Loading...
HomeMy WebLinkAbout20240486 Ver 1_AddInfo Received_20240424Homer, Seren M From: Adam Williams <adam@bfec.org> Sent: Wednesday, April 24, 2024 10:24 AM To: Fuemmeler, Amanda J CIV USARMY CESAW (USA) Cc: Homer, Seren M; David Pedersen Subject: [External] RE: Provisional Nationwide Permit #3 and #29 for Pigeon Roost, Watauga County / AID:2024-00641 Attachments: Goetz PCN pg 7-8.pdf; 24Apr2024_Goetz_60%_rev.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Thank you Amanda. Per our conversation, and recent email about Goetz we have attached: • An edited version of the plan set that shows the spillway outlet occurring outside of the wetland boundary. (visible on sheets 4-5, and 7) • We added the pre-existing pipe impact that exists downstream of our enhancement area to impact table of PCN. The impact table from the PCN which was edited to: remove the aforementioned wetland impact and added the after -the - fact pipe impact (pg 7-8). Regarding the cold water release: you and I discussed a follow up to Andrea's comment and my recent email. We intend to keep the current concrete riser system that was engineered and preferred by the landowner. To address the cold water release request, our plan is to open the gate valve shown on page C5 of the attached plan set to release water, to release water 7 feet below the pond surface. The great thing about this option is, this valve can be adjusted with time of year flow changes. Let me know if you have any questions. Thank you, Adam Williams, PWS Brushy Fork Environmental Consulting, Inc. 10565 Highway 421 South Trade, Tennessee 37691 ph: 423.727.4476 cell: 828.773.3820 www.bfec.org "Whether you think you can, or you think you can't --you're right." - Henry Ford 1 From: Fuemmeler, Amanda J CIV USARMY CESAW (USA) <Amanda.Jones@usace.army.mil> Sent: Wednesday, April 24, 2024 8:20 AM To: Adam Williams <adam@bfec.org> Cc: Homer, Seren M <seren.homer@deg.nc.gov> Subject: Provisional Nationwide Permit #3 and #29 for PigeonRoost, Watauga County / AID: 2024-00641 This is a provisional notification that your proposed work SAW-2024-00641 Pigeonroost Pond Modification may be authorized by the above referenced general permit provided a 401 Certification is issued or waived. Once a 401 Certification is issued or waived, the Corps will provide you with a final general permit verification. Your proposed work shall not commence until after the 401 Certification has been issued or waived and until a final general permit verification has been provided to you. Additional special conditions may be added to the final general permit verification. As stated above, this is a provisional notification. This email does NOT provide Department of the Army (DA) authorization. You are cautioned that commencement of the proposed activity requested prior to receiving a written DA authorization would constitute a violation of Federal laws and subject you to further enforcement action. Receipt of a permit from the state (e.g., NCDWR) does not preclude the requirement for obtaining DA authorization (e.g., an NWP verification letter) prior to commencing the work. Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers regulatory program. Amanda Jones Project Manager US Army Corps of Engineers Asheville Regulatory Field Office 828-271-7980 ext. 4225 3/27/24, 11:19 AM Resume Submission Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. "W." will be used in the table below to represent the word "wetland". 1a. Site # * 2a. Reason * ct type (?) 2c. Type of W. 2d. W. name l2e. Forested 2f. Type of 2g. Impact Yt IIL urisdicition*(?) area* W1 Filling of Driveway P and 1 No • Corps 1[0�0759 W1 � No � Corps (acres) W2 Spoils P Seep Wetland 2 rps v--I[0.011 No Co J� (acres) Add 2g. Total Temporary Wetland Impact 0.000 2g. Total Permanent Wetland Impact 0.07 2g. Total Wetland Impact 0.07 2i. Comments: 0.059 ± acres of Wetland 1 will be impacted for the proposed expansion of a driveway. 0.011 ± acres of Wetland 2 will be impacted to fill the lower field with pond spoils. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. "S." will be used in the table below to represent the word "stream". https://edocs.deq.nc.gov/Forms/form/resume/865/509585 7/12 3/27/24, 11:19 AM Resume Submission E1_3a. Reason for impact* (?) 3b.lmpact type* 3c, Type rN Impact* 3d, S, name" 3c Stream �Tjlpe*('1 3f. Type of Jurisdiction* 3g. S. width* s1 s2 Restoration/enhar Extension of barrE �� Permanent v ["kbilization Y Pigeonroost Creel Perennial v LAverage Botn V 9 [feet) Permanent Culvert Pigeonroost Creel Perennial Botn 9 Averege(feet) s2 24" Pipe Installation (Previous) I Permanent v IL f Culvert IL Pigeonroost Creel Perennial v Both 9 Arerege (feet) =9(.eel) "All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 187 3i. Total temporary stream impacts: 0 3i. Total stream and ditch impacts: 187 3j. Comments: 147 ± LF of Pigeonroost Creek will be impacted for the proposed installation of Natural Channel Design structures and benching of streambanks. 10 LF of Pigeonroost Creek will be impacted for the extension of the pond barrel. 30 LF has previously been impacted for installation of 30' of 24" pipe. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: * Pond flow will be diverted around the work area during excavation of accumulated sediment and all riser/barrel retrofitting as well as stream enhancement. All disturbed areas will be seeded with temporary and permanent cover immediately upon completion (see Plan sheet 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: * All pond excavation will be performed in the "dry" with flow diverted around the work area. All in -stream enhancement will be performed with flow diverted around work area. Heavy equipment will work from the banks whenever possible and will only work in the channel 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: This is not a mitigation project and no credits are involved. NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS (https:Hribits.usace.army.mil/ribits_apex/ f? p=107:27:2734709611497::NO:RP:P27_BUTTON_KEY:O) website. https://edocs.deq.nc.gov/Forms/form/resume/865/509585 8/12 Pigeonroost Pond Modification Pigeonroost Dam Modification Map":, 11�a 'r y)tti w y i op��/ .o a 1 PID:1889732093000 li t• f o;. t Watauga County, NC R f } 4f r Q A Y _ LOAr r (V. �' ° '"�%.� ��•��' 36.170799,-81.821523 ' e Esr,. Mexar. E rths�er Geond [he GIB U er Commun t� Legend N Parcel 0 125 250 500 Feet Streams Roads Watauga County, NC SHEET INDEX COVER 1 CONSTRUCTION NOTES and LEGEND 2 OVERALL EXISTING CONDITIONS MAP 3 OVERALL PROPOSED CONDITIONS SITE PLAN 4 OVERALL EROSION & SEDIMENT CONTROL SITE PLAN 5 PLAN & PROFILE RISER SPILLWAY 6 PLAN & PROFILE AUXILIARY SPILLWAY 7 PLAN & PROFILE PIGEONROOST CREEK 8 PIGEONROOST CROSS SECTIONS 1-3 9 PIGEONROOST CROSS SECTIONS 4-6 10 AUXILIARY PROFILE CROSS SECTIONS S1-S4 11 TYPICAL DESIGN CROSS SECTION 12 PIGEONROOST CREEK MORPHOLOGICAL TABLE 13 CONSTRUCTION DETAILS C1-C11 GENERAL NOTES: 1. STREAM ASSESSMENT DATA (LONGITUDINAL PROFILE, CROSS -SECTIONS, ETC.) PRESENTED HEREIN COLLECTED BY BFEC/BFED. 2. CONTOUR DATA PRESENTED IN THIS DOCUMENT IS TAKEN FROM USGS LIDAR DATA (2' and 10' CONTOURS). 3. HORIZONTAL AND VERTICAL GRID CONTROL TIED TO PROJECT BY BFED. SURVEY DATA USED FOR DESIGN IS RELATIVE TO ITSELF AND APPROXIMATELY SET TO REAL WORLD COORDINATES BASED ON LIDAR DATA. 4. PRIOR TO CONSTRUCTION, BFEC WILL FLAG TREES APPROVED TO BE REMOVED DURING CONSTRUCTION AS AN EFFORT TO PRESERVE THE EXISTING RIPARIAN BUFFER. 5. PRIOR TO CONSTRUCTION, BFEC WILL ESTABLISH SURVEY CONTROL POINTS AND WILL STAKE OUT STRUCTURES. 60 % PROGRESS DRAWINGS DO NOT USE FOR CONSTRUCTION UY roW �z o gm 0 c 0 m Sheet 1 EROSION AND SEDIMENT CONTROL NOTES: 1. ONCE SITE CONSTRUCTION WITHIN AN AREA HAS CEASED, ALL DISTURBED AREAS WILL BE IMMEDIATELY SEEDED (TEMPORARY & PERMANENT SEED), MATTED (COIR AND COCONUT FIBER EROSION CONTROL BLANKET, NAG C700BN), AND STABILIZED (SEE SHEET 9). 2. LIVE STAKES AND BIODEGRADABLE MATTING STAKES WILL BE USED TO SECURE THE MATTING. 3. BROADCAST SEEDING RATES WILL BE AS SPECIFIED ON SHEET 10. 4. PRECAUTIONS WILL BE TAKEN TO KEEP HEAVY EQUIPMENT OUT OF THE STREAM CHANNEL EXCEPT WHERE ABSOLUTELY NECESSARY TO INSTALL BANK STABILIZATION/ENHANCEMENT MEASURES AND IN -STREAM STRUCTURES. 5. NO CONSTRUCTION ACTIVITIES WILL OCCUR OUTSIDE THE CONSTRUCTION LIMITS AS SHOWN ON THE SITE PLAN. 60% PROGRESS DRAWINGS DO NOT USE FOR CONSTRUCTION co0) ° ��In 5 o o^ `� LEGEND ' p 3 EXISTING CONDITIONS co 3m`r3 Eo c PAVED DRIVEWAY BRIDGE .10 w jog'\yogi EXISTING TOP OF BANK ® CULVERT/PIPE 0 o Co EXISTING FENCE EXISTING STRUCTURES a� a� c \ EXISTING TRIBUTARY GRAVEL DRIVEWAY w 2' EXISTING CONTOURS rrirrri�riirrir POND°eT�g '?a *111"'�'F:111_ 10'EXISTING CONTOURSTREE g PROPERTY LINES • � WETLAND PROPOSED DESIGN PROPOSED STREAM CONSTRUCTED RIFFLE CENTERLINE 1' PROPOSED CONTOURS ® CULVERT/PIPE mm �: N Z Q Y « � U C O O U �i 5' PROPOSED CONTOURS °� RISER FOOTER PROPOSED STREAM BANKFULLb ROCK SILL a BOULDER REVETMENT & o V ' HEAD WALL/ENDWALL a � ROCK STEP DIVERSION SWALE ROCK LINED � �z CHANNEL a u Zp Q. ro' 5c EROSION & SEDIMENT CONTROL 0 roz 3 m U � AREA OF DISTURBANCE 22 " (1.71 AC) SPOILS/FILL AREA 0 a / LIMITS OF DISTURBANCE III —III —I TEMPORARY CONSTRUCTION U ACCESS SILT FENCE TEMPORARY CONSTRUCTION ENTRANCE Sheet ® RETENTION BERM WETLAND IMPACTS (0.09 AC) 2 0 50 100 Feet 60 % PROGRESS DRAWINGS DO NOT USE FOR CONSTRUCTION ERROL F. SHOOK 1869-63-8321-000 \ WILLIAM BRADLEY SHOOK / 1869-73-2653-000 X \k XS 5 n �I � f O Z� ti a XS 4' ` -XS 3 XS 2 XS 1 44 �� G gSA 9p _ lwal LEGEND EXISTING CONDITIONS PAVED DRIVEWAY EXISTING TOP OF BANK / EXISTING FENCE EXISTING TRIBUTARY 2' EXISTING CONTOURS —\-� 10' EXISTING CONTOURS --� PROPERTYLINES \M JOHN D & ANDROMEDA WILLIAMS 1869-73-2093-000 f f }? � 4? r i ® BRIDGE ® CULVERT/PIPE _ EXISTING STRUCTURES GRAVEL DRIVEWAY POND 3 TREE 0 WETLAND k Y N O a > m z¢ m0 W V O O U c � c o oco •• 0 a UW a : c p 3 m �- LARSON WHITNEY SMITH U o a MICHELLE COLETTE DINEEN W 1869-72-7668-000 Sheet r — � 3 LEGEND PROPOSED DESIGN CONSTRUCTED RIFFLE PROPOSED STREAM CULVERT/PIPE CENTERLINE 1' PROPOSED CONTOURS 0 RISER FOOTER 5' PROPOSED CONTOURS **"888C1% ROCK SILL PROPOSED STREAM 0000%ROCK BANKFULL STEP BOULDER REVETMENT & ROCK LINED HEADWALLIENDWALL CHANNEL DIVERSION SWALE Pond Contour Modification Riser Spillway Profile \ `Pigeonroost Creek Stream Restoration /O'o1 Barrel Pipe Extension -o _l I XS 3 qX2 _ x Barrel Pipe Extension New Riser Structure with Concrete Footer � Rock -Lined o \ \\ Channel \ \ \ \ aT n Auxiliary }c� Spillway 4 Weir _4911111110 c O O a' 'w Pond Excavation Spoil Spreading a Area XS 4 w f AM Aft m f" \ /y �I Rock -Lined Channel Outlet Protection Drainage Pipe C� Extension 4? S S 3xp0 S/S Driveway Shoulder xpansion with Zkoo Vegetated Channel I I 0 50 100 Feet 60 % PROGRESS DRAWINGS DO NOT USE FOR CONSTRUCTION I I - I k S/. � 2 38 �/•` "� o��� O = CU EE o O OO .' W 0 00 N Y ON m m Q V O \ O U Auxiliary r � � Spillway i Sheet Profile n 1 LEGEND EROSION & SEDIMENT CONTROL / AREA OF DISTURBANCE (1.71 AC) ® SPOILS/FILL AREA LIMITS OF DISTURBANCE TEMPORARY CONSTRUCTION ACCESS SILT FENCE ® TEMPORARY CONSTRUCTION ENTRANCE RETENTION BERM WETLAND IMPACTS (0.08 AC) 60% PROGRESS DRAWINGS DO NOT USE FOR CONSTRUCTION 10 "I 4 \ I / b LIMITS 100 1� \ v1 f / l XS 4 XS3 XS 2 AOL XS 1 \ S ff. A c o C.: ' Wetland Impact � t 0.011 acres,-'.- EE o W 0 / W Eo I } k a N Y a z¢ w* V -•-• O O U CL 4?%S/S Y••� Ct) n��S 3x00 • C p c row �- — BLS_ _ •.'�•/ U a° � c w 00 3 C0 a) CA am x — X X C75 ii Cho Wetland Impact \ o 0.059 acres o Lu 0 60 120 Sheet Feet / 5 X Install new Riser Spillway and Footer �� � OM Maintain top of bank Repair Entire Length of Riser � + M + �ti� eo x o 0 CO o v o o CO \ \ (see detail) - — _ _ _ _ — \ elevation of 4080.5' Spillway Pipe with Insituform CIPP 65 ro + Z Np — — — _ — — (performed b Federal EC LLC and 10' width around (p Y ) �, o N M C, 3 ro " N pond Remove Existing B T TOB i T 6°xnPECPP 2+ Risers � Spillway p Y TOB c o w �11 II 2 „CMP TOB TOB B -0 I I I I I\\\ 1 ,+ 1 III I o Extend Riser IIII ai \\ \ I I I Spillway Pipe 20' 11 � Grade back of \\\\ pond at 4:1 slope \\ \ \ \ 1 1 1 I I O O Extend Riser Spillway Pipe 10' y �b Remove fence \\ \\ from pond \ \ \ \ \ \ // //// // // i / I I Install Rock Step Auxiliary\ \ \ \ \ \ \ \ \ \ \ \ \ / // / / // / / I I 1 below Barrel outlet \ Spillway \ 1 1 ��� / / ( I invert; install Endwall / // 1 1 \\ / (see Detail) Recede tributaries from pond, blend I �, confluences with I I ��i�� i �� i Grade front of O O O O O 0 pond at 3:1 slope O 0 0 0 0 0 0 30 60 Feet L —i���i 4:1 slope into pond Top of Berm, EL 41 10'W min Riser Spillway Profile N a Z N Y � � ¢ U 2 O O U 409 408 To of Dam: 40 0.5', 10' berm idth N rural Pool: 078.0 Riser Struc 4' lure Concr � 4'xIU see to Box Detail _-Riser Invert: 4078. ' B rrel Outflo CU m 408 ILS F Q a Q O Exten Spillway Pipe 10' Z 407 4:1 Slop :1 Slope Exi Ling Barre a U W m M a .� +- :c c 407 O 3 m a O O - 10'.10'x2 Concrete F Bedding'o ter withO 4068.0' "-Extend Spillway Pipe 2 ' N 406 a 406 x�0 x�0 X30 x�0 xh0 xb0 0 0 0 0 0 0 x�0 x-0 xq0 0 0 0 X o t0 30 �0 y0 b0 �O �0 q0 , , , N0 �0 ti Lx 30 N0 y0 b0 �0 tix I 1 ti tix Ox�O �x�p �x00 �x1� Station EXISTING PROPOSED PROPOSED Sheet CONDITION CONDITION WATER SURFACE 6 \ \. \ \ \_ \\ \A \ 0 30 60 Feet %j \ Auxiliary Spillway Weir EL 4079.0'-4078.7' eV_ I \ k =_ c0- � o Replace gravel ballast with Headwall (see Detail) Ax00 \-Remove Fence \ Rock -Lined Channel (see Detail) Remove existing 18" spillway pipe 3p,,xDP I C N"I �S�5-5-5—s 5 ��—S � S 2+00 rL W \_Existing Drainage Pipe invert: 4072.2' 7707 \ NW Q Install 240' 30" HDPE Drainage Pipe (see 3 o �S�s�s x� Detail)-5—'Q�S—s Install Vegetated Channel at toe of slope (see Detail) Wo Driveway extension W W W W boundary \W W W W W W W W \ \ W Extend driveway shoulder 5'; fill existing wetland channel, install French Drain (see Detail), grade 2:1 slope to existing ground contour Auxiliary Spillway Profile Station EXISTING CONDITION O 7­7 _ le - x� PROPOSED CONDITION W W W W W W az W W W C/) 3 m N W W W W W W W W W Q o W W W W W E: p O T v W W W W W L W W W LLB W W W W W W W W W W W W } '0 W Install Rock -lined i Channel (see Detail) W from outlet to .0) W W wetland confluence w W W W W W W W W } yq g p W W W W } W W W } \ Install 4" french drain x (see detail), backfill P 0.06 acres of wetland PROPOSED BKF/ TOP OF BANK N mm o� V O \ O U CU vJ Q o rn' Q. Z3 c N +� It c 0 3Q i0 i Q. 0 Ca am 0 6 ro Q. Sheet 7 Install Headwall (see Grade Left Streambank 2:1 Slope Starting at Bankfull, Downstream to Bridge � - Backfill �ry stream along Barrel extension HDI CA /, 00 Install Rock Step below Barrel Outlet Pipe; Install Endwall (see Detail) 4068 4066 4064 m cD Q 4062 0 4060 4058 4056 Step Pool Channel (see Detail) — X_X= B\ X _ X X G o (b Remove Foot Bridge, Restore Streambank to Original - Contour Contour GZ "I 0 Xry� Install Boulder Revetment \�feX Oe� _ X X Z ,TOB \ TO@ X \TOB ��\ \TO X__ \\X_ f��T06 ��TOB�T �TX �T°B--TOBOB--TO$ O k �\./ TOB (b �co "o s�s1s�s�� \ ,�� "I N �S �'0 x B Existing Headwall and Culvert Shorten Pipe to Bank Toe rt Shallow Diversion Grade Right Swale (15'Wx0.5') Streambank Install Boulder 2:1 Slope Starting Revetment at Bankfull, (30') / Pigeonroost Creek Centerline 0 0 20 40 Feet C) Barrel ------Extension, Existing Culvert/ 01) f� + co + —F O + N + ^ L + ^ co i ro ;L7Crf O codh co O O N O O 65 CO N co M k X co 0 X cc QC 5 `Lxbr1. �X1 �x�0 3x�h �x5° 3x1h �0 �x coo V EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL co O C) ay 3 ro d m O = EE 2 O 0 .' W 0 Z3 v0i v N Y O m m m a O O U c 0 U a O 4'�'U ZZ a UW O rn a :� w s_ 0 3m 'c O N a - Sheet Station m Q XS 1 Sta 2+96 \o ill 1�130 Station XS 3 Sta 3+23 m cD Q 0 13►'iml am]MIZ:3 �o yo e" 0 0 lip Station x�0 x�0 xn0 0 0 ox yo o xbo 0x.1ell,00 0 0 0 o" Station EXISTING PROPOSED PROPOSED PROPOSED WATER CONDITION CONDITION BANKFULL SURFACE �00) o cn q: � co O N 5 _ N cu ° ~ NoLOO Q OO c w c 0 N Y m O > � O ¢ O 2 U ox1Q .= O c U O U a ZZ W Q. Co :c N m 3 U 10 � o i0 a O O O cl- Sheet 9 _ O N 5 c ai ~ � _ t m L Lo XS 4 Sta 3+44 w m o (D 406 Q 0) O O Q) C 406 W ll, x10 0 0 x30 0 pxp0 Station pxjq 0((V XS 5 Sta 3+96 m (D 406 G Q O 406 nl0 x�0 xry0 Station v o m m a, � ¢ O O 2 U XS 6 Sta 4+34 C° Shallow Diversion o m le U 406 c/) Q O 2,U p ZZ a U C)w o co : c 406 0 �0 00 �0 50 b0 �0 l0 N 3 m e e e o ox ox Ox Ox (� Oi ell, Station pX�b 4- G p A-- c 0 a� .a, CL EXISTING PROPOSED PROPOSED PROPOSED WATER Sheet CONDITION CONDITION BANKFULL SURFACE 10 C') R U XS IS Sta 0+55 EXISTING o a N C/) 3 ro CONDITION , _ ' Q m 408 E0 c� o 407 4m LZ PROPOSED o e ell CONDITION a oXoo oX3o o Station C/) i N PROPOSED BANKFULL w XS S2 Sta 1 +77 10:1 Slop vegetated Chann 2:1 Slop 30" HDPE O �b ' < 407 Drainage Pipe ,, Q o Install 4" French Drain (see detail) 407 n�0 c�0 x�0 xr�0 x�0 0 0 0 0 ox Ox�o oxh� Station XS S3 Sta 2+92 N Y p > N m V m m O « Y « 2:1 Sloe 2 Q Q m 10:1 Sloe p V getated Channe � 407 a Insta 14 French Drain (s e det il) O C/) n 406 4064 O �O �O �O �0 b0 lO q0 O C O O O O ell o 0 o ell') OX�p Station � U a (� Z Z XS S4 Sta 3+49 U a � h m O 3m iO G m 10:1 Slope Veg tated Channel 2:1 Sloped a°> C, _ 407 a Install 4" French Drain see detail R5 406 Q 40641— .�O ti0 .�0 y0 �O oQ el 0O 0 0j0 x�0 x30 0 0 0 0 �O �x �0 Sheet o" �x \x Station 11 5 1 2.5 406 405 00 0" Typical Riffle and Step W-bkf 1 2 A-bkf 1 Typical Scour Pool 5 W-bkf 2.5 406 2 A-bkf 4058 e00 D-bkf D-bkf Typical Cross Section Riffle Scour Pool Bankfull Area (A-bkf, sq ff) 7.4 11.5 Bankfull Width (W-bkf, ff) 10.0 10.0 Bankfull Mean Depth (ff) 0.7 1.2 Bankfull Max Depth (D-bkf, ff) 0.9 1.8 Bankfull W/D (Stream Type) 13.5 8.7 Inner Berm Width (ff) 8.2 8.2 Inner Berm Max Depth (ff) 0.45 1.35 Approx. Wetted Width (ff) 7.6 7.6 Approx. Wetted Max Depth (ff) 0.3 1.2 Channel Bottom Width (W-bottom, ff) 6.4 2.8 �D0) CO o� CO CU EEo 0 W O(W N Y N � U � ¢ 2 O O U Sheet 12 m o v Q � � V U R ~ � 3m`r3 a ' m Ncoo Q � 0 W Q i Q) N w Y Jl s N O mm Z Q O �: Y « U U a� U O o 0 Q � �z UW O m �� a� �° a, � U o c 0 a� a� Sheet Pigeonroost Creek Stream Assessment Parameters Existing Condition Proposed Condition BOULDER REVETMENT Restore all disturbed area with Riparian Seeding (see Detail) Wooden Stake Streambank Matting, (see Detail) ---� Existing Ground—, — Top of Bank (Stream Type B) Proposed Ground Header Rock Streambed 1 Footer Rock Geotextile Liner (if needed, see Note 3) ,f JBankfull Elevation Backfill with suitable alluvial material (see Note 7) Section A - A View N. T. S. Notes: 1. Boulder Revetments shall be installed along the base of the design streambank toe at locations and stream lengths designated in the Site Plans. 2. Footer, Header, and Sill Rock shall be min. 3.0' dia. long axis, min. 2.5' dia. intermediate axis and min. 1.0' dia. height. 3. Geotextile Liner shall be medium weight non -woven polypropylene (Weight 7oz/sq yd; Tensile Strength 180 Ibs). Geotextile Liner shall be installed if backfill is fine-grained, as approved by the Project Engineer. Place Liner behind all rock layers and key in at the bottom. Trim excess or visible fabric. 4. Footer Rocks shall extend below scour depth or to bedrock, whichever is shallower. The scour depth is estimated to be the max. pool depth near the structure, unless otherwise specified. 5. Header Rocks must extend upwards above the bankfull elevation at least 12" due to high shear stress of larger storm events carried in the channel. The revetment shall have an even grade along the entire length. 6. Install two or more Header Rocks overlain and offset backwards moving up the bank if existing substrate elevation is below that needed for Header Rock Sill, extend into streambank (see Note 8) FAO Edge of Water at Normal Flow C) Q)C� o MCA _ N N cLo cLo Q I c 0 Top of Bank w (Stream Type B) CIO Bankfull \ q � i a> m \ o _ w q Plan View N. T. S. Geotextile Liner (if needed, see Note 3) Rock to extend above bankfull elevation or if additional protection is needed for exposed tree roots or other bank feature. Do not exceed the top of bank elevation. 7. Footer Rocks and Header Rocks shall be backfilled with gravel alluvial material, if suitable size and consistency is available. Suitable backfill shall have a minimum median diameter of 2" and not exceed 6" dia. It shall drain quickly and support weight without shifting or sinking. For fine sediment substrates, outside gravel may be needed for backfill and Footer Rocks shall be supported with a layer of stone, as approved by the Project Engineer. 8. Sill Rocks shall extend into the bank a minimum of 6', passed the top of bank plane. 9. After Boulder Revetment has been installed, backfill any remaining vertical streambank with clean soil fill material and compact at the proposed bank angle (2:5:1 slope). 10. Stabilize streambank with Riparian Seeding, Streambank Matting, and Livestaking (see Details). Header Rock Footer Rock Toe of Bank Slope Backfill with suitable alluvial material (see Note 7) N Y � mph DU N Q U ¢ 2 O O U Sheet C1 Riffle alluvial gravel layer, Section A - A View N. T. S. Notes: 1. Constructed Riffle lengths and slopes are provided in the Longitudinal Profile. Elevation for Head of Riffle (Rock Sill) and End of Riffle (Rock Step) are listed in referenced Structure Tables. 2. Constructed Riffles shall be composed of natural alluvial gravel and cobble materials harvested from the existing channel during installation of step -pool sequence and excavation (see Detail). 3. The median particle size is estimated to be small cobble (76 mm or 3" diameter)., Avoid alluvial materials with excess fine sediments derived from bank erosion. CONSTRUCTED RIFFLE D of Bank Ensure well graded materials from the channel is used. 4. Excavate streambed minimum 4" below finished grade and add gravel material. Line entire active bed to prevent scour along the bank toe. 5. Create heterogeneity in Constructed Riffles by embedding cobbles and woody debris within the gravel substrate. O Plan View N. T. S. Ee N Y � mph DU � ¢ 2 O O U Sheet C2 HEADWALLS AND EN DWALLS SEE AUXILIARY SPILLWAY INLET AND RISER SPILLWAY OUTLET Headwall/Endwall Header Rocks Geotextile Liner Extend sill 6.0' into Bank Top of Bank Top of Bank wingwail Header Rocks SECTION A -A VIEW NTS 1-1.5D1.5D-7 i-li-2 _"' V�� _ Rock 1. VEGETATED CHANNEL (DRIVEWAY TOP OF BANK —_� CHANNEL BOTTOM EROSION CONTROL MATTING) PROFILE VIEW NTS W TRENCHZI D b MATTING 6" MIN. EROSION CONTROL MATTIN EXISTING GROUND OR BEDROCK CROSS SECTION VIEW D NTSN Y a O \ O U 7—Footer Notes: %Culvert Rocks Channel Dimensions 1. Place Vegetated Swale along bottom of road embankment along the Driveway Expansion (See Headwall/Endwall Invert Channel Area (sq ft) 4.0 Auxiliary Spillway Cross Sections 2-4, Sheet 8) �,� ,o Header Rocks (See Profiles) Channel Width ft) 2. Slope Vegetated Swale approx 0.8%. -'? N (W, 6.0 3. Excavate the Vegetated Swale along the cis SECTION A VIEW Channel Depth (D, ft) 1.0 driveway expansion toe of slope down to the y p p p� � o C' 2 NTS foundation of the Erosion Control Matting +0.2', ci Channel Bottom Width (b, ft) 2.0 4. Remove all stumps, roots, loose rock and other Notes: and key in at the bottom. Side Slope ( X:1 ) 2 debris from the channel perimeter. ° z 1. Install a Headwall along the Auxilliary Spillway 5. Place Footer Rocks just below the culvert 5. Seed with Permanent (Riparian) and Temporary co ° " Profile at Sta 0+92 for the 30" HDPE inlet. Install invert. Ensure the thalweg is in the center of the Max Discharge (cfs) 11.0 Seeding (see Detail). o a an Endwall along the Riser Spillway Profile at channel. 6. Install Erosion Control Matting (see Detail), trench U 2 co Sta 2+72 for the 24'' barrel pipe outlet. 6. Install Footer Rocks down to the bedrock or Max Velocity (ft/s) 2.8 the upper, lower extent and sides of the matting a 2. All measurements for this detail are based on erosion resistant layer in the channel bottom to minimum of 6". Where overlap is necessary, the culvert diameter D. prevent scour under the structure. Ensure all Max Shear Stress (lb/sgft) 0.5 overlap the downstream edge a minimum 6" with 3. Sill, Header, and Footer Rocks shall be min. 3' W Header and Footer rocks are touching, with no the upstream edge that is trenched minimum 6". x 2' L x 1.0' H. gaps between rocks. 7. Extend matting minimum 18" passed the top of 4. Geotextile Liner shall be medium weight 7. Extend Headwall/Endwall min 12" above top bank. Sheet non -woven polypropylene (Weight 7oz/sq yd; of culvert. Tensile Strength 180 Ibs). Place liner on the 8. Extend wingwall a distance of 3xD into the upstream side of both footer rock and sill rock channel. n3 RISER SPILLWAY BARREL EXTENSION Notes- i� 3. The Barrel extensions shall be 24" corrugated metal pipe (CMP), extending into the pond to the riser (Sta 1 +06-1 +26, Riser Spillway Profile, Sheet 4) and extending into the receiving stream (Sta 2+62-2+72, Riser Spillway Profile, Sheet 5). (ADS HDPE N-12 or similar). Extensions will be secured to existing barrel CMP using watertight couplers with mastic. The barrel extension will be inserted into the bottom riser section, and sealed using hydraulic cement. The interior of the CMP barrel pipe including extensions (167') will be lined with Insituform cured -in -place pipe to ensure structural integrity of the entire lengh. This lining will be installed by Federal EC, LLC, Atlanta, GA following barrel extension. Barrel Diameter (in) 24 Mannings n 0.012 Barrel Area (sqft) - A 3.14 Perimeter (ft) 6.28 Hydraulic Radius- R 0.50 Slope (ft/ft) - S 0.019 Capacity Discharge (cfs) - Q 33.9 DRAINAGE PIPES DRIVEWAY FRENCH DRAIN Notes: l . A French Drain shall be installed along the Driveway expansion section (190'). 2. The French Drain shall consist of a 4" corrugated HDPE perforated pipe enclosed in filter sock surrounded by 57 stone. 3. Minimum trench size shall be 8" deep by 8" wide extending below the groundwater table. 4. The French Drain shall be have a minimum 1 % slope. AUXILIARY SPILLWAY CULVERT EXTENSION Notes: 1. HDPE pipe shall be installed at Sta 0+92 - 2+72 along the Auxiliary Spillway Profile (see Sheet 5). HDPE pipe shall be 30" diameter, smooth interior, corrugated exterior (ADS HDPE N-12 or similar). 2. Pipe and connections must be soil and watertight. Pipe shall have a flared bell and tapering spigot at the connections, sealed with manufacturer provided gaskets. 3. Minimum trench width required for installation is 5.0'. Minimum cover over pipe is 12". 4. HDPE Pipe shall be bedded with 57 stone in areas where it intercepts the water table, minimum 6" thickness. 5. Outlet protection shall be installed at the end of the pipe prior to entering the receiving stream. Outlet protection shall consist of a Rock -Lined channel (see Detail). Barrel Diameter (in) 30 Mannings n 0.012 Barrel Area (sqft) - A 4.91 Perimeter (ft) 7.85 Hydraulic Radius - R 0.63 Slope (ft/ft) - S 0.031 Capacity Discharge (cfs) - Q 78.4 Required Discharge (cfs) 48.0 co O O GO N OO W 0 N Y � mph DU � ¢ 2 O O U Sheet C4 RISER SPILLWAY Top Trash Rack Handwheel Riser Top, Stem Guide El: 4078.0' Riser Access Stairs Gate Stem (18" spacing) Riser Section, Square Concrete Box 3'H x 4'W x 4'L Barrel 24" CMP with CIPP Drainage lining; Invert: 4069.3 Gate Valve 4„ Invert: 4071.0' Base Section, Square Concrete Box 4'H x 4'W x 4'L Riser Bottom El: 4068.0' Concrete Footer ' 2� , r • 57 Stone Bedding 10.0' Cr]/"IAIT \/IC\A/ The Riser Spillway in combination with the Auxiliary Spillway have been designed to convey the 25 year 24 hour design storm. This is the maximum flow that can be conveyed with the existing 24" Barrel Structure. Riser Spillway Notes • Sheet 4 provides a complete profile of the Riser Spillway through the dam embankment and into the receiving stream • Any modifications to Riser Spillway components must be approved by the Project Engineer. Riser Structure: 1. The Riser Structure will be designed and fabricated by Old Castle Infrastructure, or similar. 2. Concrete Box Riser and Base sections shall be square, 4'Wx4'L. 3. The Base section shall have a cut-out for the 24" Barrel pipe and the 4" Drainage Gate Valve. Geotextile Liner Drainage Gate Valve: 1. The Gate Valve shall be a 4" Asahi Gate Valve designed and fabricated by Asahi/America, Lawrence MA., or similar. 2. The Contractor shall coordinate with the Riser Structure vendor to include cut-out to accommodate the gate opening and the bolt pattern for the gate stem guides. Trash Rack: 1. The trash rack shall be a metal grate bolted onto the top of the Riser Concrete Footer: (See Detail) Barrel Structure: 1. The Barrel will be a lined retrofit to the existing corrugated metal pipe, with a 20' extension into the pond interior and a 10' extension into the receiving stream. 2. The Barrel Structure shall be inserted into the Riser bottom section through a prefabricated "cut-out" and sealed with hydraulic cement (See Drainage Pipe Detail). CONCRETE FOOTER Riser Structure footprint p / a • 4 . • •° • • . ° • ' •• • •• .. 4. .. #6@12" O.C. 2" from edg 10 3D VIEW NTS #6@12" O.C. Top & Bottom Mats Standard Hook, Both Ends FOOTER STEEL LAYOUT NTS Notes: 1. Install Concrete Footer to anchor Riser Structure. 2. Concrete must have ultimate compressive strength of 4000 psi. 3. Forms (wood or metal) shall be used on sides and top of cradle throughout length. co �252 o N N 5 ro �~ N oLoo Q E oO .' W U) c Lo o ,N Z ro ro 2 O or 4 o U U UZ o o c� z' o a U Sheet C5 2x Ripi ROCK LINED CHANNEL (EMERGENCY SPILLWAY Top of Bank Channel Dimensions Top of Dam Weir Outlet Channel Outlet Protection Centerline Station 0+00-0+10 0+10-0+92 4+00-4+14 Channel Area (sq ft) 17.0 10.5 9.5 Channel Width (W, ft) 19.0 10.0 11.5 Channel Max Depth (D, ft) 1.0 1.5 1.0 Channel Bottom Width (b, ft) 15.0 4.0 7.5 Side Slope (X:1) 2 2 2 Channel Slope (ft/ft) 0.03 0.08 0.08 Max Discharge (cfs) 57.3 62.1 49.0 Required Discharge (cfs) 48.0 48.0 48.0 Velocity (ft/s) 3.1 5.5 5.2 Shear Stress (lb/sgft) 1.7 6.5 5.0 Riprap D50 (in) 18-24 18-24 18-24 PROFILE VIEW NTS LL cc Notes: 1. Excavate the Rock -Lined Channel down to the foundation of the Geotextile Liner +0.2', according to the Auxiliary Spillway Profile (Sheet 5). � mph 2. Remove all stumps, roots, loose rock and other w N DU debris from the channel perimeter. O O U 3. Install NCDOT Type 2 Geotextile (US205NW or equivalent) and secure in place along the sides and bottom prior to adding Riprap with heavy duty I W �' staples or rebar. --- - - -III- - = -III_III-III-III-'' - -1��1 4. Trench the upper and lower extent of the channel X I D I Geotextile Liner a minimum of 12". Where overlap is 0 j ��TI b j I necessary, overlap the downstream edge a minimum 12" with the upstream edge that is .N ro �, Riprap Channel Lining I 5. trenched minimum 12".° Install riprap in outlet channel, taking care not to rip O C/) CO o ca 2 x D50 or tear the Geotextile Liner. o I;' .o r - I III=III=III=III=III=III=III=III=III=III=III=III=III=III 6. Riprap shall be well -graded and extend to a z o minimum depth of 2 x the D50 of the rock diameter. .c o o Geotextile Liner Existing ground or 7. Key the toe of the Rock -lined channel minimum to a CIO a� bedrock depth of 2 x Riprap layer thickness or down to 0 co bedrock, which ever is shallower. SECTION VIEW NTS Sheet C6 O ROCK SILL (STREAM) ROCK STEP (STREAM Bankfull Bank Toe—\ W ' W W �/ I •Y W W W O i Riffle )otextile Liner (see Note 3) \I i W 1/ 1 W W Extend Sill J/ Bank Toe (6min.) Bankfull Width Plan View N. T. S. fu IW -A Sill Rock Apex Step Rock Flow �� Streambed Flow Step - - --- ­2—� Height \ ae------------- GC� -'----------- Pool Riff/e Riffle __-________ Scour Rocks Geotextile Liner ..... Pool Geotextile Liner Bankfull Elevation (see Note 3) Footer Rock --------------------------------- - (see Note 3) (see Note 8) Splash Rock 1/2 Bankfull Footer Rock _CAr�tinn d ---------------- �' �J Section C N. T. S. J N.T.S. Entire rock Sill below proposed Sill extends into Bank Toe streambed Section B elevation (Note 4) N. T. S. Step Rocks keyed in at inner berm Rock Sill and Step Notes: 1. Rock Step and Footer boulders shall be min. 3.0' dia. long axis, min. 2.0' dia. intermediate axis, and min. 1.0' dia. height. 2. Rock Sill boulders shall be min. 2.0' dia. 3. Geotextile Liner shall be medium weight non -woven polypropylene (Weight 7oz/sq yd; Tensile Strength 180 Ibs). Place liner on the upstream side of both footer rock and sill rock/log and key in at the bottom. Geotextile Liner shall be installed if backfill is fine-grained, as approved by the Project Engineer. Trim excess or visible fabric. 4. Rock Sill boulders are placed just below the channel bottom, ensuring thalweg elevation above the center rock. 5. Rock Step boulders are placed above the Bankfull channel bottom, dropping the water surface = Step Height. Step Height is the total structure drop between the Rock Step and next head of facet. 6. For Rock Steps, the proposed thalweg is at the top of the center Step rock. 7. Rock Step boulders are keyed in at inner berm elevation or higher. 8. Extend Footer rocks below the upstream scour pool depth, as approved by the Project Engineer. 9. For Rock Sills at the head of riffle, construct the riffle starting at the Rock Sill and extend the riffle length downstream. Ensure a pavement layer of substrate covers the Rock Sill. See Constructed Riffle Detail. Rock Sill and Rock Step Structure Table Centerline Thalweg Bankfull Step Structure Station EL (ft) (ft) Height (ft) Rock Sill 3+41 4062.6 4063.5 N/A Rock Step 3+59 4061.85 4062.75 0.5 Rock Sill 3+81 4061.35 1 4062.25 N/A Structures will be staked out by construction oversight staff prior to construction Bankfull Elevation_ Section D N. T. S. Step Rocks protrude \_above proposed streambed elevation (Note 5-6) N Y � mph DU � ¢ 2 O O U Sheet C7 Bank Toe Bankfull-",,,,, I 0 r r � s 1 Step Rock42 1 POOL ST STEP 2�77 � Footer Rocks POOL Splash Rocks 1 STEP i / L► I I Bankfull (BKF) Width PLAN VIEW N.T.S. Notes: 1. The Step Pool Channel shall be placed in the location shown on the Site Plan and Riser Spillway Profile. 2. Step Header, Footer and Sill Rocks shall be min. 3' dia. long axis, min., 3.0' dia. intermediate axis, and min. 1.5height. 3. Splash Rocks in the pool shall be 6-9" median diameter stone. A larger Splash Rock shall be placed in front of the structure below the maximum pool depth to protect against scour. 4. Geotextile Liner shall be NCDOT Type 2 (US205NW or similar). STEP -POOL CHANNEL (STREAM le Liner nd sill 6' min bank toe Armor entire pool bottom with cobble, extend above water surface FLOW -- I�36" 12" -- l " 1 ` Splash Rocks Step Height 18 min POOL 24" min Geotextile Liner) I� Step Rock Footer Rock Footer Splash 5. Extend Footer Rocks and Splash Rocks a min. 12" below scour depth or to bedrock, whichever is shallower. (The scour depth is assumed to be the max. pool depth associated with the structure). 6. All Rocks must be touching and fit snug against each other to ensure a tighter seal. 7. Step Height is the Total Structure Drop of the water surface. The water surface drop across the Step Rocks is measured along the stream profile. See Section A and Structure Table. 8. The proposed thalweg is at the top of the Step Rocks, in the center of the channel. 9. Step Structures will be keyed in at inner berm or higher, but not above bankfull. PROFILE VIEW (A) N.T.S. Bankfull (BKF) Width � \-Step Rock Streambed SECTION VIEW (B) N.T.S. Step -Pool Elevation Table Step Centerline Station Thalweg (Step) EL (ft) Bankfull EL (ft) Step Height (ft) 2+72 4066.2 4067.1 0.5 2+87 4065.7 4066.6 1.1 3+05 4064.6 4065.5 1.0 3+23 4063.6 4064.5 1.0 N Y DU N Q Q U O O U1 Sheet SILT FENCE 6" Max. 6' Spacing without fence Wire Fence min. Max. 8' Spacing with fence (if applicable) Steel 6" Geotextile Fabric Post min. Backfill and Wire/Plastic compact soil 24" Ties ° 24" a Fey 8" Existing Y Existing Q min. Ground 00 Ground — — — — E 81, I I -III-III -III-I I I I -I I p CD mini' 24" Bo-1 of min. min. 24" min. Trench Geotextile Steel Post Fabric PROFILE VIEW SECTION VIEW NTS NTS Notes: 1. Silt fence shall meet the requirements of the NC Erosion and Sediment Control Planning and Design Manual (2013) Std and Spec 6.62. 2. Do not install silt fence across areas of concentrated flow, including streams, ditches, or waterways. 3. Silt fence is limited to fill heights of 10 ft or less, and shall not exceed slope length corresponding to drainage area size and slope (Table 6.62a). 4. Steel posts shall be 5' min. length, with 1.25 lb/linear ft steel. Wooden stakes are not allowed. 5. Geotextile fabric shall comply with specifications in Table 6.62b. If Wire Fence reinforcement is needed, wire shall be 14 gauge min. with max. 6" mesh spacing and extend to bottom of trench. 6. Wire or Plastic ties shall have 50 lb tensile strength min. 7. When two separate sections of geotextile fabric adjoin each other, they shall overlap by 6" and be double folded. 8. Geotextile fabric shall be fastened with plastic or wire ties securely to the posts at the top, vertical midpoint and bottom of geotextile fabric. 9. The distance between the toe of the fill to the silt fence shall be a minimum of 5'. SLOPE MATTING Use key trench on top edge. min. overlap -I Jp a Flow Bottom Edge g s 9sn�q Space wood Note: Rotate stakes 20° towards stakes every 36" in PLAN VIEW direction of flow to prevent uplift. diamond shape NTS pattern. Fill and compact 6° min. trench with topsoil ` Erosion Control Matting min. SECTION VIEW NTS Extend matting below normal flow elevation Notes: 1. Streambank Matting shall be applied to slopes 3:1 or greater, including all streambanks and terrace slopes. 2. Streambank Matting shall be 700 gram coir fiber matting (20.3 oz./sq. yd.). Rolls shall be 6' min. width. 3. Seed and mulch the ground surface before installing matting (use native Riparian Seed mix plus a temporary cover crop). 4. Alternate fastening devices require Project Engineer's approval before use. 5. Extend matting 18" min. past the top of bank or top of slope. Upstream fabric overlaps downstream fabric by 6 in. 6. For streambanks, extend matting below normal flow elevation to promote saturation in order to weigh the matting down and encourage a biofilm seal with the underlying soil. 7. For streambanks, do not trench or stake the bottom of the matting to avoid disturbance and instability along the toe of slope. 8. Tuck matting behind and under toe protection measures such as revetments and rock. N Y � mph DU N 2 Q Y � � U � ¢ 2 O O U Sheet C9 PERMANENT AND TEMPORARY SEEDING Permanent Seed Mix - Disturbed upslope areas outside of floodplain riparian areas and streambanks Minimum Care Lawn Total Lbs. Per Ac Commercial or Residential 200-250 Kentucky 31 or Turf -Type Tall Fescue 90-100% Improved Perennial Ryegrass 0-10% Kentucky Bluegrass 0-10% Rioarian Permanent Seed Mix — Disturbed floodDlain rioarian areas and streambanks NC Mountains Riparian Mix 20 lbs. per acre 2 (Ernst Conservation Seeds ERNMX-304 or similar) Topsoil 4 inches, free from weed seeds Fertilizer As recommended by soil test 3 Lime As recommended by soil test Mulch 2 tons per acre (slopes < 3:1) hay, free from weed seeds 4 Temporary Seed Mix - All areas where Permanent and Riparian Permanent Seed Mixes are applied Total Lbs. Per Acre Sept 1 -Feb 15 5' Winter wheat 100 April 15 - Sept 1 Browntop or German millet 100 Feb 15 - April 15 o mix of above species 100 6' *Annual ryegrass shall not be applied to any areas due to allelopathic properties with native species. **Species may be substituted based on local availability, as 7 approved by the Project Engineer. Mulch: 2 tons per acre (slopes < 3:1) hay or straw, free from weed seeds STREAMBANK LIVESTAKING 1. Following construction, all streambank areas shall be seeded with Permanent Riparian Seeding (see Detail). Erosion Control Matting (see Detail) shall be installed. 2. Plant livestakes in two rows with 5' spacing between rows along both left and right streambanks of disturbed reach. Plant livestakes from bank toe up to top of bank. 3. Livestake species include: Corpus amomum, Physocarpus opulifolius, Salix serecia, Sambucus canadensis. Any substitutions must be approved by Project Engineer. Notes: Permanent and Temporary Seeding shall meet the requirements of the North Carolina Erosion and Sediment Control Planning and Design Manual Handbook (2013) Practice Standards and Specifications 6.11 -Permanent Seeding and 6.12 Temporary Seeding. Seed mix may be altered to match existing land -use requirements (example pasture needs, as suggested by the landowner). Changes to seed mixes must be approved by the Project Engineer. Soil tests must be performed prior to construction activities to determine appropriate fertilizer and lime rates at the time of construction, in coordination with the Project Engineer. Permanent Seeding must be applied to all disturbed areas within 15 working days after reaching final grade. Topsoil shall be applied uniformly over existing soil to all Temporary and Permanent Seeding areas to a depth of 4 inches. Topsoil shall be free of weed seed, rock, and debris to the extent possible. Apply all seed uniformly with a broadcast seeder, drill, culti-packer seeder, or hydroseeder on a firm, friable seedbed to a depth of a to 2 inch according to seed rates specified above or by the seed distributor. Apply mulch following seeding, fertilizer, and lime application, ensure mulch is properly tacked down to avoid wind dispersal. For slopes >/= 3:1, use Streambank Matting (see Detail) instead of mulch. The Contractor is responsible for establishing permanent groundcover (>80% coverage) following these details and specifications within one year of project completion to the extent that no erosion is occurring due to lack of permanent groundcover, as approved by the Project Engineer. TEMPORARY CONSTRUCTION A � 10' 10' min L Paved Road) ENTRANCE/EXIT 0' min. 0 Clean washed stone 2"-4" dia., 8" depth underlain with Geotextile Fabric Temporary Drainage Pipe, as needed PLAN VIEW NTS Existing — 50' min _ Ground Paved 20% slope Road Clean washed stone 3" min. �� 2"-4" dia., 8" depth Non -woven Geotextile Fabric shall be placed under entire width/length of stone Temporary Drainage Pipe, as needed SECTION VIEW NTS Notes: 1. Temporary Construction Entrance specifications are described in North Carolina Erosion and Sediment Control Planning and Design Manual (2013) Std and Spec 6.06. 2. Excavate 3" minimum undercut prior to placement of stone along Entrance length. 3. Replenish stone when surface rock becomes compressed < 8", stone becomes covered with fine sediment, or sediment is visible on the paved road. N Y � mph DU N 2 Q Y � � U ¢ 2 O O U Sheet C10 PUMP AROUND DETAIL 0 Pump Hose Sandbag Dam Weir "In -stream" work location Non -Permeable Material Verify Hose Diameter and Pump Size Adequate to Drain Sand Bag Temp Dam N Y � mph DU � ¢ 2 O O U Notes: M 1. Pump around method is designed for flows of 5 cfs or less using a maximum pump size with a 6" diameter hose. 2. Clear area of debris for temporary dam installation. C) .o 3. Layout hose and pump along route adequate to allow for o ,N in -stream work. 4. Provide splash pad at outlet of hose to spread and slow U Cn C_ CO velocity of flow before reentering live stream flow. 5. Install Sandbags perpendicular to flow of water. 208 z 6. Allow for overflow weir --4' min width and --1.5' depth. -6min 7. Overlay dam structure with non -permeable plastic or similar ° z> material. CO a 8. Begin pumping process, with regular monitoring to ensure co hose diameter is adequate to carry flow and check to ensure o filter at hose inlet does not clog and restrict flow. "In CIO) 0 9. If -stream" work extends beyond one day, open weir section W of sand bags to allow flow through work area overnight. Sheet C11