HomeMy WebLinkAbout20200322 Ver 1_DCM Permit Renewals_20240528Permit Class
RENEWAL
Permit Number
54-20
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
,Perm it
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS I I3A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to Tim Powell, PO Box 1945, Shallotte, NC 28459
Authorizing development in Brunswick County at adj. to the AIWW and Shallotte Inlet, at
1790 Shallotte Inlet Dr. , as requested in the permittee's application letter dated
5/1/24.
This permit, issued on May 28, 2024 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
NOTE: This renewal shall be attached to Permit No. 54-20, which was issued to the permittee on
5/5/20, as well as all subsequent modifications, refinements, and renewals, and copies of all
documents shall be readily available on site when a Division representative inspects the
project for compliance.
1) All conditions and stipulations of the active permit remain in force under this renewal. [07J .0209(a)]
NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No.
2020-0322
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No.
2020-003 89.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2025
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the
Chairman of the Coastal Resources Commission.
For Tancred Miller, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee