Loading...
HomeMy WebLinkAboutSW8000825_APPROVED PLANS_20010221 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW80LYD DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD SITE WORK NOTES: m LEGEND o 0 1, CLEARING AND GRUBBING REMOVE ALL TREES, STUMPS, A A ROOTS, m4mmY, STRUCTURES, ETC• THROUGHOUT SITE r7 PROPERTY LINE r- I 2 GRACING, REMOVE HE SITE 5--0' .E MATERIAL, DEBRIS, ETC, AND CONSTRUCTION LIMITS 12• I�-12' WITH SIXPASSES, USING U�SNG A TEN TON STTATTIC ROL�R REMDING OVE Z �} I/I' WIPE MESH EXISTING CONTOUR 7 ANY MATERIAL THAT PUMPS OR RUTS. LU O H \\ PROPOSED CONTOUR 2 PLAN VIEW 3. FILL: BEFORE PLACING RU_ THE SURFACE OF AREAS TO 0- u 1/2" RECEIVE FILL SHALL HAVE THE TOP 6• COMPACTED TO AT IY EXISTING SPOT ELEVATION " LEAST TEN TTx �MAAx�A�LLL AT BE PLACED LACED NNMO� (n Z 3 (S5F-F TEN PROPOSED FINISH GRADE 1 1/2• NOT To ECEED M AND COMPACT® AERIAL IS OO D o p 2 / (SELF-FASTEN 2e 00 6'-11" STEEL ANGLE TYPE) SPOT ELEVATION JJ PARAGRAPH COMPACT�TO�E AREO�FDB�ISITY EAQI�LALY6R SIHAI�I.Y� QZ L ' z DRAINAGE SHALE 7T HoLn WETTED BY SPRNKLNG N ACCORDANCE WITH COMPACTION w Q / -. _. _� REQUIREMENTS. F THE MATERIAL IS TOO WET TO SECURE Q 1 PROPER COMPACTION Ti SHALL BE HARROWED REPEATEDLY OR 0 0 OTHERWISE AERATED WITH SUITABLE EQUIPMENT UNTIL OPTIMUM p V I z ASPHALT PAVEMENT -- a MOISTURE CONTENT S OBTAINED FILL SHALL BE PLACED N N _ \ / STORE mNmo �IW FRONT VIEW SUCH A MANNER THAT THE SURFACE WILL DRAM READILY AT w 0 Tom, z NOTES: NEW CONCRETE a' '•'.,:} :': ALL TIMES. FILL PLACED WREN EXISTING DITCHES SHALL Q 10' X 1�IP-RAP %E l5 CONTROL STONE // sNNL eE Is OR EST. BE A CLEAN COARSE SAND. p O / / 2. WIRE MESH SELL BE ENERGY DISSIPAT / SECTION A-A HARDWARE CLOTH 19 GAGE 4. DENSITY AND MOISTURE CONTENT: THE MAXIMUM DENSITY AT WIN. AND SHALL NAME I/A' / MULTI-DIRECTIONAL FLOW NESH OPENINGS. 1/2• 1/2" REBAR ACCORDANCCEE Wf�TH CONTENT D-698 DETER IN m " INLET PROTECTION 5 ;n 00"Cli nCOMPACTIONSHALL 0 15 CPP / N 5" s�DAYYSS 6 5. COMPACTTON VIBRATORY ROLLER N AREAS INACCESSIBLE TO THE A N U / / / 18.75 1 n SHALL INV. �1EY.0. . f J I•..,��� "\_ j �u li'4` Wn w , L.o+E W E.o�E MMECHANICCOMPACTION L T AAMPPERS THE MOIS TURE EO CONTENT OF WITH URING 60 oc - - - - - _ END VIEW r x r-a N r FILL DEPTH of THE LAYER RIAL SHALL BE APPROXIMATELY C COMPACT® TO H E 'wn COMPACTH O THE COMPACTION SHALL SE CONTINUED UNTIL THE °pO 00 SPECFED DENSITY. O 18.50 6. SCHEDULE OF COMPACTION: MATERIAL IN THE VARIOUS ��. I N s E E L STOP DETAIL PEaCENTACES OF MAXIMUM DENSITY AT OPTIMUM CONTENT. O ELEMENTS OF WORK SHALL BE COMPACTED r0 THE FOLLOWING W+, GRAVEL LOAD G AREA A. EMSTNC "GRADE BENEATH FLOOR SLAB /■ �I ^ (6" ABC STONE I I GRADE - % PERCENT / / GEO FABRIC) T-6' x T-0' x .080 STD. ALUM. B. SUBGRAD: BENEATH FOOTINGS - 98 PERCENT Z FILTRATION HANDICAPPED PARKING SIGN i- C. ALL OTHER FILLDE AND BNGK- 1 - E PERCENT 0000 0° I WIT READ H IDENTIFICATION SYMBOL D. UPPER UNDER BUILDING - 100 PERCENT O NT 0 00 / BASIN 'T °Oo°°0° / pOo° Doc 18.20 I �b56a,\�z \ RESERVED o T-6" TESTING LABORATFIELD T OR GAENG ED ANU PAD FOR BTING SHALL BE DONE By AN EWNER. Q BOLT TO WD. POST W/ 3/9' CADMIUM °° 16 17 Ito PARKING PLATED NUTS, BOLTS 6 WASHERS. J O / - - 1S _ \ 1$" 9' x TO REA.060 OVAN ACCESSILLE 8 PAVEMENT SHALL BE STANDARDSPECFICATKNSTRUCTID N ACCORDANCE WITH NCDOT 7 �S r` 1 . 0 BOLT TO WD. POST WITH 31W CADMIUM 19 L 21 \ PLATED NUTS, BOLTS fr WASHERS 9. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND J 10' RIP-RAP C b PROTECTION OF EXISTING UTILITIES DURING CONSTRUCTION. C w� 9' x T-O' x .080 STD ALUM. SKIN � w J NERGY DISSIPATQR� \ _ `c0 ° AND _ _ y y TO READ 'MAXIMUM PENALTY V,50, 10. THE CONTRACTOR SHALL OBTAIN ANY REQIURED DRIVEWAY I- _ / \\ - � o I CS 20-37.6*. BOLT TO WD. POST PERMITS WITH 3/8' CADMIUM PLATED 84• REQUIREMENTS FOR DRIVEWAY PIPING.ATE WITH �T IN DETERMINING Pht LEGEND AND BORDER - GREEN NUTS. BOLTS 6 WASHERS. INV. = 16.50 I sk co P 2 ft 2 �( WHITE SYMBOL ON BLUE BACKGROUND F�D 11. ALL ELEVATIONS SHOWN ON PLANS ARE ASSUMED DATUM. _ 2 � I 3(ys I BACKGROUND - WHTE TREATED WOOD 4'x4' POST. INLET STRUCTURE �S o°� ,�� 11rz, R. cTY� 1 uz, R. 1a ALL rD�TTiRESHOLDS SHALL � SLOP® AWAY FROM BUILDING TOP GRATE = 18.50 -�� " ` ��� INV. = 16.10 44 v � MAXIMUMI- -IJ 9.50 3. 22.00 9" T" 3/8• 9• ACCESSIBLE 3/6• -1 I I=I I E, cl I I-III- 3'-0" 1gT6 23 I I I=I I I_i I U I I-1-1 I I I. TRA TM�s" �C ISAME NO'®°U INU III-I i I� CI I I-I I i- zEER,`THa"a'Ts°�'>PA�.'"E A:'�""``W°'H` "s„T°°`® CONSTRUC N/GRADING 12' 12" _ a TMOMmEWAUTorN oIwIM IONT _--� 4 TIg815OEWALK TO r N LAST 3 WH6tE R A91R5 PAVFIB•If I ( LEGEND AND BORDER - GREEN LEGEND AND BORDER - =III-I-I I I wRN No aR® LiJ BACKGROUND - WHITE BACKGROUND - WHITE -III=1 I I=1=III IL Vr WFANsnN"Iff"RE=W AT W MAX AT SCEWALK H- LIMITS ANCrOK AT S=CrU ,AND AS NOT®ON SRE PLAx a PROVIDE A LAYER OF eA Etna PILT BETw�WALK AND ADIACENT LaJ W N _ I ( TYPICAL HANDICAPPED SIGN DETAIL z Lai •• PARALLRK CURB OR STRICTURE. 7. R9FORCE d6&-ZM W.WAt G W 20.50 NTs V7 WAN" 0 Z CC U HW- 20.00 J ' � NCDOT ��� I EROSION CONTROL ous 5o MAX VACHC EXPANSION JOINT (E.1) j O M a o STONE n ' c v VOM O�.TAN uj rn n / DISTRIBUTION BOX i veYt roa®IOR+T W M M 01 at NUM M ' HC SIGN t� FFE 23.50 I • 2 Z Z t rn3a � SEPTIC TANK I 100, 1A EXIST. o J o BOX CONTRACTION a CONTRACTION JOINT (C.J.) :12 SLOPE UP 7 7 EXIST SEPTIC TANK 0 ^ PLAN z Lli � o SIDEWALK JOINT DETAILS t 1 Nrs THIS SECTION F SIDE WALK 1 1 I 5 SIDEWALK W TO BE FLUS W/PAVEMENT ' I pnH µp�� ,� SEE SITE PLAN STONE SHALL NOT Li BLOCK OR IMPEDE I r-1/� E (` P dtN�M%�� PIPE FLOW z `�'r� 6��.��"i '`'°�• 11 0 ` 23.00 15' 20' 15' .00 �'f,.ws.6 arV 4'" 1 4, 1 II J1_ z vWr 114 SEE SITE PLAN W 1 u�l vl+rT" y G SECTION A - A MIRAFl 600X FILTER FABRIC Z IOBf1�. ` c0� I 3.95 : 70 I I " Ww�°9+i_ OR APPROVED EQUAL 1 -s aAr a S� 2.70 FTC: jj': : I ++ NOTE: FILTER FABRIC AND STONE SHALL N# TOED UNDER FLARED END SECTION A A R5' age. �•+nr �w ENERGY DISSIPATOR .. . . .. .° .a. o . .° o o. I = I wLbM 1NTS °o°o°o°oP R5' TEMPORARY GRAVEL ° J /� H, Y"$). . . . $. . o.00°oQo° o°o�. p w6w7t' i0A 4 7 tis M O o o°o°o °oI? CONSTRUCTION ENTRANCE s �' . .O° ° ° °°Aoo'O 2 21.40 R' 24 0o0oOA o °000o ZZ.00 �.. . . . . r�. .;. . .:. . . .°90o.°o0. °A o. v c c v G CONC.C .o 0 0. o d n E. .L T. A PH. DRIVE E AND PAPY.,I I I IIII (I II III) . . . . u ooho0opo0 6 R5.1 INV mil* I o writ . . . . . .. . . . . . MP IIIIIII IIIIIII 9 I nflA•' � PLAN n R8 l`P R5'I ( �� je1„lb . +` �- �+ky� k BAFFLE WALL 2' X 2' FRAME 6 GRATE \ >� 2/0 .9 . . 23.00 b/t�e ��1. �riSH�t . YwSL' }si oI s'�/ ,�t1H+ 'lLo � VA `01, INV. = 18.00 TOP = 18.50 IIIIIII III II - -- + , M `Nt ^^b.r 4e* � I I I III I I oW SP'��B'R' m uv 15" CCP �$°0 4' x 6' PRECAST BOX 001q FOR BYPASS - -_� \rt �pJ4S`It/1 . 1 1 � 51 oa JPN 15" CCP OUTLET TO Dm DLL w I INFILTRATION AREA gu,MA, , b INV. = 16.10 DATE 6/21/00 �p r MN •� fib' Y+�w.+A d INV: _ 1,6.60 15��v err\ A�Z� C _ � •'R7`" COARSE AG(REGATf � _1L O __�_-_- lr► \a>� 1•MA►v4tR•s Z+Ib,tO w �r �^ (iH�•�^+1 ) r,/ Twa.•� se r� 6" CLASS 1 STONE SITE -_..__,_II _I„--_. isw4mi` > w�..�-51 N li•1 ' COMPACT SUBGRADE - -i TEMPORARY GRAVELLED 111966��� �' �` _ CONSTRUCTION ENTRANCE ' E° a►sALP�L Or 6ER �� INLET STRUCTURE RECEIVED .,,P" ' ..W° %wuft wow '�k LtiNr+ A O{ ok � U�L IvW+L� , yQLIP Nc �qr , SU�ON STSgMP cCl) NMI AL� SWALE s• �.. SCALE: 1 " 2 0' NTS LANT A 0 .i ( i Y 4 Av I ,& T �m��'► A,No�W+A DWQ c 1 U.S. HIGHWAY #421 _ �y � N ���L„�,�,,,�� J,�W J.1` n{ ,11,43c OwA I,A o 20 ao 60 PROJ# =�i,/a �L� gz� (150' PUBLIC R/W) gID I al.��y Joe lilosl + V4 T► 'tI1� ' '1Ip1, �'3W�s� ' NOTE: THERE ARE NO WETLANDS IN THE AREA OF THIS PROJECT. VICINITY MAP NOT TO SCALE nn 3.s a SIN. CL'161 _ (- 31fi16'� P88{}2 a t ISms3)= z 19e7 t 3)�3b,6 Li 5' )Txtq 77 z J . ., : . .. VICINITY MAP NOT TO SCALE m N 18 W SITE 1 6 0 15 a x 14 � ^� v � 13 cn = QUEENSBORO STEEL 12 p9 34p,56 o N w 0 100 200 290 S 39 33 z (,o Q SECTION "A-A" o Z HORIZONAL SCALE: 1"=60' w © J VERTICAL SCALE: 1"=6' $ �2 oQ ^ O NOTE: MAXIMUM SLOPE = 1:8 5 42 54 3 r- SV1j' N Q O ST�M PLANT Ln U _ 19 25 L u = 4N. 2 a o 0 CL = Z byy 00j LLJ ., 5 cy PROPERTY LINE Q LJ..1 Q O DRAINAGE AREA - - - - - - - - Q F'- EXISTING CONTOUR .� 0 INFILTRATION AREA --------'—� �pr4N M W Z DIRECTION OF RUNOFF EXISTING SPOT ELEVATION EL:12.11 X nSy� Y ' � y O J ASPHALT PAVEMENT + + + + + /� jy n /+ V tK D + `ICJ ��wvv""" SIDEWALK AREA GRAVEL AREA o - BUILDING AREA LEGEND TEMPORARY/PERMANENT GRASSING DETAIL 1 51 1. CHIS:L COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER J S 28'13'37'28:7.52' ADVERSE SOIL CONDITIONS. �rL t 2. RIP THE ENTIRE AREA TO A r INCH DEPTH. to a 5 0 3. REMOVE ALL ROCKS, ROOTS AND OTHER OBSTRUCTIONS LEAVING SURFACES Lv w N 1 5. L 4. SMOOTH AND UNIFORM. 3 2 0 w 3'33"1TL \ 4. APPLY AGRICULTURAL LIME AND FERTILIZER UNIFORMLY AND MIX WITH SOIL. O i a c� ' ' k LIME: 45 LBS. PER 1000 S.F. PHOSPHOROUS: 20 LBS PER 1000 S.F. FERTILIZER: 17 LBS. PER 1000 S.F. M * E 5. CON EINUE TILLAGE UNTIL A WELL PULVERIZED, FIRM, UNIFORM SEED BED n m IS PREPARED 4-6 INCHES DEEP.' \ 6. SEED ON A FRESHLY PREPARED SEED BED AND COVER SEED LIGHTLY. _ -.- Ltc DC4 1nO v L?E "SLOW) � W, � I ` - Q /� S.F.CF ;" r �u T \ 7. MULl'_H IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. E $51 fFI� �sWAt E L 3 F ! 139 82' GRAIN STRAW & HAY AT 75 TO 100 LBS PER 1000 S.F. a CC,° k.=. o y WOOD CHIPS AT 500 LBS. PER 1000 S.F. z w (PRETREATMENT .UNI o JUTE 6 MESH AS PER MANUFACTURER o x 3 =' REMOVE SEDIMENT U l N O a 3 a r r 8. ASPHALT FOR ANCHORING MULCH SHALL BE TYPE SS-1 EMULSION AND m 3 a 3 * 6 ikf0 2.0' FROM ,( 33.04' APPLIED AT A RATE OF 1000 GAL. PER ACRE FOR SLOPE STABILIZATION, AND 150 GAL. PER TON OF STRAW FOR ANCHORING STRAW. rn ' 61. 6' 0 9. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEED �— 4� WITHIN THE PLANTING SEASON, IF POSSIBLE. IF GRASS STAND SHOULD BE r U 0 �� s„- OVER' YO% DAMAGED, REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER Z y0 S 8'1 4"1 S 4'1 / AND SEEDING RATES. 10. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE, TREATMENT, AND N / 61 75' FERTLIZATION AFTER PERMANENT COVER IS ESTABLISHED. CC p 5 11. SEED FOR TEMPORARY AND PERMANENT APPLICATIONS SHALL BE: 2 % CARPET GRASS Z 99.9 \\ \ 4%20% TURF FBERMUESCUE ASS 10% CREEPING RED FESCUE Z 1. 24% ANNUAL RYE GRASS W 50' 100`. 4D• 1' --100 -I 6'—1Q0.0 � (: o *13ERMUDA SEED SHALL BE HULLED FOR WARM WEATHER L PLANTING. PURITY OF SEED SHALL BE A MIN. OF 98% AND 0 G_RMINATION SHALL BE A MIN. OF 85%. \\ Z z \\ N ( w ALL DISTURBED AREA SHALL BE SEEDED WITHIN 15 DAYS OF THE COMPLETION t- OF C2ADING. -E \ 0�, COMULT CONSERVATION ENGINEER OR SOIL CONSERVATION SERVICE FOR D \ 3 ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION to OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO Z \ z N WELL UNDER LOCAL CONDITIONS, OTHER SEEDING SCHEDULES MAY BE POSSIBLE. 0 3' I U N 33'2� W2.47' 5' fO rL - T N III��� ��IIII = : : : : : 5T :: .. + *6T, STORMWATER :,:::::.:: :;: : : 6'.' ' IIIIIII IIIIIII' � APPROVED: NORTH CA /AL IIIII II IIIII III II ROLINA ENVIRM � 2�1\7L41 �3 - — —— — 3 . � MA COMMISSIONEMENT SG OF WATER QUALITY ' 744.6734" W Q III II6' " Date R 200J Stormwater Permit No LALF0607.2S 44.82' 93' 93' 93' 00195 DES. JPN cm PN C }" 7WJ . oitwir JBGS f 20pj ah 10/26/00 A�0 KUSKE Q`N CA •'�O 4. r � a 1 � y�L SCALE : 1 " = 60 ' �• LIP 0 60 120 180 A 1 NOTE: THERE ARE NO WETLANDS ON THE PROJECT SITE. C DWG FILE C:XXXXXXX, PLOT:X T