HomeMy WebLinkAboutNCGNE1676_NE Insp Rpt_20240530 Compliance Inspection Report
Permit:NCGNE1676 Effective: Expiration: Owner: Tesla Inc
SOC: Effective: Expiration: Facility: NA-US-NC-Morrisville-Globe Road
County: Wake 10312 Globe Rd
Region: Raleigh
Morrisville NC 27560
Contact Person:Luke Tsoflias Title: Phone: 717-419-8066
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 05/30/2024 Entry Time 01:05PM Exit Time: 02:OOPM
Primary Inspector:Thaddeus W Valentine Phone:
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Technical Assistance
Permit Inspection Type: Stormwater Discharge, No Exposure Certificate
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Miscellaneous Questions Misc
(See attachment summary)
Page 1 of 3
Permit: NCGNE1676 Owner-Facility:TeslaInc
Inspection Date: 05/30/2024 Inspection Type:Technical Assistance Reason for Visit: Routine
Inspection Summary:
Al Gilmer, the Warehouse Lead, showed me around the facility. The building stores supplies for solar panel installation and
it is all located inside the building. There are two poly tanks and two drums on the back of the building under a overhang that
will need to be stored inside or under cover where they can't be exposed to stormwater. Where the tanks and drums sit now,
they can be exposed to stormwater and if they were to be punctured or spilled, they would flow away from the building to the
back lot.
Please provide photos of the new storage area for the tanks and drums and be aware that if they are stored outside anytime
in the future,that will effect the no exposure and it will no longer be valid.
Everything else looks good and I recommend the no exposure.
Page 2 of 3
Permit: NCGNE1676 Owner-Facility:TeslaInc
Inspection Date: 05/30/2024 Inspection Type:Technical Assistance Reason for Visit: Routine
MISc Yes No NA NE
Is the facility compliant? ❑ ❑ ❑ ❑
Comment: The facility is compliant with the no exposure
Page 3 of 3