HomeMy WebLinkAboutSW8000329_HISTORICAL FILE_20090917 STORMWATER DIVISION CODING SHEET
POST-CONSTRUCTION PERMITS
PERMIT NO. SW8 aX?,. y
DOC TYPE ❑ CURRENT PERMIT
❑ APPROVED PLANS
L7 HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE Q�ooq oy (�
YYYYMMDD
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
September 17, 2009
C.A. Boggs, President
Boggs Paving, Inc.
P.O. Box 1609
Monroe, NC 28111
Subject: State Stormwater Management Permit No. SW8 000329 Renewal
Boggs Asphalt Plant - Leland
High Density Commercial Project
Brunswick County
Dear Mr. Boggs:
The Wilmington Regional Office received a complete Stormwater Management Permit Renewal
Application for Boggs Asphalt Plant - Leland on August 26, 2009. Therefore permit SW8 000329
has been renewed on September 17, 2009, and shall be effective until October 13, 2020. The
plans previously approved on October 13, 2000, in accordance with the regulations set forth in
Title 15A NCAC 2H.1000 effective September 1, 1995, remain in full force and effect.
The re-issuance of this stormwater permit does not imply that the site is currently in compliance
with the terms and conditions of this state stormwater permit. This site was on inspected on
September 1, 2009 and it has been determined that an Engineer's Certificate must be
submitted once this facility is completed and before operation and production occurs.
Please pay special attention to the Operation and Maintenance requirements in this permit.
Failure to establish an adequate system for operation and maintenance of the stormwater
management system will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the
right to request an adjudicatory hearing upon written request within thirty (30) days following
receipt of this permit. This request must be in the form of a written petition, conforming to
Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative
Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this
permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact
David Cox, or me at (910) 796-7215.
Sinc rely,
Georgette colt
Stormwater Supervisor
Division of Water Quality
GDS/dwc:
S:\WQS\STORMWATER\PERMIT\000329ren.sepO9
cc: David Cox
Wilmington Regional Office
Central Files
Wilmington Regional Office
127 Cardinal Drive Extension,Wilmington,North Carolina 28405 One
Phone:910-796-72151 FAX:910-350-2004\Customer Service:1-877.623-6748 North(Carolina
Internet:w ncwalerquality.org ;n F ma lff
An Equal Opportunity l Affirmative Acton Employer Ltb l (`
State Stormwater Management Systems
Permit No. SW8 000329 Renewal
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY COMMERCIAL DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
C. A. Boggs & Boggs Paving, Inc.
Boggs Asphalt Plant - Leland
1815 Fletcher Rd., Leland, Brunswick County
FOR THE
construction, operation and maintenance of 2 wet detention ponds in compliance with
the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules')
and the approved stormwater management plans and specifications and other
supporting data as attached and on file with and approved by the Division of Water
Quality and considered a part of this permit.
This permit shall be effective from the date of issuance until October 13, 2020, and
shall be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.7 on page 3 of this permit. The stormwater
control has been designed to handle the runoff from 164,700 ft2 and 173,393 ft2,
respectively, of impervious area.
3. The tract will be limited to the amount of built-upon area indicated on page 3 of
this permit, and per approved plans.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built-upon area within the permitted drainage area(s) of this
project must be directed into the permitted stormwater control system.
Page 2 of 8
State Stormwater Management Systems
Permit No. SW8 000329 Renewal
6. The following design criteria have been provided in the wet detention pond and
must be maintained at design condition:
Pond 1
a. Drainage Area, acres: 4.77
Onsite, ft : 207,781
Offsite, ftz: N/A
b. Total Impervious Surfaces, ftz: 164,700
C. Design Storm, inches: 1"
d. Pond Design Depth, feet: 6
e. TSS removal efficiency: 90%
f. Permanent Pool Elevation, FMSL : 41.50
g. Permanent Pool Surface Areq, ft : 9,775
h. Permitted Storage Volume, ft : 37,056 attemporarypoolel
i. Temporary Storage Elevation, FMSL: 43
j. Controlling Orifice: 1.5"0 pipe
k. Permitted Forebay Volume, ft3: 7,488
I. Fountain Horsepower, HP 1/8
M. Receiving Stream/River Basin: Banton Branch / Cape Fear
n. Stream Index Number: 18-77-1-1-2
o. Classification of Water Body: "C Sw"
Pond 2
a. Drainage Area, 9cres: 5.42
Onsite, ft : 236,163
Offsite, ftz: N/A
b. Total Impervious Surfaces, ftz: 173,393
C. Design Storm, inches: 1"
d. Pond Design Depth, feet: 6
e. TSS removal efficiency: 90%
f. Permanent Pool Elevation, FMSL : 40.50
g. Permanent Pool Surface Areq, ft : 9,821
h. Permitted Storage Volume, ft : 38,064attemporarypoolel
i. Temporary Storage Elevation, FMSL: 42.00
j. Controlling Orifice: 1.5"O pipe
k. Permitted Forebay Volume, ft3: 7,620
I. Fountain Horsepower, HP 1/8
M. Receiving Stream/River Basin: Banton Creek / Cape Fear
n. Stream Index Number: 18-77-1-2
o. Classification of Water Body: "C Sw"
IL SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built-upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all time provide the operation and maintenance necessary
to assure the permitted stormwater system functions at optimum efficiency. The
approved Operation and Maintenance Plan must be followed in its entirety and
maintenance must occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re-vegetation of slopes and the vegetated filter.
Page 3 of 8
State Stormwater Management Systems
Permit No. SW8 000329 Renewal
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow
spreader, catch basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of DWQ. The records will indicate the date,
activity, name of person performing the work and what actions were taken.
5. Decorative spray fountains will be allowed in the stormwater treatment system,
subject to the following criteria:
a. The fountain must draw its water from less than 2' below the permanent
pool surface.
b. Separated units, where the nozzle, pump and intake are connected by
tubing, may be used only if they draw water from the surface in the
deepest part of the pond.
c. The falling water from the fountain must be centered in the pond, away
from the shoreline.
d. The maximum horsepower for a fountain in this pond is 1/8 horsepower
for both ponds.
6. The facilities shall be constructed as shown on the approved plans. This permit
shall become void unless the facilities are constructed in accordance with the
conditions of this permit, the approved plans and specifications, and other
supporting data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
8. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
9. Access to the stormwater facilities for inspection and maintenance shall be
maintained via appropriate recorded easements at all times.
10. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built-upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built-upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
Page 4 of 8
State Stormwater Management Systems
Permit No. SW8 000329 Renewal
11. Prior to the construction of any permitted future areas shown on the approved
plans, the permittee shall submit final site layout and grading plans to the
Division for approval.
12. A copy of the approved plans and specifications shall be maintained on file by
the Permittee at all times. At the time the permit is transferred to a new owner,
the permittee shall forward the approved plans to the new owner.
13. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
III. GENERAL CONDITIONS
1. This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a completed Name/Ownership Change Form signed by both parties, to
the Division of Water Quality, accompanied by the supporting documentation as
listed on page 2 of the form. The approval of this request will be considered on
its merits and may or may not be approved.
2. The permittee is responsible for compliance with all permit conditions until such
time as the Division approves the transfer request.
3. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
accordance with North Carolina General Statute 143-215.6A to 143-215.6C.
4. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
5. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
6. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
7. The permit remains in force and effect until modified, revoked, terminated or
renewed. The permit may be modified, revoked and reissued or terminated for
cause. The filing of a request for a permit modification, revocation and re-
issuance or termination does not stay any permit condition.
8. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
9. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
10. The permittee shall notify the Division of any name, ownership or mailing
address changes at least 30 days prior to making such changes.
Page 5 of 8
State Stormwater Management Systems
Permit No. SW8 000329 Renewal
11. The permittee shall submit a permit renewal request at least 180 days prior to
the expiration date of this permit. The renewal request must include the
appropriate documentation and the processing fee.
Permit issued this the 17t' day of September, 2009.
NORTTH/CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
fofUoleen Hf6ullins, Director
Division of Water Quality
By Authority of the Environmental Management Commission
Page 6 of 8
State Stormwater Management Systems
Permit No. SW8 000329 Renewal
Boggs Asphalt Plant
Stormwater Permit No. SW8 000329
Brunswick County
Designer's Certification
I, , as a duly registered in the
State of North Carolina, having been authorized to observe (periodically/weekly/ full
time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specifications:
SEAL
Signature
Registration Number
Date
Page 7 of 8
State Stormwater Management Systems
Permit No. SW8 000329 Renewal
Certification Requirements:
1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built-upon area.
3. All the built-upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The outlet structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. Required drawdown devices are correctly sized and located per the
approved plans.
13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
15. The required system dimensions are provided per the approved plans.
16. All components of the stormwater BMP are located in either recorded
common areas, or recorded easements.
cc: NCDENR-DWQ Regional Office
Brunswick County Building Inspections
Page 8 of 8
DWQ USE ONLY
Date Received Fee Paid Permit Number
r� = 09 r I S` eS, od 0 13'71 JW Y ,190 0 3a
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT RENEWAL APPLICATION FORM
This form may he photocopied for use as an original
I. GENERAL INFORMATION
AUG 2 s 2009
1. Stormwater Management Permit Number: SW8 000329
BY:_�_
2. Permit Holder's name(specify the name of the corporation,individual,etc.):
Bodes Paving,Inc.
3. Print Owner/Signing Official's name and title(person legally responsible for permit):
C.A.Boggs,President
4. Mailing Address for person listed in item 2 above:
P.O. Box 1609
City:Monroe State:NC Zip:28111
Phone: (704 1 289-8482 Fax: (704 ) 282-1129
Email:dboggs@bogg5paving.com
5. Project Name:Boggs Asphalt Plant-Leland
6. Location of Project(street address):
1815 Fletcher Rd.North East
City:Leland County:Brunswick Zip:28451
7. Directions to project(from nearest major intersection):
Fletcher Road NE @ Lanvale Intersection
From Wilm Eton West on US 74 exit at Leland South on Lanvale Rd for.25 miles,left onto Fletcher Drive for
.2 miles to site on left.
II. PERMIT INFORMATION:
1. Specify the type of stormwater treatment. ❑Constructed Welland ❑Bioretention ®Wet Detention Basin
❑Dry Detention Basin ❑Infiltration Basin ❑Infiltration Trench ❑Sand Filter ❑Other:
2. List any changes from project that was originally approved(attach additional pages if needed):
None
Form SWU-102(Renewal Form) Version 02.16.09 Page I of 3
3. Do you have a copy of the original Operation and Maintenance Agreement? (check one)
®Yes (If yes,submit the attached(page 3) Operations and Maintenance verification sheet.)
❑No (If no,then submit a new Operations and Maintenance Agreement that can be located on the
Division of Water Quality Home Page under the BMP Manual link:
httpJ/h2o.enr.state.nc.us/su/bmp_forrns.htm)
III. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality(DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the
interactive online map at http://h2o.enr.state.nc.us/su/msi maps htm)
1. Please indicate that you have provided the following required information by initialing in the space provided
next to each item.
Initials
• Original&I copy of the Stormwater Management Permit Renewal Application Form A"J
• Application fee of$505.00 (made payable to NCDENR) 46*6 9=
• Operation&Maintenance Verification or a new O&M Agreement f A�
• SWU-101 Application Form (if requesting a modification to the permit)
• Transfer of Ownership/Name Change Form (if requesting transfer of ownership)
VI. APPLICANT'S CERTIFICATION
I, (print or type name of person listed in General Information, item 3) Carl A. Boggs III
certify that the information included on this permit renewal application is,to the best of my knowledge,correct
and complete. ��®®
Signature: Date: 8-/L-09
Form SWU-102(Renewal Form) Version 02.16.09 Page 2 of 3
Operations and Maintenance Verification
I acknowledge and agree by my signature below that I am responsible for the performance of the
maintenance procedures listed in the original Operations and Maintenance Agreement. I agree to notify
DWQ of any problems with the system or prior to any changes to the system or responsible party.
Print name:Carl A Boggs III
Title:President
Address:PO Box 1609
Phone:704-289-8482 Signature: 61'jk'('q /R
Ian an--
Date: - t -09
Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold
and
1aaresident of the subdivision has been named the president.
I, �1�ytty 1 ICI i, L c rn YY and a Notary Public for the State of 6 6r h I,�7
al l,kia .,
County of U 11 I Ui'1 do hereby certify that 02r J A 6�a4 S
personally appeared before me this day of I , aoo q , and acknowledge the due
execution of the forgoing stormwater BMP maiht6nance requirements. Witness my hand and official
seal,
Notary Signature: e V11 Y
�aaumnuyn
#0T� G
i
SEAtw
%GZ i0�/BL��► v
My commission expires: �AljA 3 a O 1 1
U
Form SWU-102(Renewal Form) Version 02.16.09 Page 3 of 3
I
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor -Director Secretary
August 10, 2009
Mr. C. A. Boggs, President
Boggs Paving, Inc.
P. O. Box 1609
Monroe, NC 28111-1609
Subject: PERMIT RENEWAL REQUEST
Stormwater Permit No. SW8 000329
Boggs Asphalt Plant, Leland
Brunswick County
Dear Mr. Boggs:
The Division of Water Quality issued a Coastal Stormwater Management Permit, Number SW8 000329 to you for a
High Density Project on October 13, 2000. This permit expires on October 13, 2010. Per 15A NCAC 2H.1003(h)
' (the stormwater rules), applications for permit renewals shall be submitted 180 days prior to the expiration of a
permit and must be accompanied by a processing fee, which is currently set at $505.00. If this is still an active
project please complete and submit the enclosed renewal application prior to May 13, 2010. If this project has not
been constructed and a permit is no longer needed, please submit a request to have the permit rescinded. If you
have sold the project, or are no longer the permittee, please provide the name, mailing address and phone number
of the person or entity that is now responsible for this permit. Enclosed is a form for change of ownership, which
should be completed and submitted if the property has changed hands.
Your permit requires that upon completion of construction and prior to operation of the permitted stormwater
treatment system, a certification of completion be submitted to the Division from an appropriate designer for the
type of system installed. This is to certify that the permitted facility has been installed in accordance with the permit,
the approved plans, specifications and supporting documentation. Please include a copy of the certification with
your permit renewal request and processing fee. Enclosed is a copy of a sample certification. Also enclosed is a
new Operation and Maintenance agreement that should be completed and submitted along with your renewal
application.
You should be aware that failure to provide the Designer's Certification and the operation of a stormwater treatment
facility without a valid permit, are violations of NC General Statute 143-215.1 and may result in appropriate
enforcement action including the assessment of civil penalties of up to $10,000 per day.
If you have any questions, please feel free to contact David Cox at 910-796-7318.
S' cerely,
Gkorgette Scott, Stormwater Supervisor
Surface Water Protection Section
Wilmington Regional Office
Enclosures
GDS/dwc S:\WQS\Stormwater\Renewal\Requests\2000\000329.augO9
cc: Wilmington Regional Office File
Wilmington Regional Office
127 Cardinal Drive Extension,Wilmington,North Carolina 28405 �rOn..e.1.
Phone:910-796-7215\FAX:910-350-20041 Customer Service:1-877-623-6748 1VOLU Carol1
ina
Internet:www.nmaterquality.org ']�'atmi�//�
An Equal Opportunity l Affirmative Action Employer ��/!t {1L `(