HomeMy WebLinkAbout430024_30 Day POA for high freeboard_20240524PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number:
Facility Name:
Certified Operator Name:
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
2. Check all applicable items
________
X
________
________
3. Earliest possible date to begin land application of waste:
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
___________________________________________
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
Joseph W Ferrell
Facility Owner/Manager (print)
Facility Owner/Manager (signature)
43-24
Ferrell Farms
Joseph W Ferrell
Lagoon 1
1
N
14
Lagoon 2
2
N
15
Lagoon 3
County:
Operator Number:
Lagoon 4
Phone:
Date:
Harnett
Lagoon 5
5/23/2024
919-669-3957
5/23/2024
20196
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
4384
4384
4384
4384
IV. FACILITY'S PoA OVERALL PAN BALANCE
w.
x.
y.
NARRATIVE:
1. Structure ID:
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
n.
p. field #
5-1
6-1
5-2
5-3
v. Total PAN available for all fields (sum of column t) =
Total PAN to be land applied (line n from section II) =
Crop's remaining PAN balance (line v from section III) =
Overall PAN balance (w - x) =
1
2
lines 1 + 2 + 3 + 4 + 5 + 6 =
q. crop
CB/Graze
CB/Graze
CB/Graze
CB/Graze
r. acres
5.15
5.82
2.97
2.19
line m =
line m =
line m =
line m =
line m =
line m =
s. remaining IRR-2 PAN balance (lb/acre)
235
206
235
235
0
0
0
0
270.0009972
186.216669466667
0
0
0
0
456.217666666667
t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s
1210.25
1198.92
697.95
514.65
0
0
0
0
3621.77
456.217666666667
3621.77
-3165.55233333333
lb PAN
lb PAN
lb PAN
lb PAN
lb PAN
lb PAN
lb PAN
u. application window1
APR-AUG
APR-AUG
APR-AUG
APR-AUG
lb. PAN
lb. PAN
lb. PAN
lb. PAN
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1.
2.
3.
4.
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Structure Name/Identifier (ID):
Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a.
b.
c.
d.
e.
Projected volume of waste liquid produced during draw down period
f.
g.
h.
i.
j.
k.
Total PAN to be land applied during draw down period
l.
m.
current liquid level according to marker
designed 25 yr./24 hr. storm & structural freeboard
line b - line a (inches in red zone) =
top of dike surface area according to design
(area at below structural freeboard elevation)
line c/12 x line d x 7.48 gallons/ft3
temporary storage period according to structural design
volume of waste produced according to structural design
current herd #
actual waste produced = current herd # x line g =
volume of wash water according to structural design
excess rainfall over evaporation according to design
(lines h + i + j) x 7.48 x
current waste analysis dated
((lines e + k)/1000) x line l =
3040
30
1
certified herd #
certified herd #
days/line f=
2/28/2024
3040
14
19
5
27550
85864.1666666667
180
22272
22272
0
16070
47799.6933333333
2.02
270.0009972
inches
inches
inches
ft2
gallons
days
ft3
ft3
ft3
ft3
gallons
lbs. PAN
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1.
2.
3.
4.
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Structure Name/Identifier (ID):
Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a.
b.
c.
d.
e.
Projected volume of waste liquid produced during draw down period
f.
g.
h.
i.
j.
k.
Total PAN to be land applied during draw down period
l.
m.
current liquid level according to marker
designed 25 yr./24 hr. storm & structural freeboard
line b - line a (inches in red zone) =
top of dike surface area according to design
(area at below structural freeboard elevation)
line c/12 x line d x 7.48 gallons/ft3
temporary storage period according to structural design
volume of waste produced according to structural design
current herd #
actual waste produced = current herd # x line g =
volume of wash water according to structural design
excess rainfall over evaporation according to design
(lines h + i + j) x 7.48 x
current waste analysis dated
((lines e + k)/1000) x line l =
3040
30
2
certified herd #
certified herd #
days/line f=
2/28/2024
3040
15
19
4
24000
59840
180
22272
22272
0
16070
47799.6933333333
1.73
186.216669466667
inches
inches
inches
ft2
gallons
days
ft3
ft3
ft3
ft3
gallons
lbs/1000 gal.
lbs. PAN
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1.
2.
3.
4.
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Structure Name/Identifier (ID):
Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a.
b.
c.
d.
e.
Projected volume of waste liquid produced during draw down period
f.
g.
h.
i.
j.
k.
Total PAN to be land applied during draw down period
l.
m.
current liquid level according to marker
designed 25 yr./24 hr. storm & structural freeboard
line b - line a (inches in red zone) =
top of dike surface area according to design
(area at below structural freeboard elevation)
line c/12 x line d x 7.48 gallons/ft3
temporary storage period according to structural design
volume of waste produced according to structural design
current herd #
actual waste produced = current herd # x line g =
volume of wash water according to structural design
excess rainfall over evaporation according to design
(lines h + i + j) x 7.48 x
current waste analysis dated
((lines e + k)/1000) x line l =
30
certified herd #
certified herd #
days/line f=
0
0
0
0
0
inches
inches
inches
ft2
gallons
days
ft3
ft3
ft3
ft3
gallons
lbs/1000 gal.
lbs. PAN
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1.
2.
3.
4.
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Structure Name/Identifier (ID):
Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a.
b.
c.
d.
e.
Projected volume of waste liquid produced during draw down period
f.
g.
h.
i.
j.
k.
Total PAN to be land applied during draw down period
l.
m.
current liquid level according to marker
designed 25 yr./24 hr. storm & structural freeboard
line b - line a (inches in red zone) =
top of dike surface area according to design
(area at below structural freeboard elevation)
line c/12 x line d x 7.48 gallons/ft3
temporary storage period according to structural design
volume of waste produced according to structural design
current herd #
actual waste produced = current herd # x line g =
volume of wash water according to structural design
excess rainfall over evaporation according to design
(lines h + i + j) x 7.48 x
current waste analysis dated
((lines e + k)/1000) x line l =
30
certified herd #
certified herd #
days/line f=
0
0
0
0
0
inches
inches
inches
ft2
gallons
days
ft3
ft3
ft3
ft3
gallons
lbs/1000 gal.
lbs. PAN
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1.
2.
3.
4.
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Structure Name/Identifier (ID):
Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a.
b.
c.
d.
e.
Projected volume of waste liquid produced during draw down period
f.
g.
h.
i.
j.
k.
Total PAN to be land applied during draw down period
l.
m.
current liquid level according to marker
designed 25 yr./24 hr. storm & structural freeboard
line b - line a (inches in red zone) =
top of dike surface area according to design
(area at below structural freeboard elevation)
line c/12 x line d x 7.48 gallons/ft3
temporary storage period according to structural design
volume of waste produced according to structural design
current herd #
actual waste produced = current herd # x line g =
volume of wash water according to structural design
excess rainfall over evaporation according to design
(lines h + i + j) x 7.48 x
current waste analysis dated
((lines e + k)/1000) x line l =
30
certified herd #
certified herd #
days/line f=
0
0
0
0
0
inches
inches
inches
ft2
gallons
days
ft3
ft3
ft3
ft3
gallons
lbs/1000 gal.
lbs. PAN
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1.
2.
3.
4.
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Structure Name/Identifier (ID):
Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a.
b.
c.
d.
e.
Projected volume of waste liquid produced during draw down period
f.
g.
h.
i.
j.
k.
Total PAN to be land applied during draw down period
l.
m.
current liquid level according to marker
designed 25 yr./24 hr. storm & structural freeboard
line b - line a (inches in red zone) =
top of dike surface area according to design
(area at below structural freeboard elevation)
line c/12 x line d x 7.48 gallons/ft3
temporary storage period according to structural design
volume of waste produced according to structural design
current herd #
actual waste produced = current herd # x line g =
volume of wash water according to structural design
excess rainfall over evaporation according to design
(lines h + i + j) x 7.48 x
current waste analysis dated
((lines e + k)/1000) x line l =
30
certified herd #
certified herd #
days/line f=
0
0
0
0
0
inches
inches
inches
ft2
gallons
days
ft3
ft3
ft3
ft3
gallons
lbs/1000 gal.
lbs. PAN