HomeMy WebLinkAboutNC0021717_Authorization to Construct_20240530 DocuSign Envelope ID: D6D99C1E-5A95-49F2-AE82-5B2712C6880C o,,tHt STATE � Fy ROY COOPER u o Governor ELIZABETH S.BISER Secretary *`�`Q. RICHARD E.ROGERS,JR. NORTH CAROLINA Director Environmental Quality May 30, 2024 Mr. Kenneth Noland, Town Manager Town of Wilkesboro PO Box 1056 Wilkesboro,North Carolina 28697 SUBJECT: Authorization to Construct A to C No. 021717A04 Town of Wilkesboro Cub Creek WWTP NPDES Permit N.NCO021717 DWI Project NO. SRP-W-0208 Dear Mr.Noland: A letter of request for an Authorization to Construct was received enter date,by the Division of Water Resources (Division). With additional information received on May 28, 2024, final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 4.9 MGD Cub Creek WWTP with discharge of treated wastewater into the Yadkin River, in the Yadkin-Pee Dee River Basin. This authorization results in an increase in design and permitted capacity to 8.0 MGD, and is awarded for the construction of the following specific modifications: • Three (3) influent submersible end-suction pumps,two (2) duty and one(1) standby, each rated for 4,840 GPM @ 59.6 ft TDH with VFDs; • Three (3)perforated plate mechanical bar screens each rated for 7 MGD at peak hourly flow; • One(1) 70 ft3/hour washer compactor; • One(1)250 GPM grit classifier; • Conversion of existing aeration basin to one (1) 3.8 million gallon flow EQ basin; • Repurposing Secondary Clarifier 4 as a 600,000-gallon Influent Buffer Tank and AGS pump station wet well with addition of one (1)40 HP floating mixers and Three (3)Aerobic Granular Sludge(AGS) influent submersible end-suction pumps,two (2) duty and one (1) standby, each rated for 6,330 GPM @ 73 ft TDH with VFDs; • Three (3) 1.29 million gallon AGS Sequencing Batch Reactors; • Six(6)AGS hybrid rotary lobe blowers, five(5) duty and one(1) standby, each rated for 1,566 cftn(2,580 scfm); • One(1) 149,400-gallon AGS Intermediate Tank; • Repurposing of Secondary Clarifier 3 as a 490,000-gallon AGS Sludge Buffer Tank; • Two (2)parallel UV light disinfection channels, each with three (3)banks, two (2) duty and one(1) standby,with each bank consisting of 12 lamps and rated for 9.1 MGD at peak hourly flow; D EQNorth Carolina Department of Environmental Quality 1Division of Water Resources 512 North Salisbury Street 11611 Mail Service Center Raleigh,North Carolina 27699-1611 ie� _ _A r.,�.i n:,-:, -✓. 919.707.9000 DocuSign Envelope ID: D6D99C1E-5A95-49F2-AE82-5B2712C6880C Mr. Kenneth Noland, Town Manager May 30,2024 Page 2 of 3 • Two (2)WAS submersible end-suction pumps, one (1) duty and one (1) standby, each rated for 335 GPM @ 25 ft TDH; • Two (2) floating digester decanter pumps, each rated for 210 GPM @ 8 ft TDH; • Two (2) double disc digested sludge pumps, one (1) duty and one(1) standby, each rated for 120 GPM @ 126 ft TDH; • Two (2)486 dry pound/hour sludge dewatering screw presses; • All necessary piping and controls (if applicable); in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0021717 issued effective June 1,2024 and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0021717. It is the Owner's responsibility to ensure that the as-constructed project meets the requirements of all applicable regulations and statutes,the ATC Permit Application package, and all the requirements contained herein. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number 336-776-9797, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on-site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit and the ATC Permit Application package. Mail the Certification to: Division of Water Resources, WQ Permitting — NPDES, 1617 Mail Service Center, Raleigh, NC 27699-1617. The Engineer's Certification form is included with this submittal. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge(ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility DocuSign Envelope ID: D6D99C1E-5A95-49F2-AE82-5B2712C6880C Mr. Kenneth Noland, Town Manager May 30,2024 Page 3 of 3 at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. All ORC site inspections must be documented in a log to be on-site and available for review at all times. A copy of the project plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the Permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in compliance with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. The issuance of this ATC does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal)which have jurisdiction. If you have any questions or need additional information, please contact Nick Coco, PE at telephone number 919-707-3609 or by email at nick.coco@deq.nc.gov. Sincerely, AD.o'c'u,Siigne'd byy:A `1•�y In.''` 1VWk � C-1 h C464531431644FE... by Michael J. Montebello NPDES Permitting Branch Chief Division of Water Resources cc: NPDES Files Wilkes County Health e-copy: C. Wes Bramlett, PE, HDR Email: wes.bramlett@hdrinc.com DWR Winston-Salem Regional Office,Water Quality Programs DWI/Ali Ajami DocuSign Envelope ID:D6D99C1E-5A95-49F2-AE82-5B2712C6880C Town of Wilkesboro Cub Creek WWTP Authorization to Construct No. 021717A04 Issued May 30, 2024 NPDES Permit No.NC0021717 Engineer's Certification ❑ Final Engineering Certification/ ❑ Partial Engineering Certification (mark all that apply) I, , as a duly registered Professional Engineer in the State of North Carolina,having been authorized to observe(periodically/weekly/full time)the construction of the modifications and improvements to the Cub Creek Wastewater Treatment Plant, located in Wilkes County, hereby state that,to the best of my abilities, due care and diligence was used in the observation of the following construction of: ❑ (3)influent submersible end-suction pumps, two(2) duty and one(1) standby, each rated for 4,840 GPM @ 59.6 ft TDH with VFDs; ❑ Three(3)perforated plate mechanical bar screens each rated for 7 MGD at peak hourly flow; ❑ One(1)70 ft3/hour washer compactor; ❑ One(1)250 GPM grit classifier; ❑ Conversion of existing aeration basin to one(1) 3.8 million gallon flow EQ basin; ❑ Repurposing Secondary Clarifier 4 as a 600,000-gallon Influent Buffer Tank and AGS pump station wet well with addition of one(1)40 HP floating mixers and Three (3)Aerobic Granular Sludge(AGS) influent submersible end-suction pumps,two(2) duty and one (1) standby, each rated for 6,330 GPM @ 73 ft TDH with VFDs; ❑ Three(3) 1.29 million gallon AGS Sequencing Batch Reactors; ❑ Six(6)AGS hybrid rotary lobe blowers, five(5)duty and one(1) standby, each rated for 1,566 cfm(2,580 scfm); ❑ One(1) 149,400-gallon AGS Intermediate Tank; ❑ Repurposing of Secondary Clarifier 3 as a 490,000-gallon AGS Sludge Buffer Tank; ❑ Two(2)parallel UV light disinfection channels, each with three (3)banks,two(2)duty and one(1) standby, with each bank consisting of 12 lamps and rated for 9.1 MGD at peak hourly flow; ❑ Two(2)WAS submersible end-suction pumps, one(1) duty and one(1)standby, each rated for 335 GPM @ 25 ft TDH; ❑ Two(2) floating digester decanter pumps, each rated for 210 GPM @ 8 ft TDH; ❑ Two(2) double disc digested sludge pumps,one (1)duty and one (1) standby, each rated for 120 GPM @ 126 ft TDH; ❑ Two(2)486 dry pound/hour sludge dewatering screw presses; ❑ All necessary piping and controls (if applicable); in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantia compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Registration No. Date Mail this Certification to: Attn: Ori Tuvia NPDES Industrial Permitting Unit DEQ/DWR/Water Quality Programs SNAIL 1617 Mail Service Center Raleigh,NC 27699-1617