Loading...
HomeMy WebLinkAboutNCC201608_NOT Closeout Documents_20240528 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300,Winston-Salem,NC 27105 (336) 776-9800 County: Guilford Project: Contract 2011-067,Alamance Church River basin: Cape Fear Person financially responsible:City of Greensboro-John D Fersner,Chief Design Project#: GUILF-2020-035 Engineer Address: PO Box 3136,Greensboro,NC 27402-3136 1. Project Location: Alamance Church Rd.,Greensboro Pictures: Yes-Digital 2. Weather and soil conditions: Sunny,Workable soil conditions Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: May 13,2024 9. Corrective action needed: 10. Comments: A routine inspection was performed.Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Forms/NCGO1 Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Contact the Winston Salem Regional Office for any questions. Reported by: Jason Moffitt Others present: Kimberly Turney,MD Mahfuz Islam Date of inspection: May 08,2024 Time arriving on site: 3:30 PM Time leaving site: 3:45 PM CC: