Loading...
HomeMy WebLinkAboutSW8040509_HISTORICAL FILE_20040520 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 QL}USOcI DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS 91 HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20 04 0'3 20 YYYYMMDD - �OF \^1A TF� Michael F.Easley,Governor William G.Ross Jr.,Secretary Y North Carolina Department of Environment and Natural Resources j r Alan W.Klimek,P.E.,Director O T Division of Water Quality Coleen H.Sullins,Deputy Director Division of Water Quality May 20, 2004 Thomas N. Tucker Three Oak Property, LLC 315 Friday Drive Wilmington, NC 28411 Subject: Permit No. SW8 040509 Three Oaks Mixed Use Development High Density Stormwater Project New Hanover County Dear Mr.Tucker: The Wilmington Regional Office received a complete Stormwater Management Permit Application for Three Oaks Mixed Use Development on May 19, 2004. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 040509 dated May 20, 2004, for the construction of Three Oaks Mixed Use Development. This permit shall be effective from the date of issuance until May 20, 2014, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicator),hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter;please contact Laurie Munn, or me at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor RSS/:Ism S:`.\WQS'STORA4�NIAT\PERMIT\040509.may04 cc: John Kuske, P.E. New Hanover County Building Inspections Beth E. Wetherill, New Hanover County Engineering Laurie Munn Wilmington Regional Office Central Files N. C.Division of Water Qualip 127 Cardinal Drive Extension (910)395-3900 Customer Service QA Wilmington Regional O;n;,e Wilmington,NC 28405 (910)350-2004 Fax 1 800 623-7748 State Stormwater Management Systems Permit No. SW8 040509 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Three Oak Property, LLC Three Oaks Mixed Use Development New Hanover County FOR THE construction, operation and maintenance of 2 infiltration basins in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until May 20, 2014, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 270,064 square feet of impervious area. 3. The tract will be limited to the amount of built-upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built-upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. A permit modification must be submitted and approved prior to the construction of additional built-upon area from outside of the approved drainage area. 2 - State Stormwater Management Systems Permit No. SW8 040509 DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Project Name: Three Oak Property, LLC Permit Number: SW8 040509 Location: New Hanover County Applicant: Mr. Thomas N. Tucker Mailing Address: Three Oak Property, LLC 315 Friday Drive Wilmington, NC 28411 Application Date: May 19, 2004 Receiving Stream/River Basin: Pages Creek/Cape Fear Stream Index Number: 18-87-22 Classification of Water Body: "SA" Basin 1 Basin 2 Drainage Area, acres: 5.47 4.12 Onsite, sq. ft.: 231,754 179,450 Offsite, sq. ft.: 6,500 0 Total Impervious Surfaces, sq. ft.: 154,550 115,514 Buildings, sq. ft.: 48,550 50,314 Parking, sq. ft.: 85,000 50,200 Sidewalks, sq. ft.: 14,500 15,000 Offsite, sq. ft.: 6,500 0 Basin Depth, feet: 2.9 2.9 Bottom Elevation, FMSL: 19.0 19.0 Bottom Surface Area, ftZ: 5,484 3,620 Permitted Storage Volume, ft3: 21,936 16,162 Temporary Storage Elevation, FMSL: 21.9 21.9 Seasonal High Water Table Elev.: 17.0 16.33 Type of Soil: Gray Sand Gray Sand 3 State Stormwater Management Systems Permit No. SW8 040509 II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built-upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built-upon area or to the drainage area. C. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 4 State Stormwater Management Systems Permit No. SW8 040509 9. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. If the proposed BUA exceeds the amount permitted under this permit, a modification to the permit must be submitted and approved prior to construction. 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. It. At least 30 days prior to the sale or lease of any portion of the property, the permittee shall notify DWQ and provide the name, mailing address and phone number of the purchaser or leasee. An access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale or lease of any portion of the property. 12. The permittee must maintain compliance with the proposed built-upon area and ensure that the runoff from all the built-upon is directed into the permitted system. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 14. The permittee must maintain the current permitted drainage area. No additional runoff from outside of the permitted drainage area boundary may enter the permitted stormwater facilities without first applying for and receiving a permit modification. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 5 State Stormwater Management Systems Permit No. SW8 040509 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 20th day of May 2004. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION « � C, A/ AN AAA � �h AlanWKlimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission 6 State Stormwater Management Systems Permit No. SW8 040509 Three Oaks Mixed Use Development Stormwater Permit No. SW8 040509 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature Registration Number Date 7 State Stormwater Management Systems Permit No. SW8 040509 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built-upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. 6. Trash rack is provided on the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The overall dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ Regional Office New Hanover County Building Inspections 8 A&K#04022 nGkinG_i.i.eG_nrn v F Date Re c ived Fee Paid Permit Number Sw 9 o State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original 1. GENERAL INFORMATION I. Applicants name(specify the name of the corporation, individual, etc. who owns the project): Three Oak Property, LLC 2. Print Owner/Signing Official's name and title(person legally responsible for facility and compliance): Thomas N. Tucker, Member 3. Mailing Address for person listed in item 2 above: 315 Friday Drive City: Wilmington State: NC Zip: 28411 Telephone Number: (910) 538-5719 4. Project Name(subdivision, facility, or establishment name—should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Three Oaks Mixed Use Development S. Location of Project(street address): 7750 Market Street City: Wilmington County: New Hanover 6. Directions to project(from nearest major intersection): The site is located approximately 4.60 miles north east from the intersection of US Hwy. 17 / Market Street and US Hwy. 74 / Eastwood Road 7. Latitude: 340 17' 9"N Longitude: 770 48' 20"W of project 8. Contact person who can answer questions about the project: Name: John A. Kuske, III, P.E. Telephone Number: (910) 343-9653 IL PERMIT INFORMATION 1. Specify whether project is (check one): X New Renewal Modification Form SWU-101 Version 3.99 Page 1 of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the Existing permit number N/A And its issue date(if known) N/A 3. Specify the type of project(check one): Low Density X High Density Redevelop General Permit Other 4. Additional Project Requirements(check applicable blanks): CAMA Major X Sedimentation/Erosion Control _ 404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. Ill. PROJECT INFORMATION I In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages)describing stormwater management for the project. The site is located in an SA watershed. The 1.5"rainfall/runoff will be treated in two(2)stormwater infiltration ponds. Each stormwater infiltration pond includes an offline bypass special junction box. Therefore,the rainfall/runoff above the 1.5"volume will bypass each stormwater infiltration pond and flow into a separate stormwater pond designed to meet the New Hanover County Stormwater Ordinance. Two(2)vegetated filters are included in the design as shown on the plans. 2. Stormwater runoff from this project drains to the Cape Fear River Basin. Site Area: 11.87 AC 65%for Total Drainage Area 3. Total Project Area: Total Drainage Area: 9.59 AC 4. Project Built Upon Area: ss%for oa nageA ea No.z Drainage Area No. 1:5.47 AC(Includes Offsite in NC DOT ROW) Drainage Area No.2:4.12 AC 5. How many drainage areas does the project have? 2 ZZ 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Infiltration Pond No. 1 Infiltration Pond No. 2 Basinlnformation Drainage Area Dtaina e Area 2 Receiving Stream Name Pages Creek Pages Creek Receiving Stream Class SA SA Drainage Area 238,254 SF/ 5.47 AC 179,450 SF 14.12 AC Existing Impervious * Area N/A N/A Proposed Impervious* Area 154,550 SF / 3.55 AC 115,514 SF / 2.65 AC % Impervious* Area total 64.90% = 65% 1 64.32% = 65% Includes Phase 2&NC DOT Offsite for Includes Pool For Drainage Area No.2 Drainage Area No. 1 Im ervious*. Surface.Area , . Drama e Area,I ;^ Drainage Area 2 On-site Buildings 48,550 SF 11.12 AC 50,314 SF / 1.16 AC On-site Streets Access Included Below) N/A N/A On-site Parking/Asphalt Access, Parking,Curb 85,000 SF / 1.95 AC 50,200 SF / 1.15 AC On-site Sidewalks/Concrete 14,500 SF /0.33 AC 15,000 SF 1034 AC Other on-site N/A N/A Off-site 6,500 SF /0.15 AC N/A Total: 154,550 SF 13.55 AC Total: 115,514 SF / 2.65 AC *Impervious area is defined as the built upon area including, but not limited to, buildings, roads,parking areas sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 7. How was the off-site impervious area listed above derived? From field survey information and site visits by Engineer. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built-upon area for each lot must be provided as an attachment. I. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet ofany lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in,piped, or altered except as necessary to provide driveway crossings. 4. Built-upon area in excess of the permitted amount requires a.state stormwater management permit modification prior to construction. 5. Allpermitted runofffrom outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at(919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off-Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality(DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. l. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initi • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable supplement form(s) for each BMP • Permit application processing fee of$420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/ Project name - Engineer and firm - Legend - North arrow - Scale - Revision number&date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Wetlands delineated, or a note on plans that none exist - Existing drainage(including off-site),drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers(where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. John A. Kuske, III, P.E. Designated agent(individual or firm): Andrew& Kuske Consulting Engineers, Inc. Mailing Address: 902 Market Street City: Wilmington State: NC Zip: 28401 Phone: (910) 343-9653 Fax: (910) 343-9604 Vlll. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) Thomas N. Tucker, Member Certify that the information included on this permit application form is, to the best of my knowledge,correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants a recorded, and that the proposed project complies with the requirements of 15A NCAC 2H.1000. Signature: Date: / p '0 Y Form SWU-101 Version 3.99 Page 4 of 4 T Andrew & Kuske CONSULTING ENGINEERS, INC. John R.Andrew,P.E. J. Philip Norris,P.E. 902 N ,rkei Street Wilmington,NC 28401 d733 John S.Tunstall,P.E. Neal W,Andrew,P.E. -- John A. Kuske,III,P.E. J.A.Kuske,P.E.of Counsel 910/343-9653 910/343-9604 Fox www.andrewandkuskocom James T. Pyrtle,P.E. C. Lawrence Sneeden,Jr.,P.E. May 18, 2004 Ms. Laurie Munn, Environmental Engineer NC DENR Division of Water Quality 127 Cardinal Drive Extension R�v ,t`rr Wilmington, NC 28405-3845 ED Re: State Stormwater Express Permit Submittal MAY 19 24004 Three Oaks Mixed Use Development BY: 7750 Market Street New Hanover County, NC A & K Project No. 04022 Dear Ms. Munn: Enclosed are two (2) sets of plans for the subject project, one (1) drainage area plan, one (1) set of calculations, the original Division of Water Quality Stormwater Management Permit application, two (2) original SWU-103 supplement forms for infiltration Basin 1 and infiltration Basin 2, one (1) copy of the stormwater narrative and a $4,000.00 check for the Express Permit review fee. Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, ANDREW & KUSKE CONSULTING ENGINEERS, INC. Joh A. Kuske, III, P.E. JAKI I I/asn 04022 05-18-04-s-sw express-Itr Enclosures cc: Cameron Weaver / NC DENR Express Division Tom Tucker / Three Oak Property, LLC STORMWATER AND EROSION CONTROL CALCULATIONS THREE OAKS. MIXED USE DEVELOPMENT 7750 MARKET STREET WILMINGTON, NORTH CAROLINA (� For .R.&C&IV Three Oak Property, LLC MAY j 926 Bayshore Drive 9 ?a�4 Wilmington, NC 2841VRoJ* DWQ (910) 686-1234 ®�®eaaea�neeeeo ° a e •• Y °e A °��eteeeeeee0ce May 2004 Prepared by: ANDREW & KUSKE CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) E-mail: office@andrewandkuske.com A & K Project No. 04022 i PROJECT DESCRIPTION: The project site is an 11.87 acre site located in New Hanover County, North Carolina at 7750 Market Street / US Highway 17. A mixed use development is proposed with paved parking and access to Market Street / US Highway 17. The mixed use development will include a 6,000 SF 1-Story Retail Building, an 8,400 SF 2-Story Retail / Office Building, a 7,200 SF 2-Story Retail / Office Building and 156 2-Bedroom Apartment Units. Phase 1 construction will include the 156 2-Bedroom Apartments. Phase 2 construction will include the Retail Building and the two (2) Retail / Office Buildings. Stormwater runoff from the site drains to Pages Creek, which is classified as an SA water body. Therefore, stormwater runoff from the site will be treated in two (2) above ground stormwater infiltration ponds designed to meet the State Stormwater Regulations for an SA water body and a third stormwater pond designed to meet the New Hanover County Stormwater Ordinance. The drainage area for the stormwater system design includes the Phase 1 and Phase 2 onsite area and an offsite area, which is a portion of Market Street / US Highway 17 within the NC DOT Right of Way. The disturbed area / construction limits for the project consist of the Phase 1 and Phase 2 onsite area and a portion of Market Street / US Highway 17 as required for offsite improvements including a right turn lane and utility work. SITE DESCRIPTION AND INFORMATION: As mentioned above, improvements will take place on the site as shown on the attached plans. The majority of the site is cleared of underbrush but is heavily wooded with trees and sandy soils. Existing trees on the site will remain to the extent possible. Grades on the site range from 0.10% to 10.00%. The stormwater runoff from the undeveloped site currently sheet flows to the rear of the property. EROSION CONTROL MEASURES: The attached plans and specifications give the requirements for erosion control measures. Silt fence shall be installed on the site prior to grading as shown on the attached plans. Erosion control measures shall be installed around the drop inlets as shown on the plans to trap silt during construction. Inspect the erosion control around the inlets after each rain to make repairs as needed. Remove sediment as necessary to provide adequate storage volume for subsequent rains. When the contributing drainage area has been adequately stabilized, remove all materials and any unsuitable soil and either salvage or dispose of it properly. Bring the disturbed area to proper grade, then smooth and compact it. Appropriately stabilize all bare areas around the drop inlets. Gravel construction entrances will be provided as noted on the plans. Maintain the gravel construction entrances in a condition to prevent mud or sediment from leaving the site. STORMWATER MANAGEMENT MEASURES: The project site is located within New Hanover County, North Carolina. Land disturbing on the site will exceed one acre, which requires the site to comply with the NC DENR State Stormwater Regulations. In addition, the site will also have to comply with the New Hanover County Stormwater Ordinance, which requires that the post development discharge rate shall not exceed the pre-development discharge rate for the 2 year, 10 year and 25 year storms. This narrative will focus on the aspects of the NC DENR State Stormwater design. Two (2) above ground stormwater infiltration ponds have been designed to store and infiltrate the first 1.5-inch runoff from the two (2) drainage areas Drainage Area No. 1 is 5.47 acres. Drainage Area No. 1 drains into Stormwater Infiltration Pond No. 1. Drainage Area No. 1 includes a small portion of offsite area within the NC Dot Right of Way. Drainage Area No. 2 is 4.12 acres. Drainage Area No. 2 drains into Stormwater Infiltration Pond No. 2. See the plans and calculations for a detailed design description of the above ground stormwater infiltration ponds. Stormwater runoff from each drainage area above the 1.5- inch volume will bypass each state infiltration pond through an offline bypass special junction box. The stormwater runoff from each special junction box will be collected in a common storm drain pipe, which discharges into a vegetated filter prior to flowing into the stormwater pond designed to meet the New Hanover County Stormwater Ordinance. The discharge from the stormwater pond designed to meet the New Hanover County Stormwater Ordinance will flow through a second vegetated filter at the end of the outfall pipe prior to entering the existing site outlet swale and offsite wetland. An infiltration evaluation of the site was performed by Engineering Consulting Services, Ltd. on August 22, 2003. A copy of the Infiltration Evaluation by ECS, Ltd. dated August 26, 2003 is attached to the stormwater and erosion control calculations for review. The infiltration evaluation includes information on subsurface soil and groundwater conditions at sixteen (16) hand auger boring locations. Three (3) infiltration tests were also performed on the site. Subsurface soil conditions, groundwater conditions and infiltration rates are included in the infiltration evaluation for each infiltration test location. We visited the site with Vincent Lewis of NC DENR on February 16, 2004 to review and confirm the infiltration evaluation results performed by ECS, Ltd. Vincent Lewis advanced seventeen (17) hand auger borings to review the subsurface soil and groundwater conditions. Vincent Lewis determined an approximate seasonal high groundwater table depth at each hand auger boring location. A copy of a letter to the project owner dated February 17, 2004 summarizing Vincent Lewis' findings is attached to the stormwater and erosion control calculations for review. Date Design Andrew and Kuske Sheet S�6'� 902 Market St. CONSULTING ENGINEERS, INC. Wilmington,N.C.28401 3 Of Check Job For Job No. oef/irG9G.C:A/GE.!/ Tia:�:F �a'ilCJ"M/XE. o /i✓Go.t.�,.r-Tr a.✓ vS�- U�'a/c_' _c.��.�F.-✓T /�¢oZZ NO'TF: S�� TNZ �:h.FG Ln1'�"•O QiLi^l?rvsj+6-,� /,97'L�=.'9 PC.i1"n/ to 77a7794 f'iTZ-" g7 S/ 7 oS-g SF e 7b7""4- O/JS/7Z /�,@el-inlJGA� /P.L4:4L o TdT79'L /Sr/ C lvSGcarF U e�T h/i h/G 70 STyf �W 41 op T s< ,00,? h// 7-Ar Ve. r/cT- O 1- / o To 7 rq L O or--- - "✓eq C-e S°1.fc/ 4i7,7 No7�: Tl✓� Td77?'�. 0•�•?�tif/-Cs-E �it��f- h//�.G. d.� /�/V/��Q STb2.-+ter �iiTT ,L /n/r/GTr /l7za�/ ✓�a�/C>.T. ///✓ /PTT�M/�T h'/t,T ,QE,E�/ /'�srlYJE 70 D/I//O,E Tit 7b Ti?L DR S- 4-7 fic / -3 g zS4J'x- NOS; O/_rh/�/�'i'G.= /9YLF.i'f /✓O, / //VG.L(/iJE�/"' �� G ,-! /I �"/ �o•c77 oi.J O% . YiiSriil_FT STh s�r7- 7WW -/r n/G t�c�7- �' o fr/ . Goy /I ivG`/122/✓-/� Date Design Andrew and Kuske Sheet 902 Market St. CONSULTING ENGINEERS, INC. Wilmington,N.C.28401 � Of Check Job For Job No. /n/�a2.�r/-77 o f/SE /7Fte'16r>./rY1�.vD` ��•OZz 77Z:) o A.csr�r.irPc„ �i`/L •� era Z = 4, /z p.e/17iv iP lsn! /J°e���9 h/o. Z /J e�t7y�/✓ 7Z7 Date Design Andrew and Kuske Sheet 5�/BBC¢ yGT 902 Market St. CONSULTING ENGINEERS, INC. Wilmington,N.C.28401 SOf Check Job Sry7 rr+'cr+wrJ7-r For Job No. sTir7�. Sro2.�v✓�sTElt C✓r`lc,�c ry77o-.J.S f�- 0,6"�/n/�yC�' ..�-.�.G.�- n.�a . 1 _ /i^-/�Eti viovl i9.c-F//J' f0� pith i.l if'Y-G /Prt-.Gi'P`n�0 . / ; 3 /s tii✓i T.9vrrn r ri6.✓7' By/<oln/aJ = z S Soo J F r %Soo SF / z g 4-n!17— 2- -o Tog:-., 7W7 G /o ooa SF X 5 O !Yni = q-.moo®.S/= 2 Z- lZ-,O—F 7W7e- 36o0S,= oFrice` !h-a'Loiivr� 8o X 45 ' 2 D 7a 7N"� �15�/�s`t T /�iJ7t/c in��/�1L/G-J l g SOon S/-- //✓c.Gv p/SIG o• 7-o7xlL /aviP.�ifivlc�-..r .ajiGN.�! /a!z- 1��77�/.�7'��' � /S�SSas�/ m ,O,�ira .`✓�9cE /a��-� !�/o. / = Z,3g� Z,i 95.��,5�97 etc m 7vL. /^JN�fivlv� v ijiEF! /S�� SSt�S/3, SSigc IP &a_/o7,�r rs•� /9 .vU, ! G-vFr_-..lr9.L:-ey = 83,7o g 12i94 Date Design Andrew and Kuske Sheet 902 Market St, CONSULTING ENGINEERS, INC. Wilmington,N.C. 28401 Of Check Job c/f For 7///cC Job No, 60.E 0.9 nso. ! �M.r, //lF_ Uf"�✓ './-o�r•tP eve' O`f�i'L'G 5, f7,4c Geq c c-vL�^f7Y /. S �� S7o��G�_Va4 osm vo, t ss-0 t- o,Zo L/g3, -70 1-) //✓�/C.-T7L/l�On/ iC.'97-h= !-o/L /-0-.-f72 j fpoi..//' /✓o77;E ; !/f l_ /ni.:-iG arc . 977., �J 7 C 1'T n/o . / O�PTi9 l ito •� d� 7-2f-F l/c 7'z�c = O,03-757 7- 2- 0 6 7a S6flJonJ�C /f/Gf/ G�oti �.Owi?7 /C- 7r�l1LE_ Na7� ; f�E-iC. J`i TT= v/J'/7'" !i✓/77•f v/NC-G�v7-� G,��✓/•f' O.� NG O .F/.//C //�/ �r /9rLIr i� dry //✓FiG P2L.'TT)vi`/ 7 o 3i7z C of Tr/ @ ////i✓D i9'(/c-f",� 1. ol/I77rtii - f_='X/J'.•7n./C_ .FL G- ✓r7�T2�^-/ •= 2' o . ,5-0 � i r�/�3X/✓�Iv q ii✓F>G77� ITS>n�./ = G v. O - 3, Sc> ` = /7, Oo Date Design Andrew and Kuske Sheet 902 Market St. CONSULTING ENGINEERS, INC. Wilmington,N.C.28401 / Of Check Job 5-7>/ 5 For r r p Q�,�.f-/7o��'�"p Job No. l'•^02 &`f /JU. 09 J ZZ. //✓,t'/L;rx-.t77ci-�J />on�p nip . / >//�YI 1 O o 2z. oa =yBS�sr 2l, oo '/766 Sr- 2v, Ov G' 077-a . +�1 f=c F i�T o.�/ _. / 9, Oo S 9 GI crrc�/� /, S'; S��F'-�� .�,cr�c�ir�7�•.� 3y /N7�K-/��LiV7�Ji.l ; X = Z1 , coo y/ = -/-76 6 S� lrxr 7-76 ro Cr9L C ✓L /7-7� /. ,j � ' .f7b2.9-G-� .��o✓ilJ�/J o a /• .r s7v� rfG� loevir�r l7 = G f 9 3 � �7- _ a ,? Gam' AeA:c i cr✓ z // �/z t 3 0 Cj /1?O FC,� i/✓,zCYL ,vJ/�i7•i--�/ Lv/GC f�i!!er✓ UiJ lJF'i'C i-✓��/tf/��S,f. Date Design Andrew and Kuske Sheet J7f15? qpp Market Si. CONSULTING ENGINEERS, INC. Wilmington,N.C.28401 g pt Check Job .fr /,!'ru�.�wil7�'t- �''T-�-1 ForvC,j Job No. Fc/C- /fin IVO- !ji / ✓t-r.oeA'�' "'. 0110 Z-L P ram../� /✓�. I G/9Zc.�G��_ /sue/=ic.l':L�r.+ti/ Por�/D No, / ' 6�z'/t't✓/Ja�,✓n✓ 77re,F; m I>dC✓/c✓ /Joc✓ ti / j�� / �'2 +f/� r /�/r/J STuit�Sa� O� 2 /, 4✓ 2 T- a- � CD o Z S azs� � 7— /z /�: T_ -- 6 o iPo� r 1 sr fJ�-�9-c,t,, /�v c..�n/ 77r�i.�. ,*=v.c P•2v v/ ,o�,� S'Tv 2-�-z�' CJ = /37. /v T OF�L/NF l�yP�9.(J' QEG//2�T(/NG�otillloXn4�/ /h/FO•G/"/�jf)o.•`J : Nam: �7b�.^�//�v�l-n�2_ �'� v/✓��'/= � c//�� 77j Date Design Andrew and Kuske Sheet 902 Market St. CONSULTING ENGINEERS, INC. Wilmington,N.C. 28401 � pf Check Job S'Ti:'r STvrrvwr.,i�•rr_'/(_ Form Job No, /r-�� /G7rc�?'At�-✓ /ltr✓!J r•a. ( //.t-rz' OE- f/f: G<f/N,,EnJ/'� O 7 022 S717 O!� O /Iv�?r-!G,�. .S��-•-�vw r•97�=.../L won//J r✓�'. :S /D .q 4 G-.67-f' 7 . /9" r 17 / �G /,L9/lfb• / 4 /Z Q/z, -7,r2,��, Q/�osr�, � /3, 33 cFs F-zor/ r'ty o.��c.r00 /�Er�/C. H✓r-?/7'YZ.�/C /•-02. Soa e y7'e -. 4. 770-�. ' � / ?, / ! ^- / 8, Oc� c / , / / ' 1f_- O .r"'If�✓!` %7l_r'1f' LTaX 7b/° E6 F T/a .�� - ✓3. -O ' — /� �i �" �f , G 7 ' p J7I7 S%�"' <'J/i^�I f=ry;/ G-L-. .�h•JesCJy'" f}.�.-✓G/•f-�'f�l.�lG /9. S31 ' 67 Oe- L�,.N_) Date Design Andrew and Kuske Sheet 902 Market St. CONSULTING ENGINEERS, INC, Wilmington,N.C.28401 Check Job .STYj s x-:- 7Xvt For y�,r; o�x.1' Job No. �irZcl.��orc. 0r7-r.16' 4-1� r> x.y/XE=<7 v-1'E DE✓elr,—v r./Gi/�-/197ortJ �7p•-'r•.7 NO.L ' S7Ti9�' S7L J�✓r97? rY_ Cf{GL✓��a�c J1 �olL D2/l� �r11��JY�6_/1 n/v. C /r/f iLi>"L�Y37c �t /Vv ire rj0 Z /✓U7 GoGC oL�7 i�z7- /c2r-7�7-9— .-I1" 61-1 No, / .��/ � /rJ /�� rL 7')L/!7`7 erg/ ��O.•./� ^/"U. / , Pam. : a/G witc 6' - E �r o/t- /.v �i� 7�� �."no•-./ ,ova.✓s7 � . Z 7b 7T/ !'o �r t� G d C�77�a•-vr �f /I�JG 7iL,-IV7 /M/�F/L%'iv i11 /�'i-F_.iif �yi� �.'I�+..r.y-(r✓= ✓l�-r"iy rJ'y. � 2 4- V^,l i 7- So J'F - / /Z !/r✓/T �7r�r�7-.^-rc,1,7- /f'VrLc�.e./G = 63oos� r9"T l03 o a .rf r2o v/= r�Jn-E.4- - �i 9SaoSi= rGoo� rlw�.7 — Z Z4- (/Nr%- i'I/'�n�-�i%�'lEn./i— /3vrL.�i.✓G1 = Z-'�, DOG.Src f•1- - G � Ci�.`f'v ✓,.!-E .ls'VlGO,�JG.- (00 �X �/-O r = 2�f-G�,j'�' �964SF e -7-8--l77-7z %3 -7 / -I- �oJ ��JF o Gor./�✓�•.G�-�' 1"/+J,E c,�/!L/�..f' ir•,�G G,�O/rv(f_ = /Sr o0U,fi f�UU L ® 7" % /`__ �!/��i(i✓/u -r /,>Yr�.�� r=off - // S Date Design Andrew and Kuske h 902 Market St. CONSULTING ENGINEERS, INC. Wilmington,N.C.28401 Of Check Job 57r?il�f7Dn-,'7l��f"/T.(_'/Z— For 72/X,—`,E_ /,,.r�IL./•✓+�l/XP:�'iJ Job No. /yh✓G//✓Y'7LT�'A7lr. -�//10r.JO lW^L �.5�-- 17�f/�iF Fi'J/✓i.�✓„�/'Gs O�I o'Z� a; 72) 7,r7,?- / %�.�-✓��v� ✓l,zr1?- _ //SS/ �T�/ z, 6SrJz f=•c�it /j/L�S>r.J/JL,C /1N-�!".'Y hlo. �- ® /J �,9Z� �/ILs,'/� n/a, Z G � f:� rho = G�3. 936SF /, 57rlL s ,Os�--r��.rcc �y,•�.c.�- ,.��, 2 �a - los �a crJ-Gc� Z-.-T-;� 7.;r"E- /. S- /2 � ,ems�v/,«� is •, s7vh,�it,� � •/,�, 03 8 �r-s /,✓�i�7�sr�7o-../,��7P= /-"a.tr ir✓�ic_iYt.o7�otiJ aa..Jy n/o. Z ; UTL ; v1F 7717_'' .Tn�E' /L..�TT-� �:r /h1F/LTn-•9`i c� /.�v�0 /..Q. / ,D€/�i"7f 7 a S�i-,9 So ..J'.� /fiG N City v.•./OGi�9��.c Tv3c� ; ' f�<=o77f T Srrtl d.✓�Gz fy��/� Gbh Try trtE = �o A 67 ' - r��r>u , . �-r /�f-i�l�r n37<• ✓ - /B.00 '- / 67 '� y�0/v/J �f.�7"i� 1b ry7i77ti v�ry-�tit f 2, oo � v®.. 1iti�iG. i.�..i;'�7v../ f�v../lJ i'✓O. Z j0l3?Ji"/ _ /7 00 / Date Design_ Andrew and Kuske Sheet 5Bla `//� 902 Market St. CONSULTING ENGINEERS, INC. Wilmington,N.C.28401 // /z Of Check Job For 1;y1t !- o.t-er. rsl,cF_-sy Job No. Goy/xe o. rn irk vl GL"vFca//r�EvT— ©40ZZ /./o 7b1-2 of ii9a.✓iC 5c- v/77,n•�/ — Z3. Oa 2z , o0 76 6 9,S.-- /.S " S7nTF_ 2 / -J o 75 o if-g S/= ,!�;a 77-e i / G ve/ 77 n��/ - /9. O c7 36 Zo S.c G.'rFC/�- /. .S� �• 5�;?�r i'r-i:G� �`�{-/�ri✓77�c-�../ t3� //y77�2,L� Li;77o^i: m �/ rJ66 l - GZ93 l �Zl• `Io Cft�c� �ry7E I . S- " --STn/+ �9CG ® /. S ' S7a/ �l-G /� -o v/4�/� _ Z3 26 1 3t57- 2,�7 Z ® /i S " 5-7b L--f G� PiGc� /i ta�/� llP d /6 2 S '/ STv.z� G� 2� Q v/ cG/� = 16 , 03 8 GT 3 Z. S7D•2-if (ram CJ K a �,�f--�/.� rf y�•-9:rJ' S,o�c f.�JZ ._n�r..�.i��•� /"L .-7->- J S-. /Y!O/�!/` /f.Jf=GH�l^1770r`> G�/GL YC�LGDc-..1 0�•�J Date Design Sheet Andrew and Kuske S-11fl,p4- C *Y-W 902 Market St. CONSULTING ENGINEERS, INC. Wilmington,N.C.28401 Of Check Job,f'77�'T2��t'VbA-, For •• /%,.r!,/,' Oi�1C./�/"'7/)C'G/J Job No. (/Sc- UG-'✓L Gas�M � Q'r'�'O x••�. GAG G v c_ n7 r /i�Jr/c T�.�17,or✓ i�v //a /Vo, Z p24-Lj 0 Y../-J i 'Ile 9 oG /,6/ o35' T=7-3 Q — 1-57 /4 6 2 G� = (36 S--) C 1 ) 7T= /6/ ;7 - / 77, z•7_ /--7/n/ 2 `IZ S- h'zv 0 /)K.�1-c--� o o V.-✓ 77✓�iE �vsL %l�o ciJ D.�.J ..1'/n/L.l'"'zG �j�,�Gi.�JFl3 y,�.g„�'J' -�/�r G/iJL ✓?i.-�/G97D-�J �OXJJO. Z /N�(�.^-///Tl• /a•L Z7-y/ 'j 77 17;'72-'- S7-Va • k c,J/7'Y1'2 v�//LC. ear ►✓7rC� �/ r�^r� f? CJ FF G /+-J� S.�/„fJ�!�n../r^_ G L�'./hti/O�T 1%r.•�JG. y- /t�:^h't�/� F=v /t-. ,�O/<`< /�JZ ✓Yry G,'�p,-�J I�+? � �./a. 2 S.Z> /0/'. joTTb�-j al- //c:, K dz'o / cc::>, So 80 ,(jo:/•. 7"ra.-' !.. r vi'J'f•)�'•'\J -' G.S, S"O %8, o o ' _ �.-76 Date Design Andrew and Kuske Sheet 902 Market St, CONSULTING ENGINEERS, INC. Wilmington,N.C.28401 Check Job JiYI'47--J714"7w�,g,4— For %7/y(-�.G D�,'FCf�l/;>�� Job No. /7vw�..! F',Lc�.�/ /-�`�" ;vP �Lf'�,r.�J'Tio--✓ t�,L 23, 56 ltFr-G ✓E G r'l37�J h=i� 7�� (/�Lo�/77�� /t7 /O yl�� faty= /G-P o c oO C-Y%1 ep r%r % T1 �'yC <.�i�% G`LG f G/C L�r2 omo7 05 Zv ' X 6 0 v Gf" auto-¢' r--ie-TC-'C_ l/V'-7Lv c /7)-1 /, NEW HANOVER COUNTY STORM WATER DESIGN MANUAL SECTION 60 - OPEN CHANNEL DESIGN PROCEDURES TABLE G0-1 MAXIMUM ALLOWABLE DESIGN VELOCITIES FOR VEGETATED CHANNELS ' Permissible Velocit Typical Soil Grass for Established Grass Channel Slope Charateristics' Lining Lining(fUsec) 0-5% Easily Erodible Bermudagrass 5.0 Non-plastic Tall Fescue 4.5 (sand&silts) Bahiagrass 4.5 Kentucky bluegrass 4.5 Grass-legume mixture 3.5 Erosion Resistant Bermudagrass 6.0 Plastic Tall Fescue 5.5 (clay mixes) Bahiagrass 5.5 Kentucky bluegrass 5.5 Grass-legume mixture 4.5 . 5-10% Easily Erodible Bermudagrass 4.5 Non-plastic Tall Fescue 4.0 (sand&silts) Bahiagrass 4.0 Kentucky bluegrass 4.0 Grass-legume mixture 3.0 Erosion Resistant Bermudagrass 5.5 Plastic Tall Fescue 5.0 (clay mixes) Bahiagrass 5.0 Kentucky bluegrass 5.0 Grass-legume mixture 3.5 Easily Erodible Bermuda s Non-plastic Fescue 3.5 P Tall Fescue 2,5 (sand&silts) Bahiagrass 2.5 Kentucky bluegrass 2.5 Erosion Resistant Bermudagrass 4.5 Plastic Tall Fescue 3.5 (clay mixes) Bahiagrass 3.5 Kentucky bluegrass 3.5 Source: USDA-SCS Modified, Erosion and Sediment Control Planning and Design Manual, N.C. Department of Natural Resources and Community Development, Land Quality Section, May 1994. NOTE: 'Permissible Velocity based on 10-yr storm peak runoff. 'Soil erodibility based on resistance to soil movement from concentrated flowing water. 'Before grass is established,permissible velocity is determined by the type of temporary liner used, ADOPTED SEPTEUREt 5. 2000 /lo ENGINEERING CONSULTING SERVICES, I TD. Geotechnical a Construction Materials .Environmental R 2003 Mr.SteveNiemeyer /nICT�l77p/ / 7zrr7 Nb, 1 = Z7 TriCoast Properties,LLC ///r/L7)C?J7on/ TEfT/Vo, /N 1650 Military Cutoff Road Z � /Z Suite200 /Nf/e 7xgTio,� 7�rT�o , 3'e lfZ /N/h,� Wilmington,North Carolina 28403 Re: Infiltration Evaluation -I�-rfvE�t�G = 0-7 '"11/414- Saunders Properly NC AeSn/� ry/i✓ii•7 v O..SZ Wi]mington,NorthCarolina � �•�' �hG! ECS Project No.22.10702 Dear Mr.Niemeyer. Engineering Consulting Services, Ltd• (ECS) recently conducted an infiltration evaluation for the Saunders Property located off of Market Street in Wilmington,North Carolina. This letter, With attachments,is the report of our investigation. Feld Investigations On August 22, 2003, ECS conducted an investigation of the subsurface soil and ground water conditions at the locations indicated on the provided Site Sketch The purpose of our investigation was to determine the consistency of the subsurface soils across the site and the infiltration rate of the subsurface soils at three test locations. We investigated the subsurface soil and ground water conditions by drilling 16 hand auger borings to depths of approximately 5 feet to 8 feet below the existing ground surface at the approximate locations indicated on the- site sketch. We visually classified the subsurface soils and obtained representative samples of each soil type encountered. The attached Infiltration Evaluation Form provides a summary of the subsurface conditions encountered at the hand auger boring locations and the results of our infiltration tests. Our field classifications indicate that the subsurface soils at the test locations consisted of gray silty fine to medium sand and tan fine to medium sand stratas. Ground water was not encountered at the time of our exploration to the depths investigated. However, the subsurface soils below 36 to 60 inches did appear to become moist with depth. We denoted a gray coloration in the sand stratas at depths ranging from 36 to 84 inches below existing grades. We conducted three infiltration tests near the band auger boring locations#1,V,and Nil. The infiltration tests were conducted within the upper stratum of sands, where the base of an infiltration system will be installed at least 24 inches above seasonal high ground water levels. The results of the tests are summarized on the attached Infiltration Evaluation sheets and are also listed below. P.O.Box 10434,Wilmington,NC 28404.(910)686-9114.FAX(910) 686-9666. 1-8D0-327-5832 . Jacksonville,NC(910)355-2727. www.ceslimiled.cot ' Abstkcn.MD• Atlanty GA Austin'rX Rahinw¢,MD ClunUlly,VA•Chalone,NC psirago,IL•Coraclia,CA• •Dallas,TX Danville.VA• Raksick.MU•Fcini<k$wrE.V Grt=boeo,NC.Gtecnviilq SC-Norfolk,VA•Research Tsimgk Pak NC-Riclunon<k,VA-Roanoke.VA•San Antonio.TX-Williamsburg,VA-W ihningion•NC •W inchester.V A •Testing S<rvices Only / 7 InfiWatioo Evalwtion saundeu Property Wilruirtgon,North Carolina ECS Project No.22.10702 Infiltration test #1 was performed at a depl}t of approximately 24 inches below existing grade and indicated an infiltration rate of 0.45 incurs per minute. 'Infiltration test#2 was performed at a depth of approximately 24 inches below existing grade and indicated an infiltration rate of 0.2 inches per minute. Infiltration test #3 was perfomied at a depth of approximately 60 inches below existing grade and indicated an infiltration rate of 0.7 inches per minute. Please see the attached site sketch for infiltration test locations. Evaluations Based on observations in the hand auger beings,it is our opinion that the seasonal high ground water level at the site ranges from a depth of approximately 36 inches to 84 inches below existing grade. In order to keep the base of the infiltration system.at least 24 inches above the level of the seasonal high ground water levels,the infiltration system will need to extend no deeper than 24 inches below existing grade at infiltration test locations#1 and#2 and 60 inches below existing grade at infiltration test location #3. Such installation depths will place the base of the infiltration system within the upper stratum of moderately-drainable sands. Our test results indicate that the infiltration rate for these materials is 0.45 inches per minute at test location#1, .0.2 inches per minute at test location#2,and 0.7 inches per minute at test location#3. The lower stratum of relatively free-draining fine to medium sands,within which seasonal high groundwater levels are likely to occur,is expected to have infiltration rates considerably greater than the controlling infiltration rates for the shallow soils. It is also likely that the seasonal high groundwater conditions and infiltration rates can vary across the site due to naturally occurring soil type and because of the surface topography. If you have any questions regarding this report,please do not hesitate to contact us. Respectfully, ENGINEERING CONSULTING SERVICES,LTD. i'°I�rltrCAP ��' i Q Kris J.S rm Walid M. Sob h 22 0 8 a ��03 Construction Services er Mama g Principal Engine"e� NC License No.2�2 lei,4p M. c•O : Attachments: Site Sketch Infiltration Evaluation wrm E- Fngincering Consulting Set-vices,Ltd. Infiltration Evaluation Job Number 10702 Location:Wilmington,NC Job Name:Saunders Property Contractor.TriCoast Properties,LLC [lead Depth/ . Auger Date Elevation Sal Classification. Blows Remarks l.ocatiea i g2203 O-W White to Tart Fate to Medium SAND No ground water encountered to depths explored Seasonal High Water Level at tI4" Infiltration Test 93/Rale=0.7 inrmin 2 V2203 0-4r Gray Silty Fine to Medium SAND No ground water eneountercd to depths explored 48-W Gray Fine to Medium SAND Seasonal High WaterLcvel at4g" 3 8M03 0-96' Gtay Fme to Medium SAND No ground water rncountered to depths implored Seasonal High Water Level at 72" 4 V2203 0-84" White to Tan Fine to Medium SAND No ground water encountered to depOns explored Seasonal High Water Level at 72" 5 92203 0-94" Cray to Tan Fine to Medium SAND No ground water encountered to depths explored Seasonal high Water level at 60"- 6 8/2203 0-60" Gray to Tan Fine to Medium SAND No ground water encountered to depths explored Seasonal High Water Level at 54" 7 U2203 0-49" While to Tan Fine to Medium SAND No ground water encountered to depths explored 48-72" Gray Fine to Medium SAND Infiltration Test N2/Rate=02 in/nnin Scasomal Iligh Water Level at 48" Engineering Consulting Services,Ltd. Infiltration Evaluation Job Number: 10702 Location:Wilmington,NC Job Name:Saunders Property Contractor.TriCoast Properties,LLC nand Depth Roger Date Elevation Sot(e7assir"tioa Bloxs Remarks LoetUon 8 UnD3 0448" Gray to Brown Fine to Medium SAND No ground water encountered to depths explored 48-72" Gray Fine to Medium SAND Seasonal High Water Level at 42" 9 812203 0-60" Gray Fine to Medium SAND No ground water eocountered to depths ezplorcd Seasonal High Water Level at42" 10 &UO3 0-h2" Peat(Organic Matter) No ground water encountered to depths w*cd 12-36" Dark Gray Silty Fine to Medium SAND 36-W Gray Fine to Medium SAND Seasonal High Water Level at 36" 11 8/2203 0-7r Gray to Tan Fine to Medium SAND No ground water encountered to depths explored Se=nal High Water revel at 48" Infiltration Test#IAWe=0.45 Wmin 12 8a203 0-72" Gray Fine to Medium SAND No&round water encountered to depths explored Seasonal High Water Level at 54" 13 82203 0-72" Gray Fine to Medium SAND No ground water encourucred to depths explored Seasonal High Water r,cvd at 60" 20 Engineeeing Consulting Services,Ltd. Infiltration );valuation Job Number. 107O2 Location:Wilmington,NC Job Name: Saunders Property Contractor.TriCoast Properties,LLC -F�� I Nand Depth Auger Date Elevation Son ClassiGestSon Blows Remarks Location 14 812703 0-72" Tan to Gray Silty Fine to Medium SAND No ground water enco miettd to depths explored 72-9C Gray Silty Fine to Medium SAND Seasonal High Water Level at 72" 15 82703 0-54" White Fine to Medium SAND No gramd water encountered to depths explored W2" Gray Silty Fine to Medium SAND Seasonal nigh Water Level at 54" 16 82703 0S' Peat(Organic Matter) No ground water eno=lcred to depths explored 6-36" Dark Gray silty riot to Medium SAND 3fr60" Gray Silty Fine to Medium SAND Seasonal High Water at 36" urc /r+F/Grxer�J R.a�C' a�OvL . -9 g + i Sir i I S DENOTES NANO AUGER LOCATION DENOTES IAFILTMTION TEST LOCATION Pntbwi:cG lOeQSmiw, rrta[cr AuueCn fa101 ciunrc rc. Ad SITE LOCATION FLO sUyE Nit 74SOMIftSONN �LTb umfe[�NC21411 SAO,ROCRS AAOFCRTY. WILMINGTON, NC ryf0)6RFSllt "OF'i0`Yo N 2Z -_ _—Andrew & Kuske CONSULTING ENGINEERS, INC. John R.Andrew,P.E. J.Phillip Norris, P.E. 902 Markel Street Wilmington,NC 28401-4733 John S.Tunsiail,P.E. Neal W.Andrew.P.E. 910/343-9653 910/343-9604 Fax John A,Kaska,III,P.E. J.A.Kuske,P.E.of Counsel — w .andrewandkuske.com James T.Pyrtle,P.E. C.Lawrence Sneeden,Jr.,P.E. February 17, 2004 Mr. John Lare, Member Three Oak Property, LLC 926 Bayshore Drive Wilmington, NC 28411-9425 Re: Site Infiltration Evaluation Three Oaks Mixed Use Development 7750 Market Street New Hanover County, NC A & K Project No. 04022 Dear Mr. Lare: We met with Tom Tucker and Vincent Lewis, NC DENR Regional Soil Specialist at the Three Oaks site on February 16, 2004 to review and confirm the infiltration evaluation results performed by Engineering Consulting Services, Ltd. Vincent Lewis advanced seventeen (17) hand auger borings in the approximate locations shown on the attached schematic plan. The seasonal high groundwater table (SHGT) varied in the locations of the hand auger borings as shown on the attached schematic plan. The depth to the seasonal high groundwater table (SHGT) was shallower then anticipated. Please note that the State Stormwater Regulations and the New Hanover County Stormwater Ordinance require a 2' minimum separation from the bottom of any proposed stormwater infiltration system to the seasonal high groundwater table (SHGT). The State Stormwater Regulations allow soil fill on a case-by-case basis to meet the required 2' minimum separation. Therefore, additional soil fill may be required on the site. Based on the soils encountered and the depth to the seasonal high groundwater table, Vincent Lewis determined that the site would be acceptable for stormwater infiltration. We appreciate the opportunity to assist you on this project. Please contact us with any questions or comments you may have. Sincerely, ANDREW & KUSKE C SULTING ENGINEERS, INC. Joh A. Kusk e, III, P.E. JAKIII/asn 0402202-17-04-Itr cc: Vincent Lewis / NC DENR Regional Soil Specialist Linda Lewis / NC DENR Tom Tucker/ Three Oak Property, LLC Dave Sweyer/ Century 21 Sweyer & Associates Adam Rahhal /.New Hanover County Engineering Dept .. L THREE OAKS A&K Project No. 04022 Legend -m _ Approximate location v of hdnd auger boring ILg" ' by Vincent Lewis, SHGT 6T• NG DENR.Regional Soil Specialist SHGT Seasonal High + " Groundwater Table 1 r _ j_ ♦ / 1.4 ! Sycrso. ; � ��♦ t t�� � / ... 01 •ham-J�� [OJ � / // 01 t SHGT 58"A SHGT 44" • ��� i 0 1 O It I ♦ON I �, rN ♦�� / SHGT 32" SHGT 36"A SHGT 36"► • 1 1 i k CIE �T��� ` 1(y�� �\ 11 1 b-� _ • � �Exicl7l.JG— i -- \/1� •SH�.Zfl• SI�� 4 � ♦.P�� Date Design Andrew and Kuske Sheet 902 Market St, CONSULTING ENGINEERS,INC. Wilmington,N.C.29401 Of Check Job NEVV/fil>✓ociC,L tcvM L/ For 7//�EE gym�rXL�O Job No. sTD�ci-I�//l7�it Ole tvc?7>4al1 04o2z d/Eh/C///I./Ot/GIL GOv/N/Ty STb/LMw GALL✓L -1-770 f nb : �4 S7Dsr. 7t//PTc� SyU7L��? Nell 77J STDrt-E �i r�//�+ /.�/�/�-Tn-?T� 7!J`� •�i�J'T`� /. S �'h/cy ��n/F.9L C. /�vNOFiC /tir /�LLciLO/TJ�rG-� /��/T77F T/f?� 7b !/�.7Lr c .�'_ d'cs r.✓G rr./ i9- Srf G c �.>-s/r=rE ,o /•✓C e i17. 7 � fYJ T.EM /9f .eE 4%,ivotG/J /�i✓d �� /../7t5 H/�iJOvEiC Coci../Tzf STd�Mk/?�!L (yC-O/.v/h.I,GE_, T7>`L�. G.ov..A7'y S7TJ2M k//f-rE-� GVG O/N/rTVGE rrir-r�,f` 777.E %o,rTOEvE_ 4o/�M.E../T Zvi-./OAF FjLa✓7 ,c v/✓O F/- G.e o.-, �7Y� t.T� Fog. 7it� 77vo 7t✓F../7-y /=ivE C 2sJ y�./s .c s722)� epi=- OF�if�if STa� i �6L G bcL✓f OE7Yt�4/ivc %7t�. .rAr rX /I"n/� �O.!"T- ,O�f/� c.oP/H.�-/�J./�- iC-"✓i�/o/CiG'. /�o(�. EfrGH S7b2..� 7�tE .r7a2ryr✓itTCrL LO/�/)7f.4LS`R!^»�"'7 �'�I✓.TT so ,��Ec�,�rr o Syr nr� /oo yc�nc. sraa.y ui o7;2� : sTo-cr7e' r-o� .oi�E cstGG�G�/77o.�/f' .��••L �i`E cr✓r?E Oo T ,ro�c. ,�. �� C zs-) y��•i..- sro.�..-,-� �,�E�/rr�9c.`�Eo,---off /eE i//mow. ` NEW HANOVER COUNTYSTORM WATER DESIGN MANUAL SECTTON 40-R UNOFF DETERMINATiON PROCEDURES TABLE 40-3 NEW HANOVER COUNTY DEPTH-DURATION-FREQUENCY TABLE TABLE 40-3A Duration Return Period 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr (time) (in) (in) (in) (in) (in) (in) 5 min 0.49 0.55 0." 0.68 0.74 0.80 I'll 0.88 0.99 1.07 1.20 1.31 1.41 15 min 1.15 1.29 1A' 1.57 1.70 1.84 30 min 1.62 1." 2.14 2.47 2.73 2.99 60 min 2.10 2.58 2.92 3.41 3.80 4.18 2 hr 2.50 3.30 3.60 4.20 4.70 5.20 3 hr 2.80 3.50 4.05 4.70 5.20 5.80 6 hr 3.30 4.20 4.82 5.71 6.40 7.00 12 hr 3.90 5.00 5.80 6.90 7.70 8.60 24 hr 4.50 5.80 7.00 8.05 9.00 10.00 TABLE 40-3B Duration Return Period 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr (time) (u✓llr) (iMu•) (in/lu') (Mr) (inthr) (in/hr) 5 min 5.88 6.63 7.23 8.15 8.87 9.60 10 min 5.28 5.91 6.43 7.22 7.85 8.48 15 min 4.60 5.15 5.59 6.27 6.82 7.36 30 nun 3.23 3.84 4.28 4.94 5.46 5.97 60 nun 2.10 2.58 2.92 3.41 3.80 4.18 2lir 1.25 1.65 1.80 2.10 2.35 2.60 3 hr 0.93 1.17 1.35 1.57 1.73 1.93 6 hr 0.55 0.70 0.80 0.95 1.07 1.17 12 hr 0.33 0.42 0.48 0.58 0.64 0.72 241rr 0.19 0.24 0.29 0.34 0.38 0.42 Source: Latest Versions ofNWS TP-40 and NWS Hydro-35 ADOPTED SEPTEMBER 5, 2000 PAGE 40-5 1-12 P-12 1-13 u� I-9 j I-1 P-13 P-8 L P 2 I-3 I-6 P-6 J-2 P-7 I-8 P-11 J-1 P-14 Outlet P-3 14 P4 5 P-10 P-18 1-11 1-14 1-17 P-9 L15 P 17 1-10 P-16 1- Project Title:THREE OAKS STORM DRAIN PIPE CALCULATIONS FOR DRAINAGE AREA NO.1 Project Engineer:JOHN A.KUSKE,III,P.E. c:VhaestadlstmcVoakda1.slm SITEWORKS DESIGN GROUP StonnCAD v1.0 05/13/04 10:12:50 PM ®Haeslad Methods,Inc. 37 Brookside Road Waterbury,CT 06708 USA (203)755-1666 Page 1 0/1 P/PE e4ccuc,f�q,�f DOT Report Pipe -Node- Inlet Inlet Total -Ground- -HGL- Slope- -Section- -Section- Length Average Description Upstream Area CA CA Upstream Upstream Energy Discharge Shape (ft) Velocity Downstream (acres) (acres) (acres) Downstream Downstream Constructed Capacity Size (ft/s) (ft) (ft) (ft/ft) (cfs) P-12 1-12 0.14 0.13 0.13 22.50 20.91 0.000171 0.84 Circular 140.00 0.69 1-13 22.20 20.89 0.002500 3.23 15 inch P-13 1-13 0.35 0.29 0.42 22.20 20.89 0.001411 2.43 Circular 70.00 1.98 J-1 23.50 20.79 0.003000 3.54 15 inch P-9 1-10 0.22 0.17 0.17 24.00 21.49 0.000289 1.10 Circular 70.00 0.90 1-11 24.00 21.47 0.002857 3.45 15 inch P-10 1-11 0.15 0.12 0.29 24.00 21.47 0.000772 1.80 Circular 65.00 1.46 1-8 24.10 21.42 0.004769 4.46 15 inch P-8 1-9 0.28 0.27 0.27 22.70 21.46 0.000684 1.69 Circular 68.00 1.38 1-8 24.10 21.42 0.002059 2.93 15 inch P-15 1-14 0.34 0.28 0.28 30.40 25.56 0.004192 1.77 Circular 110.00 2.93 1-15 30.10 25.20 0.005000 4.57 15 inch P-16 1-15 0.25 0.19 0.47 30.10 25.20 0.004319 2.94 Circular 138.00 3.49 1-16 28.10 24.70 0.005000 4.57 15 inch P-17 1-16 0.25 0.24 0.71 28.10 24.70 0.002000 4.34 Circular 170.00 3.13 1-17 26.50 24.49 0.005000 7.43 18 inch P-18 1-17 0.34 0.32 1.03 26.50 24.49 0.003439 6.16 Circular 16.00 3.49 1-4 26.50 24.44 0.010000 10.50 18 inch P-1 1-1 0.16 0.15 0.15 31.70 27.32 0,009080 0.97 Circular 50.00 2.54 1-2 31.70 26.93 0.010000 6.46 15 inch P-2 1-2 0.11 0.10 0.26 31.70 26.93 0.009650 1.61 Circular 120.00 3.05 1-3 28.10 25.86 0.010000 6.46 15 inch P-3 1-3 0.15 0.14 0.40 28.10 25.86 0.011059 2.47 Circular 145.00 3.00 1-4 26.50 24.44 0.016966 8.41 15 inch P-4 1-4 0.52 0.44 1.87 26.50 24.44 0.011264 11.15 Circular 158.00 6.31 1-5 24.10 22.66 0,011013 11.02 18 inch P-5 1-5 0.93 0.79 2.66 24.10 22.66 0.004596 15.69 Circular 190.00 5.52 1-6 23.80 21.85 0.005000 16.00 24 inch P-6 1-6 0.51 0.44 3.10 23.80 21.85 0.002671 17.97 Circular 71.00 4.85 J-2 24.80 21.66 0.002535 20.65 30 inch P-7 J-2 N/A N/A 3.10 24.80 21.66 0.002728 17.84 Circular 83.00 4.89 1-8 24.10 21.42 0.002530 20.63 30 inch P-11 1-8 0.07 0.04 3.71 24.10 21.42 0.002602 21.13 Circular 230.00 5.10 J-1 23.50 20.79 0.002522 33.49 36 inch P-14 J-1 N/A N/A 4.13 23.50 20.79 0.003519 23.00 Circular 37.00 5.96 Outlet 23.00 20.54 0.002973 36.37 36 inch Project Title:THREE OAKS STORM DRAIN PIPE CALCULATIONS FOR DRAINAGE AREA NO. 1 Project Engineer:JOHN A.KUSKE,III,P.E. c:lhaestad%tmcltoakdal.stm SITEWORKS DESIGN GROUP StormCAD v1.0 05/13/04 10:00:33 PM ®Haestad Methods, Inc. 37 Brookside Road Waterbury,CT 06708 USA (203)755-1666 Page 1 of 1 P/PE CAGGvrcy�1- DOT Report /o 7--'f Pipe -Node- Inlet Inlet Total -Ground- -HGL- -Slope- -Section- -Section- Length Average Description Upstream Area CA CA Upstream Upstream Energy Discharge Shape (ft) Velocity Downstream (acres) (acres) (acres) Downstream Downstream Constructed Capacity Size ON (ft) (ft) (tuft) (cfs) P-12 1-12 0.14 0.13 0.13 22.50 22.05 0.000171 0.84 Circular 140.00 0.69 1-13 22.20 22.03 0.002500 3.23 15 inch P-13 1-13 0.35 0.29 0.42 22.20 22.03 0,001411 2.43 Circular 70.00 1.98 J-1 23.50 21.93 0.003000 3.54 15 inch P-9 1-10 0.22 0.17 0.17 24.00 22.17 0.000289 1.10 Circular 70.00 0.90 1-11 24.00 22.15 0.002857 3.45 15 inch P-10 1-11 0.15 0.12 0.29 24,00 22.15 0.000772 1.80 Circular 65.00 1.46 1-8 24.10 22.10 0.004769 4.46 15 inch P-8 1-9 0.28 0.27 0.27 22.70 22.14 0.000684 1.69 Circular 68.00 1.38 1-8 24.10 22.10 0.002059 2.93 15 inch P-15 1-14 0.34 0.28 0.28 30.40 25.58 0.001849 1.77 Circular 110.00 2.48 1-15 30.10 25.51 0.005000 4.57 15 inch P-16 1-15 0.25 0.19 0.47 30.10 25.51 0.001990 2.93 Circular 138.00 2.54 1-16 28.10 25.26 0.005000 4.57 15 inch P-17 1-16 0,25 0.24 0.71 28.10 25.26 0.001669 4.30 Circular 170.00 2.44 1-17 26.50 24.97 0.005000 7.43 18 inch P-18 1-17 0.34 0.32 1.03 26.50 24.97 0.003318 6.05 Circular 16.00 3.42 14 26.50 24.92 0.010000 10.50 18 inch P-1 1-1 0.16 0.15 0.15 31.70 27.32 0,009080 0.97 Circular 50.00 2.54 1-2 31.70 26.93 0.010000 6.46 15 inch P-2 1-2 0.11 0.10 0.26 31.70 26.93 0.009650 1.61 Circular 120.00 3.05 1-3 28.10 25.86 0.010000 6.46 15 inch P-3 1-3 0.15 0.14 0.40 28.10 25.86 0.007751 2.47 Circular 145.00 3.00 14 26.50 24.92 0.016966 8.41 15 inch P4 14 0.52 0.44 1.87 26.50 24.92 0.010865 10.95 Circular 158.00 6.20 1-5 24.10 23.20 0.011013 11.02 18 inch P-5 1-5 0.93 0.79 2.66 24.10 23.20 0.004635 15.40 Circular 190.00 4.90 1-6 23.80 22.32 0.005000 16.00 24 inch P-6 1-6 0.51 0.44 3.10 23.80 22.32 0.001612 17.60 Circular 71.00 3.75 J-2 24.80 22.22 0.002535 20.65 30 inch P-7 J-2 N/A N/A 3.10 24.80 22.22 0.001571 17.43 Circular 83.00 3.63 1-8 24.10 22.10 0.002530 20.63 30 inch P-11 1-8 0.07 0.04 3.71 24.10 22.10 0.000887 20.58 Circular 230.00 3.18 J-1 23.50 21.93 0.002522 33.49 36 inch P-14 J-1 N/A N/A 4.13 23.50 21.93 0.000979 22.38 Circular 37.00 3.22 Outlet 23.00 21.90 0.002973 36.37 36 inch Project Title:THREE OAKS STORM DRAIN PIPE CALCULATIONS FOR DRAINAGE AREA NO. 1 Project Engineer:JOHN A.KUSKE,III,P.E. c:thaestad�stmc\toakda1.stm SITEWORKS DESIGN GROUP StormCAD v1.0 05/13/04 10:01:45 PM C Haestad Methods,Inc. 37 Brookside Road Waterbury,CT 06708 USA (203)755-1666 Page 1 of 1 PIPE cAGGvc- A7?0^Ar DOT Report Pipe -Node- Inlet Inlet Total -Ground- -HGL- -Slope- -Section- -Section- Length Average Description Upstream Area CA CA Upstream Upstream Energy Discharge Shape (ft) Velocity Downstream (acres) (acres) (acres) Downstream Downstream Constructed Capacity Size (fus) (ft) (ft) (Wft) (cfs) P-12 1-12 0.14 0.13 0.13 22.50 21.06 0.000219 0.96 Circular 140.00 0.78 1-13 22.20 21.03 0.002500 3.23 15 inch P-13 1-13 0.35 0.29 0.42 22.20 21.03 0.001850 2.78 Circular 70.00 2.26 J-1 23.50 20.90 0.003000 3.54 15 inch P-9 1-10 0.22 OA7 0.17 24.00 21.62 0.000371 1.24 Circular 70.00 1.01, 1-11 24.00 21.60 0.002857 3.45 15 inch P-10 1-11 0.15 0.12 0.29 24.00 21.60 0,000998 2.04 Circular 65.00 1.66 1-8 24.10 21.53 0.004769 4.46 15 inch P-8 1-9 0.28 0.27 0.27 22.70 21.59 0.000876 1.91 Circular 68.00 1.56 1-8 24.10 21.53 0.002059 2.93 15 inch P-15 1-14 0.34 0.28 0.28 30.40 26.05 0.000931 2.00 Circular 110.00 1.74 1-15 30.10 25.96 0.005000 4.57 15 Inch P-16 1-15 0.25 0.19 0.47 30.10 25.96 0.002587 3.29 Circular 138.00 2.68 1-16 28.10 25.60 0.005000 4.57 15 Inch P-17 1-16 0.25 0.24 0.71 28.10 25.60 0.002111 4.63 Circular 170.00 2.73 1-17 26.50 25.24 0.005000 7.43 18 inch P-18 1-17 0.34 0.32 1.03 26.50 25.24 0.004216 6.82 Circular 16.00 3.86 1-4 26.50 25.17 0.010000 10.50 18 inch P-1 1-1 0.16 0.15 OA5 31.70 27.34 0.009018 1.09 Circular 50.00 2.64 1-2 31.70 26.97 0.010000 6.46 15 inch P-2 1-2 0.11 0.10 0.26 31.70 26.97 0.009626 1.83 Circular 120.00 3.17 1-3 28.10 25.90 0.010000 6.46 15 inch P-3 1-3 0.15 0.14 0.40 28A0 25.90 0.006322 2.79 Circular 145.00 3.22 1-4 26.50 25.17 0.016966 8.41 15 inch P-4 1-4 0.52 0.44 1.87 26.50 25.17 0.013815 12.35 Circular 158.00 6.99 1-5 24.10 22.99 0.011013 11.02 18 inch P-5 1-5 0.93 0.79 2.66 24.10 22.99 0.005194 17.39 Circular 190.00 5.59 1-6 23.80 21.99 0.005000 16.00 24 inch P-6 1-6 0.51 0.44 3.10 23.80 21.99 0.002751 19.92 Circular 71.00 4.98 J-2 24.80 21.79 0.002535 20.65 30 inch P-7 J-2 N/A N/A 3.10 24.80 21.79 0.002829 19.78 Circular 83.00 5.04 1-8 24.10 21.53 0.002530 20.63 30 inch P-11 1-8 0.07 0.04 3.71 24.10 21.53 0.002627 23.42 Circular 230.00 5.24 J-1 23.50 20.90 0.002522 33.49 36 inch P-14 J-1 N/A N/A 4.13 23.50 20.90 0.003617 25.59 Circular 37.00 6.17 Outlet 23.00 20.63 0.002973 36.37 36 inch Project Titlei THREE OAKS STORM DRAIN PIPE CALCULATIONS FOR DRAINAGE AREA NO. 1 Project Engineer:JOHN A.KUSKE,III,P.E. c:Vtaestad%tmc%toakda l.stm SITEWORKS DESIGN GROUP StormCAD v1.0 05/13/04 10:14:30 PM C Haestad Methods,Inc. 37 Brookside Road Waterbury,CT 06708 USA (203)755-1666 Page 1 of 1 DOT Report Pipe -Node- Inlet Inlet Total -Ground- -HGL- -Slope- -Section- -Section- Length Average Description (Upstream Area CA CA Upstream Upstream Energy Discharge Shape (ft) Velocity Downstream acres) (acres) (acres) Downstream Downstream Constructed Capacity Size (ft/s) (ft) (ft) (tuft) (cfs) P-12 1-12 0.14 0.13 0.13 22.50 22.10 0.000219 0.96 Circular 140.00 0.78 1-13 22.20 22.07 0.002500 3.23 15 inch P-13 1-13 0.35 0.29 0.42 22.20 22.07 0.001850 2.78 Circular 70.00 2.26 J-1 23.50 21.94 0.003000 3.54 15 inch P-9 1-10 0.22 0.17 0.17 24.00 22.25 0,000371 1.24 Circular 70.00 1.01 1-11 24.00 22.22 0.002857 3.45 15 inch P-10 1-11 0.15 0.12 0.29 24.00 22.22 0.000998 2.04 Circular 65.00 1.66 1-8 24.10 22.16 0.004769 4.46 15 inch P-8 1-9 0.28 0.27 0.27 22.70 22.22 0.000876 1.91 Circular 68.00 1.56 1-8 24.10 22.16 0.002059 2.93 15 inch P-15 1-14 0.34 0.28 0.28 30.40 26.64 0.000957 2.00 Circular 110.00 1.63 1-15 30.10 26.54 0.005000 4.57 15 inch P-16 1-15 0.25 0.19 0.47 30.10 26.54 0.002577 3.28 Circular 138.00 2.67 1-16 28.10 26.18 0.005000 4.57 15 inch P-17 1-16 0.25 0.24 0.71 28.10 26.18 0.002102 4.82 Circular 170.00 2.73 1-17 26.50 25.82 0.005000 7.43 18 inch P-18 1-17 0.34 0.32 1.03 26.50 25.82 0.004198 6.81 Circular 16.00 3.85 IA 26.50 25.76 0.010000 10.50 18 inch P-1 1-1 OA6 0.15 0.15 31.70 27.34 0.009018 1.09 Circular 50.00 2.64 1-2 31.70 26.97 0.010000 6.46 15 inch P-2 1-2 0.11 0.10 0.26 31.70 26.97 0.009626 1.83 Circular 120.00 3.17 1-3 28.10 25.90 0.010000 6.46 15 inch P-3 1-3 OAS 0.14 0.40 28.10 25.90 0.002297 2.79 Circular 145.00 3.22 1-4 26.50 25.76 0.016966 8.41 15 inch P4 1-4 0.52 0.44 1.87 26.50 25.76 0.013756 12.32 Circular 158.00 6.97 1-5 24.10 23.58 0.011013 11.02 18 inch P-5 1-5 0.93 0.79 2.66 24A0 23.58 0.005884 17.35 Circular 190.00 5.52 1-6 23.80 22.47 0.005000 16.00 24 inch P-6 1-6 0.51 0.44 3.10 23.80 22.47 0.002050 19.87 Circular 71.00 4.10 J-2 24.80 22.32 0.002535 20.65 30 inch P-7 J-2 N/A N/A 3.10 24.80 22.32 0.002063 19.70 Circular 83.00 4.04 1-8 24.10 22.16 0.002530 20.63 30 inch P-11 1-8 0.07 0.04 3.71 24.10 22.16 0.001113 23.28 Circular 230.00 3.56 J-1 23.50 21.94 0.002522 33.49 36 inch P-14 J-1 N/A N/A 4.13 23.50 21.94 0.001261 25.40 Circular 37.00 3.65 Outlet 23.00 21.90 0.002973 36.37 36 inch Project Title:THREE OAKS STORM DRAIN PIPE CALCULATIONS FOR DRAINAGE AREA NO. 1 Project Engineer:JOHN A.KUSKE,III,P.E. c:VhaestadtslmcUoakdat.stm SITEWORKS DESIGN GROUP StormCAD v1.0 05/13/04 10:13:39 PM C Haestad Methods,Inc. 37 Brookside Road Waterbury,CT 06708 USA (203)755-1666 Page 1 of 1 �/�E CALr-✓��cr�/l' F+� G►��in/i¢GE �t.�E�No. 2 Outlet P-8 1-7 P 7 J� 1-3 -6 P-2 1_1 P-1 1-2 P-3 -4 P-5 I-6 P 4 I-5 Project Title:THREE OAKS STORM DRAIN PIPE CALCULATIONS FOR DRAINAGE AREA NO,2 Project Engineer:JOHN A.KUSKE, III,P.E. 0haestad\stmcUoa1kda2.stm SITEWORKS DESIGN GROUP StormCAD v1.0 05/13/04 07*36:21 PM ®Haestad Methods. Inc. 37 Brookside Road Waterbury,CT 06708 USA (203)755-1666 Page 1 of 1 /i/�E C/./G L.C/G�TI LONJ DOT Report Pipe -Node- Inlet Inlet Total -Ground- -HGL- -Slope- -Section- -Section- Length Average Description Upstream Area CA CA Upstream Upstream Energy Discharge Shape (ft) Velocity Downstream (acres) (acres) (acres) Downstream Downstream Constructed Capacity Size (ft/s) (ft) (ft) (ft/ft) (cfs) P-4 1-5 0.44 0.42 0.42 22.60 21.34 0.001811 2.65 Circular 90.00 2.55 1-6 22.60 21.20 0.003000 3.54 15 inch P-5 1-6 0.29 0.28 0.69 22.60 21.20 0.000501 4.33 Circular 105.00 1.51 1-4 22.70 21.16 0.002000 9.39 18 inch P-2 1-3 0.37 0.31 0.31 23.40 21.31 0.001130 1.95 Circular 105.00 2,01 1-2 22.70 21.22 0.003048 3.57 15 inch P-1 1-1 0.30 0.28 0.28 23.20 21.36 0.001064 1.81 Circular 170.00 1.94 1-2 22.70 21.22 0.002471 3.21 15 inch P-3 1-2 0.50 0.43 1.02 22.70 21.22 0.001038 6.23 Circular 77.00 2.17 14 22.70 21.16 0.002987 11.48 18 inch P-6 IA 0.32 0.30 2.02 22.70 21.16 0.003018 12.11 Circular 170.00 3.68 1-7 22.50 20.70 0.004000 13.29 18 inch P-7 1-7 0.74 0.58 2.60 22.50 20.70 0.001412 15.26 Circular 88.00 3.06 J-1 23.50 20.59 0.002045 20.46 24 inch P-8 J-1 N/A N/A 2.60 23.50 20.59 0.003348 15.05 Circular 36.00 5.31 Outlet 23.00 20.31 0.001944 18.09 30 inch Project Title:THREE OAKS STORM DRAIN PIPE CALCULATIONS FOR DRAINAGE AREA NO.2 Project Engineer:JOHN A.KUSKE,III,P.E. c:\haestad\slmc\toakda2.stm SITEWORKS DESIGN GROUP StormCAD v1.0 05/13/04 08:00:42 PM ©Haestad Methods,Inc. 37 Brookside Road Waterbury,CT 06708 USA (203)755-1666 Page 1 of 1 P/YE c,-1c ctiZ.i 7Toq/f DOT Report /0 - y4w-'c `f7a,ti Tit/Ga./ 2 EGEviPrlan/= Z/.9 Pipe -Node- Inlet Inlet Total -Ground- -HGL- -Slope- -Section- -Section- Length Average Description Upstream Area CA CA Upstream Upstream Energy Discharge Shape (ft) Velocity Downstream (acres) (acres) (acres) Downstream Downstream Constructed Capacity Size (ft/s) (ft) (ft) (ft/ft) (cfs) P-4 1-5 0.44 0.42 0.42 22.60 22.78 0.002050 2.65 Circular 90.00 2.16 1-6 22.60 22.60 0,003000 3.54 15 inch P-5 1-6 0.29 0.28 0.69 22.60 22.63 0.000423 4.32 Circular 105.00 1.22 1-4 22.70 22.59 0.002000 9.39 18 inch P-2 1-3 0.37 0.31 0.31 23.40 22.75 0.000908 1.95 Circular 105.00 1.59 1-2 22.70 22.65 0.003048 3.57 15 inch P-1 1-1 0.30 0.28 0.28 23.20 22.79 0.000785 1.81 Circular 170.00 1.47 1-2 22.70 22.65 0.002471 3.21 15 inch P-3 1-2 0.50 0.43 1.02 22.70 22.65 0.000857 6.15 Circular 77.00 1.74 1-4 22.70 22.59 0.002987 11.48 18 inch P-6 14 0.32 0.30 2.02 22.70 22.59 0.003210 11.90 Circular 170.00 3.37 1-7 22.50 22.04 0.004000 13.29 18 inch P-7 1-7 0.74 0.58 2.60 22.50 22.04 0.001094 14.96 Circular 88.00 2.38 J-1 23.50 21.95 0.002045 20.46 24 inch P-8 J-1 N/A N/A 2,60 23.50 21.95 0.001283 14.69 Circular 36.00 2.99 Outlet 23.00 21.90 0.001944 18.09 30 inch Project Title:THREE OAKS STORM DRAIN PIPE CALCULATIONS FOR DRAINAGE AREA NO.2 Project Engineer:JOHN A.KUSKE,III,P.E. c:VlaestadlstmcUoakda2.stm SITEWORKS DESIGN GROUP StormCAD v1.0 05/13/04 07:52:20 PM ®Haestad Methods,Inc. 37 Brookside Road Waterbury,CT 06708 USA (203)755-1666 Page 1 of 1 f-"-a ' �""'C' VJ DOT Report Z S- Gam-/ 779:5ilL 40Eev77l Pipe -Node- Inlet Inlet Total -Ground- -HGL- -Slope- -Section- -Section- Length Average Description Upstream Area CA CA Upstream Upstream Energy Discharge Shape (ft) Velocity Downstream (acres) (acres) (acres) Downstream Downstream Constructed Capacity Size (ft/s) (ft) (ft) Oft) (cls) P-4 1-5 0.44 0.42 0.42 22.60 21.77 0,002163 3.00 Circular 90.00 2.45 1-6 22.60 21.58 0.003000 3.54 15 inch P-5 1-6 0.29 0.28 0.69 22.60 21.58 0.000531 4.90 Circular 105.00 1.40 1-4 22.70 21.53 0.002000 9.39 18 inch P-2 1-3 0.37 0.31 0.31 23.40 21.73 0.001159 2.20 Circular 105.00 1.80 1-2 22.70 21.61 0.003048 3.57 15 inch P-1 1-1 0.30 0.28 0.28 23.20 21.77 0.000992 2.05 Circular 170.00 1.68 1-2 22.70 21.61 0.002471 3.21 15 inch P-3 1-2 0.50 0.43 1.02 22.70 21.61 0.001089 7.01 Circular 77.00 1.99 14 22.70 21.53 0.002987 11.48 18 inch P-6 1-4 0.32 0.30 2.02 22.70 21.53 0.004192 13.60 Circular 170.00 3.85 1-7 22.50 20.81 0.004000 13.29 18 inch P-7 1-7 0.74 0.58 2.60 22.50 2081. 0.001524 17,16 Circular 88.00 3.20 J-1 23.50 20.69 0.002045 20.46 24 inch P-8 J-1 N/A N/A 2.60 23.50 20.69 0.003511 16.93 Circular 36.00 5.53 Outlet 23.00 20.39 0.001944 18.09 30 inch Project Title:THREE OAKS STORM DRAIN PIPE CALCULATIONS FOR DRAINAGE AREA NO.2 Project Engineer:JOHN A.KUSKE,111,P.E. c:Vtaestad\stmcUoakda2.stm SITEWORKS DESIGN GROUP SIom1CAD v1.0 05/13/04 08:07:16 PM ®Haestad Methods,Inc. 37 Brookside Road Waterbury,CT 06708 USA (203)755-1656 Page 1 of 1 DOT Report Pipe -Node- Inlet Inlet Total -Ground- -HGL- -Slope- -Section- -Section- Length Average Description Upstream Area CA CA Upstream Upstream Energy Discharge Shape (ft) Velocity Downstream (acres) (acres) (acres) Downstream Downstream Constructed Capacity Size (ft/s) (ft) (ft) (It/ft) (cfs) P-4 1-5 0.44 0.42 0.42 22.60 23.05 0.003902 3.00 Circular 90.00 2.45 1-6 22.60 22.70 0.003000 3.54 15 inch P-5 1-6 0.29 0.28 0.69 22.60 22.86 0.001490 4.90 Circular 105.00 1.39 1-4 22.70 22.70 0.002000 9.39 18 inch P-2 1-3 0.37 0.31 0.31 23.40 23.01 0.002924 2.20 Circular 105.00 1.80 1-2 22.70 22.70 0.003048 3.57 15 inch P-1 1-1 0.30 0.28 0.28 23.20 23.06 0.002093 2.05 Circular 170.00 1.67 1-2 22.70 22.70 0.002471 3.21 15 inch P-3 1-2 0.50 0.43 1.02 22.70 22.88 0.002402 7.01 Circular 77.00 1.98 1-4 22.70 22.70 0.002987 11.48 18 inch P-6 14 0.32 0.30 2.02 22.70 22.80 0.004188 13.59 Circular 170.00 3.85 1-7 22.50 22.09 0.004000 13.29 18 inch P-7 1-7 0.74 0.58 2.60 22.50 22.09 0.001437 17.15 Circular 88.00 2.73 J-1 23.50 21.96 0.002045 20.46 24 inch P-8 J-1 N/A N/A 2.60 23.50 21.96 0.001693 16.88 Circular 36.00 3.44 Outlet 23.00 21.90 0.001944 18.09 30 inch Project Title:THREE OAKS STORM DRAIN PIPE CALCULATIONS FOR DRAINAGE AREA NO.2 Project Engineer:JOHN A.KUSKE,III,P.E. c:\haestad\stmc\toakda2.stm SITEWORKS DESIGN GROUP StormCAD v1.0 05/13/04 08'13:35 PM ®Haestad Methods,Inc. 37 Brookside Road Waterbury,CT 06708 USA (203)755-1666 Page 1 of 1 1S 2S Drainag Area 1 Drainag Area 2 3P A4P Infiltration Po 1 Inf' ration Pond 2 FR SDMHith 30" Ove 71 w Pipe 5R 60' Veget ted Filter A6P NHC Stor ater Pond 3 8R 60' Vegetated Swale Subcat Reach on [Link Drainage Diagram for 04022 ThreeOaks FH repared by Andrew 8 Kuske Consulting Engineers, Inc. 5/18/2004 ydroCAD©7.01 s/n 000479 ©1986-2004 Applied Microcomputer Systems 04022 ThreeOaks Type 111 24-hr 2 Yr. Storm Rainfall=4.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 2 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Time span=11.00-15.00 hrs, dt=0.01 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Drainage Area 1 Runoff Area=5.470 ac Runoff Depth=1.85" Tc=10.0 min CN=81 Runoff=14.28 cfs 0.841 of Subcatchment 2S: Drainage Area 2 Runoff Area=4.120 ac Runoff Depth=1.85" Tc=10.0 min CN=81 Runoff=10.76 cfs 0.634 of Reach 5R: 60' Vegetated Filter Peak Depth=0.00' Max Vet=0.0 fps Inflow=0.00 cfs 0.000 of n=0.030 L=60.0' S=0.0050'/' Capacity=43.09 cfs Outflow=0.00 cfs 0,000 of Reach 7R: SDMH with 30" Overflow Pipe Peak Depth=0.00' Max Vet=0.0 fps Inflow=0.00 cfs 0.000 of D=30.0" n=0.013 L=190.0' S=0.0039 '/' Capacity=25.60 cfs Outflow=0.00 cfs 0.000 of Reach 8R: 60' Vegetated Swale Peak Depth=0.00' Max Vet=0.0 fps Inflow=0.00 cfs 0.000 of n=0.030 L=60.0' S=0.0167 '/' Capacity=78.66 cfs Outflow=0.00 cfs 0.000 of Pond 3P: Infiltration Pond 1 Peak EIev=21.10' Storage=14,121 cf Inflow=14.28 cfs 0.841 of Discarded=3.33 cfs 0.826 of Primary=0.00 cfs 0.000 of Outflow=3.33 cfs 0.826 of Pond 4P: Infiltration Pond 2 Peak EIev=21.10' Storage=10,514 cf Inflow=10.76 cfs 0.634 of Discarded=2.66 cfs 0.623 of Primary=0.00 cfs 0.000 of Outflow=2.66 cfs 0.623 of Pond 6P: NHC Stormwater Pond #3 Peak EIev=16.50' Storage=0 cf Inflow=0.00 cfs 0.000 of Outflow=0.00 cfs 0.000 of Total Runoff Area= 9.590 ac Runoff Volume= 1.475 of Average Runoff Depth = 1.85" 04022 Three0aks Type 11124-hr 2 Yr. Storm Rainfall=4.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 3 HydroCAD®7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Subcatchment 1S: Drainage Area 1 Runoff = 14.28 cfs @ 12.14 hrs, Volume= 0.841 af, Depth= 1.85" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Type III 24-hr 2 Yr. Storm Rainfall=4.50" Area (ac) CN Description 3.550 98 Paved parking & roofs 1.920 50 Green Area 5.470 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 1S: Drainage Area 1 Hydrograph t ..._ ........ _...... _...-. -__. _._ __.. .. ........__.--- ------- . . ❑Runofl 1428cfe@iz.i4h2 _ _.._- - -- - - - -- --- ----- ---- __ "-- ----- ... 14- °'- .. . . Type.III.24-hr 2 Yr..Storm. 13' 41 ...................Rainfall=4.50",.. 12=. .. . x ... Runoff Ame5A70 ac- --- - . .....Runoff.Volume 0.841 of 9' Runoff iDepth=1-.85"-- 3 8 ...... LL 7- Tc=10:0 min CN=81- 5- 4= 3. 2- 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type /// 24-hr 2 Yr. Storm Rainfall=4.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 4 HydroCAD®7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Subcatchment 2S: Drainage Area 2 Runoff = 10.76 cfs @ 12.14 hrs, Volume= 0.634 af, Depth= 1.85" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Type III 24-hr 2 Yr. Storm Rainfall=4.50" Area (ac) CN Description 2.650 98 Paved parking & roofs 1.470 50 Green Area 4.120 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 2S: Drainage Area 2 Hydrograph 12- .....,.,.,-. 0 Runoff 11- 1a 76 CN 1z14 nrs III 24-hr 2-Yr. Storm. .. o r, ... . .. .. . . Rainfa11=4:50 _.. .... .Runoff Area=4.120 ac „ - Runoff Volume=0.634 of 7 _ ... . .... . _ Runoff Depth=1.85" u 5- Tc=10.0 min. _ .......... ....... . CN=81.... 4.: 3- 2- 0 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type 111 24-hr 2 Yr. Storm Rainfall=4.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 5 HydroCAD®7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Reach 5R: 60' Vegetated Filter Inflow Area = 9.590 ac, Inflow Depth = 0.00" for 2 Yr. Storm event Inflow = 0.00 cfs @ 11.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 11.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Max. Velocity= 0.0 fps, Min. Travel Time= 0.0 min Avg. Velocity = 0.0 fps, Avg. Travel Time= 0.0 min Peak Depth= 0.00' @ 11.00 hrs Capacity at bank full= 43.09 cfs Inlet Invert= 19.10', Outlet Invert= 18.80' 10.00' x 1.00' deep channel, n= 0.030 Length= 60.0' Slope= 0.0050 '/' Side Slope Z-value= 5.0 7' Reach 5R: 60' Vegetated Filter Hydrograph 1 / 13Inflow O Outflow Inflow Area=9.590 ac Peak Depth=0.00' Max Vet=0.0 fps n=0.030 0 L=60.0' LL S=0.0050 T Capacity=43.09 cfs AN 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type 1/124-hr 2 Yr. Storm Rainfall=4.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 6 HydroCADO 7.01 s/n 000479 O 1986-2004 Applied Microcomputer Systems 5/18/2004 Reach 7R: SDMH with 30" Overflow Pipe Inflow Area = 9.590 ac, Inflow Depth = 0.00" for 2 Yr. Storm event Inflow = 0.00 cfs @ 11.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 11.00 hrs, Volume= 0.000 at, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Max. Velocity= 0.0 fps, Min. Travel Time= 0.0 min Avg. Velocity = 0.0 fps, Avg. Travel Time= 0.0 min Peak Depth= 0.00' @ 11.00 hrs Capacity at bank full= 25.60 cfs Inlet Invert= 19.84', Outlet Invert= 19.10' 30.0" Diameter Pipe n= 0.013 Length= 190.0' Slope= 0.0039 T Reach 7R: SDMH with 30" Overflow Pipe Hydrograph Inflow Outflow Inflow Area=9.590 ac Peak Depth=0.00' Max Vet=0.0 fps D=30.0" n=0.013 L=190.0' S=0.0039 T Capacity=25.60 cfs Goo aF n.GG ' 000 crs n.00 ms 11 12 13 14 15 Time (hours) 04022 Three0aks Type 11124-hr 2 Yr. Storm Rainfall=4.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 7 HydroCADO 7.01 s/n 000479 O 1986-2004 Applied Microcomputer Systems 5/18/2004 Reach 8R: 60' Vegetated Swale Inflow Area = 9.590 ac, Inflow Depth = 0.00" for 2 Yr. Storm event Inflow = 0.00 cfs @ 11.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 11.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Max. Velocity= 0.0 fps, Min. Travel Time= 0.0 min Avg. Velocity = 0.0 fps, Avg. Travel Time= 0.0 min Peak Depth= 0.00' @ 11.00 hrs Capacity at bank full= 78.66 cfs Inlet Invert= 15.00', Outlet Invert= 14.00' 10.00' x 1.00' deep channel, n= 0.030 Length= 60.0' Slope= 0.0167 '/' Side Slope Z-value= 5.0 7' Reach 8R: 60' Vegetated Swale Hydrograph ©Inflow Outflow Inflow Area=9.590 ac Peak Depth=0.00' Max Vet=0.0 fps n=0.030 N 3 L=60.0' 0 S=0.0167 '/' Capacity=78.66 cfs Q 00 11! ,,.W Ms aoa s o- 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type III 24-hr 2 Yr. Storm Rainfall=4.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 8 HydroCAD®7.01 s/n 000479 @ 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 3P: Infiltration Pond 1 Inflow Area = 5.470 ac, Inflow Depth = 1.85" for 2 Yr. Storm event Inflow = 14.28 cfs @ 12.14 hrs, Volume= 0.841 of Outflow = 3.33 cfs @ 12.60 hrs, Volume= 0.826 af, Atten= 77%, Lag= 27.5 min Discarded = 3.33 cfs @ 12.60 hrs, Volume= 0.826 of Primary = 0.00 cfs @ 11.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 21.10' @ 12.60 hrs Surf.Area= 7,980 sf Storage= 14,121 cf Plug-Flow detention time= 41.6 min calculated for 0.825 of(98% of inflow) Center-of-Mass det. time= 38.9 min ( 792.0 - 753.1 ) # Invert Avail.Storage Storage Description 1 19.00, 32,468 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 19.00 5,484 0 0 20.00 6,591 6,038 6,038 21.00 7,766 7,179 13,216 22.00 9,853 8,810 22,026 23.00 11,031 10,442 32,468 # Routing Invert Outlet Devices 1 Discarded 0.00' 0.025000 fpm Exfiltration over entire Surface area 2 Primary 20.10' 24.0" x 64.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 19.84' S= 0.0041 T n= 0.013 Cc= 0.900 3 Device 2 21.90' 6.0' long x 1.0' high Sharp-Crested Rectangular Weir 2 End Contraction(s) 4.00' Rise Discarded OutFlow Max=3.33 cfs @ 12.60 hrs HW=21.10' (Free Discharge) t 1=Exfiltration (Exfiltration Controls 3.33 cfs) Primary OutFlow Max=0.00 cfs @ 11.00 hrs HW=19.00' (Free Discharge) t-2=Culvert ( Controls 0.00 cis) t3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) 04022 ThreeOaks Type 111 24-hr 2 Yr. Storm Rainfall=4.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 9 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 3P: Infiltration Pond 1 Hydrograph ........- 1428 d1 12.14W ._. ....... .........- .. ..._. t]Outt. ..... Inflow Area=5.470 _ac O Discarded O Primary Peak EleV=21 10' 3 . _ Storage=14,121 cf- 12 - ----- ----. 10- - _-- .-------. _._.. .--`-..-... . _.__ .......... _.... ...._. _ LL ,_ .......... 333ci a s 1260 333 .- �...-. 4 3': 2 oaoms 1100h,s 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type /I/ 24-hr 2 Yr. Storm Rainfall=4.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 10 HydroCAD®7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 4P: Infiltration Pond 2 Inflow Area = 4.120 ac, Inflow Depth = 1.85" for 2 Yr. Storm event Inflow = 10.76 cfs @ 12.14 hrs, Volume= 0.634 of Outflow = 2.66 cfs @ 12.58 hrs, Volume= 0.623 af, Atten= 75%, Lag= 26.6 min Discarded = 2.66 cfs @ 12.58 hrs, Volume= 0.623 of Primary = 0.00 cfs @ 11.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 21.10' @ 12.58 hrs Surf.Area= 6,384 sf Storage= 10,514 cf Plug-Flow detention time= 39.6 min calculated for 0.623 of(98% of inflow) Center-of-Mass det. time= 37.1 min ( 790.2 - 753.1 ) # Invert Avail.Storage Storage Description 1 19.00, 25,212 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 19.00 3,620 0 0 20.00 4,894 4,257 4,257 21.00 6,243 5,569 9,826 22.00 7,669 6,956 16,782 23.00 9,192 8,431 25,212 # Routing Invert Outlet Devices 1 Discarded 0.00' 0.025000 fpm Exfiltration over entire Surface area 2 Primary 20.00' 24.0" x 65.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 19.84' S= 0.0025 T n= 0.013 Cc= 0.900 3 Device 2 21.90' 6.0' long x 1.9' high Sharp-Crested Rectangular Weir 2 End Contraction(s) 1.00' Rise Discarded OutFlow Max=2.66 cfs @ 12.58 hrs HW=21.10' (Free Discharge) t1=Exfiltration (Exfiltration Controls 2.66 cfs) Primary OutFlow Max=0.00 cfs @ 11.00 hrs HW=19.00' (Free Discharge) t2=Culvert ( Controls 0.00 cfs) t-3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) 04022 ThreeOaks Type 1/124-hr 2 Yr. Storm Rainfall=4.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 11 HydroCAD® 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 4P: Infiltration Pond 2 Hydrograph .. .. . . .. _.. . ._. ...._ .. .. �I°n0ow " 10]6 tls 4.14M � ❑ ({IOW . Inflow-Area=4.120 ac °°Iscarded 12- - ❑Primary _.. Peak Elev=21..1.0,..- 10' Storage=10,514 d 9- 7 7f _ . . . ._ u ., .. ....._... r-_.__ .-.... .........-. ___..__ ........_ _......-._ 3 6- " o ___ - ___ __ _____ 5t " , .. -----....- ..2E66- 11 0fin" ......... 4. 2.6E 3 2 f/ 0a0dl 11020 nrs 0- 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type /II 24-hr 2 Yr. Storm Rainfall=4.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 12 HydroCAD&7.01 s/n 000479 @ 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 6P: NHC Stormwater Pond #3 Inflow Area = 9.590 ac, Inflow Depth = 0.00" for 2 Yr. Storm event Inflow = 0.00 cfs @ 11.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 11.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min Primary = 0.00 cfs @ 11.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 16.50' @ 11.00 hrs Surf.Area= 4,854 sf Storage= 0 cf Plug-Flow detention time= (not calculated: initial storage excedes outflow) Center-of-Mass det. time= (not calculated: no inflow) # Invert Avail.Storage Storage Description 1 16.50' 25,439 cf Custom Stage Data(Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 16.50 4,854 0 0 17.00 5,495 2,587 2,587 18.00 6,856 6,176 8,763 19.00 8,300 7,578 16,341 20.00 9,896 9,098 25,439 # Routing Invert Outlet Devices 1 Primary 15.17' 30.0" x 57.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 15.00' S= 0.0030 '/' n= 0.013 Cc= 0.900 2 Device 1 16.50' 3.00' x 0.35' Vert. Orifice/Grate X 2.00 C= 0.600 3 Device 1 18.60' 16.0' long x 1.0' high Sharp-Crested Rectangular Weir 2 End Contraction(s) 1.00' Rise 4 Primary 19,00' 20.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.00 cfs @ 11.00 hrs HW=16.50' (Free Discharge) 1=Culvert (Passes 0.00 cfs of 7.09 cfs potential flow) �2=Orifice/Grate ( Controls 0.00 cfs) 3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) =Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 04022 ThreeOaks Type 111 24-hr 2 Yr. Storm Rainfall=4.50" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 13 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 6P: NHC Stormwater Pond #3 Hydrograph 0 Inflow 0 Primary Inflow Area=9.590 ac Peak Elev=16.50' Storage=0 cf 3 0 LL e0i 0 hrsl 000415 ,11WM1rs 1� 12 13 14 15 Time (hours) 04022 ThreeOaks Type Ill 24-hr 10 Yr. Storm Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 14 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Time span=11.00-15.00 hrs, dt=0.01 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Drainage Areal Runoff Area=5.470 ac Runoff Depth=3.42" Tc=10.0 min CN=81 Runoff=26.63 cfs 1.559 of Subcatchment 2S: Drainage Area 2 Runoff Area=4.120 ac Runoff Depth=3.42" Tc=10.0 min CN=81 Runoff=20.06 cfs 1.175 of Reach 5R: 60' Vegetated Filter Peak Depth=0.51' Max Vet=2.0 fps Inflow=12.65 cfs 0.415 of n=0.030 L=60.0' S=0.0050 '/' Capacity=43.09 cfs Outflow=12.64 cfs 0.415 of Reach 7R: SDMH with 30" Overflow Pipe Peak Depth=1.24' Max Vet=5.2 fps Inflow=12.67 cfs 0.415 of D=30.0" n=0.013 L=190.0' S=0.0039 '/' Capacity=25.60 cfs Outflow=12.65 cfs 0.415 of Reach 8R: 60' Vegetated Swale Peak Depth=0.30' Max Vet=2.6 fps Inflow=8.87 cfs 0.415 of n=0.030 L=60.0' S=0.0167 7' Capacity=78.66 cfs Outflow=8.87 cfs 0.415 of Pond 3P: Infiltration Pond 1 Peak EIev=22.40' Storage=26,155 cf Inflow=26.63 cfs 1.559 of Discarded=4.30 cfs 1.088 of Primary=7.15 cfs 0.240 of Outflow=11.45 cfs 1.328 of Pond 4P: Infiltration Pond 2 Peak EIev=22.33' Storage=19,530 cf Inflow=20.06 cfs 1.175 of Discarded=3.40 cfs 0.841 of Primary=5.53 cfs 0.176 of Outflow=8.93 cfs 1.017 of Pond 6P: NHC Stormwater Pond #3 Peak EIev=17.45' Storage=5,357 cf Inflow=12.64 cfs 0.415 of Outflow=8.87 cfs 0.415 of Total Runoff Area = 9.590 ac Runoff Volume=2.734 of Average Runoff Depth = 3.42" 04022 ThreeOaks Type 111 24-hr 10 Yr. Storm Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 15 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Subcatchment 1S: Drainage Area 1 Runoff = 26.63 cfs @ 12.14 hrs, Volume= 1.559 af, Depth= 3.42" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Type III 24-hr 10 Yr. Storm Rainfall=7.00" Area (ac) CN Description 3.550 98 Paved parking & roofs 1.920 50 Green Area 5.470 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 1S: Drainage Area 1 Hydrograph 26- 2UEJ c12 12]4lrts 26 Type III 247hr 10 Yr. Storm 24= . ........ .. . . .. �� ..._....... _.. .._ _. . _._. Rainfall=7.007... 22 Runoff Area=5-.470 ac-- 26-' _ ..............Runoff Vol 18_ ume=1:559-af - .............Runoff Depth=3:42" ... _.. LL 14 Tc-10.0--min_. 12-: -- ---------- CN=81._.. 10; 6' 4- ..._..._. . ._--------- --------- 2 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type 111 24-hr 10 Yr. Storm Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 16 HydroCAD@ 7.01 s/n 000479 @ 1986-2004 Applied Microcomputer Systems 5/18/2004 Subcatchment 2S: Drainage Area 2 Runoff = 20.06 cfs @ 12.14 hrs, Volume= 1.175 af, Depth= 3.42" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Type III 24-hr 10 Yr. Storm Rainfall=7.00" Area (ac) CN Description 2.650 98 Paved parking & roofs 1.470 50 Green Area 4.120 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 2S: Drainage Area 2 Hydrograph 22- .._ ._ _..... _.__... _. ..... . ._. ..... ._. ..... ...... ❑Runoff 21- _._....---.------..__ N.W cls 12.14 Ms _..-.. ... . 29- III 24=hr 10 Yr. Storm yp -- ---- - ----- . -...... . 17 . s --.-Rainfall=7.00" 16 " . _ . . _ . N __. . --Runoff Area=4.120 ac - ---- -- -_..--- - 14; Runoff.Volume _1.175 of 13.!, .... ..- 12 __ _.. ....... ;.... ... ..:.:...Runoff.Depth=3.42"::. _ -------------- - 10 . --- -- ---- .._... Tc=10.O min:. g _. .... . ..... _ 7- ..__. 5' ---_........ ..... .. _. --. ................... 3 .._.. _. . .. . . 0' 11 12 13 - 14 1,5 Time (hours) 04022 ThreeOaks Type 111 24-hr 10 Yr. Storm Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 17 HydroCAD®7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Reach 5R: 60' Vegetated Filter Inflow Area = 9.590 ac, Inflow Depth = 0.52" for 10 Yr. Storm event Inflow = 12.65 cfs @ 12.42 hrs, Volume= 0.415 of Outflow = 12.64 cfs @ 12.44 hrs, Volume= 0.415 af, Atten= 0%, Lag= 0.9 min Routing by Stor-Ind+Trans method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Max. Velocity= 2.0 fps, Min. Travel Time= 0.5 min Avg. Velocity = 0.7 fps, Avg. Travel Time= 1.4 min Peak Depth= 0.51' @ 12.43 hrs Capacity at bank full= 43.09 cfs Inlet Invert= 19.10', Outlet Invert= 18.80' 10.00' x 1.00' deep channel, n= 0.030 Length= 60.0' Slope= 0.0050 T Side Slope Z-value= 5.0 '/' Reach 5R: 60' Vegetated Filter Hydrograph _ .. .-..._ _.. _... ..... -. . _ . .-_ ........ _...,_ a Inflow 14 u5s ds ,z az ms - ❑Outflow 13- ' Inflow Area=9.590 ac Peak Depth=0.51'-.- 4 Max Vet=2.0 fps n=0.030 3 7_ L=60.0' 5- 5=0.0050 ,1, 4= ---- _- . -----------Capacity=43.09 .cfs.._.. 3- ........ ....... ....... ..... 2- _ _ . . .. ....... .. . .................... . ....... 1 11 12 73 14 15 Time (hours) 04022 ThreeOaks Type 11124-hr 10 Yr. Storm Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 18 HydroCAD®7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Reach 7R: SDMH with 30" Overflow Pipe Inflow Area = 9.590 ac, Inflow Depth = 0.52" for 10 Yr. Storm event Inflow = 12.67 cfs @ 12.41 hrs, Volume= 0.415 of Outflow = 12.65 cfs @ 12.42 hrs, Volume= 0.415 af, Atten= 0%, Lag= 1.1 min Routing by Stor-Ind+Trans method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Max. Velocity= 5.2 fps, Min. Travel Time= 0.6 min Avg. Velocity = 2.4 fps, Avg. Travel Time= 1.3 min Peak Depth= 1.24' @ 12.41 hrs Capacity at bank full= 25.60 cfs Inlet Invert= 19.84', Outlet Invert= 19.10' 30.0" Diameter Pipe n= 0.013 Length= 190.0' Slope= 0.0039 '/' Reach 7R: SDMH with 30" Overflow Pipe Hydrograph ......... .......... ...... . .............._....... O inflow 14- " 12.67 cfs '2 ms. . .. ........... ..... ... ❑Outflow 3 - ; _..___ ,2e5cfs ,212 Inflow Area=9.590 ac -.- _.. 12'14 Peak Depth=1,.24'. F 10 _. F -- -------- ------Max-'.Ye1=5.2-fps -.. -D=30 Orr .. ..... n 0.013 5_ L=190.0 x _ S=0.0039. ./. 4- ........ ......._ .. . . ........ 3 _ Capacity.=25.60 cfs 2- - --.-- ------- - 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type 111 24-hr 10 Yr. Storm Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 19 HydroCAD®7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Reach 8R: 60' Vegetated Swale Inflow Area = 9.590 ac, Inflow Depth = 0.52" for 10 Yr. Storm event Inflow = 8.87 cfs @ 12.60 hrs, Volume= 0.415 of Outflow = 8.87 cfs @ 12.61 hrs, Volume= 0.415 af, Atten= 0%, Lag= 0.6 min Routing by Stor-Ind+Trans method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Max. Velocity= 2.6 fps, Min. Travel Time= 0.4 min Avg. Velocity = 1.0 fps, Avg. Travel Time= 1.0 min Peak Depth= 0.30' @ 12.61 hrs Capacity at bank full= 78.66 cfs Inlet Invert= 15.00', Outlet Invert= 14.00' 10.00' x 1.00' deep channel, n= 0.030 Length= 60.0' Slope= 0.0167 '/' Side Slope Z-value= 5.0 '/' Reach 8R: 60' Vegetated Swale Hydrograph ....,,.. 0 Inflow _.... ........... ... ....._..-- a.67 da iswm ...._.. ._--- .___ _ .......-__._.- 0Outflow 66"`= is 6, rs ! Inf1ow .Area=9.590.ac_... Peak-Depth=0.30' 2 _ _ _Max.Vel=2.6 fps n=0.030_.. 3. ' ....... __ __ _.Capacity=78.66.cfs... 2 _.. . o; 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type /it 24-hr 10 Yr. Storm Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 20 HydroCAD®7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/1 812 0 0 4 Pond 3P: Infiltration Pond 1 Inflow Area = 5.470 ac, Inflow Depth = 3.42" for 10 Yr. Storm event Inflow = 26.63 cfs @ 12.14 hrs, Volume= 1.559 of Outflow = 11.45 cfs @ 12.41 hrs, Volume= 1.328 af, Atten= 57%, Lag= 16.4 min Discarded = 4.30 cfs @ 12.41 hrs, Volume= 1.088 of Primary = 7.15 cfs @ 12.41 hrs, Volume= 0.240 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 22.40' @ 12.41 hrs Surf.Area= 10,319 sf Storage= 26,155 cf Plug-Flow detention time= 48.4 min calculated for 1.327 of (85% of inflow) Center-of-Mass det. time= 31.2 min ( 781.4 - 750.2 ) # Invert Avail.Storage Storage Description 1 19.00, 32,468 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 19.00 5,484 0 0 20.00 6,591 6,038 6,038 21.00 7,766 7,179 13,216 22.00 9,853 8,810 22,026 23.00 11,031 10,442 32,468 # Routing Invert Outlet Devices 1 Discarded 0.00' 0.025000 fpm Exfiltration over entire Surface area 2 Primary 20.10' 24.0" x 64.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 19.84' S= 0.0041 T n= 0.013 Cc= 0.900 3 Device 2 21.90' 6.0' long x 1.0' high Sharp-Crested Rectangular Weir 2 End Contraction(s) 4.00' Rise Discarded OutFlow Max=4.30 cfs @ 12.41 hrs HW=22.40' (Free Discharge) t1=Exfiltration (Exfiltration Controls 4.30 cfs) ZPrimary OutFlow Max=7.14 cfs @ 12.41 hrs HW=22.40' (Free Discharge) =Culvert (Passes 7.14 cfs of 14.48 cfs potential flow) t3=Sharp-Crested Rectangular Weir (Weir Controls 7.14 cfs @ 2.4 fps) 04022 ThreeOaks Type /// 24-hr 10 Yr. Storm Rainfal1=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 21 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 3P: Infiltration Pond 1 Hydrograph O Inflow _. ...._. s553 as 1z ld hrs �Outllow El �.,., Inflow Area=5.470 ac 0Prary 28etl . .26- Peak Elev=22.40, �' 24 ............ __.. _ Storage=26,155.cf... 22- _ 18- 1fi cts®1241 IIrs1•__ - .. ..- -.- .. _. _ .. 14 10 ... ......... . ....__ :..... -....... . .. _...._. ._ . .. 15111 12 41 hrs d. hrs 4- 2- / 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type H/ 24-hr 10 Yr. Storm Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 22 HydroCAD® 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 4P: Infiltration Pond 2 Inflow Area = 4.120 ac, Inflow Depth = 3.42" for 10 Yr. Storm event Inflow = 20.06 cfs @ 12.14 hrs, Volume= 1.175 of Outflow = 8.93 cfs @ 12.40 hrs, Volume= 1.017 af, Atten= 55%, Lag= 15.6 min Discarded = 3.40 cfs @ 12.40 hrs, Volume= 0.841 of Primary = 5.53 cfs @ 12.40 hrs, Volume= 0.176 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 22.33' @ 12.40 hrs Surf.Area= 8,165 sf Storage= 19,530 cf Plug-Flow detention time= 47.8 min calculated for 1.014 of (86% of inflow) Center-of-Mass det. time= 32.0 min ( 782.2 - 750.2 ) # Invert Avail.Storage Storage Description 1 19.00, 25,212 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 19.00 3,620 0 0 20.00 4,894 4,257 4,257 21.00 6,243 5,569 9,826 22.00 7,669 6,956 16,782 23.00 9,192 8,431 25,212 # Routing Invert Outlet Devices 1 Discarded 0.00' 0.025000 fpm Exfiltration over entire Surface area 2 Primary 20.00' 24.0" x 65.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 19.84' S= 0.0025 '/' n= 0.013 Cc= 0.900 3 Device 2 21.90' 6.0' long x 1.9' high Sharp-Crested Rectangular Weir 2 End Contraction(s) 1.00' Rise Discarded OutFlow Max=3.40 cfs @ 12.40 hrs HW=22.33' (Free Discharge) t-1=Exfiltration (Exfiltration Controls 3.40 cfs) Primary OutFlow Max=5.52 cfs @ 12.40 hrs HW=22.33' (Free Discharge) t-2=Culvert (Passes 5.52 cfs of 13.76 cfs potential flow) t-3=Sharp-Crested Rectangular Weir (Weir Controls 5.52 cfs @ 2.2 fps) 04022 ThreeOaks Type 1/124-hr 10 Yr. Storm Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 23 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 4P: Infiltration Pond 2 Hydrograph O Inflow G70ut1. Discarded 22; ;- :.:..Inflow.:Area=4.120.:.ac oP�mary 21- ; ' ; ... .. ..•.:.Peak==Elev=22:33'--- ----. __ .-'--- --'-- ---I------.... 18. .. - - Storage 19,530 cf- n; . . _ . .. . 15 ...-... ._ . .._.._ . . ._ .... -. __ ._.. 12_ __... t093 ds®1240 tts'..._- -_" __.__ -"---- - -------- ----- LL 9 553 cis 12400rs ....... ., .. _ ... ..-- 5. ... 34 nrs 3. 2- 1- 0'. 11 12 13 14 15 Time (hours) r 04022 ThreeOaks Type 11124-hr 10 Yr, Storm Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 24 HydroCAD®7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 6P: NHC Stormwater Pond #3 Inflow Area = 9.590 ac, Inflow Depth = 0.52" for 10 Yr. Storm event Inflow = 12.64 cfs @ 12.44 hrs, Volume= 0.415 of Outflow = 8.87 cfs @ 12.60 hrs, Volume= 0.415 af, Atten= 30%, Lag= 10.0 min Primary = 8.87 cfs @ 12.60 hrs, Volume= 0.415 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 17.45' @ 12.60 hrs Surf.Area= 6,105 sf Storage= 5,357 cf Plug-Flow detention time= 9.3 min calculated for 0.414 of(100% of inflow) Center-of-Mass det. time= 9.4 min ( 761.9 - 752.5 ) It Invert Avail.Storage Storage Description 1 16.50' 25,439 cf Custom Stage Data(Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 16.50 4,854 0 0 17.00 5,495 2,587 2,587 18.00 6,856 6,176 8,763 19.00 8,300 7,578 16,341 20.00 9,896 9,098 25,439 # Routing Invert Outlet Devices 1 Primary 15.17' 30.0" x 57.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 15.00' S= 0.0030 7' n= 0.013 Cc= 0.900 2 Device 1 16.50' 3.00' x 0.35' Vert. Orifice/Grate X 2.00 C= 0.600 3 Device 1 18.60' 16.0' long x 1.0' high Sharp-Crested Rectangular Weir 2 End Contraction(s) 1.00' Rise 4 Primary 19.00' 20.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=8.87 cfs @ 12.60 hrs HW=17.45' (Free Discharge) 1=Culvert (Passes 8.87 cfs of 17.78 cfs potential flow) �2=Orifice/Grate (Orifice Controls 8.87 cfs @ 4.2 fps) 3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) =Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 04022 ThreeOaks Type /I/ 24-hr 10 Yr. Storm Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 25 f ydroCAD®7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 6P: NHC Stormwater Pond #3 Hydrograph . ......_.._........... ...__,. .. . .. E]W10w a- lz ca ds lx as nrs '; ���� ���� ©Pnmary 3- ----Inflow,-Area=9-590-ac-, 2 Peak Elev=l 7.45' . Storage=5,357 cf 9,. _.. ... .........._. . 8.87 cfs 12W8 _ U O J 41 . ..... _.............. ...... .............., .... ... ................... .... ....... ... .y1' ....... .... :. r ._.. . .-......._ ....a: .. 0, 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type 1/124-hr 25 Yr. Storm Rainfall=8.05" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 26 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Time span=11.00-15.00 hrs, dt=0.01 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Drainage Area 1 Runoff Area=5.470 ac Runoff Depth=4.09" Tc=10.0 min CN=81 Runoff=31.87 cfs 1.865 of Subcatchment 2S: Drainage Area 2 Runoff Area=4.120 ac Runoff Depth=4.09" Tc=10.0 min CN=81 Runoff=24.01 cfs 1.405 of Reach 5R: 60' Vegetated Filter Peak Depth=0.71' Max Vet=2.4 fps Inflow=22.81 cfs 0.793 of n=0.030 L=60.0' S=0.0050 '/' Capacity=43.09 cfs Outflow=22.79 cfs 0.793 of Reach 7R: SDMH with 30" Overflow Pipe Peak Depth=1.84' Max Vet=5.9 fps Inflow=22.84 cfs 0.793 of D=30.0" n=0.013 L=190.0' S=0.0039 T Capacity=25.60 cfs Outflow=22.81 cfs 0.793 of Reach 8R: 60' Vegetated Swale Peak Depth=0.37' Max Vet=3.0 fps Inflow=13.33 cfs 0.793 of n=0.030 L=60.0' S=0.0167 '/' Capacity=78.66 cfs Outflow=13.33 cfs 0.793 of Pond 3P: Infiltration Pond 1 Peak Elev=22.62' Storage=28,549 cf Inflow=31.87 cfs 1.865 of Discarded=4.41 cfs 1.134 of Primary=12.87 cfs 0.456 of Outflow=17.29 cfs 1.591 of Pond 4P: Infiltration Pond 2 Peak Elev=22.53' Storage=21,244 cf Inflow=24.01 cfs 1.405 of Discarded=3.53 cfs 0.878 of Primary=9.98 cfs 0.337 of Outflow=13.51 cfs 1.215 of Pond 6P: NHC Stormwater Pond#3 Peak Elev=18.41' Storage=11,901 cf Inflow=22.79 cfs 0.793 of Outflow=13.33 cfs 0.793 of Total Runoff Area =9.590 ac Runoff Volume= 3.270 of Average Runoff Depth =4.09" F 04022 ThreeOaks Type Ill 24-hr 25 Yr. Storm Rainfall=8.05" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 27 HydroCAD@ 7.01 s/n 000479 @ 1986-2004 Applied Microcomputer Systems 5/18/2004 Subcatchment 1S: Drainage Area 1 Runoff = 31.87 cfs @ 12.14 hrs, Volume= 1.865 af, Depth= 4.09" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Type III 24-hr 25 Yr. Storm Rainfall=8.05 Area (ac) CN Description 3.550 98 Paved parking & roofs 1.920 50 Green Area 5.470 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 1S: Drainage Area 1 Hydrograph 34' .... ...... .. . .. ❑Runof( __.. ... e7 cis@i2v4 nrs .......... ... 32- 30= " - Type III 24-hr, 25 Yr: Storm Rainfall=8.05' 26- _-- __.-_ � T. Runoff Area=5:470-ac- 24= --- - P " 22? _ .._.. -... ;-. -....... -..--. Runoff Volume 1�865 of-- - --- _ -._._ ----.. 20 _ - _- .- -- ----Runoff-Depth=4 09"- 318, . b - - r ------ 16' -- Tc=10:0 min- --.. ----.. ,2- - _ - _ -------- 0 8' 6- 4- -_._....... ... ......... .-..... .... �. _,...._. ........._._ . --__-. -._. _._ _ --.__ _...... --..... _ . ........... .............. 2= 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type /// 24-hr 25 Yr. Storm Rainfall=8.05" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 28 HydroCAD®7.01 s/n 000479 @ 1986-2004 Applied Microcomputer Systems 5/18/2004 Subcatchment 2S: Drainage Area 2 Runoff = 24.01 cfs @ 12.14 hrs, Volume= 1.405 af, Depth= 4.09" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Type III 24-hr 25 Yr. Storm Rainfall=8.05 Area (ac) CN Description 2.650 98 Paved parking & roofs 1.470 50 Green Area 4.120 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 2S: Drainage Area 2 Hydrograph 26 Runoff 2401 c1s@1214 Ors Yp24 -.---Type 22 .-......- a f= .... .___.Rainfall=8.05"...-. 20; , " - s - Runoff-Area=4.420 ac 18- 16 - -------- - Runoff-Volume=1A05 of .. 14 Runoff Depth=4.09 3 ,2- - c=1.0�0-mini - -- --- - 10- ' ---- M-41._ 6 6_ - - - ------ -.._ ------- _ ---- 2- o-, 11 1,2 73 1a 16 Time (hours) 04022 ThreeOaks Type 111 24-hr 25 Yr. Storm Rainfall=8.05" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 29 HydroCAD(D 7.01 s/n 000479 @ 1986-2004 Applied Microcomputer Systems 5/18/2004 Reach 5R: 60' Vegetated Filter Inflow Area = 9.590 ac, Inflow Depth = 0.99" for 25 Yr. Storm event Inflow = 22.81 cfs @ 12.34 hrs, Volume= 0.793 of Outflow = 22.79 cfs @ 12.35 hrs, Volume= 0.793 af, Atten= 0%, Lag= 0.7 min Routing by Stor-Ind+Trans method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Max. Velocity= 2.4 fps, Min. Travel Time= 0.4 min Avg. Velocity = 0.9 fps, Avg. Travel Time= 1.2 min Peak Depth= 0.71' @ 12.34 hrs Capacity at bank full= 43.09 cfs Inlet Invert= 19.10', Outlet Invert= 18.80' 10.00' x 1.00' deep channel, n= 0.030 Length= 60.0' Slope= 0.0050 '/' Side Slope Z-value= 5.0 7' Reach 5R: 60' Vegetated Filter Hydrograph -.. . -........ .... .......... .--... -....... Inflow n ei cis is as nrs --- ElOutflow 24- ... _. ... Inflow Area=9 590 ac 22 ---- --- -------- -- ' --'--.. - ---- -- . . - -- 20 ;. -.; _Peak Depth=0.7.1.'.._. -- Max Vet=2:4-f s ,8- � p s; n=0.030 14 127 _ . _ .. L=.60 0' .. . _ ...... 10:: ,. _ S=0.0050 a- _Capacity=43.09 cfs 6- _. ...... _........ .. -- - ---. ...---- ------- --..-- ........... .. . .— ,_ f 2- 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type /// 24-hr 25 Yr. Storm Rainfall=8.05" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 30 HydroCAD@ 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Reach 7R: SDMH with 30" Overflow Pipe Inflow Area = 9.590 ac, Inflow Depth = 0.99" for 25 Yr. Storm event Inflow = 22.84 cfs @ 12.32 hrs, Volume= 0.793 of Outflow = 22.81 cfs @ 12.34 hrs, Volume= 0.793 af, Atten= 0%, Lag= 1.0 min Routing by Stor-Ind+Trans method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Max. Velocity= 5.9 fps, Min. Travel Time= 0.5 min Avg. Velocity = 2.8 fps, Avg. Travel Time= 1.1 min Peak Depth= 1.84' @ 12.33 hrs Capacity at bank full= 25.60 cfs Inlet Invert= 19.84', Outlet Invert= 19.10' 30.0" Diameter Pipe n= 0.013 Length= 190.0' Slope= 0.0039 '/' Reach 7R: SDMH with 30" Overflow Pipe Hydrograph 24- zzsads izums ❑Outflow 22- z2'"`` '23 N Inflow Area-9.590 car, t Peak Depth 1 .84' 18= ......_.-._Max.Ve.l.5.9.fps_.. LL12 .' ... .--..._.._ _.._. 7 ---- -- ----- .Capacity=25.60-.cfs- - ---------- 2 o- 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type 111 24-hr 25 Yr. Storm Rainfall=8.05" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 31 HydroCADV 7.01 s/n 000479 @ 1986-2004 Applied Microcomputer Systems 5/18/2004 Reach 8R: 60' Vegetated Swale Inflow Area = 9.590 ac, Inflow Depth = 0.99" for 25 Yr. Storm event Inflow = 13.33 cfs @ 12.58 hrs, Volume= 0.793 of Outflow = 13.33 cfs @ 12.59 hrs, Volume= 0.793 af, Atten= 0%, Lag= 0.6 min Routing by Stor-Ind+Trans method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Max. Velocity= 3.0 fps, Min. Travel Time= 0.3 min Avg. Velocity = 1.2 fps, Avg. Travel Time= 0.8 min Peak Depth= 0.37' @ 12.59 hrs Capacity at bank full= 78.66 cfs Inlet Invert= 15.00', Outlet Invert= 14.00' 10.00' x 1.00' deep channel, n= 0.030 Length= 60.0' Slope= 0.0167 Side Slope Z-value= 5.0 '/' Reach 8R: 60' Vegetated Swale Hydrograph ---._ ----_.... ... . _ 0Innow 1333 cis 12.M hrs ❑Qu,110W 1333d. ,259nrs l Inflow_Area=9.590 ac .. ,2- _.- Peak Depth=0.37' Max Vet=3.0.fps.... __ . .. . 9; n=0.030 N 5!. ---.. .._. ... ° _ _._.. . ...... .. --- r Capacity=78 66_.cfs..... 3: 0 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type 111 24-hr 25 Yr. Storm Rainfall=8.05" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 32 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 3P: Infiltration Pond 1 Inflow Area = 5.470 ac, Inflow Depth = 4.09" for 25 Yr. Storm event Inflow = 31.87 cfs @ 12.14 hrs, Volume= 1.865 of Outflow = 17,29 cfs @ 12.33 hrs, Volume= 1.591 af, Atten= 46%, Lag= 11.3 min Discarded = 4.41 cfs @ 12.33 hrs, Volume= 1.134 of Primary = 12.87 cfs @ 12.33 hrs, Volume= 0.456 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 22.62' @ 12.33 hrs Surf.Area= 10,589 sf Storage= 28,549 cf Plug-Flow detention time= 43.4 min calculated for 1.586 of (85% of inflow) Center-of-Mass det. time= 26.5 min ( 776.0 - 749.5 ) # Invert Avail.Storage Storage Description 1 19.00, 32,468 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 19.00 5,484 0 0 20.00 6,591 6,038 6,038 21.00 7,766 7,179 13,216 22.00 9,853 8,810 22,026 23.00 11,031 10,442 32,468 # Routing Invert Outlet Devices 1 Discarded 0.00' 0.025000 fpm Exfiltration over entire Surface area 2 Primary 20.10' 24.0" x 64.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 19.84' S= 0.0041 T n= 0.013 Cc= 0.900 3 Device 2 21.90' 6.0' long x 1.0' high Sharp-Crested Rectangular Weir 2 End Contraction(s) 4.00' Rise Discarded OutFlow Max=4.41 cfs @ 12.33 hrs HW=22.62' (Free Discharge) t1=Exfiltration (Exfiltration Controls 4.41 cfs) Primary OutFlow Max=12.86 cfs @ 12.33 hrs HW=22.62' (Free Discharge) t2=Culvert (Passes 12.86 cfs of 15.85 cfs potential flow) t3=Sharp-Crested Rectangular Weir (Weir Controls 12.86 cfs @ 3.0 fps) 04022 ThreeOaks Type 11124-hr 25 Yr. Storm Rainfall=8.05" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 33 HydroCAD®7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 3P: Infiltration Pond 1 Hydrograph .__ .. ... ... Olnflow f 10 n __ - ._ . . — ®Outflow Inflow Area=S 470 -ac °Primary 3] is 12 34? ' .. O Primary _ __ ' - Peak-flev=22:62'- r 30j Storage=28,549 cf 24-. _..... .___...... .. ..-.... - _. -_.. !.. . - 22 ------------- 1]29 ds�4331vs ...... .__._ .._... V 20' ...._-_.. LL 14=' , _. _ tz.9]tls tz.33 Ns ._.. -.._.j_'." .-__._... -"'i ---"- - _..-----"'-'-. 12i' _ . ..__...-.. _ ....-_.. ... 6.: 4- 2- 0'. 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type 111 24-hr 25 Yr. Storm Rainfall=8.05" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 34 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 4P: Infiltration Pond 2 Inflow Area = 4.120 ac, Inflow Depth = 4.09" for 25 Yr. Storm event Inflow = 24.01 cfs @ 12.14 hrs, Volume= 1.405 of Outflow = 13.51 cfs @ 12.31 hrs, Volume= 1.215 af, Atten= 44%, Lag= 10.6 min Discarded = 3.53 cfs @ 12.31 hrs, Volume= 0.878 of Primary = 9.98 cfs @ 12.31 hrs, Volume= 0.337 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 22.53' @ 12.31 hrs Surf.Area= 8,475 sf Storage= 21,244 cf Plug-Flow detention time= 43.3 min calculated for 1.214 of(86% of inflow) Center-of-Mass det. time= 27.2 min ( 776.8 - 749.5 ) # Invert Avail.Storage Storage Description 1 19.00, 25,212 cf Custom Stage Data(Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 19.00 3,620 0 0 20.00 4,894 4,257 4,257 21.00 6,243 5,569 9,826 22.00 7,669 6,956 16,782 23.00 9,192 8,431 25,212 # Routing Invert Outlet Devices 1 Discarded 0.00' 0.025000 fpm Exfiltration over entire Surface area 2 Primary 20.00' 24.0" x 65.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 19.84' S= 0.0025 '/' n= 0.013 Cc= 0.900 3 Device 2 21.90' 6.0' long x 1.9' high Sharp-Crested Rectangular Weir 2 End Contraction(s) 1.00' Rise Discarded OutFlow Max=3.53 cfs @ 12.31 hrs HW=22.53' (Free Discharge) t1=Exfiltration (Exfiltration Controls 3.53 cfs) Primary OutFlow Max=9.98 cfs @ 12.31 hrs HW=22.53' (Free Discharge) t2=Culvert (Passes 9.98 cfs of 14.92 cfs potential flow) t-3=Sharp-Crested Rectangular Weir (Weir Controls 9.98 cfs @ 2.7 fps) 04022 ThreeOaks Type /// 24-hr 25 Yr. Storm Rainfall=8.05" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 35 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 4P: Infiltration Pond 2 Hydrograph ---------------.. --- .-- zam w - D Inflow ... 1214 nrs _._ . ..._- -._. ...-- ❑Outflow Inflow Area=4120 ac °D15`a`de° 26- � r, O Primary Peak Elev=22.53' 22' ... ....Storage.=..21 ,244.cf. .. 20 18 I u ... LL 12. ...._... _.. 9.98c1s 1231 hrs f 10- ..-._.... .-...... .............. _.. .... ..................._.. 8. 6'': 9 .r 4- 2- 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type 1/124-hr 25 Yr. Storm Rainfall=8.05" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 36 HydroCAD®7.01 s/n 000479 @ 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 6P: NHC Stormwater Pond #3 Inflow Area = 9.590 ac, Inflow Depth = 0.99" for 25 Yr. Storm event Inflow = 22.79 cfs @ 12.35 hrs, Volume= 0.793 of Outflow = 13.33 cfs @ 12.58 hrs, Volume= 0.793 af, Atten= 42%, Lag= 14.0 min Primary = 13.33 cfs @ 12.58 hrs, Volume= 0.793 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 18.41' @ 12.58 hrs Surf.Area= 7,454 sf Storage= 11,901 cf Plug-Flow detention time= 12.2 min calculated for 0.791 of(100% of inflow) Center-of-Mass det. time= 12.3 min ( 761.9 - 749.6 ) # Invert Avail.Storage Storage Description 1 16.50' 25,439 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 16.50 4,854 0 0 17.00 5,495 2,587 2,587 18.00 6,856 6,176 8,763 19.00 8,300 7,578 16,341 20.00 9,896 9,098 25,439 # Routing Invert Outlet Devices 1 Primary 15.17' 30.0" x 57.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 15.00' S= 0.0030 T n= 0.013 Cc= 0.900 2 Device 1 16.50' 3.00' x 0.35' Vert. Orifice/Grate X 2.00 C= 0.600 3 Device 1 18.60' 16.0' long x 1.0' high Sharp-Crested Rectangular Weir 2 End Contraction(s) 1.00' Rise 4 Primary 19.00' 20.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=13.33 cfs @ 12.58 hrs HW=18.41' (Free Discharge) 1=Culvert (Passes 13.33 cfs of 27.66 cfs potential flow) �2=Orifice/Grate (Orifice Controls 13.33 cfs @ 6.3 fps) 3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) =Broad-C rested Rectangular Weir ( Controls 0.00 cfs) 04022 ThreeOaks Type 1/124-hr 25 Yr. Storm Rainfall=8.05" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 37 HydroCAD9)7 01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 6P: NHC Stormwater Pond #3 Hydrograph __.. ....._. __ _.. ._. _..---- --------------.. _""'_. . ____. ❑Inflow 2279 cis 1235 hrs 113Pnmary 24 Inflow Area=9.590 ac 22- .......... ........ ........ ......:.._ ............._ ... 20- Peak Elev=18.41'. t8_ . _._... __._... _ ......Storage=1 1-;901_cf.... 16 14_ 1333 ds A1258 hrs J... ......... a12,. .... .. ..... ._. _.. . ..._. . _....... . . L., .. ...,. _.._.._.. .. LL 10- 8- .........._ .......... :.... 6,: _._..._.... .. . ......... _r 4, _ . ._.... . 2_ 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type 111 24-hr 100 Yr. Storm Rainfall=10.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 38 HydroCAD®7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Time span=11.00-15.00 hrs, dt=0.01 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Drainage Area 1 Runoff Area=5.470 ac Runoff Depth=5.34" Tc=10.0 min CN=81 Runoff=41.59 cfs 2.433 of Subcatchment 2S: Drainage Area 2 Runoff Area=4.120 ac Runoff Depth=5.34" Tc=10.0 min CN=81 Runoff=31.33 cfs 1.833 of Reach 5R: 60' Vegetated Filter Peak Depth=0.77' Max Vet=2.5 fps Inflow=27.06 cfs 1.549 of n=0.030 L=60.0' S=0.00507 Capacity=43.09 cfs Outflow=26.12 cfs 1.549 of Reach 7R: SDMH with 30" Overflow Pipe Peak Depth=2.50' Max Vet=5.9 fps Inflow=59.11 cfs 1.549 of D=30.0" n=0.013 L=190.0' S=0.0039 '/' Capacity=25.60 cfs Outflow=27.06 cfs 1.549 of Reach 8R: 60' Vegetated Swale Peak Depth=0.54' Max Vet=3.7 fps Inflow=25.60 cfs 1.549 of n=0.030 L=60.0' S=0.0167'/' Capacity=78.66 cfs Outflow=25.60 cfs 1.549 of Pond 3P: Infiltration Pond 1 Peak Elev=28.92' Storage=32,468 cf Inflow=41.59 cfs 2.433 of Discarded=4.60 cfs 1.199 of Primary=42.31 cfs 0.891 of Outflow=46.90 cfs 2.090 of Pond 4P: Infiltration Pond 2 Peak Elev=22.92' Storage=24,503 cf Inflow=31.33 cfs 1.833 of Discarded=3.78 cfs 0.929 of Primary=17.21 cfs 0.658 of Outflow=20.98 cfs 1.587 of Pond 6P: NHC Stormwater Pond#3 Peak Elev=18.93' Storage=15,829 cf Inflow=26.12 cfs 1.549 of Outflow=25.60 cfs 1.549 of Total Runoff Area =9.590 ac Runoff Volume=4.266 of Average Runoff Depth = 5.34" 04022 ThreeOaks Type Ill 24-hr 100 Yr. Storm Rainfall=10.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 39 HydroCAD@ 7.01 s/n 000479 @ 1986-2004 Applied Microcomputer Systems 5/18/2004 Subcatchment 1S: Drainage Area 1 Runoff = 41.59 cfs @ 12.14 hrs, Volume= 2.433 af, Depth= 5.34" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Type III 24-hr 100 Yr. Storm Rainfall=10.00" Area (ac) CN Description 3.550 98 Paved parking & roofs 1.920 50 Green Area 5.470 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 1S: Drainage Area 1 Hydrograph 46: ..... ._. ..... .... .... -._ .. . ....... _.. . . .... ..... ❑Runoff ats9 crs .�2.ta nrs -"' 42 40j Type.11l 24 hrA00.Yr.:Storm:: 38' 36'.. .. ..__. .... ....._.._.. r: . .. ...... . ..... • -........ ............ ..Rainfall=10:00„ _......... __..._. 34-. ... . ... ..... .. RunoffArea=5.470 ac.. 32. . .__ ...... .... ... .... . .. . ...... ......... ....._. 30 ""' ' Runoff'Volume=2.433 af ' 28 -..._ _. 26 Runoff Depth=5.34 = 24 ... ._ _ _. . . 22- , _ . - ------------------------ --------.---------- Tc=10.0.m i n.. LL 2p_ ... 18i _ CN=8.1 . 16- -. .-....... ............ 14. ..........._...._... _. 12 .............. ...._.. -- - ---------- 10; _.__ _....... a 6- ............. _.-_. .- 4; _........__.., 2- 0 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type /// 24-hr 100 Yr. Storm Rainfall=10.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 40 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Subcatchment 2S: Drainage Area 2 Runoff = 31.33 cfs @ 12.14 hrs, Volume= 1.833 at, Depth= 5.34" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Type III 24-hr 100 Yr. Storm Rainfall=10.00" Area (ac) CN Description 2.650 98 Paved parking & roofs 1.470 50 Green Area 4.120 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 2S: Drainage Area 2 Hydrograph ................ ..._.__ . -------- ------- _. . :...--..-- -_.._.... ...:�..------ ---------- .__. 34 ..._._... ❑Runoff 31,33 Is... 14d4 Ms -...-..-. .• -..------ . 32i 30' ' Type 111-24-hr;100 Yr:-Storm - 28 . . .... %. ! .. . .. Rainfall=.10.00"., 24' Runoff Area=4:120 ac 22' _-- -------- f' ,,' -.__._-- _...-........ Runoff Volume=1.833 af... 2 8 -- ... -- --------------- Runoff-Depth=5.34"--.. Tc=10:0 min. 14 .CN=81.. ,2- 10-' 8- s= 4= 2. 0 , 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type 1/124-hr 100 Yr. Storm Rainfall=10.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 41 HydroCADO 7.01 sln 000479 @ 1986-2004 Applied Microcomputer Systems 5/18/2004 Reach 5R: 60' Vegetated Filter Inflow Area = 9.590 ac, Inflow Depth = 1.94" for 100 Yr. Storm event Inflow = 27.06 cfs @ 12.17 hrs, Volume= 1.549 of Outflow = 26.12 cfs @ 12.19 hrs, Volume= 1.549 af, Atten= 3%, Lag= 0.9 min Routing by Stor-Ind+Trans method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Max. Velocity= 2.5 fps, Min. Travel Time= 0.4 min Avg. Velocity = 1.0 fps, Avg. Travel Time= 1.0 min Peak Depth= 0.77' @ 12.18 hrs Capacity at bank full= 43.09 cfs Inlet Invert= 19.10', Outlet Invert= 18.80' 10.00' x 1.00' deep channel, n= 0.030 Length= 60.0' Slope= 0.0050 T Side Slope Z-value= 5.0 7' Reach 5R: 60' Vegetated Filter Hydrograph . . .. ... ._. ..... .. ..... . ... ... __ .... ._ ..... ......... ..._ ©Inflow 30. 2706 c4 12,17 nrs ❑Outflow 29 i. 2612ch 12.19 hn Inflow-Area=9.590- ac - 25: - - -- - -- - - - } -Peak-Depth=037' 22= :.Max Veal .;2.5..fps:::: 20 .... ... .. . k ..... n=0.030 N 16- L. .. r 4KJ .. . .. ... ... _ Or . 0 14' . . 60. LL 2- , ---- -S=0:0050 T =' - ----- 8- _ " .... . ..... Capacity=43.09..cfs.... 4- 2= ' 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type /// 24-hr 100 Yr. Storm Rainfall=10.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 42 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Reach 7R: SDMH with 30" Overflow Pipe Inflow Area = 9.590 ac, Inflow Depth = 1.94" for 100 Yr. Storm event Inflow = 59.11 cfs @ 12.21 hrs, Volume= 1.549 of Outflow = 27.06 cfs @ 12.17 hrs, Volume= 1.549 af, Atten= 54%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Max. Velocity= 5.9 fps, Min. Travel Time= 0.5 min Avg. Velocity = 2.9 fps, Avg. Travel Time= 1.1 min Peak Depth= 2.50' @ 12.17 hrs Capacity at bank full= 25.60 cfs Inlet Invert= 19.84', Outlet Invert= 19.10' 30.0" Diameter Pipe n= 0.013 Length= 190.0' Slope= 0.0039 '/' Reach 7R: SDMH with 30" Overflow Pipe Hydrograph -_...._ _.-. . .. ..----- .-. .....- ---------------. ❑Inflow ❑Outflow 60: - - -Inflow Area=9.590 ac 55 , .. .. .. .._._. . . ,.,, . ..._... .......PeakDepth=2.50' . 50- .....__.. . .----- - ..__- -- -- - -... _....-- 45- .. ...... Max:Vel 5.9 fps.... .... _.... 46 ' ..... .... . . . 13=30.0"... 35. ..-.._ _....... _ -._....n=0:01.3... 3 .2 30 _ ........ 2706 cfs @12.17Ms ........ __._........ L=190.0'25- ... - _ --- S0.0= 039 '/' 20- __ ... --- ----- 15_ _._._ ... -...- . .. .Capacity.=25.60 cfs.._- . �} 0-. 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type 111 24-hr 100 Yr. Storm Rainfall=10.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 43 HydroCAD@ 7.01 s/n 000479 @ 1986-2004 Applied Microcomputer Systems 5/18/2004 Reach 8R: 60' Vegetated Swale Inflow Area = 9.590 ac, Inflow Depth = 1.94" for 100 Yr. Storm event Inflow = 25.60 cfs @ 12.78 hrs, Volume= 1.549 of Outflow = 25.60 cfs @ 12.78 hrs, Volume= 1.549 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Max. Velocity= 3.7 fps, Min. Travel Time= 0.3 min Avg. Velocity = 1.6 fps, Avg. Travel Time= 0.6 min Peak Depth= 0.54' @ 12.78 hrs Capacity at bank full= 78.66 cfs Inlet Invert= 15.00', Outlet Invert= 14.00' 10.00' x 1.00' deep channel, n= 0.030 Length= 60.0' Slope= 0.0167 '/' Side Slope Z-value= 5.0 7' Reach 8R: 60' Vegetated Swale Hydrograph Fo Inflow 28'. - - - - - - - 25 W cfs P 1z78 ms --.... -- ❑Outflow 26- _ _ zsW"s 1,12 Inflow Area=9.590 ac 22 _...--- - ------ ,:,.. _... Peak Depth=0_.54......... 20_ . . ---- . Max-Vet=3 7 fps 18- r ...... 16 .. _.. � ... 0 . . n .030 14, _ .... L=60 0' .. 3 12 __ 10-1 - _.... .. 8- ...... Capacity=78.66 cfs 4: _. ....... . .. . ,$: .. 2 'd 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type 1/124-hr 100 Yr. Storm Rainfall=10.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 44 HydroCAD® 7.01 s/n 000479 @ 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 3P: Infiltration Pond 1 Inflow Area = 5.470 ac, Inflow Depth = 5.34" for 100 Yr. Storm event Inflow = 41.59 cfs @ 12.14 hrs, Volume= 2.433 of Outflow = 46.90 cfs @ 12.21 hrs, Volume= 2.090 af, Atten= 0%, Lag= 4.4 min Discarded = 4.60 cfs @ 12.20 hrs, Volume= 1.199 of Primary = 42.31 cfs @ 12.21 hrs, Volume= 0.891 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 28.92' @ 12.21 hrs Surf.Area= 11,031 sf Storage= 32,468 cf Plug-Flow detention time= 37.4 min calculated for 2.089 of(86% of inflow) Center-of-Mass det. time= 20.9 min ( 769.5 - 748.6 ) # Invert Avail.Storage Storage Description 1 19.00, 32,468 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 19.00 5,484 0 0 20.00 6,591 6,038 6,038 21.00 7,766 7,179 13,216 22.00 9,853 8,810 22,026 23.00 11,031 10,442 32,468 # Routing Invert Outlet Devices 1 Discarded 0.00' 0.025000 fpm Exfiltration over entire Surface area 2 Primary 20.10' 24.0" x 64.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 19.84' S= 0.0041 T n= 0.013 Cc= 0.900 3 Device 2 21.90' 6.0' long x 1.0' high Sharp-Crested Rectangular Weir 2 End Contraction(s) 4.00' Rise Discarded OutFlow Max=4.60 cfs @ 12.20 hrs HW=23.03' (Free Discharge) t-1=Exfiltration (Exfiltration Controls 4.60 cfs) Primary OutFlow Max=42.26 cfs @ 12.21 hrs HW=28.91' (Free Discharge) t2=Culvert (Inlet Controls 42.26 cfs @ 13.5 fps) t3=Sharp-Crested Rectangular Weir (Passes 42.26 cfs of 421.04 cfs potential flow) 04022 ThreeOaks Type 111 24-hr 100 Yr. Storm Rainfall=10.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 45 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 3P: Infiltration Pond 1 Hydrograph .. _ ..._ . ... .... ......_................... wn....... as s0 c�sD1221 hrs __ . . . . . Di Ica detl inflow Area=5 470 ac ❑ s. Primary 50_ ... 4159 Gs 14hrs r= Peak Elev=28.92' 45- --- 42.31 cis 122t nrs " ; " m Stora(ye=32,468 cf 40: jh ...... ..... .... w30_ ' _........ .._ ..._ . . ..__._..... 3: 25- " ..._._ ,:'a• .. ' _..... __._._...... :....... . . '................__.. u 7 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type 1/124-hr 100 Yr. Storm Rainfall=10.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 46 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 4P: Infiltration Pond 2 Inflow Area = 4.120 ac, Inflow Depth = 5.34" for 100 Yr. Storm event Inflow = 31.33 cfs @ 12.14 hrs, Volume= 1.833 of Outflow = 20.98 cfs @ 12.26 hrs, Volume= 1.587 af, Atten= 33%, Lag= 7.4 min Discarded = 3.78 cfs @ 12.26 hrs, Volume= 0.929 of Primary = 17.21 cfs @ 12.26 hrs, Volume= 0.658 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 22.92' @ 12.26 hrs Surf.Area= 9,064 sf Storage= 24,503 cf Plug-Flow detention time= 37.0 min calculated for 1.583 of (86% of inflow) Center-of-Mass det. time= 21.2 min ( 769.8 - 748.6 ) # Invert Avail.Storage Storage Description 1 19.00, 25,212 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 19.00 3,620 0 0 20.00 4,894 4,257 4,257 21.00 6,243 5,569 9,826 22.00 7,669 6,956 16,782 23.00 9,192 8,431 25,212 # Routing Invert Outlet Devices 1 Discarded 0.00' 0.025000 fpm Exfiltration over entire Surface area 2 Primary 20.00' 24.0" x 65.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 19.84' S= 0.0025 T n= 0.013 Cc= 0.900 3 Device 2 21.90' 6.0' long x 1.9' high Sharp-Crested Rectangular Weir 2 End Contraction(s) 1.00' Rise ' Discarded OutFlow Max=3.78 cfs @ 12.26 hrs HW=22.92' (Free Discharge) L1=Exfiltration (Exfiltration Controls 3.78 cfs) MPrimary OutFlow Max=17.20 cfs @ 12.26 hrs HW=22.92' (Free Discharge) L2=Culvert (Barrel Controls 17.20 cfs @ 5.5 fps) t3=Sharp-Crested Rectangular Weir (Passes 17.20 cfs of 20.65 cfs potential flow) 04022 ThreeOaks Type 111 24-hr 100 Yr. Storm Rainfall=10.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 47 HydroCADO 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 4P: Infiltration Pond 2 Hydrograph _... .. _.. .... --- __ .. Inflow 81? eis 7, n OOl1Iow - - ®Discarded 34 Inflow;Area; 4120=ac-;; �Prlmary .- e., 32-' _ - --- -- __.._. Peak Elev=22.92r 28: - . .. . .. , ._' . . . . . . . .. Storage=24-503 cf24 . . --- - ----- - -- -------- 22; .....__ 1 .__. ......... ....__..... __- 20 18� ... _. -_.__ ....._ _. . _ - ..... __. __.. __... ......... t - 17,21 CIS 1226 nrs ii i6i }, LL v _ __ ______ __ 12- . . . . .. ...-_... ... . 10- 6' I j. J". cis 1226 . . 4' 2_ p, 11 12 13 14 15 Time (hours) 04022 ThreeOaks Type III 24-hr 100 Yr. Storm Rainfall=10.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 48 HydroCADO 7.01 s/n 000479 @ 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 6P: NHC Stormwater Pond #3 Inflow Area = 9.590 ac, Inflow Depth = 1.94" for 100 Yr. Storm event Inflow = 26.12 cfs @ 12.19 hrs, Volume= 1.549 of Outflow = 25.60 cfs @ 12.78 hrs, Volume= 1.549 af, Atten= 2%, Lag= 35.6 min Primary = 25.60 cfs @ 12.78 hrs, Volume= 1.549 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 18.93' @ 12.78 hrs Surf.Area= 8,203 sf Storage= 15,829 cf Plug-Flow detention time= 11.4 min calculated for 1.545 of(100% of inflow) Center-of-Mass det. time= 11.4 min ( 762.9 - 751.4 ) # Invert Avail.Storage Storage Description 1 16.50' 25,439 cf Custom Stage Data(Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 16.50 4,854 0 0 17.00 5,495 2,587 2,587 18.00 6,856 6,176 8,763 19.00 8,300 7,578 16,341 20.00 9,896 9,098 25,439 # Routing Invert Outlet Devices 1 Primary 15.17' 30.0" x 57.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 15.00' S= 0.0030 '/' n= 0.013 Cc= 0.900 2 Device 1 16.50' 3.00' x 0.35' Vert. Orifice/Grate X 2.00 C= 0.600 3 Device 1 18.60' 16.0' long x 1.0' high Sharp-Crested Rectangular Weir 2 End Contraction(s) 1.00' Rise 4 Primary 19.00' 20.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=25.58 cfs @ 12.78 hrs HW=18.93' (Free Discharge) 1=Culvert (Passes 25.58 cfs of 33.11 cfs potential flow) �2=Orifice/Grate (Orifice Controls 15.19 cfs @ 7.2 fps) 3=Sharp-Crested Rectangular Weir (Weir Controls 10.40 cfs @ 2.0 fps) =Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 04022 ThreeOaks Type 1/124-hr 100 Yr. Storm Rainfall=10.00" Prepared by Andrew & Kuske Consulting Engineers, Inc. Page 49 Hydro(DAD&7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 5/18/2004 Pond 6P: NHC Stormwater Pond #3 Hydrograph FO Inflow 28- . .. .......... 2612 d 12.19 Ms .. .. . _ - ...... ...... ... ..... ❑Primary ...... - 266ntls 1278�s Inflow Area=9 590 ac zs- �<w 24. ..... ' ...._ _.Peak- Elev...18.93'.... .. ...... . . ...... . PO - Storage=15,829 cf- 20- w . 18- c 14 ...._..._ ....... .. LL ...- ._. _.._.. __.. ....... ____ 10- _. . . ..... ..... .-.. .......... .......... 4-1 2: . 11 12 13 14 15 Time (hours) STORMWATER SYSTEM & EROSION CONTROL NARRATIVE THREE OAKS MIXED USE DEVELOPMENT 7750 MARKET STREET NEW HANOVER COUNTY, NORTH CAROLINA For Three Oak Property, LLC 315 Friday Drive Wilmington, NC 28411 (910) 538-5719 o�apeNeeeeeyo o as e� May 2004 Prepared by: ANDREW & KUSKE CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) E-mail: office@andrewandkuske.com A & K Project No. 04022 I , NARRATIVE PROJECT DESCRIPTION: The project site is an 11.87 acre site located in New Hanover County, North Carolina at 7750 Market Street / US Highway 17. A mixed use development is proposed with paved parking and access to Market Street / US Highway 17. The mixed use development will include a 6,000 SF 1-Story Retail Building, an 8,400 SF 2-Story Retail / Office Building, a 7,200 SF 2-Story Retail / Office Building and 156 2-Bedroom Apartment Units. Phase 1 construction will include the 156 2-Bedroom Apartments. Phase 2 construction will include the Retail Building and the two (2) Retail /Office Buildings. Stormwater runoff from the site drains to Pages Creek, which is classified as an SA water body. Therefore, stormwater runoff from the site will be treated in two (2) above ground stormwater infiltration ponds designed to meet the State Stormwater Regulations for an SA water body and a third stormwater pond designed to meet the New Hanover County Stormwater Ordinance. The drainage area for the stormwater system design includes the Phase 1 and Phase 2 onsite area and an offsite area, which is a portion of Market Street / US Highway 17 within the NC DOT Right of Way. The disturbed area / construction limits for the project consist of the Phase 1 and Phase 2 onsite area and a portion of Market Street / US Highway 17 as required for offsite improvements including a right.turn lane and utility work. SITE DESCRIPTION AND INFORMATION: As mentioned above, improvements will take place on the site as shown on the attached plans. The majority of the site is cleared of underbrush but is heavily wooded with trees and sandy soils. Existing trees on the site will remain to the extent possible. Grades on the site range from 0.10% to 10.00%. The stormwater runoff from the undeveloped site currently sheet flows to the rear of the property. EROSION CONTROL MEASURES: The attached plans and specifications give the requirements for erosion control measures. Silt fence shall be installed on the site prior to grading as shown on the attached plans. Erosion control measures shall be installed around the drop inlets as shown on the plans to trap silt during construction. Inspect the erosion control around the inlets after each rain to make repairs as needed. Remove sediment as necessary to provide adequate storage volume for subsequent rains. When the contributing drainage area has been adequately stabilized, remove all materials and any unsuitable soil and either salvage or dispose of it properly. Bring the disturbed area to proper grade, then smooth and compact it. Appropriately stabilize all bare areas around the drop inlets. Gravel construction entrances will be provided as noted on the plans. Maintain the gravel construction entrances in a condition to prevent mud or sediment from leaving the site. STORMWATER MANAGEMENT MEASURES: The project site is located within New Hanover County, North Carolina. Land disturbing on the site will exceed one acre, which requires the site to comply with the NC DENR State Stormwater Regulations. In addition, the site will also have to comply with the New Hanover County Stormwater Ordinance, which requires that the post development discharge rate shall not exceed the pre-development discharge rate for the 2 year, 10 year and 25 year storms. This narrative will focus on the aspects of the NC DENR State Stormwater design. Two (2) above ground stormwater infiltration ponds have been designed to store and infiltrate the first 1.5-inch runoff from the two (2) drainage areas Drainage Area No. 1 is 5.47 acres. Drainage Area No. 1 drains into Stormwater Infiltration Pond No. 1. Drainage Area No. 1 includes a small portion of offsite area within the NC Dot Right of Way. Drainage Area No. 2 is 4.12 acres. Drainage Area No. 2 drains into Stormwater Infiltration Pond No. 2. See the plans and calculations for a detailed design description of the above ground stormwater infiltration ponds. Stormwater runoff from each drainage area above the 1.5- inch volume will bypass each state infiltration pond through an offline bypass special junction box. The stormwater runoff from each special junction box will be collected in a common storm drain pipe, which discharges into a vegetated filter prior to flowing into the stormwater pond designed to meet the New Hanover County Stormwater Ordinance. The discharge from the stormwater pond designed to meet the New Hanover County Stormwater Ordinance will flow through a second vegetated filter at the end of the outfall pipe prior to entering the existing site outlet swale and offsite wetland. An infiltration evaluation of the site was performed by Engineering Consulting Services, Ltd. on August 22, 2003. A copy of the Infiltration Evaluation by ECS, Ltd. dated August 26, 2003 is attached to the stormwater and erosion control calculations for review. The infiltration evaluation includes information on subsurface soil and groundwater conditions at sixteen (16) hand auger boring locations. Three (3) infiltration tests were also performed on the site. Subsurface soil conditions, groundwater conditions and infiltration rates are included in the infiltration evaluation for each infiltration test location. We visited the site with Vincent Lewis of NC DENR on February 16, 2004 to review and confirm the infiltration evaluation results performed by ECS, Ltd. Vincent Lewis advanced seventeen (17) hand auger borings to review the subsurface soil and groundwater conditions. Vincent Lewis determined an approximate seasonal high groundwater table depth at each hand auger boring location. A copy of a letter to the project owner dated February 17, 2004 summarizing Vincent Lewis' findings is attached to the stormwater and erosion control calculations for review. CONSTRUCTION SEQUENCE: The contractor will install the gravel construction entrances, silt fence and other erosion control measures specified as required prior to beginning any grading operations. Disturbed areas will be landscaped or stabilized within 15 days of disturbance. MAINTENANCE PLAN 1. All erosion and sediment control practices will be checked for stability and operation following every runoff-producing rainfall but in no case less than once every week. Any needed repairs will be made immediately to maintain all practices as designed. 2. Install erosion control measures before beginning construction or as soon thereafter as possible. All erosion and sediment control practices will be checked for stability and operation following every runoff-producing rainfall but in no case less than once every week. Any needed repairs will be made immediately to maintain all practices as designed. 3. Maintain the gravel construction entrances in a condition to prevent mud or sediment from leaving the construction site. The contractor shall inspect the construction entrances on a daily basis. This will require periodic top dressing with additional No. 4 stone. Any objectionable materials spilled, washed, or tracked onto public roadways shall be removed immediately. 4. Install erosion control measures around the drop inlets as shown on the plans to trap silt during construction. Inspect the erosion control around the inlets after each rain and make repairs immediately. Remove sediment when it becomes 0.50 deep to provide adequate storage volume for subsequent rains. When the contributing drainage area has been adequately stabilized, remove all materials and any unstable soil and either salvage or dispose of it properly. Bring the disturbed area to proper grade and appropriately stabilize all bare areas around the drop inlets. 5. Sediment will be removed from behind the silt fence when it becomes 0.5 feet deep at the fence. The sediment fence will be repaired as necessary to maintain a barrier. 6. No cut or fill slopes shall exceed a side slope of 1 vertical to 3 horizontal unless otherwise specified on the plan. All slopes shall be seeded and stabilized within 15 days. 7. The stormwater ponds will act as sediment basins and will be cleaned out when the level of sediment reaches 2.0 ft below the top of the riser. Gravel will be cleaned or replaced when the sediment pool no longer drains properly. 8. No cut or fill slopes shall exceed a side slope of 1 vertical to 3 horizontal unless otherwise specified on the plan. All slopes shall be seeded and stabilized within 15 days. 9. All disturbed areas shall be seeded within 15 days of disturbance. All seeded areas will be fertilized, reseeded as necessary and mulched according to specifications in the vegetative plan to maintain a vigorous, dense vegetative cover. 10. More stringent measures shall be used to halt erosion if those shown on this plan are not effective. 11. All erosion shall be controlled including side slopes before the project is completed. 12. Remove temporary measures upon completion of project. All permanent measures will be well established before project closeout. SECTION 02920 SOIL EROSION AND SEDIMENTATION CONTROL 1. GENERAL 1.1 Contractor shall take every reasonable precaution throughout construction to prevent the erosion of soil and the sedimentation of streams, lakes, reservoirs, other water impoundments, ground surfaces, or other property as required by State and Local regulations. 1.2 The Contractor shall install all required silt fences, and construction entrances at the initiation of work, and have these measures reviewed and approved by the local permit authority prior to clearing and grading operations. 1.3 The Contractor shall, within 15 days of suspension or completion of land disturbing activities, provide permanent protective covering for disturbed areas. Temporary and permanent erosion control measures shall be coordinated to assure economical, effective, and continuous erosion and siltation control throughout the construction and post-construction period. Use the specified seed for both temporary and permanent seeding. 2. PRODUCTS 2.1 Asphalt for anchoring mulch shall be Type SS-1 Emulsion. 2.2 Fertilizer shall be 10-10-10 grade or equivalent. 2.3 Lime shall be dolomitic agricultural ground limestone containing not less than 10 percent magnesium oxide. 2.4 Mulch shall be small grain straw, hay, wood chips, asphalt emulsion, jute or other suitable material free of undesirable weed seed. 2.5 Phosphate shall be 20 percent superphosphate or equivalent. 2.6 Seed shall be 20% carpet grass, 24% Bermuda, 20% turf Fescue, 10% Creeping Red Fescue, and 24% Annual Rye grain. Bermuda seed shall be hulled for warm weather planting and unhulled for cool weather planting. Purity of seed shall be a minimum of 98 percent and germination shall be a minimum of 85 percent. 2.7 Silt fence shall consist of NCDOT Class A fabric supported by wood or metal posts spaced not more than 6 feet on center. The bottom of the fabric shall be buried a minimum of 6 inches. 2.8 Gravel for check dams shall be #57 washed stone. 2.9 Aggregate for construction entrance shall be #4 washed stone. 2.10 Stone rip rap for check dams and erosion control shall be NCDOT Class A or B as shown. 3. EXECUTION 3.1 General: Take every practicable measure during construction or suspension to work to minimize erosion and siltation. Measures should include good construction practices, temporary physical barriers to sediment travel, settling basins for new ditches, and establishment of vegetative cover. 3.2 Construction Practices 3.2.1 Avoid dumping soil or sediment into any wetland or watercourse. 3.2.2 Maintain an undisturbed vegetative buffer where possible between a natural watercourse and trenching and grading operations. 3.2.3 Avoid equipment crossings of streams, creeks, and ditches where practicable. 3.2.4 Grade all cut, fill and ditch slopes to minimum slope of 3:1, unless otherwise shown or directed. 3.3 Temporary Physical Barriers are required where sedimentation on off site property or excessive erosion is a problem. 3.3.1 Mulch shall be used for temporary stabilization of areas subject to excessive erosion and for protection of seedbeds after planting where required. 1. Apply grain straw and hay at a rate of 75 to 100 pounds per 1000 square feet and wood chips at a rate of 500 pounds per 1000 square feet. Jute and mesh should be installed as per manufacturer's instructions. 2. Asphalt emulsion for slope stabilization should be applied at a rate of 1,000 gallons per acre. Asphalt emulsion used for anchoring straw should be applied at a rate of 150 gallons per ton of straw. 3.3.2 Silt Fences shall be used at the base of slopes to restrict movement of sediment from the site. Clean silt fence of accumulated sediment after each rainfall event or when it exceeds a depth of 0.5 feet above natural grade. 3.3.3 Stone Check Dams, placed at the discharges of creeks, ditches, and swales, shall consist of Class A rip rap at minimum two feet high and three feet thick across the watercourse, with a one-foot thick layer of gravel on upstream side. Remove sediment if accumulated to a depth of 1.0 feet at upstream face. 3.4 Vegetative Cover: Establish and maintain permanent vegetative cover on all unpaved areas disturbed by the work. 3.4.1 Preparation of Seedbed: Areas to be seeded shall be scarified to a depth of 4 inches and until a firm, well pulverized, uniform seedbed is prepared. Lime, phosphorous and fertilizer shall be applied during the scarification process in accordance with the following rates: Lime: 45 pounds per 1000 square feet Phosphorous: 20 pounds per 1000 square feet Fertilizer: 17 pounds per 1000 square feet 3.4.2 Seeding: Disturbed areas shall be seeded with 2 to 3 pounds per 1000 square feet of the specified seed mixture. Seed shall be worked into the bed to a depth of 1/4 inch. Regrade and seed eroded areas immediately 3.4.3 Mulch all areas immediately after seeding. Mulch shall be applied and anchored as specified hereinbefore. Reapply as necessary to retain cover until grass is established. 3.5 Construction Entrance: Provide an aggregate drive, 20 feet wide by 50 feet long by 6 inches thick at each entrance to the site used by construction vehicles, until such time as the permanent roadway is constructed. Remove soil if accumulated to a depth greater than 0.5 inches. 3.6 Maintenance: The Owner and Contractor shall be responsible for maintaining all temporary and permanent erosion control measures. Temporary structures shall be maintained until such time as vegetation is firmly established in the area protected by the structure. Permanent streambank protection and grassed areas shall be maintained until completion of the project. Areas that fail to show a suitable stand of grass or which are damaged by erosion shall be immediately repaired. END OF SECTION JPN JST NORRIS, KUSKE & TUNSTALL JAKIII CONSULTING ENGINEERS, INC. CLS JTP 902 Market Street •WiLnington, NC 28401 • 910/343-9653 • 910/343-9604 -Fax GSB MEMO DRAFTING CONFERENCE TELEPHONE CALL TO: ,r FROM: �Toff�/ -4 ArL4FAfIF- -=7 PE AM S M Q . W TH F S PM �1;f / I .S1/ 8 20 PROJECT: Oil/C [.--f^.-,z7/n/G PROJECT# G�¢v2 i E vwo E.L Sly e 03 0 .S Z 8 �,iE vs�lL ��,--� os✓ 772ic- ( ) Action Necessary by Norris, Kuske & Tunstall ( ) No Action Necessary by Norris, Kuske & Tunstall 7-6 6-9 ,1`4-1 77) .1" Tit c.i C 7z--'l42 49E / Jz'r✓L 77 Sw8 � yv5o9 =_ _—Andrew & Kuske CONSULTING ENGINEERS, INC. John R.Andrew,P.E. J.Phillip Norris,P.E. 902 Market Street Wilmington,NC 28401-4733 John S.Tunstall,P.E. Neal W,Andrew,P.E. 910/343-9653 910/343-9604 Fax John A, Kuske,III,P.E. J.A.Kuske,P.E.of Counsel w .andrewandkuske.com James T.Pyrite,P.E. C.Lawrence Sneeden,Jr.,P.E. February 17, 2004 Mr. John Lare, Member RECEIVED Three Oak Property, LLC FEB 2 2004 Wilmington, Bngton, a Drive Wilmington, NC 28411-9425 Re: Site Infiltration Evaluation Three Oaks Mixed Use Development 7750 Market Street New Hanover County, NC A & K Project No. 04022 Dear Mr. Lare: We met with Tom Tucker and Vincent Lewis, NC DENR Regional Soil Specialist at the Three Oaks site on February 16, 2004 to review and confirm the infiltration evaluation results performed by Engineering Consulting Services, Ltd. Vincent Lewis advanced seventeen (17) hand auger borings in the approximate locations shown on the attached schematic plan. The seasonal high groundwater table (SHGT) varied in the locations of the hand auger borings as shown on the attached schematic plan. The depth to the seasonal high groundwater table (SHGT) was shallower then anticipated. . Please note that the State Stormwater Regulations and the New Hanover County Stormwater Ordinance require a 2' minimum separation from the bottom of any proposed stormwater 'infiltration system to the seasonal high groundwater table (SHGT). The State Stormwater Regulations allow soil fill on a case-by-case basis to meet the required 2' minimum separation. Therefore, additional soil fill may be required on the site. Based on the soils encountered and the depth to the seasonal high groundwater table, Vincent Lewis determined that the site would be acceptable for stormwater infiltration. We appreciate the opportunity to assist you on this project. Please contact us with any questions or comments you may have. Sincerely, ANDREW Sr KUSKE C SULTING ENGINEERS, INC. �[/�-� Joh A. Kuske, III, P.E. JAKllllasn 0402202-17-04-Itr cc: Vincent Lewis/ NC DENR Regional Soil Specialist Linda Lewis / NC DENR Tom Tucker/ Three Oak Property, LLC Dave Sweyer/ Century 21 Sweyer & Associates Adam Rahhal / New Hanover County Engineering Dept. THREE OAKS A&K Project No. 04022 • .r.a ApproArnate location of kind auger boring by VincentNC DENR ' • onalSoil speoWist i �yvavxwv::va:a-rr.•� SHGT Seasonal High Groundwater Table I ' a � a J >' R,t '>> FF '• r F C r�a L t 1 w i1�ZSa'�Irf'! FF F A i �� y •�r ;�1 ' h >rae'�1UrJ.ie:pY.t:}.—vL:.u..wa. \ � r •O g,i ° y a < 1� 1i= T p S y ♦'\ � a•.:.a: .R.,..�v_.fae•.wFl�.w,...rawj0.-....y»j. Oro IF I \ \'��� .��rJr.•iVt tYslFAfrr.a•va�•w>� R ' `. e q � �~•• a r.SU<G:•*orn»as a•NIh. O. O Q 1 , y THREE OAKS A&K Project No. 04022 swra it CA f .Mq of kind auger e t 9. 0 • boring 1Vincent Soil Specialist — SHGT Seasonal Highkn° f WAt Groundwater Table, 'S It 1-7 • raf . > i � e > •(..� y.,yy./.y1i LiTi y.�Ti1%f•�T\�/:Yp1� + ° , }�{� '. °.�►� It '. �"r:si�.'�'�:��-�'+ '�t= � 4T+!, 1� r ° J e ° a °s` ° e Z.� .