Loading...
HomeMy WebLinkAbout20071856 Ver 1_Stormwater Approval_20071206~~ W A TF9 Michael F. Easley, Governor Q ~ ~ r ta S Willi G R J `~ i Vj tom... ry r., ec e am . oss North Carolina Department of Environment and Natural Resources J ~ ~ .,~- Collen H. Sullins, Director Division of Water Quality December 6, 2007 DWQ EXP No. 07-1856 Franklin County CERTIFIED MAIL: RETURN RECEIPT REQUESTED CADE Construction, Inc. Attn: Bill Bland 120 F. Weathers Street Youngsville, NC 27596 Subject Property: Arch Aluminum APPROVAL OF STORMWATER MANAGEMENT PLAN Dear Mr. Bland: The Division of Water Quality (DWQ) has reviewed your stormwater management plan received on November 9, 2007 and subsequent revisions received on December 3, 2007, December 5, 2007 and December 6, 2007. This Stormwater Management Plan will satisfy the stormwater management conditions required by the 401 Water Quality Certification issued for the Youngsville Industrial Park on December 19,.2002 but only for the Arch Aluminum site. You are required to meet the following conditions (as well as the conditions contained within the Water Quality Certification): 1. The structural stormwater practices as approved by DWQ as well as drainage patterns must be maintained in perpetuity. No changes to the structural storrrtwater practices shall be made without written authorization from the DWQ. Stormwater easements shall be recorded for a distance of at least 10 feet on each side of all stormwater conveyances on the lot(s) containing these structures including future access for maintenance. The stormwater easements shall allow for the ability to maintain the structures, perform corrective actions, and shall provide protection of the structures from potential alternations by future property owners. 2. Notification of Construction: The applicant and/or authorized agent shall contact the DWQ Express Review Program in writing at the letterhead address within ten (10) days of the commencement of construction. 3. Please be advised that per current regulations, future development on other sites or lots which are part of the Youngsville Industrial Park will require separate Stormwater Management Plan Review if the built upon area exceeds 24%. 401 Oversight/Express Review Permitting Unit ]650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http://h2o.enr.state.nc.us/ncwetlands No~ehCarolina ~atura!!y An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Mr. Bill Bland Page 2 of 2 December 6, 2007 This letter completes the review of the DWQ under Section 401 of the Clean Water Act. If you have any questions, please contact Cyndi Karoly, Joseph Gyamfi or Lia Myott at 919-733-1786. Cyndi Bell Karoly, Supervisor 401 Oversight, Express Review Program CBK/jg cc: James Shern, USACE Raleigh Regulatory Field Office Lauren Witherspoon, DWQ Raleigh Regional Office File Copy Central Files Jay Keller, Keller Environmental, 7921 Haymarket Lane, Raleigh, NC 27615