Loading...
HomeMy WebLinkAboutSW8000414_COMPLIANCE_20141028 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Compliance Inspection Report Permit: SW8000414 Effective:01/17/06 Expiration: 01/17/20 Project: First Baptist Church Of Jacksonville Inc Owner: First Baptist Church Of Jacksonville Inc County: Onslow Actress: 1985 Gum Branch Rd Region: Wilmington CitylState/Zip: Jacksonville NC 28540 Contact Person: Bob McLaughlin Title: President Phone: 910-455-2700 Directions to Project: 1985 Gum Branch Road:approx 279'west of intersection of NCSR 1308(Gum Branch Rd)and Plantation Blvd. Type of Project: State Stormwater-HD-Detention Pond Drain Areas: 1 -(Unnamed Tributary to New River(Rufus Creek)) (03-05-02)(SC;HQW) 2-(NEW RIVER) (03-05-02)(C;NSW) On-Site Representative(s): Related Permits: Inspection Date: 10/28/2014 Entry Time: 01:OOPM Exit Time: 01:30PM Primary Inspector: Steven G Pusey Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: State Stormwater Facility Status: 0 Compliant ❑ Not Compliant Question Areas: S State Stormwater (See attachment summary) page: 1 Permit: SW8000414 Owner-Project: first Baptist Church Of Jacksonville Inc Inspection Date: 10/28/2014 Inspection Type Compliance Evaluation Reason for Visit: Routine Inspection Summary: This site meets the minimum requirements for compliance with the permit. File Review Yes No NA NE Is the permit active? ® ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ® ❑ ❑ ❑ Signed copy of the Operation&Maintenance Agreement is in the file? ® ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ❑ ❑ ® ❑ Comment: Built Upon Area Yea No NA NE Is the site BUA constructed as per the permit and approval plans? ® ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ® ❑ ❑ ❑ Is the BUA(as permitted)graded such that the runoff drains to the system? ® ❑ ❑ ❑ Comment: Main drainage area#2 was inspected. SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ® ❑ ❑ ❑ Are the inlets located per the approved plans? ® ❑ ❑ ❑ Are the outlet structures located per the approved plans? ® ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ® ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ DWO upon request? Comment: page: 2 A T4 Michael F.Easley,Governor William G.Ross Jr.,Secretary North Carolina Department of Environment and Natural Resources 7 3 Alan W.Klimek,P.E.,Director Division of Water Quality Coleen H.Sullins,Deputy Director Division of Water Quality Stormwater Inspection Sheet L,7 Name of Site: E' Permit#: svv,1 ,, Date of Inspection: .1 u Weather and Temp: &D�1` Location of site:cns co Pond or swale Conditions: F —M Trash Rack Present. Deed Restrictions/Eng Certification Provided: 2"'C', Condition of Outlet Structure: 3K Do the plans match the site: r, Wetlands Orl Condition: History Of Site: 7J 7 "j- 1 V 71� -Aiii.AWL N.C.Division of Water Quality 127 Cardinal Drive Extension (910)395-3900 Customer 3-- Wilmington Regional Office Wilmington,NC 28405 (910)350-2004 Fax 1 80C 623-7748 NC DE%R First Baptist Church of JacksonviHe SW 000414 July 21, 2005 �r .. {