Loading...
HomeMy WebLinkAboutSW6240107_Response To Comments_20240529 IM MCADAMS RESPONSE TO COMMENTS > DKE23021 May 7, 2024 NCDEQ Division of Energy, Mineral, and Land Resources Stormwater Program 512 N Salisbury Street Raleigh, North Carolina 27699 RE: Raeford South 115kV—Substation Rebuild Permit#SW6240107 Response to 2nd Permit Application Review Comments DKE23021 The following are the response comments for the above-mentioned project. Our response comments are in bold. ENGINEERING REVIEW Jim Farkas 919. 707. 3646 1. Per our watershed boundary map,this site appears to be partly located within the Lumber River Basin and partly located within the Cape Fear River Basin (and possibly draining to 3 separate receiving waters, see attached map). Low-density projects that drain to multiple receiving waters will have multiple drainage areas, one for each different receiving water.These drainage areas will be equal to the portion of the project area that ultimately drains to each receiving water(and all of the drainage areas will add up to the entire project area). Please revise the Application and other submittal items to show the multiple drainage areas for this project. NOTE: As indicated in the stormwater narrative, the site is fairly flat here so our watershed boundary map may not be 100%accurate for this site (For example, the site may only drain to two separate surface waters instead of the three shown). McAdams Response: Drainage map,application, and Supplement-EZ form were all updated to include the 3 separate drainage areas. Updated forms are attached. 2. Please provide and complete the Supplement-EZ Form for this project (the form can be found at the following address: https://www.deq.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-design-manual and is required per Sections V&Vl,3 of the Application Form). NOTE: An outdated version of the supplement form was provided with the submission, however you need to use the latest version of this form. Please revise as needed. McAdams Response: Latest Supplement-EZ form is completed and attached. creating experiences through experience 621 Hillsborough Street,Suite 500,Raleigh,NC 27603/919.361.5000 ILII MCADAMS RESPONSE TO COMMENTS > DKE23021 3. Please provide a hard copy of the BUA plan sheet. An electronic copy of this plan sheet (listing the square footage of each of the different types of BUA) was provided, however a hard copy of this sheet does not appear to have been included in the submission. Please provide the following: > 1x hard copy& 1x electronic copy of the revised pages of the Application Form. > 1x hard copy& 1x electronic copy of the Supplement-EZ Form. > 1x hard copy& 1x electronic copy of the requested plan sheet. > 1x hard copy& 1x electronic copy of the revised calculations. > 1x hard copy (2x hard copies for plan sheets) & 1x electronic copy of any other items needed to address these comments. Hard copies should be mailed to me at the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640M Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group) will be able to receive the submission. Do not leave the package in the foyer with the security guard. NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the submission package may be lost while being sent from the Regional Office to me in the Central Office. Electronic copies should be uploaded at the following location: https://edocs.deq.nc.gov/Forms/SW- Supplemental-Upload McAdams Response:All documents listed above are attached. creating experiences through experience 2 of 3 IM MCADAMS RESPONSE TO COMMENTS > DKE23021 Consideration of this response is greatly appreciated. If you should have any questions or require additional information, please do not hesitate to contact me at 919. 361. 5000. Sincerely, MCADAMS Dl Patrick Covil, PE Senior Project Manager, Energy PC/kt creating experiences through experience 3 of 3