Loading...
HomeMy WebLinkAboutNC0076783_authorization to construct_19970619State of North Carolina Department of Environment, Health and Natural Resources 4 ' • Division of Water Quality James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary p E A. Preston Howard, Jr., P.E., Director Mr. M. J. Noland, Chief Operating Officer Public Works Commission 508 Person Street Fayetteville, North Carolina 28302 June 19, 1997 Subject: Permit No. AC0076783 Issuance P.O. Hoffer WTF Authorization to Construct Cumberland County Dear Mr. Noland: A letter of request for an Authorization to Construct was received May 1, 1997 by the Division and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of a Residuals Processing System at Glenville Lake WTF, P.O. Hoffer WTF, and Cross Creek WRF. The construction consists of a pump station and pipe cleaning system at Glenville Lake; three 106 foot diameter clarifiers, polymer building and pump station at P.O. Hoffer WTF; a thickened residuals storage tank and thickener building at Cross Creek WRF and all associated controls, piping and appurtenances as specified in the approved plans for the above referenced project with discharge of treated wastewater into the Cape Fear River in the Cape Fear River Basin. This Authorization to Construct is issued in accordance with Part III, Paragraph A. of NPDES Permit No. NCO076783 issued July 26, 1993, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0076783. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Fayetteville Regional Office, telephone number (910) 486-1541, shall be notified at least forty- eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional office shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC 27626-0535. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone (919)733.5083 FAX (919)733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Permit No. AC0076783 P.O. Hoffer WTF Authorization to Construct June 19, 1997 Page 2 Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8A, .0202. The ORC of the facility must visit Class 1 facilities at least weekly and Class II, III and IV facilities daily, excluding weekends and holidays, and must properly manage and document operation and maintenance of the facility and must comply with all other conditions of Title 15A, Chapter 8A, .0202. Once the facility is classified, the Permittee must submit a letter to the Certification Commission which designates the operator in responsible charge within thirty days after the wastewater treatment facilities are 50% complete. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143- 215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1)'set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Ms. Mary Cabe, telephone number (919) 733- 5083, extension 518. Sincerely, Preston Howard, Jr., P.E. Attachment cc: Central Files Training and Certification Unit Permits and Engineering Unit Fayetteville Regional Office / Ed Buchen Victor Ganjehsani, P.E. / Public Works Commission Mr. Richard Tsang / Camp Dresser & McKee 5400 Glenwood Ave, Suite 300 Raleigh, NC 27612