HomeMy WebLinkAbout550007_Structure Volume Calcs_20240315C. Checking Size Waste Storage Pond 187' x 272' 2.2' 3:1 \ 1 9.8, %3:1 115' x 200' Volume = 9.8/6[115 x 200 + 173.8 x 258.8 + 4(144.4 x 229.4)] = 327,452 cu ft- Approximately 33,400 cu ft is available for -solids accumulations. Maximum pond level 0.-5' + 1.0' + 11,539 cu ft/(1751x2601-) 1.8' below top of dam or 0.8' below the emergency spillway Check of total size to determine if -dam is -NC dam safety - size. Volume = 12/6[115 x 200 + 187 x 272 + 4.(151 -x 236)-] = 432,816 cu ft 9.93 ac-ft (Not dam safety size) D. Pump Out Elevation and ESW Elevation This waste -storage pond should be pumped to second -pond before the water level reaches the 25 yr - 24 hr storage volume. This elevation -is 1.8 ft below the top of dam.. The emergency spillway elevation is planned 1.-0 foot below the top of dam. E. Pump Pit -at New 'Freestall Barn The pump pit is designed to store 3 days of manure and flush water from parlor. Manure Volume = 250 cows * 1.4 gal/day/cow * 3 days 7.48 gal/cu ft- = 1,404 cu ft Flush Water = 2500 Qal/dav x 3 days 7.48 gal/cu ft = 1,003 cu ft Total = 1,404 + 1,003 = 2,407 cu ft Size Basin - 81xl9'xl9' = 2,888 cu ft Additional Capacity is available in gravity channel -& volume available above the pump pit elevation. Additional Volume— 861x4.51x3' + 4'x28'x28 = 4,297 cu ft Total Capacity = 4,297 cu ft + 2,888 cu ft = 7,185 cu ft For the 17,.000 sq ft lot, this is equivalent to 5 inches of runoff capacity. C. Checking.,Size.Waste.Storage Pond Due to deepness of pond, it is assumed bottom 2' is not pumped. 120' x 202' 2.8' 2:1 12.2' 2.5:1 2.5:1 2.5:1 2.0 43' x 117' volume = 12.2/6[52 x 127.+ 106.9 x 188 + 4(79.5 x 157.5)] = 156,132 cu ft Existing Pond has in excess of 5 months of storage. Manure will be pumped to second waste storage pond as required to maintain the 25 yr storage level. Maximum pond level 0.5' + 1.5' + 10,945 cu ft/(ll2'xl951) = 2.5' below top of dam or 1.0' below the emergency spillway D. Pump Out Elevation and ESW Elevation This waste storage pond should be pumped to second pond before the water level reaches the 25 yr - 24 hr storage volume. This elevation is 2.5 ft below the top of dam.* The emergency spillway elevation is planned 1-.5 foot below the top of dam. C. Sizing Waste Storage Pond 236' x 236' 3 :1 \ J -9.5' / 3 :1 / - 9'7A Volume = 9.5/6[170.x 170 + 227 x 227 + 4(198.5 x 198'.5)] = 376,893 cu . ft At maximum capacity, the storage period will be approximately 3 months. Normal Pump.Out Volume 171,397 +.29,579 + 2,992 + 96,257 + 38,339 = 335,572-cu-ft per 90 days. = 1,360,931 cu ft per 365 days = 375 ac-in per year = 10,180,471 gallons per year Maximum pump out level 0.5' + 1.0' = 1.5' D. Pump Out Elevation and ESW Elevation The waste storage pond for runoff should be hauled or irrigated before the water level reaches the 25 yr-- 24 hr storage volume. This elevation is 1.5 ft below the top of dam. The emergency.spillway elevation is planned 1.0 foot below the top of dam. VII.-Dry.-Stack at New -Dry Cow Freestall Barn - This component of the waste management system was not designed by NRCS. What follows are calculations that show the component was sized appropriately. A. Design Volumes A maximum of 250 dry cows will be on the lot 100% of the time. Volume = (250 head *-74 lb/head/day) / 62 lb/cubic ft = 298.4 cubic ft per day or 2,232 gallons per day The dry stack is under roof and no runoff will be allowed to enter the system. Therefore, runoff will not be taken into account in the design of this system. B. Calculated Size of the Waste Storage Facility The dry stack pit was built 125' long, 20' wide, and 12' deep with approximately 4:1 entrance ramps on each side of the pit (see illustration below). The illustration below shows the pit looking down at an angle from above. The green surfaces will contact manure. Assuming the waste is not stacked above the floor elevation of the barn, this pit provides a volume of 18,480 cubic feet or 138,230 gallons. Therefore, the pit is sized for a storage period of about 62 days. VIII. Clean Water Exclusion A. ' Diversions Clean water diversions will be maintained around waste storage ponds. The District Conservationist will design all diversions. Diversions shall be designed to carry the 25 year - 24 hour runoff plus capacity to store some sediment. B. Guttering Clean water shall be excluded to the fullest extent possible by guttering. Any new roof runoff into feedlot area will be guttered.