Loading...
HomeMy WebLinkAboutNCG120087 DMR SW (4)SMITH+6ARONER EN61NEERS March 10, 2015 Mr. John Holley, P.E. ADDRESS TEL WEB 14 N. Boylan Avenue, Raleigh NC 27603 919.828.0577 www.smitligardnerinc.com Regional Engineer Division of Energy, -Minerals and Land Resources - 1628 Mail Service Center Raleigh, NC 27699 RE: Tier 3 Notification Johnston County Landfill Certificate of Coverage#NC6120087 General Permit#NCG120000 Dear Mr. Holley: MARr22o15. EVVtR RAL P/LES ooN On behalf of Johnston County, Smith Gardner Inc. (S+G) has prepared this official notification to the Division of Energy, Minerals and Land Resources (DEMLR) - Stormwater Permitting Program to inform you.that the.Johnston County Landfill (COC#NCG120087) has entered Tier 3 status due to four (4) exceedances over the TSS benchmark value at SDO 4A -5A, during this permit term. CURRENT NPOES PERMIT STATUS As you are,aware, Representative Outfall Status (ROS) was granted' for the site in August 2014 following a stormwater records review and site visit by the DEMLR-Stormwater permitting program. Since the current permit was issued (November 2012), the Johnston County Landfill has conducted qualitative monitoring at SDO 4A -5A ten (10) times (as shown in the table below). Please note that SDO 4A -5A is has not been in Tier 2 status for TSS prior to the last sampling event (February 2015), when this outfall went into Tier 2 and Tier 3 status simultaneously for TSS. S00 4A -5A —TSS ANALYTICAL MONITORING RESULTS (2012-2014) DATE TSS (Benchmark=100) September 2012 4.4 November 2012 34 December 2012 630 _ January 2013 44 February 2013 58 March 2013 89 November 2013 22 March 2014 330 December 2014 90 January 2015 1,500 February 2015 150 '.Approval Letter - Request for Representative Outfall Status & Compliance Evaluation Inspection - Johnston County Landfill. DEMLR. August 19, 2014. Mr. John Holley,P.E. March 10, 2015 Page 2of2 ON-GOING SITE IMPROVEMENT STATUS SDO 4A -5A has a drainage area that encompasses the area of a significant portion of the active operations at the landfill.. Daily cover and other exposed soils in this area area necessity for daily operations at the facility. Several best management practices have been utilized in this;area in accordance with the approved erosion and sediment control plan. Below is'a list of site practices that are in use to minimize TSS levels at this SDO: • Stabilization of outer landfill slopes draining to basin (in addition to grass, wood chips have been used frequently); • Use of slope drains; • Installation of rip -rap channels in high flow areas; • Installation of check -dams and filter berms; • Placement of coir -fiber wattles in channels; and • Regular maintenance of Basin 5A (including removal of sediment from basin and replacement of stone surrounding the riser structure). PLANNED ADDITIONAL MEASURES At this time, Johnston County is prepared to continue the above BMPs that have shown to reduce TSS in most conditions. In addition to these items. Johnston County plans to move this sampling location (SDO 4A -5A) approximately 700 feet toward the property line where the stormwater from this basin actually leaves the property. Johnston County will monitor this outfall monthly until three (3) consecutive events measuring under the TSS thresholds have.been confirmed.; Please contact me by phone (919- 828-0577, ext. 224) or by email below with any questions or comments. Sincerely, SMITH GARON C. 0' Don M. isenheimer Project Scientist, ext. 224 don fdsmithgardnerinc.com dmm Cc. David Parnell, NCDENR Rick Proctor, Johnston County Kevin Shields, Johnston County Pieter K. Scheer, P.E., S+G File C:\Users\donmisenheimer\Desktop\notification letterjoco.docx