Loading...
HomeMy WebLinkAboutInspectionReport_38222.3.3_4-16-2024.pdfNorth Carolina Department of Transportation Roadside Environmental Unit Erosion & Sedimentation / Stormwater Report ICA / PCN Immediate Corrective Action / Permit Consultation Needed This project does not comply with the North Carolina Erosion and Sedimentation Control laws. Immediate Corrective Action is needed to resolve the situation to full compliance with the Law: (T15A: 04B.0000). This project does not comply with the permit requirements for the project. Permit consultation is needed to resolve the situation to full compliance. Proiect Information Inspection Date: 04/16/2024 Evaluator: Justin Davis Project #: 38222.3.3 TIP #: B-4786 Contract #: C204376 Division #: 2 County: Pitt Project Type: Contract Engineer: Greenville Resident Project Length: 0.60 Disturbed Acres: 0 River Basin: Tar -Pamlico HQW Zone: NO Trout Zone: NO Location Bridge #38 on US 13 over the Tar River Description: Project Evaluation Report Type: ❑Routine ❑✓ ICA ❑ICA Ex 1st ❑ICA Ex 2nd ❑CICA - SWO ❑,/ PC ❑ ECPAR Installation Maintenance Effectiveness Plan Overall Project Length Section of BMPs of BMPs of BMPs Implementation Evaluation 0.6 The Entire Project 6 7 6 6 6 Grading Scale: 0 - 6 = Immediate Corrective Action Required, 7 = Fair, 8 = Good, 9 = Very Good, 10 = Excellent Remarks and Recommendations: An ICA/PCN is being issued for two permit violations. *1. Waste material from the project has been taken to an unapproved site. Approximatley 12 dump truck loads. Material will need to be collected and taken to the approved waste site. *2. Near End Bents 6 and 7, rock fill material has been placed in an unapproved location. Some of the rock ended up in the river. We need to meet onsite and discuss the permitted areas. Project is currently in a moratorium, in water work is not allowed. We will need to discuss the proper methods to remove the rock in the river. **I will return in 5 days to review the violations. If a good effort has been made, I will reaccess the ICA. -Met onsite with Chris Rivenbark and inspectors. Walked site and reviewed the inspectors concerns. -Chris and I agreed on the violation at End Bents 6 and 7. -The inspectors informed me of the material being taken to an unapproved site. They had followed the dump trucks earlier and found the site. 4/16/2024 4:21 PM Page 1 of 1