of the numbered lots- To be effective,any amendment most be="tied, However,the coveaans in contained in Paragraph 3 hereinabove are in perpetuity and may not be mantled without the express consent of the State of North Carolina and the Department of the Army Corps of Engineers. ' 26. F 4FORCEM—FNT: Enforcement shell be by proceedings at law m in equity against my person or persons violating or attevepting to violate my covenant either on restrain violation or recover damage.. The Developer of Williamsburg Plantation Homeowner's Association,or any lot owner,shall have the right to enforce,by my proceeding at law or in equity,all restrictions,conditions,reservations,liens and charges now or heeeaftm imposed by the provision of this Deolaration. Failure by the Developer or by Blot own"to enforce any covens or restrictions herein contained shall in no event be deemed a waiver of the right to do so Thereafter. Reference 1s also hereby made to the Declaration of Covenants,Conditions and Rastrictinra recorded in Orslow'County Rcpstry,whirl,recording created the Williamsburg Plantation Homeowners' Association. Each lot owner In Regency Park of Williamsburg u 12/14/2004 15: 0G 910-34G-1210 JOHN L PIERCE PAGE 07 COXE LEGAL CLINIC Parma 0T/0T Plantation Section One,is also a member of the Willi-' .burg Plantation Homeowners' Association. ' ' 27. VALIDITY:_ lavLbdation of arty one of These eovemnts by judgment or tout[ order shall in no way affect any of the of the other provisions which shall remain in ftdl force " and eff et. IN TESTIMONY WHEjEOF,gOHN KOENIG,�INC_has caused this ins rtunent to be signed and sealed this the_'day of December.200A. ' JOHN KOENIG,INC. BY. President NORTH CAROLINA ONSLOW COUNTY I+ a Notary Public of rile County and Stme aforesaid,cemfy that John Kocoi me g Personally ca before'!,me this.day and acknowledged that he is the Presidmt of JOHN KOENIG,INC.,a North Carolmau Corporation,and that by authority duly given and as the act of the corporation,the foregoing instrument was signed in ba name by him. . ..,v.a::: . Witness my hand and official stamp or seal this day'of December.2004. Noraty Pubis My Commission Expires: ui 4 Permit No. scua o4v'I33 (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This farm mar be photocopied f r use as an original DWQ Stormwater Management Plan Review: A complete Stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJECT INFORMATION Project Name: Huntington Park(enlargement of current design to accommodate Kensington Park) Contact Person: David K.Newsom,PE Phone Number: ( 910 ) 325-0006 For projects with multiple basins, specify which basin this worksheet applies to: 1 and only elevations Basin Bottom Elevation 19.00 ft. (floor of the basin) Permanent Pool Elevation 25.00 ft. (elevation of the orifice) Temporary Pool Elevation 26.88 ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 65,930 sq. ft. (water surface area at the orifice elevation) Drainage Area 89.99 ac. (on-site and off site drainage to the basin) Impervious Area 20.95 ac. (on-site and of drainage to the basin) volumes Permanent Pool Volume 275,847 cu. ft. (combined volume of main basin andforebay) Temporary Pool Volume 131,426 cu. ft. (volume detained above the permanent pool) Forebay Volume 55,745 cu. ft. (approximately 20% of total volume) Other parameters SAIDA t 1.33137 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 4.00 in. (2 to 5 day temporary pool draw-down required) Design Rainfall 1 in. Design TSS Removal 2 90 % (minimum 85% required) Fonn SWU-102 Rev3.99 Page I of Fooinotes: I When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed bused upon the actual impervious%and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90%TSS removal. The NCDENR BMP manual provides design tables for both 85%TSS removal and 90%TSS removal. 11. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. DfIll d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non-erosive flow calculations) f. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). l� i. Vegetative cover above the permanent pool elevation is specified. I. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. D m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does° d es not incorporate a vegetated filter at the outlet. This system (check one) 0 does O roes not incorporate pretreatment other than a forebay. Form SW U-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: I. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 clays as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4.. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4.5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3.75 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanke) V Permanent Pool Elevation 25.00 Sediment Removal El. 21.25 75/o —————— Sediment Removal Elevation 20.5 75/0 Bottom Elevation 20.00 25% ------------------------ ----- Bottom Elevation 19.00 25% FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. b. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 4 7.' All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: John Koenig Title: N/A Address:6432 In Rd. etteville,NC 28383 Phone:9 -864-19 Signatu e: Date: ZO� Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident - he subdivision has been named the president. a Notary Public for the State of County of do herebycertify that �,//� personally appeared before me this Y day of dus qand acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, BUQ �attuuniuii� �40TARy'•. ; "IC,06 SEAL My commission ex es �� ��"O Form SWU-102 Rev 3.99 Page of JOHN L. PIERCE & ASSOCIATES, P.A. LAND SURVEYING -LAND PLANNING - MAPPING P.O. Box 1685 409Johnson Blvd. Jacksonville, NC 28541 letter Of transmittal Office: (910) 346-9800 Fax No.: (910)346-1210 DATE JOB NO. March 21, L005 ATTENTION Ms. Rhonda Hall RE: TO Ms. Rhonda Hall Huntington Park N.C. Department of Environment and Natural Resources 127 North Cardinal Drive Wilmington, NC 28405 WE ARE SENDING YOU ❑ DRAWINGS ❑ ATTACHED ❑ UNDER SEPARATE COVER VIA THE FOLLOWING ITEMS: ❑ COPY OF LETTER ❑ PRINTS ❑ PLANS ❑ SAMPLES SPECff#gATIONS ❑ CHANGE ORDER ❑ COPIES DATE NUMBER DESCRIPTION 1 Stormwater plan THESE ARE TRANSMITTED as checked below:❑ ��y �, _ For approval REMARKS �- II 1\_Ci'l ,Y 1 A`r�l Y_ 9 ❑ For your use _ ❑ As requested MAK2 1 ZU ❑ Approved as submitted ❑ Approved as noted t� ❑ Returned for corrections ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ For review and comment ❑ For bids due � . ❑ Prints returned after loan to us SIGNED JOHN L. PIERCE & ASSOCIATES, P.A. LAND SURVEYING -LAND PLANNING - MAPPING P.O. Box 1685 409Johnson Blvd. Jacksonville, NC 28541 letter Of transmittal Office: (910)346-9800 Fax No.: (910)346-1210 ove ioe No. March 15, 2005 AT HXT10N Rhonda Hall RE; Huntington Park Section I O C. D Hall N.C. N. Department of Environment and NaturaiResources AN 1 6 2005 127 North Cardinal Drive Ir-.Wilmington, NC 28405 WE ARE SENDING YOU ❑ DRAWINGS ❑ ATTACHED ❑ UNDER SEPARATE COVER VIA THE FOLLOWING ITEM:;.' ❑ COPY OF LETTER ❑ PRINTS ❑ PLANS ❑ SAMPLES SPECIIEgATIONS I ❑ CHANGE ORDER ❑ COPIES DATE NUMBER DESCRIPTION 1 Seal cQpy of Sformwater plan as rPquPqLPd E<' THESE ARE TRANSMITTED as checked below: ❑ For approval REMARKS ❑ For your use ❑ As requested ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ For review and comment ❑ For bids due ❑ Prints returned after loan to us SIGNED 12/14/2004 15: 06 910-346-1210 JOHN L PIERCE PAGE 01 JOHN L. PIERCE & ASSOCIATES, P.A. LAND SURVEYING-LAND PLANNING-MAPPING OFFICE:910-346-9800 FAX NO.:910-346-1210 - E•MAIL:Jpierce®onslowonllne.net P.O.Box 1665 .. : 17 - Jacksonville, NC 28541 409 Johnson Blvd. Jacksonvilla,N.C.28540 DATE: I Z- 14-_p 4- FAX NO. (910) 346-1210 �' n TO: (ZIIO�PA NFL FROM: NUMBER OF COPIES INCLUDING THIS PAGE— REMARKS: AS PW Q4 > f o LOTS.FARMLAND AND WOODLAND SURVEYING-SITE PLANNING-SUBDIVISION LAYOUT.LAND DEVELOPMENT PLANNING CONSTRUCTION SURVEYING-TOPOGRAPHIC SURVEYING AND MAPPING Phase I Environmental Audit/Risk Assessment JOHN L. PIERCE & ASSOCIATES, P.A. LAND SURVEYING -LAND PLANNING - MAPPING CIVIL ENGINEERING P.O. Box 1685 409 Johnson Blvd. Jacksonville, NC 28541 letter Of transmittal Office: (910)346-9800 Fax No.: (910)346-1210 Dnr[ JDe No. E-Mail:jpierece@onslowonline.net October 27, 2004 nn ENTION' Rhonda Hall RE: TO Ms. Rhonda Hall Huntington Park Section I N.C. Department of Environment Stormwater Project No. SW8 040733 Division of Water Quality 127 North Cardinal Drive Wilmington, WE ARE SENDING YOU ❑ DRAWINGS ❑ ATTACHED ❑ UNDER SEPARATE COVER VIA THE FOLLOWING ITEMS: ❑ COPY OF LETTER ❑ PRINTS ❑ PLANS ❑ SAMPLES ❑ SPECIFICATIONS ❑ CHANGE ORDER ❑ COPIES DATE NUMBER DESCRIPTION 2 Copies of revised Sheet 1 of 16 & 12 of 16 Cover letter from Engineer Dave Newsom Co of your letter dated 10/18/04 1 Stormwater Treatment & Erosion Control Narrative 2 Revised Sheet 2 of 4 of Stormwater application 2 Copies of revised design calculations Ll V.�L OCT 2 9 2004 IRV. J THESE ARE TRANSMITTED as checked below: ❑ For approval REMARKS ❑ For your use ❑ As requested ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ For review and comment ❑ For bids due }{ 0 Prints returned after loan to us SIGNED Crystal Coast Engineering , PA 3817-3 Freedom Way ' Hubert, N.C. 28539 Te4: (910)325-0006 Fax: (910)325-0060 Email: crystalco teng@b¢ec.rr.wm October 27, 2004 Ms. Rhonda Hall N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.C. 28405 Re: Stormwater Project No. SW8 040733 Huntington Park at Williamsburg Plantation Onslow County Dear Ms. Hall, We are in receipt of your Request for Additional Information dated October 18, 2004 for the referenced project. We provide the following information to allow you to continue the stormwater review (item numbers correspond to your original Request): 1. Wetlands have been emphasized on Stormwater Plan. 2. Narrative attached. 3. Delineation Map Attached. 4: Sheet 12 attached. 5. Added note concerning roof drainage. 6. Stormwater Plan includes Legend. We are hopeful that this response addresses all concerns and that the permit can be issued in the near future. Should you have questions or additional concerns, please feel free to contact me. Yours t Dav . Newso , PE CRYSTAL COAST ENGINEERIN �0 \NArF9Q Michael F. Easley, Governor �O G William G. Ross, Jr., Secretary r? North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality October 18, 2004 Mr. John Koenig 6432 Yadkin Road Fayetteville, NC 28303 Subject: Request for Additional Information Stormwater Project No. SW8 040733 Huntington Park at Williamsburg Plantation . Onslow,County Dear Mr. Koenig: The Wilmington Regional Office received a Stormwater Management Permit Application for Huntington Park at Williamsburg Plantation on July 30, 2004. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please either delineate all wetlands on site, disturbedior undisturbed, or note on the plans that none exist. 2. Please provide a detailed narrative description of the stormwater treatment/management system. . 3. Please provide a drainage delineation map. The application indicates that there are three drainage areas. t 4. Sheet 1 of 16, of the plans, indicates that the stormwater pond is on sheet 12 of 16. The two sets of plans provided to this office did not contain sheet 12 of 16. Please provide two sheet of sheet 12 of 16. 5. Please provide a note of the plans that all roof drainage must be directed so as to be picked up by the pond, and the runoff from all impervious surfaces must be directed to the forebay. 6. Please provide a legend on the plans. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to November 1, 2004, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone(910)395-3900 Customer Services-877.623-6748 Wilmington Regional Office - Wilmington,NC 28405-3845 FAX (919)733-2496 Internet: h2o.enr.state.nc.us One NonhCarollina An Equal Opportunity/Affirmative Action Employer—50%Recycledl10%Post Consumer Paper Nahuatl/ Mr. Koenig October 18, 2004 Stormwater Application No. SW8 040733 The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, nn Rhonda Hall Environmental Engineer RSS/rbh: S \WQS\STORMWAT\ADDINFO\2004\040733.oct04 Fy cc: David K. Newsom, Crystal Coast Engineering, P.A. John L. Pierce & Associates, P.A. Rhonda Hall i ... . ....... ...:.. .. . :..:::.::... : .. OF \NAT�R Michael F. Easley, Governor \ O William G. Ross Jr., Secretary O\� G North Carolina Department of Environment and Natural Resources ( r >_ Alan W. Klimek, P.E.,Director O < Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality September 20, 2004 Mr. John Koenig 6432 Yadkin Road Fayetteville,NC 28303 SUBJECT: Approval of 401 Water Quality Certification Fin 0.17 Acre Jurisdictional Wetlands and 0.15 Acre of Isolated Wetlands for Huntington Park S/D in Jacksonvine DWQ Project#041020 Onslow County Dear Mr. Koenig: You have our approval, in accordance with the attached conditions (WQC#3402) to conduct the following activity on your property located within Williamsburg Plantation Subdivision, Jacksonville in Onslow County. This approval allows you to: 1. Fill 0.17 acre of jurisdictional wetland as describe in the additional information received by DWQ dated 14 September,2004; 2. Fill 0.15 acre of Isolated wetland as described in the additional information received by DWQ dated 14 September, 2004. This approval is only valid for the purpose and design that you described in your completed Pre- Construction Notification (PCN) application received by the Division of Water Quality (DWQ) on June 23 and additional information received dated August 17, 2004 and September 14, 2004. After reviewing your application, we have determined that General Water Quality Certification Number 3402 covers this activity. This Certification can also be found on line at: htt-o://h2o.enr.state.nc.us/ncwetlands/certs.html. This Certification (#3402)allows you to use your 404 Permit when the Corps of Engineers issues it. Please keep in mind that there may be additional Federal, State or Local regulations applicable to your project, such as (but not limited to) Sediment and Erosion Control,Non-Discharge and Water Supply Watershed regulations,NPDES Stormwater and Coastal Stormwater. In addition, this approval will expire when the accompanying 404 Permit expires unless otherwise specified in the General Certification. Pease be aware that if you change or modify your project,you must notify the Division (DWQ) in writing and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid,you must follow the conditions listed in the attached certification and the additional conditions listed on the following page: N.C.Division of Water Quality 127 Cardinal Drive Extension (910)395-39DO Customer Service Wilmington Regional Office Wilmington,NC 28405 (910)350-2004 Fax 1 800 623-774 One An Equal Opportunity/Aftirmalive Action Employer—50%Recycled/10%Post Consumer Paper NorthCarolina Naturally Page Two Mr. John Koenig DWQ Project#041020 September 20, 2004 ]. The.project.area-isdocated-within one•mile and draining to-Nutrient-Sensitive Waters(NSW)- 1- 7 (if-the-impervious.covecis.[o.be.greater-than.30%o the-projFc-will n quire"eztended—] rdetention-wetlands,,-bio-retentiomareas,-and ponds followed'by forested-filter strips"(designed,[ _according'to the-lastest versionrofthe-NC—DENR Stormwater ManagemenfPra`cthces - MC anual)be construe;ed as parCcif the Stonnwater management plan; 2. Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications,the applicant is required to return the attached certificate of completion to this office and a copy to the 401 Oversight/Express Review Permitting Unit,North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh,NC, 27699-1650; 3. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the PCN Application. All construction activities,including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes,or rules occur; 4. Provide a copy of the recorded restrictive covenants or deed restrictions for the remaining lots with wetlands. Please notify this Office at the number listed below if any problem arises during the construction of the project that may affect water quality. If you do not accept any of the conditions of this certification,you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition conforming to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,Raleigh,N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the DWQ Permit#041020 under Section 401 of the Clean Water Act. If you have any questions, please telephone Joanne Steenhuis or Rick Shiver at 910-395-3900. Sincerely, � � Alan W. Klimek, P.E., Director J— Division of Water Quality Attachments: GC # 3402 Certificate of Completion cc: Corps of Engineers Wilmington Field Office—Lillette Granade 401/Wetland Unit, Central Office—Cyndi Karoly Coastal Stormwater-Linda Lewis Hal Owen and Associates—Krissina B.Newcomb WiRO 'AN L. PIERCE & ASSOCIATES, P.A. RECEIVED �^ LAND SURVEYING -LAND PLANNING - MAPPING JUL 3 0 2004 CIVIL ENGINEERING � " �I P.O. Box 168' BY 409 Johnson Blvd. letter Of transmittal Jacksonville. NC 28541 Office: (910) 346-9800 Fax No.: (910) 346-1210 "A'IE 1ON NO. E-Mail:jpierece@onslowonline.net July 28, 2004 A7MNnoN Linda Lewis RE: Huntington Park At .Williamsburg Plantation TO T.inda Lewis N.C. Department of Environment Naturaland 127 North Cardinal Drive Wilmington, NC 28405 WE ARE SENDING YOU ❑ DRAWINGS ❑ ATTACHED ❑ UNDER SEPARATE COVER VIA THE FOLLOWING ITEMS: ❑ COPY OF LETTER ❑ PRINTS ❑ PLANS ❑ SAMPLES ❑ SPECIFICATIONS ❑ CHANCE ORDER ❑ COPIES DATE NUMBER DESCRIPTION 2 Sets of plans 2 "Stormwater Permit a licat'ons" 1 Check in the amount of $420.00 VI— THESE ARE TRANSMITTED as checked below: ❑ For approval REMARKS ❑ For your use ❑ As requested ❑ Approved as submitted r ❑ Approved as noted ❑ Returned for corrections j ❑ Resubmit copies for approval o ❑ Submit copies for distribution ❑ Return corrected prints ❑ For review and comment 0 For bids due Stormwater Treatment & Erosion Control Narrative Huntington Park — Section 1 Mr. John Koenig proposes to construct an eighty seven (87) lot residential subdivision on a 36.04 acre tract located in the Williamsburg Plantation Development in Jacksonville, N.C.. The site is currently undeveloped (wooded). The project area is tributary to New River(C:NSW) in the White Oak Basin. The proposed development activities are low density (BUA=18.5%) however,-_development of.the project (DA 1.)-is considered-6 pocket of high density_(BUA::=33:2%). The attached Stormwater Plan includes a wet treatment pond to provide the required treatment. The detention pond is sized to accommodate the proposed subdivision only and future construction which may occur on the undeveloped tract to the east and the proposed road right-of-way to the north will necessitate additional treatment facilities (pond enlargement). The basin is sized to accommodate 583,393 square feet of impervious area, allocated as follows: Drainage Area 1 —Huntington Park Project Drainage Area 2—Street RAW to North Drainage Area 3— Undeveloped Tract to East & Pond Area DA 1 DA 2 DA 3 Total Buildings 295,800 sf -0 -0- 295,800 sf Streets 183,996 sf 49,246 sf 12,586 sf* 245,828 sf Parking -0- -0- -0- -0- Sidewalks 41,765 sf -0- -0- 41,765 sf Other (sign) -0- -0 -0- -0- Reserve for Future -0- -0- -0- -0- Total Impervious 521,561sf 49,246 sf 12,586 sf 583,393 sf Total Drainage Area 1,570,077 sf 490,022 sf 1,100,470 sf 3,160,569 sf Percent Impervious 33.21% 10.05% 1.14% 18.46% *Exist asphalt along Williamsburg Plantation r CA Design Calculations :AL Stormwater Treatment Facilities 1 148 for i Fy /NEEP.• Huntington Park at N `` Williamsburg Plantation - Jacksonville, N.C. -7 / J01A 1. PROJECT DESCRIPTION l v f / The Project consists of a 36.0 Ac subdivision and an 11.3 Ac right of way for Western Blvd. The treatment facilities, however, are sized to accomodate approximately 25.3 Ac of of site drainage. 2.COMPUTE POND AREA REQUIRED a. Compute Percent Impervious: Impervious Areas: Existing Proposed Total On-Site Buildings 295,800 SF On-Site Streets 183,996 SF On-Site Parking 0 SF On-Site Sidewalks 41,765 SF Other on-site (Dumpsters/mailboxes) 0 Western Boulevard Ei 61,832 Sub-Total 12,586 570,807 583,393 SF FUTURE(offsite road) 0 0 0 FUTURE(unspecified) BiN I 0 SF Total 12,586 570,807 583,393 SF Total Area Drainage to Pond: SF Percent Impervious = 0.185 or 18.5 % b. Compute Pond Surface Area Using Surface Area to Drainage Area Ratio Chart for 90%TSS Removal (copy attached)and assuming 11111M foot pond depth: SAIDA= % (interpolated) Therefore: Surface Area = SAIDA x Drainage Area 34,039 SF say __.... SF c. Compute Minimum Pond Dimensions Assume rectangular shape with 3:1 Length (L)to Width (W) Ratio: Length = 323.58 feet Width = 107.86 feet Site conditions, however, dictate irregular shaped pond: Hydr. Length= 1111MMfeet so, Hydr. Width 62.3 feet(avg) Actual L/W= 9.0 (irregular shape) 3. DETERMINE VOLUME TO BE CONTROLLED FROM 1"STORM Using Schuler"Simple Method": Rv =0.05+0.009(I) where I =percent impervious Rv = 0.216 inlin Control Volume= Design Rainfall x Rv x Drainage Area Control Volume= 56,924 CF say CF 4. DETERMINE REQUIRED STORAGE DEPTH Assume: 3:1 side slopes solving for depth (d) by trial &error: d = 1.88 S. DETERMINE ORIFICE SIZE Control Volume must be drawn down over a 2 day-5 day period. Using orifice equation, solve for Diameter (D)that results in 3-112 day period: D = (Q 10.026(h)5).5 Where: Q = (Control Volume 13.5 days x 86,400 sec/day) 0.238 cis h = d12 = 0.94 Solving for D: D = 3.07 Use "pipe Actual Drawdown with actual drawdown pipe diameter (using orifice equation): Q= 0.227 cfs Draw Down Period = 3.67 days OK, < 5.0 6. SELECT OUTLET STRUCTURE DIAMETER Size outlet structure such that depth of Q10 flow<1.0 feet: Using Rational Formula (Q=CIA)where: Cimper= Cpery= Ccum= 0.35 110 = in/hr A= 72.56 ac Q10 = 165.07 cfs Assuming 1/2 circumference is used as weir and using Francis Formula (0=3.331-1-11'6) to solve for L such that H = 1.0: L= 49.57 Feet Use 60 inch diameter outlet structure 7. DETERMINE Q10 STAGE Q10= 165.07 cfs Using Francis Formula (Q=3.33LH"6) solve for H: H10 = 3.42 feet 8. DETERMINE Q100 STAGE(ELEV. OF EMERGENCY SPILLWAY) Using Rational Formula (Q=CIA)where: Ccum= 0.35 1100= irdhr A= 72.56 ac Q100= 215.86 Using Francis Formula (Q=3.33LH''6) solve for H: 1-1100= 4.08 feet 9. DETERMINE 0100 STAGE OVER EMERGENCY SPILLWAY(TOP BERM ELEV.) Assume primary spillway blocked (i.e., emergency spillway to accommodate Q100) Emergency spillway shall be a broad crested earthern weir designed to pass 100 year storm. Using broad crested weir equation H =(Q/Cw x L)213 where: Q = Q100 215.86 cfs Cw=3.0 Length = feet H = 0.80 feet 10. FOREBAY SIZING Compute Actual Pond Volumes(using average end method): Avg Incr. Incr. Cum. Main Bay Volume : Elevation Area (SF) Area SF Depth fFT Vol (CF) Vol (CF) Pond Bottom Bottom Veg Shelf L131 14,480 4.33 62,698 62,698 Normal Pond 0 23,337 1.67 38,973 101,671 Main Bay Volume = 101,671 CF Forebay Volume: Elevation Area(SF) Area SF Depth(FT) Vol (CF) Vol(CF) Pond Bottom 20.00 , Normal Pond 25.00 66' 4,869 5.00 24,345 24,345 Forebay Volume= 24,345 CF Total Pond Volume = 126,016 CF Forebay Volume equates to 19.3 %of Total Volume Temp. Storage Volume : Elevation Area SF Area SF Depth (FT) Vol CF Vol F Normal Pond 25.00 34,901 Temp. Pond Level 26-158 , 848 38,425 1.88 72,238 72,238 Temp. Pool Volume= 72,238 CF 10 Yr Storage Volume : Elevation Are SF Area SF Depth FT Vol (CF) Vol (CF) Temp Pond Level 26.88 41,948 10Yr Pond Level 48,614 3.42 166,260 166,260 Temp. Pool Volume= 166,260 CF 100 Yr Storaqe Volume , Elevation Area SF Area SF Depth FT Vol CF Vol F Temp Pond Level 26.88 41,948 Temp. Pond Level 49,939 4.08 203,749 203,749 Temp. Pool Volume = 203,749 CF 11. SUMMARY Pond Elevations: Relative Actual Top Berm (minimum) 12.77 31.77 H= 0.80 100-Yr. Flood 11.96 30.96 (emerg. weir elev) H100= 4.08 10-Yr. Flood 11.30 30.30 H10= 3.42 1-inch Storage 7,88 26.88 (primary weir elev) storage depth= 1.68 Permanent Pool 6.00 25.00 (invert out elev) . pond depth= 8 Pond Bottom 0 12. WET DETENTION BASIN SUPPLEMENT Basin Bottom Elevation 19.00 Perm. Pool Elevation 25.00 Temp. Pool Elevation 26.88 Perm Pool Surface Area 34,901 SF Drainage Area 72.56 AC Impervious Area 13.39 AC Perm. Pool Volume 126,015 CF Temp Pool Volume 72,238 CF Forebay Volume 24,345 CF SA/DA 1.077 Diameter of Orifice 3.00