Loading...
HomeMy WebLinkAboutNCC241642_Site Plan or Location Map_20240531 DATE: PAGE: NOTES AND APPLICABILITY TO LOT DEVELOPMENT NORTH CARO L I NA STANDARD SEDIMENT AND EROSION 1. This plan is for lots with an Individual disturbed area of 1.00 acre or less, and a total site disturbance of not more than 5.0 acres for individual single family or CONTROL PLAN FOR SMALL RESIDENTIAL LOTS multi-family dwellings. 2. A vicinity map showing the boundaries of the project and access to the site is to either be shown on this standard plan or to accompany this standard plan. 1',',1 Cotton Grove I�_el 3. A subdivision plat or plan showing numbered lots and the Limits of Disturbance TABLE OF CONTENTS (LoD) is to accompany this standard plan. The LoD includes lots, access to Page measures, staging areas, and utilities that may extend off-site. 1 . Title Sheet © 4. Lots are "Finished", or at final grade. Mass grading with full stabilization has eville already occurred or mass grading is not to occur. 2. Lot Information Table I=-E1 1/4„I Silver Hill 5. The property does not contain nor have jurisdictional waters within 100 feet of the FEED lots. 3. Typical Individual Lot Layout With '=-='I 6. The site is not located in a High Quality Water Zone. Feezor 1= »1 Curb and Gutter ® 7. No discharges are allowed into impaired waters. 8. Onsite vehicle or equipment washing is not allowed. 4. Typical Individual Lot Layout With ] 1.; �1 l 9. This site involves no off-site material storage, waste disposal, or borrow areas. Southmont Roadside Ditches I'''i I _E 1 10. All disturbed areas not built upon shall be provided with permanent ground cover. O 1.-,z41 11. As of April 1, 2019, applicant must apply online at deq.nc.gov/NCGO1 for the 5. NCG-01 Self-Inspection Dart Nicholas CD9pebble NCGO1 permit, if applicable. 6. NCG-01 Ground Cover & Material Park 12. The NCDEQ reserves the right to require a site-specific erosion control plan to be 9 y$s1, 1 . prepared and submitted for the 30-day review cycle. Handling ` GENERAL CONSTRUCTION SEQUENCE FOR SMALL 7. Temporary SeedingHealing = RESIDENTIAL LOT EROSION AND SEDIMENT CONTROL p Y U Tamarac Manna 9 I_.._1 Springs Recommendations 1. Upon receipt of a Certificate of Plan Approval, notify the appropriate Land Quality office at least 5 business days prior to the start of construction. 8. Permanent Seeding , 11161.17 Lai - High Rock 2. Install construction entrances(s). 9 Derricls'Sales 8 Repairs,LLC Rowan s Pooletown T 3. Install check dams and/or erosion control blankets in roadside ditch, where exists. Recommendations I03731 ICI ,, �- 4. Install yard inlet protection and perimeter controls (silt fence, silt fence outlets, etc.) 9. Construction Entrance/Exit 7,1 according to the plan. For contiguous lots with different builders or land owners, it is Na<I �' suggested that each builder/owner install their own silt fence along the shared parcel 10. Inlet Protection 61 a boundary. If silt fence is not required along the front of the lot due to the drainage 11 . Rolled Erosion Control Products Cooper A.ustralian layout, the builder must provide a measure to limit access through the construction shepherds Q entrance. Ensure inlets downgrade of disturbances are protected from siltation. (RECP) ® Iz:b'1 5. Proceed with individual lot construction. 1="`1 Newsom 6. Maintain erosion and sedimentation controls during construction. 12. Silt Fence Ili L J 7. Provide for ground stabilization after completion of any phase of grading in 13. Silt Fence Outlet Gold Hill Goaccordance with the NPDES timeframes table. Persons responsible for land disturbing activities are responsible for phased inspections to ensure the approved 14. Silt Sock/Wattle For Check Dams PROJECT NAME: 1092 SCOUT ROAD - CUSTOM BUILD erosion and sedimentation control plan is being followed. All erosion control 15. Silt Sock/Wattle For Perimeter and measures shall be inspected at least once per week and after each storm event of PROJECT NUMBER: PA-004856 1.0 inches or more in a 24-hour period. The self-inspection report, as well as Inlet Protection instructions for the self-inspection program, can be found at deq.nc.gov/NCG01. 16. Tree Protection DATE OF APPROVAL: 8. Remove any temporary driveway pipe and temporary construction entrance immediately prior to constructing permanent driveway. 9. Once construction is complete and all areas are stabilized, remove any remaining NOTE - FOR ANY PERFORMANCE RESERVATIONS REGARDING THE SEDIMENT CONTROL PLAN (PERFORMANCE erosion or sedimentation controls and stabilize any areas disturbed by their removal. BASED) OR CRITICAL AREAS, A FIELD REVISION OR A CUSTOM PLAN MAY BE REQUIRED 10. Once the last approved lot is complete, notify the appropriate Land Quality office for a close-out inspection. STANDARD SEDIMENT & EROSION CONTROL PLAN EFFECTIVE DATE:11/12/2020