HomeMy WebLinkAbout310514_Application_20240318 State of North Carolina
Department of Environmental Quality
Division of Water Resources
Animal Waste Management Systems
Request for Certification of Coverage
Facility Currently covered by an Expiring Sate Non-Discharge General Permit
On September 30, 2024, the North Carolina State Non-Discharge General Permits for Animal Waste Management Systems will
expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State
Non-Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore,all applications
must be received by the Division of Water Resources by no later than April 3,2024.
Please do not leave any question unanswered. Please verify all information and make any necessary corrections below.
Application must be signed and dated by the Permittee.
1. Certificate Of Coverage Number: AWS310514
2. Facility Name: 3501 &3102
3. Permittee's Name(same as on the Waste Management Plan): Murphy-Brown LLC
4. Permittee's Mailing Address: PO Box 856
City: Warsaw State: NC Zip: 28398-0856
Telephone Number: 910-293-3434 Ext. E-mail: kwesterbeek<a%smithfteld.com
5• Facility's Physical Address: Sr 1946
City: Rose Hill State: NC Zip: 28458
6. County where Facility is located: Duplin
7. Farm Manager's Name(if different from Landowner): David C Nordin
8. Farm Manager's telephone number(include area code): 910-293-5330 Ext.
9. Integrator's Name(if there is not an Integrator,write"None"): Murphy-Brown LLC
10. Operator Name(OIC): Derek Brown Phone No.: 910-299-0526 OIC#: 18017
11. Lessee's Name(if there is not a Lessee,write"None"):
12. Indicate animal operation type and number:
Current Permit: Operations Type Allowable Count
Swine-Farrow to Wean 4,719
Operation Types:
Swine Cattle Dry Poultry Other Types
Wean to Finish Dairy Calf Non Laying Chickens Horses-Horses
Wean to Feeder Dairy Heifer Laying Chickens Horses-Other
Farrow to Finish Milk Cow Pullets Sheep-Sheep
Feeder to Finish Dry Cow Turkeys Sheep-Other
Farrow to Wean Beef Stocker Calf Turkey Pullet
Farrow to Feeder Beef Feeder
Boar/Stud Beef Broad Cow Wet Poultry
Gilts Other Non Laying Pullet
Other Layers
13. Waste Treatment Lagoons,Digesters and Waste Storage Ponds(WSP):(Fill/Verify the following information.
Make all necessary corrections and provide missing data.)
Structure Type Estimated Liner Type Estimated Design Freeboard
Structure (Lagoon/Digester/ Date (Clay,Synthetic, Capacity Surface Area "Redline"
Name WSP) Built Unknown) (Cubic Feet) (Square Feet) (Inches)
PRIMARY Lagoon 1/1/1992 Full,clay 2,053,272.00 215,025.00 20.16
SECONDARY Lagoon 1/l/1992 Full,clay 999,760.00 102,950.00 20.04
Submit one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed
application as required by NC General Statutes 143-215.10C(d), either by mailing to the address below or sending it via
email to the email address below.
The CAWMP must include the following components:
1. The most recent Waste Utilization Plan(WUP),signed by the owner and a certified technical specialist,containing:
a. The method by which waste is applied to the disposal fields(e.g.irrigation,injection,etc.)
b. A map of every field used for land application(for example:irrigation map)
c. The soil series present on every land application field
d. The crops grown on every land application field
e. The Realistic Yield Expectation(RYE)for every crop shown in the WUP
f. The maximum PAN to be applied to every land application field
g. The waste application windows for every crop utilized in the WUP
h. The required NRCS Standard specifications
2. A site map/schematic
3.Emergency Action Plan
4.Insect Control Checklist with chosen best management practices noted
5. Odor Control Checklist with chosen best management practices noted
6.Mortality Control Checklist with selected method noted-Use the enclosed updated Mortality Control Checklist
7.Lagoon/storage pond capacity documentation(design,calculations,etc.) Please be sure the above table is
accurate and complete. Also provide any site evaluations,wetland determinations,or hazard classifications that may be
applicable to your facility.
8. Operation and Maintenance Plan
If your CAWMP includes any components not shown on this list,please include the additional components with your submittal.
(e.g.composting,digesters,solids separators,sludge drying system,waste transfers,etc.)
I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that,
if all required parts of this application are not completed and that if all required supporting information and attachments are not
included,this application package will be returned to me as incomplete.
Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18
U.S.C.Section 1001 provides a punishment by a fine of not more than$10,000 or imprisonment of not more than 5 years,or both
for a similar offense.)
Print the Name of the Permittee/Landowner/Signing Official and Sign below.(If multiple Landowners exist,all landowners
should sign. If Landowner is a corporation,signature should be by a principal executive officer of the corporation):
Name(Print): rn t LL( Title: n uo
Signature: Date:
Name(Print): Title:
Signature: Date:
Name(Print): Title:
Signature: Date:
THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS:
E-mail: animal.operations@deq.nc.gov
NCDEQ-DWR
Animal Feeding Operations Program
1636 Mail Service Center
Raleigh,North Carolina 27699-1636
System Calibration
Information presented in manufacturer's charts are based on average operation
conditions with relatively new equipment. Discharge rates and application rates change
over time as equipment gets older and components wear. In particular, pump wear tends
to reduce operating pressure and flow. With continued use, nozzle wear results in an
increase in the nozzle opening which will increase the discharge rate while decreasing the
wetted diameter.
You should be aware that operating the system differently than assumed in the design will
alter the application rate, diameter of coverage, and subsequently the application
uniformity. For example, operating the system with excessive pressure results in smaller
droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle. Clogging
of nozzles can result in pressure increase. Plugged intakes or crystallization of mainlines
will reduce operating pressure. Operating below design pressure greatly reduces the
coverage diameter and application uniformity.
For the above reason, you should calibrate your equipment on a regular basis to ensure
proper application rates and uniformity. Calibration at least once every three years is
recommended. Calibration involves collecting and measuring flow at several locations in
the application area. Any number of containers can be used to collect flow and
determine the application rate. Rain gauges work best because they already have a
graduated scale from which to read the application amount without having to perform
additional calculations. However, pans, plastic buckets, jars, or anything with a uniform
opening and cross-section can be used provided the liquid collected can be easily
transferred to a scaled container for measuring.
For stationary sprinklers, collection containers should be located randomly throughout the
application area at several distances from sprinklers. For traveling guns, sprinklers
should be located along a transect perpendicular to the direction of pull. Set out
collection containers 25 feet apart along the transect on both sides of the gun cart. You
should compute the average application rate for all nonuniformity of the application. On a
windless day, variation between containers of more than 30 percent is cause for concern.
You should contact your irrigation dealer or technical specialist for assistance.
`Reprinted for Certification Training for Operations of Animal Waste Management Systems Manual
F
f t
OPERATION & MAINTENANCE PLAN
Proper lagoon management should be a year-round priority. It is especially important to manage
levels so that you do not have problems during extended rainy and wet periods.
Maximum storage capacity should be available in the lagoon for periods when the receiving crop is
dormant(such as wintertime for bermudagrass) or when there are extended rainy spells such as a
thunderstorm season in the summertime. This means that at the first sign of plant growth in the
later winter / early spring, irrigation according to a farm waste management plan should be done
whenever the land in dry enough to receive lagoon liquid. This will make storage space available in
the lagoon for future wet periods. In the late summer/early fall the lagoon should be pumped down
to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to
maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization
plan will allow it.
Waiting until the lagoon has reached its maximum storage capacity before starting to irrigated does
not leave room for storing excess water during extended wet periods. Overflow from the lagoon for
any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action.
The routine maintenance of a lagoon involves the following:
• Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass
are the most common vegetative covers. The vegetation should be fertilized each
year, if needed, to maintain a vigorous stand. The amount of fertilized applied
should be based on a soils test, but in the event that it is not practical to obtain a
soils test each year, the lagoon embankment and surrounding areas should be
fertilized with 800 pounds per acre of 10-10-10, or equivalent.
• Brush and trees on the embankment must be controlled. This may be done by
mowing, spraying, grazing, chopping, or a combination of these practices. This
should be done at least once a year and possibly twice in years that weather
conditions are favorable for heavy vegetative growth.
NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the lagoon
water. Such chemicals could harm the bacteria in the lagoon that are treating the waste.
Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon
and at least monthly and after major rainfall and storm events. Items to be checked should include,
as a minimum, the following:
Waste Inlet Pipes, Recycling Pipes,and Overflow Pipes --look for:
1. separation of joints
2. cracks or breaks
3. accumulation of salts or minerals
4. overall condition of pipes
2
f
Lagoon surface -- look for:
1. undesirable vegetative growth
2. floating or lodged debris
Embankment -- look for:
1. settlement, cracking, or "jug" holes
2. side slope stability-- slumps or bulges
3. wet or damp areas on the back slope
4. erosion due to lack or vegetation or as a result of wave action
5. rodent damage
Larger lagoons may be subject to liner damage due to wave action caused by strong
winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam.
A good stand of vegetation will reduce the potential damage caused by wave action. If
wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be
used to reduce the wave impacts.
Any of these features could lead to erosion and weakening of the dam. If your lagoon
has any of these features, you should call an appropriate expert familiar with design and
construction of waste lagoons. You may need to provide a temporary fix if there is a
threat of a waste discharge. However, a permanent solution should be reviewed by the
technical expert. Any digging into a lagoon darn with heavy equipment is a serious
undertaking with potentially serious consequences and should not be conducted unless
recommended by an appropriate technical expert.
Transfer Pumps --check for proper operation of:
1. recycling pumps
2. irrigation pumps
Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding
noise, or a large amount of vibration, may indicate that the pump is in need of repair or
replacement.
NOTE: Pumping systems should be inspected and operated frequently enough so that
you are not completely "surprised" by equipment failure. You should perform your
pumping system maintenance at a time when your lagoon is at its low level. This will
allow some safety time should major repairs be required. Having a nearly full lagoon is
not the time to think about switching, repairing, or borrowing pumps. Probably, if your
lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an
inventory of spare parts or pumps.
• Surface water diversion features are designed to carry a!/ surface drainage
waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot
runoff) away from your lagoon and other waste treatment or storage
structures. The only water that should be coming from your lagoon is that
which comes from your flushing (washing) system pipes and the rainfall that
hits the lagoon directly. You should inspect your diversion system for the
following:
1. adequate vegetation
2. diversion capacity
3. ridge berm height
3
Identified problems should be corrected promptly. It is advisable to inspect your system
during or immediately following a heavy rain. If technical assistance is needed to
determine proper solutions, consult with appropriate experts.
You should record the level of the lagoon just prior to when rain is predicted, and then
record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will
give you an idea of how much your lagoon level will rise with a certain rainfall amount
(you must also be recording your rainfall for this to work). Knowing this should help in
planning irrigation applications and storage. If your lagoon rises excessively, you may
have an overflow problem from a surface water diversion or there may be seepage into
the lagoon from the surrounding land.
Lagoon Operation
Startup:
1. Immediately after construction establish a complete sod cover on bare soil
surfaces to avoid erosion.
2. Fill new lagoon design treatment volume at least half full of water before waste
loading begins, taking care not to erode lining or bank slopes.
3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the
pipe to discharge near the bottom of the lagoon during initial filling or another
means of slowing the incoming water to avoid erosion of the lining.
4. When possible, begin loading new lagoons in the spring to maximize bacterial
establishment (due to warmer weather).
5. It is recommended that a new lagoon be seeded with sludge from a healthy
working swine lagoon in the amount of 0.25 percent of the full lagoon liquid
volume. This seeding should occur at least two weeks prior to the addition of
wastewater.
6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add
agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume
until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0.
7. A dark color, lack of bubbling, and excessive odor signals inadequate biological
activity. Consultation with a technical specialist is recommended if these
conditions occur for prolonged periods, especially during the warm season.
Loading:
The more frequently and regularly that wastewater is added to a lagoon, the better the
lagoon will function. Flush systems that wash waste into the lagoon several times daily
are optimum for treatment. Pit recharge systems, in which one or more buildings are
drained and recharged each day, also work well.
4
• Practice water conservation --- minimize building water usage and spillage from
leaking waterers, broken pipes and washdown through proper maintenance and water
conservation.
• Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the
amount of solids entering the lagoon.
Management:
• Maintain lagoon liquid level between the permanent storage level and the full
temporary storage level.
• Place visible markers or stakes on the lagoon bank to show the minimum liquid level
and the maximum liquid level. (Figure 2-1).
• Start irrigating at the earliest possible date in the spring based on nutrient
requirements and soil moisture so that temporary storage will be maximized for the
summer thunderstorm season. Similarly, irrigate in the late summer / early fall to
provide maximum lagoon storage for the winter.
• The lagoon liquid level should never be closer than 1 foot to the lowest point of the
dam or embankment.
• Don not pump the lagoon liquid level lower than the permanent storage level unless
you are removing sludge.
• Locate float pump intakes approximately 18 inches underneath the liquid surface and
as far away from the drainpipe inlets as possible.
• Prevent additions of bedding materials, long-stemmed forage or vegetation, molded
feed, plastic syringes, or other foreign materials into the lagoon.
• Frequently remove solids from catch basins at end of confinement houses or
wherever they are installed.
• Maintain strict vegetation, rodent, and varmint control near lagoon edges.
• Do not allow trees or large bushes to grow on lagoon dam or embankment.
• Remove sludge from the lagoon either when the sludge storage capacity is full or
before it fills 50 percent of the permanent storage volume.
• If animal production is to be terminated, the owner is responsible for obtaining and
implementing a closure plan to eliminate the possibility of a pollutant discharge.
Sludge Removal:
Rate of lagoon sludge buildup can be reduced by:
5
c
• proper lagoon sizing,
• mechanical solids separation of flushed waste,
• gravity settling of flushed waste solids in an appropriately designed basin, or
• minimizing feed wastage and spillage.
Lagoon sludge that is removed annually rather than stored long term will:
• have more nutrients,
• have more odor, and
• require more land to properly use the nutrients.
Removal techniques:
• Hire a custom applicator.
• Mix the sludge and lagoon liquid with a chopper-agitator impeller pump through large-
bore sprinkler irrigation system onto nearby cropland; and soil incorporate.
• Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix
remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or
forageland; and soil incorporate.
• Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland;
dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon
to receive the sludge so that liquids can drain back into lagoon; allow sludge to
dewater; haul and spread with manure spreader onto cropland or forageland; and soil
incorporate.
Regardless of the method, you must have the sludge material analyzed for waste
constituents just as you would your lagoon water. The sludge will contain different
nutrient and metal values from the liquid. The application of the sludge to fields will be
limited by these nutrients as well as any previous waste applications to that field and crop
requirement. Waste application rates will be discussed in detail in Chapter 3.
When removing sludge, you must also pay attention to the liner to prevent damage.
Close attention by the pumper or drag-line operator will ensure that the lagoon liner
remains intact. If you see soil material or the synthetic liner material being disturbed, you
should stop the activity immediately and not resume until you are sure that the sludge can
be removed without liner injury. If the liner is damaged it must be repaired as soon as
possible.
Sludge removed from the lagoon has a much higher phosphorus and heavy metal content
than liquid. Because of this it should probably be applied to land with low phosphorus and
metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion.
Note that if the sludge is applied to fields with very high soil-test phosphors, it should be
applied only at rates equal to the crop removal of phosphorus. As with other wastes,
always have your lagoon sludge analyzed for its nutrient value.
6
The application of sludge will increase the amount of odor at the waste application site.
Extra precaution should be used to observe the wind direction and other conditions which
could increase the concern of neighbors.
Possible Causes of Lagoon Failure
Lagoon failures result in the unplanned discharge of wastewater from the structure.
Types of failures include leakage through the bottom or sides, overtopping, and breach of
the dam. Assuming proper design and construction, the owner has the responsibility for
ensuring structure safety. Items which may lead to lagoon failures include:
• Modification of the lagoon structure --an example is the placement of a pipe in the dam
without proper design and construction. (Consult an expert in lagoon design before
placing any pipes in dams.)
• Lagoon liquid levels—high levels are a safety risk.
• Failure to inspect and maintain the dam.
• Excess surface water flowing into the lagoon.
• Liner integrity -- protect from inlet pipe scouring, damage during sludge removal, or
rupture from lowering lagoon liquid level below groundwater table.
NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause
gullies to form in the dam. Once this damage starts, it can quickly cause a large
discharge of wastewater and possible dam failure.
7
EMERGENCY ACTION PLAN
PHONE NUMBERS
DIVISION OF WATER QUALITY(DWQ) (910) 796-7215
EMERGENCY MANAGEMENT SERVICES (EMS) (910) 296-2160
SOIL AND WATER CONSERVATION DISTRICT(SWCD) (910) 296-2160
NATURAL RESOURCES CONSERVATION SERVICE (NRCS) (910) 296-2120
COOPERATIVE EXTENSION SERVICE (CES) (910) 296-2143
This plan will be implemented in the event that wastes from your operation are leaking,
overflowing or running off site. You should not wait until wastes reach surface waters or
leave your property to consider that you have a problem. You should make every effort
to ensure that this does not happen. This plan should be posted in an accessible
location for all employees at the facility. The following are some action items you should
take.
1. Stop the release of wastes. Depending on the situation,this may or may not be possible. Suggested
responses to some possible problems are listed below.
A. Lagoon overflow-possible solutions are:
a) Add soil to berm to increase elevation of dam.
b) Pump wastes to fields at an acceptable rate.
c) Stop all flow to the lagoon immediately.
d) Call a pumping contractor.
e) Make sure no surface water is entering lagoon.
B. Runoff from waste application field-actions include:
a) Immediately stop waste application.
b) Create a temporary diversion to contain waste.
c) Incorporate waste to reduce runoff.
d) Evaluate and eliminate the reason(s)that cause the runoff.
e) Evaluate the application rates for the fields where runoff occurred.
C. Leakage from the waste pipes and sprinklers-action include:
a) Stop recycle pump.
b) Stop irrigation pump.
c) Close valves to eliminate further discharge.
d) Repair all leaks prior to restarting.pumps.
D. Leakage from flush systems, houses, solid separators-action include:
a) Stop recycle pump.
b) Stop irrigation pump,
c) Make sure siphon occurs.
d) Stop all flow in the house,flush systems,or solid separators.
E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks-
possible action:
a) Dig a small sump or ditch from the embankment to catch all seepage, put in a submersible
pump, and pump back to lagoon.
b) If holes are caused by burrowing animals,trap or remove animals and fill holes and
compact with a clay type soil.
c) Have a professional evaluate the condition of the side walls and the lagoon bottom as
soon as possible.
1 1'_ 5.2007
2. Assess the extent of the spill and note any obvious damages.
a. Did the waste reach surface waters?
b. Approximately how much was released and for what duration?
c. Any damage notes, such as employee injury,fish kills, or property damage?
d_ Did the spill leave the property?
e. Does the spill have the potential to reach surface waters?
f. Could a future rain event cause the spill to reach surface waters?
g. Are potable water wells in danger (either on or off the property)?
h. How much reached surface waters?
3. Contact appropriate agencies.
a. During normal business hours call your DWQ regional office; Phone #, After hours,
emergency number: (919) 733-3942. Your phone call should include: your name,
facility number, telephone number, the details of the incident from item 2 above, the
exact location of the facility, the location or direction of the movement of the spill, weather
and wind conditions. The corrective measures that have been under taken, and the
seriousness of the situation.
b. If the spill leaves property or enters surface waters, call local EMS phone number.
c. Instruct EMS to contact local Health Department.
d. Contact CE's phone number, local SWCD office phone number and the local MRCS
office for advice/technical assistance phone number.
4. If none of the above works call 911 or the Sheriff's Department and explain your problem to
them and ask the person to contact the proper agencies for you.
5. Contact the contractor of your choice to begin repair or problem to minimize offsite damage.
a. Contractors Name: Murphy Brown. LLC
b. Contractors Address: P.O. Box 856, Warsaw. NC 28398
c . Contractors Phone: 9( 10Z293-3434
6. Contact the technical specialist who certified the lagoon(NRCS, Consulting Engineer, etc.)
a. Name: Kraig Westerbeek
b. Phone: (910)293 -5330
7. Implement procedures as advised by DWQ and technical assistance agencies to rectify
the damage, repair the system, and reassess the waste management plan to keep
problems with release of wastes from happening again.
12 ; 'iu�-
CD
o C o
o t
ITJ
CD
d a
CD
a
CD
�• CD ¢
w o a
rA
F] Fx-1 Fl L
rti
rA
O
K
C� cw a. C7 oo a
CD CD
w
G ,fir* W O V1 CDK O N Y' CD O" `n gt
uo
w ec O ao ao as o °C
CD o a
p CD w n p tro rn a CD �s
CD
uo uoa u a
w c �'
;•
o as
CD n
CD CD qQ
0 CD
CD o $.
•�
0 0 d o o p o sm.
a
w f!q w CD
� w °CD CD rg c+b p O
p. CD
O CD
CCD r `rt CD
UQ o 'C°t
O
CD
to
"d
�s
t�
c� C7 9 CD
CD o.
C CD a R
(D CD w R w
CD
C
110
o
C7
R P
° o CD �, o
o a
°
CD CD
1:1 El 1:1 H Fx I H E
o (�
CD
� o
0*On �: a' iD o. co
CD M CD
w o o o a f o Q "ts
� o Q, CD CD o
CD 0
9.
a. w v, C cD w w ° o v'
• w cD w � � � w � o • o ., fD
Q.CD ap
o
CDvw va CDqQ
A. a C UQ
v,
rn
w
f
m
K
m
n'
m
N 43)
O
7 �,O C ..0. c�1
3 N
O cai s O
rA-
(D F E O C
p V — N C U LU
0
O (6 O T ro
a' d O N N 0 N 0- O
u rn
t_ Diu a) n a
f0 o ro
o E
M �_ r a ,CU (D
00
V IL p U
LL 4a N Y v7 09 ¢ a) co
co
m ui ca (6
d t L fa 3: E S
c t a-
L {
C Q D > _ > o
a +-
3 ; U t � r
a (a E41
O - 'a C s c V 3
Q 4, m
j Q 0 N Q 0
L
A OA >
aJ L U C O
O vC
=
= m y- a > a °j a Q
o
to LA m c p O c
m c d. on a +- c o a +a+s +' >
7.. 4 i i ,� m U CD IV f�
m U {7 ++ H +� m us a
a7 IV m �n O m Q L! D
E fn E N 3 -a c in D 'a
O U N o' O
a o '> i u � C a v ccj w
� 3 .Y •3
a o � c `° a L m `° -
u Q F- m w 3 a 4S w 2aj
on
a) m 4 a
u c a r
m 'O
a7 m io �
t 2-
-a t 0 C Q- C m i-
V V 3 a w >ai m m mto rai
S E > m _ `J -p `7 a Qf
V l!1 a) W 2t L :a O- t = +�, .+- +' to
N O w i O w
-a � Q m -0 E m -a .oco 6. c
U E o (° Ln a m is a a a :+ a 'n c -o
m s a a a E a c a c n c a �► � �° o a
O 3 aJ
L ++ N D0 In m m U Q L V} (��} Q c L Q
a c -� a c ar c uan v ° 'A o c t, o f
a a s v, D N a +, m Q rn Ec41 Oi y
++ of = v +. +. Q — 4 m a w chi as vi � ` a a
CrJ a�Ei '� o y a c o c U c a D a = _ m c ++
E " a a a a E m m o Z p u m v M ,c Q
ap
$ c � Sm 3m o
cr o o
v a -0 El ® ® El ® ['� ❑
a u m D >, H
w L m z c
y uU y a �; o f w o
3 a a Q u - 2 c to
O c s - a a m o m Q c
tL C 3 ++ o C. C �_
(n p - ua a m L Q D
O_ c 41 o +, u
ti z u m = W a W a CQj
p
L Y O
QH o
C uE a
ou z u � (n o uo 4A z ♦ • • • • ♦ LL . • • • N
rn
0
o �
o Lr)
o �
o H
o d I
—1 U
u W
m
L. O
U a
a
o a
z �-
vi
41
E
L
a
CL
__
c +�
N o a
E
m ca
n 75
4!
T E L
d0 V O N V) E
U a)
_ ru n
A
i •E •c N
Q
to
o o ° v °`�'
L -0 U u -0
a) a) O m 3 u io io v
n n a) L = E E
E CL
N LD o Qm r Oo � M otot t o
NN O o L
�n
°
a
L L �
O O f0
v- 76 3 O
Y O O u io bA +,
u rw -0 `° O
GJ >- c o a) c o c
s m o 4 — n3 v ° v L L a)
V a +� O ° n O O L
p o + o o a te
a) ) a a)
L aj
O Q aJ O a) m L � Q n -O 4O E c0
L C � +' p er-+ G L n O t 3 a1 O L _� �_ O@ a)
VI 4- O O U (n
O_0 un 3 ° ° u �- _ a1 Ln �° to o t \ ca
Y N M Y 9 W a) O 41 tB L a)
Q 41 N L ate+ � > t (a � 2. 4- m i w -a d
° 3u° m °o o 4 � aJ -0mp Qa - - u
Ln
L
ai
c Z CL
h c V ru O In7 t ++
—
tdA m c c c c — a
fa — � W — — — O V)z — — — cn �c — oC O
a ❑ ❑O ® ❑ ❑ ❑ ❑ ® ❑ ❑ Z El ❑ ® ® ® ❑ ❑ ❑ ❑
W a. L
�
(A �, p o
2r a) p v-
I c I Lai
L Ca L +
L 3 Q Y (D .Y Ui ° m Q u O t7 U
O c N O c _
LL an m = 'n E Q o c m a)
C u = -0 m on E =N _ v
.3 p O a Q ¢ O O c
N m ♦ ♦ ♦ ♦ ♦ m
a,
0
O N
O N
O
O �n
O aJ I
_q
LLJ
a 0
v a
L �
�4
a o
O
m
E
.Q C
D O
o
N� > >-Fu >?i O > > >
4-) "a DD O O O 110
O_ Q Q
Q G m m m O L
L 3 7 7 m Vn
U 40 V Q Q Q >, 7
+' m
h 3 O Q > T T X
L L L E
✓ L m Q Q Q
V B •41
>
O > o O
E
U
V aJ u cr � O 7
aJ tD
7 C O
T a T T T rn
w oC 222 U
F:� • • • • • • • • °0
r�
+, CL
o
t L W L i U
> v aJ
V C O N OA 0 co
7 V) N `- a) X a) aJ N U
V a) 4- GJ aJ O aT O (n
76
VI
— a1 O O i 00 ai J a) � O aJ
L O � E a Q ,w E o -2 E +� +`
U 7 U tw L p Ln N >• L CL U 7 U .0
(� d }E "a O dD O "6 '6 O p
L C ro
T 4 C a1 L a O +, p N
O L C +., 41 L i O ro Ln U m +� t -6 to
M N a) 3 O 3 aJ i al ? = N " \ a1 Q) -0 a) ra CUD � a)
O O O O a N Q > w lL0 > > '6 V Q two 4' — O
a, L _ X I O L ,� o + L E
°(Va Ln � CL
E W U 40 a
O m a-, Q m 4- 0 4— a) > Q Q1 a1 co 4- +, a) m
G O Ln O O 'n d `n O m aOj vOi vUi Ln O (A Ln t �
m U w s u H 0 Y a- cc L O *' `� O
= o ❑ ® ❑x ❑ ❑ El El El ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑
e�
Ln LLI
tto
C FQ- J
QJ J
W W W
�
LL N
I O w
O Q to Q U' U
LL tL (Af aa0 � 00 a) E a0 `n O
\ \ \ O \ p Q
IA W CA Ln mW N O E W LO
'3 u 0 o >p 0 oa a o= 0o
rn
0
N
O
O
O
O y
o v I
-d V
it W
o
a 0
V CL
CL
o a
z 0.
CA
4.0
L C
O
a
L
a� E
= v
� U
Oto
a)
a co O O O
OJ a) in 00 C v`ni
Ltw 4- w p4
IA 0 N Q Q
s C E
EL 4,
two o c Q 3 ai
L L a) V \
() N
E O z Y to
� LLA
Vl > 0 �O O O
aJ c s
C i O O
a L
E
V N 0 p O L t0
a
w L 0 a o v ct
c
c �
O 0 b°10 0 i s N
o +, w N +�
4a toin 4 > a 3 N
._ N O c
E o E � o Lac Q
o 2 +, Mcr
a� o c o n3
c �+ E 4, a�
a) w o a� M v o 0 0` a
V L N U 4- O
{. U E N M
.V L V V C C
O a1
O 0 4 ,AQ IV Q ai E c c s v O L V1 ro u E +�
(„) CJ " � ica E 0 co o " O C O _0 0
'c t c � Vo Vto
Y
AC
t CL M `^ E w
� o� c f6
a Ln o ° ° � a
M ' oo E u
_ No Qj o� p � _ C00 u O ) M u '_ uO v
o oA v � Lii W o -0 ca) a
a0 4-
Q ° c +, a� a, o. U c a, w mM Eo
u' a, to > c v O M w > w +• o oa O= a) > 00- OCO
E C i do aJ a)
M W ® ❑ ❑ ❑ ❑ ❑ ® ® ❑ ❑ ❑ ❑ ❑ ® ® ❑ ® ❑ ❑
Q
cc
ate+ O
Ln
LU Z
W O
w N w
L a a
M 0 O
� `� a) CL
Q) Z +� Q -o Q
tn O ro
o c
� u (D > Z O c
�n g N
rn
0
N
O
CD
N
O
CD r-
ui
O
a or
u n.
a
0 cu Q
z C-
4-0 a�
4A
L
a �
a�
L
O L
L � X a)
� O C
ro O p
O
> ° -u C 4) C r
L
0 O 4- N C p
u Q C p >
O cn
N +J L C y C
a t Q U C > 7 U
WN Ln y L L
41
+� Q
u >
Gp -�
al
> fu L
E Q) L L >
L a1 rn
pCU
Q Q O O N 'O to
U
E 0 -03 3 ° '3 d o
.� o o � m t m uM
3 Q Q 3 oc 3 a)
a
v a) a)
O N E
y O Np 0 0 C C y a)
V1 > L r C y O O
r6 rD
V1 41 "O C Q C +J � a-+ L C � m V O
Y C
a) a) f0
V p rD >' .C:
+J L 4-1
u O 00 0 u In f6
s =a L O v
E E y ruv O C c a)
° 3 N a) Q u in O O C
41
N •� OO O +[61
+ •V7 >
L CC LL a ° a -2
+ L0 3 - D- Q a)Q L >' "0 O N0 00 OL
4-0 ru
U +J a) C O a) al tv 4) ;, O O -O 0 a)
al A 4) 3 a) N Y = "' "' +' 6
L •C r�0 a) Q > Q 7 7 IA 0 Q .0 "O N �O V Q = O O O N
0 p r>6 O_ O fl vi vi O Q f6 t co C O a t 'F_ O +J to
•j +J
� C NC V ta)
a ma C +CJ cQo t*J ac)
0 a aJ to Q
re°v
�a+aQ
O G A Ln ° W E -a C o Q 'Q
C N Nsr v f0
+ Q) yCL v � u ` uC: o C: o a CO-aa - a
CL ai t ai QO a +-+ ro O NC
b co Q. a) Q a O OO L ° v uL3 v O
Q in U L.L. 41 D D O Q )
D 0 D O
(Q W
z ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ x❑ ® ® ❑ ❑ ❑ ❑
z
z
0
N
z J
O N N
L Q 0 y
U CL H ao U
I.�L u► CL 0 ZCL
O
Q� W Q LLI O Q
.3 u Q O 3
IA J Vf rn
/
rl
Ln
�
� b i
# d
CL 2 >
) 0
/ 0 7
g $ e a
e #
� 2 > > > > \ >
§ # $ 2 $ / / / / \ / / q
2 0 / % M § M 2
LL
o § G G § G 2 2 2 2 \ 2
LU = c a c = c c R g 2 g o /
° 7 e ) ) ) ) °
\ f 2 2 2 2 2 C _ _ C / $
2 Ln R Q R R R R R R R R R o Q
bD
%
} }
E
o § 7 /
OD ƒ \ f
Ln / R 0
k § 3 bD / \
< t E J £ $ 2
CL> k E / /
- o 5 E -
§ / / f ƒ 2
£ E e o -0 §
0
Ln / t C ® 0
a k / / § / ±
\ o E E / / \ \
> M / \ -0
P k � § § k °
0- / k 2 c 2 { f
I \ ® E : 0 4� E ®
k ( ( � k 2 ODM �
5 5 e o =
/ -E / F [ E / \ % k /
< R R / � f L a t
/ 2 / / .E / 0Ln
CL
§ to c = t ® ƒ
m 0 0 0 = W -0 e & I
. m =
E $ / % ) 0 7 G 3 s " M \
§ R < / / \ / $ ƒ f o
® ,§ � 2 8 2 0 e
« o c 6- � 6 .s @ o « O
& k \ o c c / ƒ $ \ / J J :
0 / bD 2 2 2 2 2 /
z i \ / \ } f 2 7 2 -0 § §
E u m & 00 - % § § § § » u
z % < @ @ @ ® ® y n % E y
2 & o 5
m ob@ t t@ Ln Ln m ® »
§ / q \ % 2 2 = = = = 2 2 )
p I < < < < < 2 2 2 2 m -
I c
c I m _ _ = u u Q u s 0
Q < < W w u w w z 2 2 2 2 0 \
Version--November26,2018
Mortality Management Methods
Indicate which method(s) will be implemented.
When selecting multiple methods indicate a primary versus secondary option.
Methods other than those listed must be approved by the State Veterinarian.
Primary Secondary Routine Mortality
Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal
death. The burial must be at least 300 feet from any flowing stream or public body of water
(G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal
high water table.Attach burial location map and plan.
Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC
13B .0200.
Rendering at a rendering plant licensed under G.S. 106-168.7.
Complete incineration according to 02 NCAC 52C .0102.
a A composting system approved and permitted by the NC Department of Agriculture&Con-
sumer Services Veterinary Division (attach copy of permit). If compost is distributed off-farm,
additional requirements must be met and a permit is required from NC DEQ.
a In the case of dead poultry only, placing in a disposal pit of a size and design approved by the
NC Department of Agriculture&Consumer Services(G.S. 106-549.70).
D Any method which, in the professional opinion of the State Veterinarian,would make possible
the salvage of part of a dead animal's value without endangering human or animal health.
(Written approval by the State Veterinarian must be attached).
Mass Mortality Plan
Mass mortality plans are required for farms covered by an NPDES permit. These plans are
also recommended for all animal operations. This plan outlines farm-specific mortality man-
agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup-
ports a variety of emergency mortality disposal options; contact the Division for guidance.
• A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated
when numbers of dead animals exceed normal mortality rates as specified by the State
Veterinarian.
• Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary
Division regulations and guidance.
• Mass burial sites are subject to additional permit conditions(refer to facility's animal
waste management system permit).
• In the event of imminent threat of a disease emergency, the State Veterinarian may enact
additional temporary procedures or measures for disposal according to G.S. 106-399.4.
All, = -tea
ignature of arm Owner/Manager Date
Signature of Technical Specr�i_t Date
J
r i O
.' • cc
• Q
l LL
co
O
O
CD
C
co
CD
L
d
X
tt�l
O CL
N X
N
LO W
cY _o.
m
r; cr9_ •.
o
L
cY)
� I
Q
L
fV
O
O
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
Animal Feeding Operations Permit Application Form
(THIS FORM MAYBE PHOTOCOPIED FOR USE AS AN ORIGINAL)
State General Permit - Existing Animal Waste Operations
1, GENERAL INFORMATION:
1.1 Facility name: Farm 3501 and Farm 3102
1.2 Print Land Owner's name: Murphy Brown,LLC
1.3 Mailing address: PO Box 856
City,State: Warsaw,NC Zip: 28398
Telephone number(include area code): (910)293 - 3434
1.4 Physical address: SR 1946, 546„Williams Rd.
City, State: Rose Hill,NC Zip: 28458
Telephone number(include area code): ( ) -
1.5 County where facility is located:Duplin
L6 Facility location(directions from nearest major highway,using SR numbers for state roads):From From 903 turn right onto
SR 1946,Farm entrance on the left.
1.7 Farm Manager's name(if different from Land Owner):
1.8 Lessee's/Integrator's name(if applicable; circle which type is listed):Muter h By rown
1.9 Facility's original start-up date: 1991 Date(s)of facility expansion(s)(if applicable):
2. OPERATION INFORMATION:
2.1 Facility number: 31-514
2.2 Operation Description:
Please enter the Design Capacity of the system. The "No.of Animals" should be the maximum number for which the waste
management structures were designed.
Type of Swine No.of Animals Type of Poultry No. of Animals Type of Cattle No.of Animals
❑ Wean to Feeder ❑Layer ❑Beef Brood Cow
❑ Feeder to Finish ❑Non-Layer ❑Beef Feeder
L,'anow to Wean(#sow) 4719 ❑Turkey ❑ Beef Stocker Calf
❑Farrow to Feeder(#sow) ❑Turkey Poults ❑ Dairy Calf
❑Farrow to Finish(#sow) ❑Dairy Heifer
❑Wean to Finish(#sow) ❑Dry Cow
❑Gilts ❑Milk Cow
❑Boar/Stud
❑Other Type of Livestock on the farm: No. of Animals:
FORM: AWO-STATE-G-E 1/10/06 Page 1 of 5
2.3 Acreage cleared and available for application(excluding all required buffers and areas not covered by the application
system):115gL9Required Acreage(as listed in the CAWMP: 115glr
2.4 Number of lagoons:2 Total Capacity(cubic feet): 2053272 Required Capacity(cubic feet): 1850785
Number of Storage Ponds: Total Capacity(cubic feet): Required Capacity(cubic feet):
2.5 Are subsurface drains present within 100'of any of the application fields? YES or ®O (circle one)
2.6 Are subsurface drains present in the vicinity or under the waste management system? YES or ®O (circle one)
2.7 Does this facility meet all applicable siting requirements? 0 or NO (circle one)
3. REQUIRED ITEMS CHECKLIST:
Please indicate that you have included the following required items by signing your initials in the space provided next to each
item.
Applicants Initials
3.1 One completed and signed original and two copies of the application for State General Permit-
Animal Waste Operations;
IJQ--
3.2 Three copies of a general location map indicating the location of the animal waste facilities and
field locations where animal waste is land applied and a county road map with the location of the
facility indicated; J1_
3.3 Three copies of the entire Certified Animal Waste Management Plan(CAWMP). If the facility
does not have a CAWMP, it must be completed prior to submittal of a permit application for
animal waste operations.
The CAWMP must include the following components. Some of these components may not have been required at the time
the facility was certified but should be added to the CAWMP for permitting purposes:
3.3.1 The Waste Utilization Plan(WUP)must include the amount of Plant Available Nitrogen(PAN)produced and
utilized by the facility
3.3.2 The method by which waste is applied to the disposal fields(e.g. irrigation, injection,etc.)
3.3.3 A map of every field used for land application
3.3.4 The soil series present on every land application field
3.3.5 The crops grown on every land application field
3.3.6 The Realistic Yield Expectation(RYE)for every crop shown in the WUP
3.3.7 The PAN applied to every land application field
3.3.8 The waste application windows for every crop utilized in the WUP
3.3.9 The required NRCS Standard specifications
3.3.10 A site schematic
3.3.11 Emergency Action Plan
3.3.12 Insect Control Checklist with chosen best management practices noted
3.3.13 Odor Control Checklist with chosen best management practices noted
3.3.14 Mortality Control Checklist with the selected method noted
3.3.15 Lagoon/storage pond capacity documentation(design,calculations, etc.);please be sure to include any site
evaluations,wetland determinations,or hazard classifications that may be applicable to your facility
3.3.16 Operation and Maintenance Plan
If your CAWMP includes any components not shown on this list,please include the additional components with your
submittal. (Composting,waste transfers, etc.)
FORM: AWO-STATE-G-E 1/10/06 Page 2 of 5
4. APPLICANT'S CERTIFICATION:
1, c\ (Land Owner's name listed in question 1.2),attest that
this application for A--C>I-Y M A- (Facility name listed in question 1.1)
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this
application are not completed and that if al required supporting information and attachments are not included,this application package
will be returned to me as inco
Signature Date
5. MANAGER'S CERTIFICATION: (complete only if different from the Land Owner)
I, (Manager's name listed in question 1.6),attest that this
application for (Facility name listed in question 1.1)
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this
application are not completed and that if all required supporting information and attachments are not included,this application package
will be returned as incomplete.
Signature Date
THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS,
SHOULD BE SENT TO THE FOLLOWING ADDRESS:
NORTH CAROLINA DIVISION OF WATER QUALITY
AQUIFER PROTECTION SECTION
ANIMAL FEEDING OPERATIONS UNIT
1636 MAIL SERVICE CENTER
RALEIGH,NORTH CAROLINA 27699-1636
TELEPHONE NUMBER: (919) 733-3221
FAX NUMBER: (919) 715-6048
FORM: AWO-STATE-G-E 1/10/06 Page 3 of 5
6. SURFACE WATER CLASSIFICATION:
This form must be completed by the appropriate DWQ regional office and included as a part of the
project submittal information.
INSTRUCTIONS TO NC PROFESSIONALS:
The classification of the downslope surface waters(the surface waters that any overflow from the facility would flow toward) in
which this animal waste management system will be operated must be determined by the appropriate DWQ regional office.
Therefore,you are required,prior to submittal of the application package,to submit this form,with items 1 through 6
completed,to the appropriate Division of Water Quality Regional Aquifer Protection Supervisor(see page 6 of 10). At a
minimum,you must include an 8.5" by I I" copy of the portion of a 7.5 minute USGS Topographic Map which shows the
location of this animal waste application system and the downslope surface waters in which they will be located. Identify the
closest downslope surface waters on the attached map copy. Once the regional office has completed the classification,
reincorporate this completed page and the topographic map into the complete application form and submit the
application package.
6.1 Farm Name:
6.2 Name&complete address of engineering firm:
Telephone number:( ) -
6.3 Name of closest downslope surface waters:
6.4 County(ies)where the animal waste management system and surface waters are located
6.5 Map name and date:
6.6 NC Professional's Sea](If appropriate),Signature,and Date:
TO: REGIONAL AQUIFER PROTECTION SUPERVISOR
Please provide me with the classification of the watershed where this animal waste management facility will be or has been
constructed or field located,as identified on the attached map segment(s):
Name of surface waters:
Classification(as established by the Environmental Management Commission):
Proposed classification, if applicable:
Signature of regional office personnel: Date:
(All attachments must be signed)
FORM: AWO-STATE-G-E 1/10/06 Page 4 of 5
DIVISION OF WATER QUALITY REGIONAL OFFICES (9/05)
Asheville Regional APS Supervisor Washington Regional APS Supervisor Raleigh Regional APS Supervisor
2090 U.S. Highway 70 943 Washington Square Mall 1628 Mail Service Center
Swannanoa,NC 28778 Washington,NC 27889 Raleigh,NC 27699-1628
(828)296-4500 (252)946-6481 (919)791-4200
Fax(828)299-7043 Fax(252)975-3716 Fax(919)571-4718
Avery Macon Beaufort Jones Chatham Nash
Buncombe Madison Bertie Lenoir Durham Northampton
Burke McDowell Camden Martin Edgecombe Orange
Caldwell Mitchell Chowan Pamlico Franklin Person
Cherokee Polk Craven Pasquotank Granville Vance
Clay Rutherford Currituck Perquimans Halifax Wake
Graham Swain Dare Pitt Johnston Warren
Haywood Transylvania Gates Tyrell Lee Wilson
Henderson Yancey Greene Washington
Jackson Hertford Wayne
Hyde
Fayetteville Regional APS Supervisor Mooresville Regional APS Supervisor Wilmington Region APS Supervisor
225 Green Street, Suite 714 610 East Center Avenue 127 Cardinal Drive Extension
Fayetteville,NC 28301-5094 Mooresville,NC 28115 Wilmington,NC 28405-3845
(910)486-1541 (704)663-1699 (910)796-7215
Fax(910)486-0707 Fax(704)663-6040 Fax(910)350-2004
Anson Moore Alexander Lincoln Brunswick New Hanover
Bladen Richmond Cabarrus Mecklenburg Carteret Onslow
Cumberland Robeson Catawba Rowan Columbus Pender
Harnett Sampson Cleveland Stanly Duplin
Hoke Scotland Gaston Union
Montgomery ]redell
Winston-Salem Regional APS Supervisor
585 Waughtown Street
Winston-Salem,NC 27107
(336)771-5000
Fax(336)771-4631
Alamance Rockingham
Alleghany Randolph
Ashe Stokes
Caswell Surry
Davidson Watauga
Davie Wilkes
Forsyth Yadkin
Guilford
FORM: AWO-STATE-G-E 1/10/06 Page 5 of 5
Animal Waste Management Plan Certification
(Please type or print all information that does not require a signature)
General Information:
Name of Farm: Farm 3501 and Farm 3102 Facility No: 31-514
Owner(s) Name: Murphy Brown, LLC Phone No: 910-293-5334
Mailing Address: PO Box 856 Warsaw, NC 28398
Farm Location: County Farm is located in: Duplin
Latitude and Longitude: 34 48' 3" / 78 11' 00" Integrator: Murphy Brown
Please attach a copy of a county road map with location identified and described below(Be specific: road
names, directions, milepost, etc.): SR 1126 off 903 east of Delwa
Operation Description:
Type of Swine No. of Animals Type of Poultry No. of Animals Type of Cattle No. of Animals
wean to Feeder 0 Layer Dairy
Feeder to Finish 0 Pullets Beef
Farrow to Wean 4719
Farrow to Feeder
[] Farrow to Finish
0 Wean to Finish
0 Gilts
Boars
Acreage Available for Application: 115.96 Required Acreage: 115.96
Number of Lagoons/Storage Ponds: 2 Total Capacity: 2,053,272 Cubic Feet(ft3)
Are subsurface drains present on the farm: Yes or No (please circle one)
If YES: are subsurface drains present in the area of the LAGOON or SPRAY FIELD (please circle one)
Owner/ Manager Agreement
I (we) verify that all the above information is correct and will be updated upon changing. I (we) understand the operation and
maintenance procedures established in the approved animal waste management plan for the farm named above and will implement
these procedures. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or
construction of new facilities will require a new certification to be submitted to the Division of Environmental Management before the
new animals are stocked. I (we) understand that there must be no discharge of animal waste from the storage or application system
to surface waters of the state either directly through a man-made conveyance or from a storm event less severe than the 25 -year,
24 - hour storm and there must not be run-off from the application of animal waste. I (we) understand that run-off of pollutants from
lounging and heavy use areas must be minimized using technical standards developed by the Natural Resources Conservation
Service. The approved plan will be filed at the farm and at the office of the local Soil and Water Conservation District. I (we) know
that any modification must be approved by a technical specialist and submitted to the Soil and Water Conservation District prior to
implementation. A change in land ownership requires written notification to DEM or a new certification (if the approved plan is
changed)within 60 days of a title transfer.
Name of Land Owner: ur h r wn LLC
Signature:' Date: "1 — 13-Z�1 1p
Name of Manager(/different from owner):
Signature: Date
AWC -- August 1, 1997 1
Technical Specialist Certification
I. As a technical specialist designated by the North Carolina Soil and Water Conservation Commission
pursuant to 15A NCAC 6F .0005. 1 certify that the animal waste management system for this farm named
above has an animal waste management plan that meets or exceeds standards and specifications of the
Division of Environmental Management (DEM) as specified in 15A NCAC 2H.201 and the USDA-Natural
Resources Conservation Service (NRCS) and/or the North Carolina Soil and Water Conservation
Commission pursuant to 15A NCAC 2H.0217 and 15A NCAC 6F .0001.0005. The following elements are
included in the plan as applicable. While each category designates a technical specialist who may sign each
certification (SD, SI, WUP, RC, 1), the technical specialist should only certify parts for which they are
technically competent.
11. Certification of Design
A) Collection. Storage, Treatment System
Check thee opriate box
EFe Existing-facility Existing-facility without retrofit (SD or WUP)
Storage volume is adequate for operation capacity: storage capability consistent with waste
utilization requirements.
New, expanded or retrofitted facili (SD)
Animal waste storage and treatment structures, such as but not limited to collection systems,
lagoons and ponds, have been designed to meet or exceed the minimum standards and
specifications.
Name of Technical Specialist (Please Print): Toni W. King
Affiliation Murphy-Brown, LLC Date Work Completed:
Address (Age cy): P.O. Box 856, Warsaw, NC 2839E Phone No.:(910)293-3434
Signature: - S y2L Date: :2- >l3-'Zp ` cT
B) Land Application Site(WUP)
The plan provides for minimum separations (buffers); adequate amount of land for waste utilization;
chosen crop is suitable for waste management hydraulic and nutrient loading rates.
Name of Technical Specialist (Please Print): Toni King
Affiliation Murphy-Brown, LLC Date Work Completed:
Address (Ag ncy): P.O. Box 85 , Warsaw, NC 2839E Phone No.: 910 293-3434
Signature: Date: - 3 -Zp I.L, -
C) Runoff Controls from Exterior Lots
Check the appropriate box
Facility without exterior lots (SD or WUP or RC)
This facility does not contain any exterior lots.
Facility with exterior lots (RC)
Methods to minimize the run off of pollutants from lounging and heavy use areas have been
designed in accordance with technical standards developed by NRCS.
Name of Technical Specialist (Please Print): Toni W. King
Affiliation Murphy-Brown, LLC Date Work Completed:
Address (Agen y): P.O. Box 856, Warsaw, NC 2839E Phone No.:(910) 293-3434 _
Signature: Date: 13--2o1La
AWC --August 1, 1997 2
D). Application and Handlinq Equipment
Check th ppropnafe box
Existing or expanding facility with existing waste application equipment(WUP or 1)
Animal waste application equipment specified in the plan has been either field calibrated or
evaluated in accordance with existing design charts and tables and is able to apply waste as
necessary to accommodate the waste management plan: (existing application equipment can cover
the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading
rates. A schedule for timing of applications has been established; required buffers can be
maintained and calibration and adjustment guidance are contained as part of the plan).
❑ New, expanded or existing facility without existing waste application equipment forspray irrigation.
(1)
Animal waste application equipment specified in the plan has been designed to apply waste as
necessary to accommodate the waste management plan: (proposed application equipment can
cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient
loading rates; a schedule for timing of applications has been established: required buffers can be
maintained: calibration and adjustment guidance are contained as part of the plan).
0 New, expanded or existing facility without existing waste apDlication equipment for land s readin
not using spray irrigation. (WUP or 1)
Animal waste application equipment specified in the plan has been selected to apply waste as
necessary to accommodate the waste management plan: (proposed application equipment can
cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient
loading rates: a schedule for timing of applications has been established; required buffers can be
maintained: calibration and adjustment guidance are contained as a part of the plan).
Name of Technical Specialist (Please Print): Toni W. King
Affiliation Murphy-Brown, LLC Date Work Completed:
Address (Age cy): , P.O. Box 856, Warsaw, INC 2839E Phone No..(910) 293-3434
Signature: Date: -13 '2 Ot l.o
E) Odor Con rol, Insect Control, Mortality M agement and Emergency Action Plan (SD.
SI, WUP, RC or 1)
The waste management plan for this facility includes a Waste Management Odor Control Checklist,
an Insect Control Checklist, a Mortality Management Checklist and an Emergency Action Plan.
Sources of both odors and insects have been evaluated with respect to this site and Best
Management Practices to Minimize Odors and Best Management Practices to Control Insects have
been selected and included in the waste management plan. Both the Mortality Management Plan
and the Emergency Action Plan are complete and can be implemented by this facility.
Name of Technical Specialist (Please Print): Toni W. King
Affiliation Murphy-Brown, LLC Date Work Completed:
Address (Age cy): P.O. Box 856 Warsaw, INC 2839E Phone No.:(910) 293-3434
Signature: Date:
F) Written Notice of New or Expanding SvAne Farm
The following signature block is only to be used for new or expanding swine farms that begin
construction after June 21, 1996. If the facility was built before June 21, 1996, when was it
constructed or last expanded
I (we) certify that I (we) have attempted to contact by certified mail all adjoining property owners and
all property owners who own property located across a public road, street or highway from this new
or expanding swine farm. The notice was in compliance with the requirements of NCGS 106-805.
A copy of the notice and a list of property owners notified is attached.
Name of Land Owner:
Signature: Date:
Name of Manager(if different from owner):
Signature: Date
AWC --August 1, 1997 3
11/. Certification of Installation
A) Collection, Storage, Treatment Installation
New, expanded or retrofitted facility (SI)
Animal waste storage and treatment structures, such as but not limited to lagoons and ponds,have
been installed in accordance with the approved plan to meet or exceed the minimum standards and
specifications.
For existing facilities without retrofits, no certification is necessary.
Name of Technical Specialist (Please Print):
Affiliation Date Work Completed:
Address (Agency): Phone No.:
Signature: Date:
B) Land Application Site(WUP)
Che�theappriate box
e cropping system is in lace on all land as specified in the animal waste management Ian.
PP 9 Y P P 9 P
ED Conditional Approval: all required land as specified in the plan is cleared for planting: the
cropping system as specified in the waste utilization plan has not been established and the owner
has committed to establish the vegetation as specified in the plan by (month/day/year);
the proposed cover crop is appropriate for compliance with the waste utilization plan.
Also check this box if appropriate
If the cropping system as specified in the plan can not be established on newly cleared
land within 30 days of this certification,the owner has committed to establish an interim
crop for erosion control:
Name of Technical Specialist (Please Print): Toni W. Kinq
Affiliation Murphy-Brown, LLC Date Work Completed:
Address (Age cy): P.O. Box 856, Warsaw, NC 2839E Phone No.:(910)293-3434
Signature: Date: Z.4i L4
This following signature block is only to be used when the box for conditional approval in III. B
I (we) certify that I (we) have committed to establish the cropping system as specified in my (our) waste
utilization plan, and if appropriate to establish the interim crop for erosion control, and will submit to DEM a
verification of completion from a Technical Specialist within 15 calendar days following the date specified in the
conditional certification. I (we) realize that failure to submit this verification is a violation of the waste
management plan and will subject me(us)to an enforcement action from DEM.
Name of Land Owner:
Signature: Date:
Name of Manager(if different from owner):
Signature: Date
AWC --August 1, 1997 4
C) Runoff Controls from Exterior Lots (RC)
Facility with exterior lots
Methods to minimize the run off of pollutants from lounging and heavy use area have been installed
as specified in the plan.
For facilities without exterior lots, no certification is necessary.
Name of Technical Specialist (Please Print):
Affiliation Date Work Completed:
Address (Agency): Phone No.-.-
Signature: Date:
D) Application and Handling Equipment Installation (WUP or 1)
Check the appropriate ck
Animal waste application and handling equipment specified in the plan is on site and
ready for use; calibration and adjustment materials have been provided to the owners
and are contained as part of the plan.
E:1 Animal waste application and handling equipment specified in the plan has not been
installed but the owner has produced leasing or third party application and has provided
a signed contract: equipment specified in the contract agrees with the requirements of
the plan: required buffers can be maintained: calibration and adjustment guidance
have been provided to the owners and are continued as part of the plan.
0 Conditional approval: Animal waste application and handling equipment specified in
the plan has been purchased and will be on site and installed by
(month/day/year); there is adequate storage to hold the waste until the equipment is
installed and until the waste can be land applied in accordance with the cropping
system contained in the plan; and calibration and adjustment guidance have been
provided to the owners and are contained as part of the plan.
Name of Technical Specialist (Please Print): Toni W. King
Affiliation Murphy-Brown, LLC Date Work Completed:
Address (Age y): P.O. Box 856, YVarsaw, NC 2839E Phone No.:(910)293-3434
Signature: SL Date:
The following signature block is only us when the box for conditional approval in III D above
has been checked.
I (we) certify that I (we) have committed to purchase the animal waste application and handling equipment as
specified in my (our) waste management plan and will submit to DEM a verification of delivery and installation
from a Technical Specialist within 15 days following the date specified in the conditional certification. I (we)
realize that failure to submit this verification is a violation of the waste management plan and will subject me(us)
to an enforcement action from DEM.
Name of Land Owner.
Signature: Date:
Name of Manager(if different from owner):
Signature: Date
E) Odor Control, Insect Control and Mortality Management(SD SI WUP, RC or 1)
Methods to control odors and insects as specified in the Plan have been installed and are operational. The
mortality management system in the Plan has also been installed and is operational.
Name of Technical Specialist (Please Print): Toni W. King
Affiliation Murphy-Brown, LLC Date Work Completed:
Address (Agency): P.O. Box 856, Warsaw, NC 2839E Phone No.:(910�293-3434
Signature: Date: —7-- V� -'Z(Z)lam.
AWC--August 1, 1997 5
Please return the completed form to the Division of Water Quality at the following Address:
Department of Environment Health and Natural Resources
Division of Water duality
Water Quality Section, Compliance Group
P.O. Box 29535
Raleigh, NC 27626-0535
Please remember to submit a copy of this form along with the complete Animal Waste
Management Plan to the local Soil and Water Conservation District Office and to keep a
copy in your files with your Animal Waste Management Plan.
AWC --August 1, 1997 6
Murphy-Brown, LLC 7/13/2016 2822 Hwy 24 West
P.O. Box 856
Warsaw, NC 28398
NUTRIENT UTILIZATION PLAN
Grower(s): Murphy Brown, LLC
Farm Name: Farm 3501 and Farm 3102 Facility 31-514
County: Duplin
Permit Capacity:
Farrow to Wean 4719
Farrow to Feeder
Farrow to Finish
Wean to Feeder
Wean to Finish
Feeder to Finish
Gilts
Boars
Storage Structure: Anaerobic Lagoon
Storage Period: >180 days
Application Method: Irrigation
The waste from your animal facility must be land applied at a specified rate to prevent pollution
of surface water and/or groundwater. The plant nutrients in the animal waste should be used
to reduce the amount of commercial fertilizer required for the crops in the fields where the waste
is to be applied.
This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed
before each application cycle. Annual soil tests are strongly encouraged so that all plant
nutrients can be balanced for realistic yields of the crop to be grown.
Several factors are important in implementing your waste utilization plan in order to maximize
the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner:
1. Always apply waste based on the needs of the crop to be grown and the nutrient
content of the waste. Do not apply more nitrogen than the crop can utilize.
2. Soil types are important as they have different infiltration rates, leaching potentials,
cation exchange capacities, and available water holding capacities.
3. Normally waste shall be applied to land eroding at less than 5 tons per acre per
year. Waste may be applied to land eroding at 5 or more tons per acre annually, but
less than 10 tons per acre per year providing that adequate filter strips are established.
4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen.
Either of these conditions may result in runoff to surface waters which is not allowed
under DWR regulations.
5. Wind conditions should also be considered to avoid drift and downwind odor
problems.
6. To maximize the value of the nutrients for crop production and to reduce the potential
for pollution, the waste should be applied to a growing crop or applied not more than
30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or
disking will conserve nutrients and reduce odor problems.
1 of 11
E
This plan is based on the waste application method shown above. If you choose to change
methods in the future,you need to revise this plan. Nutrient levels for different application
methods are not the same.
The estimated acres needed to apply the animal waste is based on typical nutrient content
for this type of facility. In some cases you may want to have plant analysis made,which could
allow additional waste to be applied. Provisions shall be made for the area receiving waste to
be flexible so as to accommodate changing waste analysis content and crop type. Lime must
be applied to maintain pH in the optimum range for specific crop production.
This waste utilization plan,if carried out,meets the requirements for compliance with 15A NCAC
2H .0217 adopted by the Environmental Management Commission.
AMOUNT OF WASTE PRODUCED PER YEAR (gallons,ft3,tons,etc.):
Capacity Type Waste Produced per Animal Total
4719 Farrow to Wean 3203 gal/yr 16,114,957 gal/yr
Farrow to Feeder 3861 gal/yr gallyr
Farrow to Finish 10478 gal/yr gallyr
Wean to Feeder 191 gal/yr gal/yr
Wean to Finish 776 gal/yr gal/yr
Feeder to Finish 927 gal/yr gallyr
Gilts 1016 gallyr gallyr
Boars 2959 gal/yr gal/yr
Total 15,114,957 gal/yr
AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (Ibs):
Capacity Type Nitrogen Produced per Animal Total
4719 Farrow to Wean 3.84 Ibs/yr 18,121 Ibs/yr
Farrow to Feeder 6.95 Ibs/yr Ibs/yr
Farrow to Finish 18.86 Ibs/yr Ibs/yr
Wean to Feeder 0.34 Ibs/yr lbs/yr
Wean to Finish 1.4 lbs/yr ibs/yr
Feeder to Finish 1.67 Ibs/yr Ibs/yr
Gilts 1.83 Ibs/yr Ibs/yr
Boars 5.33 Ibs/yr Ibs/yr
Total 18,121 I bstyr
Applying the above amount of waste is a big job. You should plan time and have appropriate
equipment to apply the waste in a timely manner.
LAND UTILIZATION SUMMARY
The following table describes the nutrient balance and land utilization rate for this facility
Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced
on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize
in the normal growing season.
Total Irrigated Acreage: 115.96
Total N Required list Year: 32728.09
Total N Required 2nd Year: 31873.99
Average Annual Nitrogen Requirement of Crops: 32,301.04
Total Nitrogen Produced by Farm: 18,120.96
Nitrogen Balance for Crops: (14,180.08)
The following table describes the specifications of the hydrants and fields that contain the crops
designated for utilization of the nitrogen produced on this facility. This chart describes the size,
soil characteristics,and uptake rate for each crop in the specified crop rotation schedule for this
facility,
2of11
z � tOvavM10Wv� � mNmWv� vaW Wm(nN W m
N O V W W M r W O N O M r N 0 .- (D O (D M O O
a N v W W v r m W '- O V W .-
N r V m W O N r(O M r m M m m (D(p I� N
N 0 m W m N V nW 0.4- 0 a mM ((D�D NW N N N
V V a N N"N N N W W .!
p(D m O O O
p mmmm °° °° °� °°rr W W W vmmm
F Vi W W W (D :' 4V V u)N W N O O N N N M(D W W
a N N N N N N N N M M W W W W M M W W W N N N
J N N N N N N N
Z (D m M m N N M (O (D
d d W m r N r N N N N N N h N N m N M
_ N aao (D � mov O
^ N N N O W V
(.Wj r O V V m N N M N m m N N CO r O co
V O N
1O W W N (D N N
't r r Obi
Z N N D N h N N
U W W W W M M M M O O 00 O O O O O O O O W W W
J` N N N N 0 0 0 0 M M M
U�
Q �
Z-0 N N m N N N N
y N
a a,
J �
0
O C
U moo 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
U Z N N N N N N N N W W W N W m W m W W N N N
C y
N a
C.
O V
U y V1 N(n m m m m � m N (D
V} w (D (D(D U] O N U1 � W (D (D
N
0
„- aa ¢ aaQa ¢a ¢ ¢ ¢ Q ¢ ¢ aQ¢ ¢ ¢¢ ¢ a
E aal aaaaaaO.aaaaaaaaaaa
Q (n(n(n(n(n(n00U)0(n(n(n(n(n(n(n(nco(n(n(n10
a
0 a
U p Z Z Z Z Z Z Z Z Y Y Y Y Y Y Y Y Y Y Y Y Z Z Z
�U
N
Z m W N v W W N �- m N m W N
N 9 N N p N V O N O M r N o lWD 0 m ID W N
a N W r W a M (D u�m W (D N M N m M 0 m h
- m, , W W W N N W O M N r M M V M W tp
N m M V N V m M 0(D m (D 00 N W O N N
O O O N a W M O M M to M t (D V O W ? N N W r M
F � V N
N (D N N W N N N N O
Z N N N m N N N N N N W W N N N N N N (p
y Q co W W W N N N N W W W W r r W W W (.4
I7 M M Cp
J V V V V M M M M '0 N W m N N N N NM M M
N N M M M M M M M
N N N N N N N
U
Q �
Z v u v
y N
a m
J of
OC
U m m m m m m m m co W W W W W W W m m m
Z li 6 M 0 (h M M 1) O o N N N N O N N N � 0 0 0
h� avvvvoovvv
a
O` V O O 00 O s 0 O O W N W W W m 't W N W 0 0 0
lD(D W W ul m N W W W N W (O W
} M M M M
N
(D W ¢N N N N
a a o a a o a a a a a n a n> j
w o 0 w 0 m w d m 0 0 m
d - 0m0a m0v0u� ono0(nvO�
co U)(0 In n(n U) N N N
E Q = - _ m m m m m m m m m m m m a a a
CL
n n n a m m
¢ ¢ ¢¢ ¢ ¢¢ LLLLLL
o m
U OOOOOOOOU U U U U U U U U U U
0 mmmmmmmmmmmO000
H U
0 ¢¢ ¢ ¢ mmmm ¢ ¢mmmmmmmmm ¢ ¢ 0
0 0 0 0 0 0 0 0 0 0 0 > > > > o o > > > o 0 0 0
0000zzzz ¢ QQ ¢zz ¢ ¢¢C7C�C�(7
O
m U N OD
U
g r (D m m r r r W m(O tD W O W N N M
() (D W W '- r M N M V N W (n 0 V r (D m f- N N �.
CL — Q
d N N ¢ m¢ m¢m W r W m O O N V N tD r W m
Qco
LL M
C
O
p. (0 v v v v v v a v a v v v o v v
a) U (D W (O W W(D W W W (D (D W W (D W W M M M M M M M
R m m m m m m m m m m m m m m m m v v v v v v
U O O O O O O O O O O O O o o o 0 M M M M M M
Z V V V M m N m m N V V m m m V M m O)
N O V N m M r O N O r r m O)
d '? m m V r m m O a m N m O d' M m N N I?�. m 0) m m M V V M N p M V r m O m am0 N r Co M((DD W
F= r m ry r N m m m m N m r N N r 0 0 0
U N N N N N N N
Q M M M M N(!)(O u)m N N N N N N N m m m
w Z V V 7 V N N N N 0410 .- m
p m m m m m m 00 m r r m m m V m m m
y m m m m V H V V N N N N m m m m M M m m m
J N N N N N N N
Z D N m M m N m M O)
'N d O m m •-- O N m m N N N m m N N
n N m
O M N(rD r W N N M N m m N N M r N N
F 7 M N m N r M (O N
U m m m m m M M M M
J
N N N N O O O O
U�
Q �
Z U N N m N N D N N m N
y y
d
J Q'
c
m
U o 0 0 0 0 0 0 0 0 0 0 0 0 0
'aZ N N N N N N N N N N N N N N N N N N N N if1 (D(D
C y
a
o
(j y (D (0 m
v (D ( m m m m
(p(p N h m m
v j
N
o $a a a a a n n a$$ a n a n a n o.a a a a
QQ Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
E aaaaaaaO.a0.aaaaaaaaa aaa
co
a
o d
U p Z Z Z Z Z Z Z Z Y Y Y Y Y Y Y Y Y Y Y Y J J J
c U
N
m co N a (D m N '- m N m m N 7 V m m q a0 (O
O N O M r N 0 (O O m r M m ti
a N m V r V N M m m m m (O N M �-- m M N r c0 (V
m `� `r N m m m N to m O N r M M M O M
h
'_ N m M V' N V m M O N m (O M O N m O N r r m It
p O m 0 (D V M V O M M m M N V O m V m N r m h
F.. � m— N m V m M .- N N r r N
D m m N m 04 N p
Z m m m m M } (P M N N N N N N m m N N N m m m
U min . N N mmmm w m (r> (n (n
y Q m m m m
w w N N
m m m m N N r r m m m
(O 6 (n m m m 00 m N N V V V
ITI
J — N N M M M M N N M M M
N N N N N N N
U�
y �
J�
OC N N(n Nu'i
7 r r r r r r r
UZ mmmmmmmm(`! (` coco co ! Nmmmmmmm
M M M M M M M M v O O N N N N O O N N N a M co M
a D
a
22 o o 0 0 0 0 0 0 0 0 0
(n m N N N V V N Vl N N
U d m m m
N
m h N N N N N N N N N
0) d ad ad a
n m ` md 0) d d a, d d
E = E 2 ncnn
m -m d
O d
U U U U U U U U U U U
6,0 p O O O O O O O O m m`m m m m m m m m m 0 0 0 0
N U
- d Q Q Q Q m m m m Q Q m m m mmm m m m¢ Q Q Q
o p p p p p p p 0 p p > > > > p p > > > p p p o
C N� (D0(D0zzzz( U` QQQQzz <<<0(D` U` (7
O
U w M m V m m N �D M r m iD m r m N a (O s} M M m h
A ` m m m r O V r m m m r I- r m m N N m O m to N M
m m 0 n
a = Q
(4 p
d N M mM Qv CO N m m r m m O O N M V N m r m m
Q LL
C
O
a v v o v v a v v v v v v
d U m m m m m m m m m m m m m m m m M M M M M M M «
A m m m m m m m m m m m m m m m m m m v m v m v O
U O O O O O O O O O O O O O O O O M M M M
N F- r r r r r r r r r r r r r r r r ti
This plan does not include commercial fertilizer. The farm should produce adequate plant
available nitrogen to satisfy the requirements of the crops listed above.
The applicator is cautioned that P and K may be over applied while meeting the N requirements.
In the future, regulations may require farmers in some pans of North Carolina to have a nutrient
management plan that addresses all nutrients. This plan only addresses nitrogen.
In interplanted fields( i.e. small grain, etc, interseeded in bermuda),forage must be removed
through grazing, hay, and/or silage. Where grazing, plants should be grazed when they
reach a height of six to nine inches. Cattle should be removed when plarits are grazed to a
height of four inches. In !'gelds where small grain, etc, is to be removed for hay or silage, care
should be exercised not to let small grain reach maturity, especially late in the season (i.e.
April or May). Shading may result if small grain gets too high and this will definitely interfere
with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen
being utilized. Rather than cutting small grain for hay or silage just before heading as is
the normal situation,you are encouraged to cut the small grain earlier. You may want to
consider harvesting hay or silage two to three times during the season, depending on the
time small grain is planted in the fall.
i
The ideal time to interplant small grain, etc, is late September or early October. Drilling is
recommended over broadcasting. Bermudagrass should be grazed or cut to a height of
about two inches before drilling for best results.
CROP CODE LEGEND
i
Crop Code Crop Description-Harvested As
A Barley Grain Crop
B Grazed Hybrid Bermudagrass Pasture/Grazed
C Hybrid Bermudagrass Hay Hay
B/C Comb. Hybrid Bermudagrass Graze/Hay Combination
D Corn - Grain Grain Crop
E Corn - Silage Silage
F Cotton Cotton Lint
G Grazed Fescue Pasture/Grazed
H Fescue Hay Hay
I Oats Grain Crop
J Rye Grain Crop
K Grazed Overseed Pasture/Grazed (Seeded in Bermudagrass)
L Overseed Hay Hay(Seeded in Bermudagrass)
M Grain Sorghum Grain Crop
N Wheat Grain Crop
O Soybean Grain Crop
P Pine Trees Pine Trees
S Small Grain Grain Crop/Hay(After Grain Crop)
CC Cover Crop Not Harvested; Burned/Disked In
SWG Swithgrass Biomass Crop
Acres shown in the preceding table are considered to be the usable acres excluding
required buffers,filter strips along ditches, odd areas unable to be irrigated,and perimeter areas
not receiving full application rates due to equipment limitations. Actual total acres in the fields
listed may, and most likely will be, more than the acres shown in the tables.
See attached map showing the fields to be used for the utilization of animal waste.
4of11
SLUDGE APPLICATION:
The following table describes the annual nitrogen accumulation rate per animal
in the lagoon sludge
Farm Specifications PAN/ r/animal Farm Total/ r
4719 Farrow to Wean 0.8 3775.2
Farrow to Feeder 0.96
Farrow to Finish 3.9
Wean to Feeder 0.07
Wean to Finish 0.27
Feeder to Finish 0.34
Gilts 0.39
Boars 0.55
The waste utilization plan must contain provisions for periodic land application of sludge at
agronomic rates. The sludge will be nutrient rich and will require precautionary measures to
prevent over application of nutrients or other elements. Your production facility will produce
approximately 3775.2 pounds of plant available nitrogen per year and will accumulate in the lagoon
sludge based on the rates of accumulation listed above.
If you remove the sludge every 5 years,you will have approximately 18876 pounds of plant
available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the
rate of 300 pounds of nitrogen per acre,you will need 62 acreas of land. If you apply the sludge
to corn at a rate of 125 pounds per acre,you will need 151.008 acres of land. Please note that these
are only estimates of the PAN produced and the land required to utilize that PAN. Actual values
may only be determined by sampling the sludge for plant available nitrogen content prior to application
Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific
application fields designated for sludge application at time of removal.
APPLICATION OF WASTE BY IRRIGATION:
The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation
such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil
structure, soil texture,water droplet size,and organic solids. The application amount should not
exceed the available water holding capacity of the soil at the time of irrigation nor should the
plant available nitrogen applied exceed the nitrogen needs of the crop.
If surface irrigation is the method of land application for this plan, it is the responsibility of the
producer and irrigation designer to ensure that an irrigation system is installed to properly
irrigate the acres shown in the preceding table. Failure to apply the recommended rates and
amounts of nitrogen shown in the tables may make this plan invalid.
`This is the maximum application amount allowed for the soil assuming the amount
of nitrogen allowed for the crop is not over applied. In many situations,the application
amount shown cannot be applied because of the nitrogen limitation. The maximum
application amount shown can be applied under optimum soil conditions.
Your facility is designed for>180 days of temporary storage and the temporary storage must
be removed on the average of once every 6 months. In no instance should the volume of the
waste stored in your structure be within the 25 year 24 hour storm storage or one foot of
freeboard except in the event of the 25 year 24 hour storm.
It is the responsibility of the producer and waste applicator to ensure that the spreader equipment
is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply
the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid.
Call your technical specialist after you receive the waste analysis report for assistance in
determining the amount of waste per acre and the proper application prior to applying the waste.
5of11
Application Rate Guide
The following is provided as a guide for establishing application rates and amounts.
Soil Application Rate Application Amount
Tract Hydrant Type Crop inlhr * inches
70964 1 GoA 0 0.4 1
70964 2 GoA 0 0.4 1
70964 3A GoA 0 0.4 1
70964 3B GoA 0 0.4 1
70964 4A NoB 0 0.5 1
70964 4B NoB 0 0.5 1
70964 5A NoB 0 0.5 1
70964 5B NoB 0 0.5 1
70964 6 GoA BIC 0.4 1
70964 7 GoA BIC 0.4 1
70964 8 AuB BIC 0.6 1
70964 9 AuB BIC 0.6 1
70964 10A AuB BIC 0.6 1
70964 10B AuB BIC 0.6 1
70964 11 NoB BIC 0.5 1
70964 12 NoB BIC 0.5 1
343 13 AuB BIC 0.6 1
343 14 AuB BIC 0.6 1
343 15 AuB BIC 0.6 1
343 16 GoA C 0.4 1
343 17 GoA D 0.4 1
343 18 GoA D 0.4 1
343 19 GoA D 0.4 1
6 of 11
Additional Comments:
This NUP converts 3501 from a 1200 farrow to feeder and 3501 from a 1000
farrow to finish to a 4719 farrow to wean with no other changes.
7of11
NUTRIENT UTILIZATION PLAN CERTIFICATION
Name of Farm: Farm 3501 and Farm 3102 Facility 31-514
Owner: Murphy Brown, LLC
Manager:
Owner/Manager Agreement:
I/we understand and will follow and implement the specifications and the operation and
maintenance procedures established in the approved animal waste nutrient management
plan for the farm named above. I/we know that any expansion to the existing design capacity
of the waste treatment and/or storage system, or construction of new facilities, will require a
new nutrient management plan and a new certification to be submitted to DWR before the new
animals are stocked.
I/we understand that I must own or have access to equipment, primarily irrigation equipment,
to land apply the animal waste described in this nutrient management plan. This equipment
must be available at the appropriate pumping time such that no discharge occurs from the lagoon
in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land
according to this plan at the appropriate times and at rates which produce no runoff.
This plan will be filed on site at the farm office and at the office of the local Soil and Water
Conservation District and will be available for review by NCDWR upon request.
Name of Facility Owner: Murphy Brown, LLC
Signature: LZLI'z
Date
Name of Manager(if different from owner):
Signature:
Date
Name of Technical Specialist: Toni W. King
Affiliation: Murphy-Brown, LLC.
Address: 2822 Hwy 24 West, PO Drawer 856
Warsaw, NC 28398
Telephone: (910) 293-3434
Signature: Lu/L�, 1 3-Za
Date
8 of 11
NUTRIENT UTILIZATION PLAN
REQUIRED SPECIFICATIONS
1 Animal waste shall not reach surface waters of the state by runoff, drift, manmade
conveyances, direct application, or direct discharge during operation or land application.
Any discharge of waste which reaches surface water is prohibited.
2 There must be documentation in the design folder that the producer either owns or has an
agreement for use of adequate land on which to properly apply the waste. If the producer
does not own adequate land to properly dispose of the waste, he/she shall provide
evidence of an agreement with a landowner, who is within a reasonable proximity,
allowing him/her the use of the land for waste application. It is the responsibility of the
owner of the waste production facility to secure an update of the Nutrient Utilization Plan
when there is a change in the operation, increase in the number of animals, method of
application, recieving crop type, or available land.
3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic
crop yields based upon soil type, available moisture, historical data, climatic conditions,
and level of management, unless there are regulations that restrict the rate of applications
for other nutrients.
4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste
may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons
per acre per year provided grass filter strips are installed where runoff leaves the field
(See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips).
5 Odors can be reduced by injecting the waste or disking after waste application. Waste
should not be applied when there is danger of drift from the land application field.
6 When animal waste is to be applied on acres subject to flooding, waste will be soil
incorporated on conventionally tilled cropland. When waste is applied to conservation tilled
crops or grassland, the waste may be broadcast provided the application does not occur
during a season prone to flooding (See 'Weather and Climate in North Carolina" for
guidance).
7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff
does not occur offsite or to surface waters and in a method which does not cause drift
from the site during application. No ponding should occur in order to control odor and
flies.
8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the
surface is frozen.
9of11
NUTRIENT UTILIZATION PLAN
REQUIRED SPECIFICATIONS
9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not
covered with waste to a depth that would inhibit growth. The potential for salt damage from
animal waste should also be considered.
10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a
high potential for leaching. Waste/nutrient loading rates on these soils should be held to a
minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall
not be applied more than 30 days prior to planting of the crop or forages breaking dormancy.
11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The
outer perimeter of the land area onto which waste is applied from a lagoon that is a component of
a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal
waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be
applied closer than 25 feet to perennial waters.
12 Animal waste shall not be applied closer than 100 feet to wells.
13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by
the landowner.
14 Waste shall be applied in a manner not to reach other property and public right-of-ways.
15 Animal waste shall not be discharged into surface waters, drainageways,or wetlands by discharge
or by over-spraying. Animal waste may be applied to prior converted cropland provided the fields
have been approved as a land application site by a "technical specialist". Animal waste shall not
be applied on grassed waterways that discharge directly into water courses, and on other grassed
waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift
from the site.
16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be
discharged into the animal waste management system.
10 of 11
NUTRIENT UTILIZATION PLAN
REQUIRED SPECIFICATIONS
17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon
embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the
vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas
where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and
structures should be inspected regularly for evidence of erosion, leakage,or discharge.
18 If animal production at the facility is to be suspended or terminated,the owner is responsible for
obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal
discharge, pollution and erosion.
19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to
prevent breakdowns,leaks and spills. A regular maintenance checklist should be kept on site.
20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human
consumption. However, if animal waste is used on crops for direct human consumption, it should
only be applied pre-plant with no further applications of animal waste during the crop season.
21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary
storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to
maintain the liquid level between the markers. A marker will be required to mark the maximum
storage volume for waste storage ponds.
22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop
sites where waste products are applied. Nitrogen shall be the rate-determining nutrient, unless
other restrictions require waste to be applied based on other nutrients, resulting in a lower
application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored
and alternative crop sites shall be used when these metals approach excessive levels. pH shall be
adjusted and maintained for optimum crop production. Soil and waste analysis records shall be
kept for a minimum of five years. Poultry dry waste application records shall be maintained for a
minimum of three years. Waste application records for all other waste shall be maintained for a
minimum of five years.
23 Dead animals will be disposed of in a manner that meets North Carolina regulations.
11 of 11
rawer: 3501 2-Stage Designed By: KBW
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: 06/09/15
Coun ; Du lin Sheet 1 of 12
ANAEROBIC WASTE LAGOON DESIGN 1st STAGE
FARM INFORMATION
Farm Population:
Nursery: .....-----....... 0
Wean to Finish: -----
-------------- 0
Finishing: ............. 0
Farrow to weanling: ---------------- 4719 Hd.
Farrow to feeder: ....—............ 0
Farrow to finish: .....—............ 0
Boars: ------------------- 0
Storage Period: --....--.......... 177 Days
25 Yr./24 Hr Storm Event ------•----------- 7:5 1n.
"Heavy Rain"Factor Not Applicable Even if Value Shown 7.5
Rainfall in Excess of Evaporation ...-----.......... 7.0 In.
Additional Water Usage: ------------------- 0
Additional Drainage Area: ---------•--------- 0
LAGOON INFORMATION
Is Lagoon Designed as an Irregular Shape? (YIN)------------ Y
Does Operator Want Emergency Spillway? (YIN)—---------- N
Was This Design Built Prior to 9/96? (YIN)------------ Y
Is Drain Tile Req'd to Lower SHWT? (Y/N)------------ N
Seasonal High Water Table Elev., ------------------- 0.00
Freeboard: —----------------- 1.0 Ft.
Emergency Spillway Flow Depth, Not Applicable.Even if Value Shown 0.3
Side Slopes: —---—----------— 3 :1 (H:V)
From Lagoon Volume Check Contours 0.0
contour areas see sheet 2 of 7... 0.0
Top of Dike Elevation: ---•-------••--• Depth 98.79 Ft.
Finished Bottom Elevation: BOTTOM E 12.79 Ft. 86.00 Ft.
Start Pump Elevation: ---------------- 20.16 In. 97.11 Ft.
Stop Pump Elevation: ................ 32.28 In. 96.10 Ft.
LAGOON VOLUME REQUIRED VOL. DESIGN VOLUMES %RE 'D.
Storm Storm 134391 (Cu.Pt.) 135,779 (Cu.Ft.) 101.03%
Temporary= 0 (Cu.Ft.) 196,662 (Cu.Ft.)
Permanent= 1716395 Cu.Ft. 1,720,931 (CuXtj 100.26%
Total Volume= 1,850,786 (Cu.Ft.) 2,053,272 (Cu.Ft.) 110.94%
112 Treatment Volume= 858,197 (Cu.Ft.)
112 Treatment Volume Elevation= 92.34 Ft. 77.42 in.
Min. Required Liner Thickness ------------------ 1.9 Ft.
Lagoon Surface Area: (Inside TOD) ------------------ 215,026 S.F.
f
i
Murphy-Brown,LLC Engineering P.O.Box 856,Warsaw,NC 28398 (910)293-3434
Grower: 3501 Z-5tage. Designed By: KBVV
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: 06/09/15
County: Du lin Sheet 2 of 12
ACTUAL DESIGN VOLUME CALCULATIONS
BASE VQLUME: Cu. Ft.
LAGOON STAGE-AREA VOLUMES
Contour
Elevation (FLJ Area SF Incr. Vol. (Cu. FT) Cumul. Vol. (Cu. FT)
87.00 143,300 190,593
88.00 149,611 146,456 337,049
89.00 155,100 152,356 489,404
90.00 160,503 157,802 647,206
91,00 165,932 163,218 810,423
92,00 170,793 168,363 978,786
93.00 175,603 173,198 1,151,984
94.00 180,581 178,092 1,330,076
95.00 185,576 183,079 1,513,154
96.00 191,178 188,377 1,701,531
97.00 196,818 193,998 1,895,529
98.00 202,531 199,675 2,095,204
98.79 216,025 164,935 2,260,138
These volumes were calculated using the vertical average end area method.
TOTAL READ VOL 1,850,785 CF CUMULATIVE VOL. ZONE VOL. 110.94%
END PUMP = _ _ 96.10 FT 1,720,931 CF TR'MT 1,720,931 100.26%
START PUMP W = = 97.11 FT 1,917,493 CF TEMP 196,562
MAX STORAGE = 97.79 FT 2,053,272 CF STOW 135,779 101.03%
Murphy-Brown,LLC Englneering P.O.Box 856,Warsaw,NO 20396 (910)293.3434
rower: 3501 2--Stage Designed By:
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: 06/09/15
County: Du fin Sheet 3 of 12
ANAEROBIC WASTE LAGOON DESIGN 2nd STAGE
FARM INFORMATION
Farm Population:
Nursery;
- ----------- -- 0
Wean to Finish: ----- ------ 0
Finishing: .................. 0
Farrow to wean Iing: ------------------- 4719 Hd.
Farrow to feeder: ------------------ 0
Farrow to finish: —----------------- 0
Boars: ------------ --- 0
Storage Period: ................... 177 Days
25 Yr./24 Hr Storm Event —---------------- 7.6 In
"Heavy Rain" Factor Not Applicable Even if Value Shown 7.5 In.
Rainfall in Excess of Evaporation —----------------- 7 In.
Additional Water Usage: —---------------- 0
Additional Drainage Area: —...—.......----- 215,025 S.F.
LAGOON INFORMATION
Is Lagoon Designed as an Irregular Shape? (YIN)----------- N
Does Operator Want Emergency Spillway? (YIN)------------ N
Was This Design Built Prior to 9/96? (YIN)----------- Y i
Is Drain Tile Req'd to Lower SHWT? (YIN
Seasonal High Water Table Elev: ------------------- 0.00
Freeboard: ------------------- 1.0 Ft.
Emergency Spillway Flow Depth: Not Applicable Even if Value Shown 0.3 Ft.
Side Slopes: --.---------------- 3 :1 (H:V)
Inside Top Length: ------------------- 290.0 Ft.
Inside Top Width: ------------------- 355.0 Ft.
Top of Dike Elevation: ---------------- Depth 58.10 Ft.
Finished Bottom Elevation: ---------------- 14.10 Ft. 44.00 Ft.
Start Pump Elevation: ................ 20.04 in. 56,43 Ft.
Stop Pump Elevation: ---------------- 157.2 In. 45.00 Ft.
LAGOON VOLUME REQUIRED VOL. DESIGN VOLUMES %RE 'D.
Storm Stor= 64344 (Cu.Ft.) 66,276 (Cu.Ft,) 101.45%
Temporary= 874664 (CuXt.) 877,499 (Cu.Ft.) W0.34%
Permanent= 0 Cu.1i 66,986 (Cu.Ft.)
Total Volume= 938,908 (Cu.Ft.) 999,760 (Cu.li 106.48%
90 Tem ora Storage Volume Elevation = 61.48 Ft. 79.49 In,
Min. Required Liner Thickness ------------------- 2.1 Ft.
Lagoon Surface Area: (Inside TOD) ------------------- 102,950 S.F.
i
Murphy-Brown, LLC Engineering P.O. Box 856,Warsaw,NC 28398 (9 10)293-3434
rower: 5901 2-5tage Designed
Address: PO Sox 856 Checked By: DSE
Warsaw, NC 28398 slate: 06/09/15
County: Du lin Sheet 4 of 12
ACTUAL DESIGN VOLUME CALCULATIONS
BASE VOLUME: Cu, Ft.
LAGOON STAGE-AREA VOLUMES
Contour
Elevation (FT.) Are SF Incr. Vol. Cu. FT CumuL Vol, Cu. FT
44.00 55,540 0
45.00 58,431 56,986 56,988
46.00 61,394 59,912 116,898
47.00 64,429 62,911 179,809
48.00 67,535 65,982 246,791
49.00 70,714 69,125 314,916
50.00 73,965 72,340 387,255
51.00 77,288 75,626 462,882
52.00 80,683 78,985 541,867
53,00 84,149 82,416 624,283
54,00 87,688 85,919 710,202
55.00 91,299 89,494 799,695
56.00 94,982 93,140 892,836
57.00 98,737 96,859 989,695
58.00 102,563 100,650 1,090,345
58.10 102,950 10,276 1,100,620
These volumes were calculated using the vertical average end area method.
TOTAL REQD VOL 2,790,726 CF CUMULATIVE VOL. ZONE VOL. 106.485/
END PUMP = = 45.00 FT 56,986 CF TR'MT 56,986
START PUMP = = 56A3 FT 934,485 CF TEMP 877,499 100.34%
MAX STORAGE = 57.10 FT 999,760 CF STORIVII 65,275 101,45%
Murphy-Brown,LLC Enghneari g A.O.Box 856,Warsaw, NC 28398 (910)293-3434
Grower: 3501 2-Stage Designed By: KIBW
Address; PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: Ot3/09/15
County: Du lin Sheet 5 of 12
MINIMUM REQUIRED VOLUME U NS 1st
Permanent Stor e;
Required Treatment Volume:
none y e uspacity ALVV (cu.ft.Ab) Tots
Nurs 0 30 1.00 0
W
ean to Finish 0 115 1.00 0
nishin 0 135 1.00 0
Farrow to weanling 4,719 433 0.67 1,369,029
Farrow to feeder 0 522 1.00 0
Farrow to finish 01 1,417 1.001 0
Boars 01 400 1.001 0
Total Required Treatment Volume(cu.ft.)4 1,369,029
Sludge Storage Volume:
Animala Capacity ALW (cu. = o a
Nursery 0 30 0.00 0
Wean to Finish 0 115 0.00 0
Finishl 0 135 0.00 0
Farrow to weanling 4,719 433 0.17 347.366
Farrow to feeder 0 522 0.00 0
Farrow to finish 0 1,417 0.00 0
Boars 0 400 0.00 0
Total Required Sludge Storage Volume(cu.ft.)= 347,386
Storm Storage:
Vol.=(Lagoon Surf.Area+Addt'I Drainage Area)*25Yr.124Hr. Storm(in)/12in./ft.
Vol.= (215025 sq.ft + 0 sq.ft_) * 7.5 in. 112 In./ft.
Total Required Volume for 25YO241-1r. Storm Event(cu.ft)= 134,391
"Heavy Rain"Storage:
Vol.=(Lagoon Surf. Area +Addt'I Drainage Area)*"Heavy Rain"Factor(in)/12in.lft.
Vol.= (215025 sq.ft + 0 sq.ft,) * 7.5 in. 112 in./ft,
Total Required Volume for"Heavy Rain"(cu,%)= 0
(far Extended Periods of Chronic Rainfall)
Total Required Storm Storage
(25Yr.124Hr.Storm+'Heavy Rain') 134,391 (CU.FT)
Total Required Permanent Storage
(Treatment+Sludge)= 1,716,396 (CU.FT)
TOTAL REQUIRED 1st STAGE VOLUME=1860785(CU.FT.)
Murphy-Brown, LLC Engineering P.O. Box 656, Warsaw NC (9 )293-3434
Grower: 3501 2-Stage Designed By: KBW
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: 06/09/15
county: Duplin Sheet 6 of 12
Temporary Storage Volume:
Manure Production;
n maTy pe a c o. era = I o a
Nursery 0 177 0,30 0
Wean to Finish 0 177 1.17 0
Finishing 0 177 1.37 0
Farrow to wean ring 4,719 177 4.39 3,670,269
Farrow to feeder 0 177 5.30 10
Farrow to finish 0 177 114.38 1 0
Boars 0 177 1 4.061 0
Total Manure Production (gals.)= 3,670,289
Total Manure Production(cuji.)m 490,678
Excess Fresh Water:
Animal e QaPaCMY Sto, Perlod=Total
Nursery 0 177 0,00 0
Wean to Finish 0 177 0.00 0
Finishhg 0 177 0.00 0
Farrow to weanling 4,719 177 2.90 2,422,203
Farrow to Feeder 0 177 0.00 0
Farrow to finish 0 177 0.00 0
Boars 0 177 1 0.00 0
Total Fresh Water Excess(gals.)= 2,422,263
Total Fresh Water Excess(cu.ft.)m 323,832
urp y- rown, LLC Engrneenng P.0. Box 856, Warsaw 29 - 4a
Grower: 3501 2-Stage Designed By: KBW
Address; PO Box B56 Checked By; DSE
Warsaw, NC 20398 Date: 06/09/15
County: Du lin Sheet 7 of 12
Temporary fa-ge Volume:dCont)
Rainfall in Excess of Evaporation;
Vol.=(Lagoon Surface Area 1 st+Lagoon Area 2nd+Additional Drainage Area)*Rainfall/121n./ft
Val.= (215025 sq.ft. + 102960 sq.ft. + 0 sq.ft.) * 7.0 in. /12 in.1ft.
Total Required Volume for Rainfall In Excess of Evap.(cu.ft.)= 60,054
Storm Storage:
Vol.=(Lagoon Surface Area 1sl+ Lagoon Area 2nd+Additional Drainage Area * 25Yr./24Hr Storm(in.)/121n.1
Vol.= (215025 sq.ft + 102950 sci t. + 0 sq.ft.) * 7.5 tn.
Total Required Volume for 2SYr.124Hr.Storm Event(cu.ft)= 64,344
"Heavy Rain"Storage:
Vol.=(Lagoon Surface Area 1st+ Lagoon Area 2nd+Additional Drainage Area)*Heavy Rain Factor(b)/12in.
Vol.= (216026 sq.ft + 102950 sq.ft. + 0 sq.ft.) * 7.6 in. 112 in.fft.
Total Required Volume for"Heavy Rain"(cu.ft.)= 0
(for Extended Periods of Chronic Rainfall)
Additional Water Storage:
No Additional Water Storage Is Required
0 0
Total Required Storm Storage
(25Yr.124Hr. Storm+'Heavy Rain')= 64,344 (CU.FT)
Total Required Temporary Storage
(Manure prod.+Excess Fr. Water+Rainfall Excess+Additional Water Storal 874,564 (CU.FT)
Total Required Permanent Storage
(Treatment+Sludge) = 0 (CU.FT)
TOTAL REQUIRED 2nd STAGE VOLUME C 938908(CU.FT.)
Murphy-Brown, LLC Engineering P.0.--Box 856, Warsaw NC 28398 (910) 3
Grower: 3501 2-Stage Designed By: KBW
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: 06/09/15
County: Du lin Sheet 8 of 12
LAGOON QgjIQN SUM IUMMARY 1st STAGE
Top of Dike Elevation ___�....._W_ 98.79 FT.
Emergency Spillway Crest Elevation Not Al Applicable
Top of 25Yr./2411r, Storm Storage ---------------- 97.79 FT,
Top of"Heavy Rain"Slorage -------------- Not Applicable
Start Pump Elevation - -- 97AI FT.
End Pump Elevation ___.__.—........ 96.10 FT.
Top of Sludge Storage 88.07 FT,
Seasonal High Watertable Elev, 0.00
Finished Bottom Elevation 86.00 FT.
Inside Top Length ---------......._ Not Applicable
Inside Top Width - ---------.. Not Applicable
Side Slopes _�_T_�_ 3.0:1 Ii:V
Lagoon Surface Area —___ 215,025 SF
Min. Liner Thickness(if required) 1.9 FT.
Freeboard Depth --—..-.----._ 1,00 FT.
Temporary Storage Period -- 177 Days
TOTAL DESIGN VOLUME=2053272(CU.FT.)
Zone Depths:
Treatment I Sludge Storage Zone Depth---------- 10.1 FT.
Temporary Storage Zone Depth ----------- 1.0 FT.
Freeboard/Storm Storage zone Depth •--•-•---•• 1.7 FT.
Total Lagoon Depth ........... 12.8 FT.
Murphy-Brown, I-LC Engineering P.od Box 856, Warsaw NC 28398 ( 10)293-3434
Grower: 3501 2-Stage Designed By: KBW
Address; PO Box 856 Chocked By DSE
Warsaw, NC 28398 Date: 06/09115
County: Duplin Sheet 9 of 12
LAGOON DESIM §UMMARY 2nO STAGE
Top of Dike Elevation ......... 58.10 FT.
Emergency Spillway Crest Elevation ----------- - Not Applicable
Top of 25Yr,/24Hr.Storm Storage --- - ---------- 57.10 FT.
Top of"Heavy Rain"Storage ----------- Not Applicable
Start Pump Elevation ..... 56.43 FT.
End Pump Elevation —------- 45.00 FT.
Top of Sludge Storage ------------- 49.45 FT.
Seasonal High Watertable Elev. ----------- 0.00
Finished Bottom Elevation ------------- 44.00 FT.
Inside Top Length ------------—---— 290.00 FT.
Inside Top Width --------- -- 355.00 FT,
Side Slopes .-____.- 3.0:1 H:V
Lagoon Surface Area --------- 102,950 SF
Min, Liner Thickness(if required) ------------- 2.1 FT.
Freeboard Depth 1.00 FT.
Temporary Storage Period -------••---•--- 177 Days
TOTAL DESIGN VOLUME=999760(CUYT.)
Zon2 Depths:
Treatment 1 Sludge Storage Zone Depth --- 1.0 FT.
Temporary Storage Zone Depth -------.--- 11.4 FT.
Freeboard 1 Storm Storage zone Depth — •----- 1.7 FT.
Total lagoon Depth —......... 1147 FT.
Murphy-Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (9 0
rn
o �
w
mU) o
aYi cl o
0
� = N
(A 4
r-
r' �I
r-
rn
w n
U' co rn
M p
N 11 WOD
wLu
o� w w w N
0 Y O O Cw7 U
o
Q w 0) a x ? �O ro
w O 0 w w cn m Lo
w 0 a O w w
O a. O =
CL~ 0. O O N
N O f- Z 00
w
O
a
r
r
<+)
OD
� N �
4 � z
N p p�
� m 0) C
m a o '�
� w
w
a.
�S 1
0Uz J
4 CO w
CIO
a,
P
V-
v�
O N
1
W Q
CO
C r
o (L) on
cn o
rn
LU
v,
a to11
$ g
W c
y w a w w w
O p W w O Z
o LL � o
o LU a LLI O � o
W ~ O O d Z �o
z a. H p N
N O ~
O
a
/
/
I
V/ I
� N �
@2z
,r M
N p
Cg 'Q ltj L C
WLU
C
a
a
� d V
C� Q U co W c
Grower: 3501 2-Stage Designed By: KBW
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: 05/09/16
count : Duplin Sheet 12 of 12
This livestock waste treatment lagoon is designed in accordance with the North Carolina
Natural Resources Conservation Service PRACTICE STANDARD 359-WASTE TREATMENT
LAGOON, revised prior to June, 1996,
Emergency Spillway:
An Emergency Spillway is not required.
CARd�;'%
NOTE: See attached Waste Utilization Plan
c 2Q y •.'y
SEAL
= 023994
DESIGNED:
P
Q•'FNGINF�• ' '�'
DATE: /� '�•��1�'S, E��•�`,�
COMMENTS: The lagoon has been designed as an irregular shape.
This design is update of start and stop pump elevations and to show the 112
treatment volume level for sludge storage. This design does not su ercede the
original certification of the farm.
This design changes animal type to farrow to wean for a group housing conversion
of the 2 sites,
Murphy-Brown, LLC Engineering P.0. Box 856, Warsaw NC 28398 (910)293-3434
rower: Designed y:
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: 12/17/08
County: Du lin Sheet 1 of 7
ANAEROBIC WASTE LAGOON DESIGN
FARM INFORMATION
Farm Population:
Nursery: ------------------- 0
Wean to Finish: ------------------- 0
Finishing: ------------------- 0
Farrow to weanling: ------------------- 0
Farrow to feeder: ------------------- 1200 Hd.
Farrow to finish: ------------------- 0
Boars: ------------------- 0
Storage Period: ------------------- 180 Days
25 Yr. /24 Hr Storm Event ------------------- 7.5 In.
"Heavy Rain" Factor
Rainfall in Excess of Evaporation ------------------- 7.0 In.
Additional Water Usage: ------------------- 0
Additional Drainage Area: ------------------- 0
LAGOON INFORMATION
Is Lagoon Designed as an Irregular Shape? (Y/N)------------ N
Does Operator Want Emergency Spillway? (YIN) ------------ N
Was This Design Built Prior to Sept. 1996? (Y/N) ------------ Y
Is Drain Tile Req'd to Lower SHWT? (Y/N)------------ N
Seasonal High Water Table Elev: ------------------- 50.00 Ft.
Freeboard: ------------------- 1.0 Ft.
Emergency Spillway Flow Depth:
Side Slopes: ------------------- 3 :1 (H:V)
Inside Top Length: 290.0 Ft.
Inside Top Width: 355.0 Ft.
Top of Dike Elevation: ---------------• Depth 58,10 Ft.
Finished Bottom Elevation: ---------------• 14.10 Ft. 44.00 Ft.
Start Pump Elevation: ---------------• 20.04 In. 56.43 Ft.
Stop Pump Elevation: --------------- 60.6 In, 53.05 Ft.
LAGOON VOLUME REQUIRED VOL. DESIGN VOLUMES % REQ'D.
Storm Stor= 64344 (Cu.Ft.) 65,275 (Cu.Ft.) 101.45%
Temporary= 213025 (Cu.Ft.) 305,906 (Cu.Ft.) 143.60%
Permanent= 626400 (Cu.Ft.) 628,579 (Cu.Ft.) 100.35%
Total Volume= 903,769 (Cu.Ft.) 999,760 (Cu.Ft.) 110.62%
112 Treatment Volume= 313,200 (Cu.Ft.)
112 Treatment Volume Elevation = 49.01 Ft. 109.12 In.
90 Temporary Storage Volume Elevation = 54.99 Ft. 37.31 In.
Min. Required Liner Thickness ------------------ 2.1 Ft,
Lagoon Surface Area: (Inside TOD) ------------------- 102,950 S.F.
Murphy-Brown, LLC Engineering P.O.Box 856,Warsaw,NC 25398 (910)293-3434
rower; 31021 Oesignad- y:
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: 12/17/08
County: Du lin Sheet 2 of 7
ACTUAL DESIGN VOLUME CALCULATIONS
BASE VOLUME: Cu. Ft.
LAGOON STAGE•AREA VOLUMES
Contour
Elevation (FT.) Area SF Incr, Vol. (Cu. FTC Cumul. Vol. (Cu. FT)
44.00 55,540 0
45.00 58,431 56,986 56,986
46.00 61,394 59,912 116,898
47.00 64,429 62,911 179,809
48.00 67,535 65,982 245,791
49.00 70,714 69,125 314,916
50.00 73,965 72,340 387,255
51.00 77,288 75,626 462,882
52.00 80,683 78,985 541,867
53.00 84,149 82,416 624,283
54.00 87,688 85,919 710,202
55.00 91,299 89,494 799,695
56.00 94,982 93,140 892,836
57.00 98,737 96,859 989,695
58.00 102,563 100,650 1,090,345
58.10 102,950 10,276 1,100,620
These volumes were calculated using the vertical average end area method.
TOTAL REQD VOL 903,769 CF CUMULATIVE VOL. ZONE VOL. 110.62%
END PUMP = = = = 53.05 FT 628,579 CF TR'MT 628,579 100.35%
START PUMP = = ; 56.43 FT 934,485 CF TEMP 305,906 143.60E
MAX STORAGE = 57.10 FT 999,760 CF STORM 65,275 101.45E
Murphy-Brown, LLC Engineering P.O.Box 856,Warsaw,NC 28398 (910)293-3434
Grower: 31021 Designed By: 0
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: 12/17/08
County: Du lin Sheet 3 of 7
MINIMUM REQUIRED VOLUME CALCULATIONS
Permanent Storage;
Required Treatment Volume:
Animal ype Capacity ALW (cu,fl.11b) = Total
Nursery 0 30 1.00 0
Wean to Finish 0 115 1.00 0
Finishing 0 135 1.00 0
Farrow to weanling 0 433 1.00 0
Farrow to feeder 1,200 522 1.00 526,400
Farrow to finish 0 1,417 1.00 0
Boars 0 400 1.00 0
Total Required Treatment Volume(cu.ft.)= 626,400
Sludge Storage Volume:
nima Type Capacity ALW cu, I. Ib = ota
Nursery 0 30 0.00 0
Wean to Finish 0 115 0.00 0
Finishing 0 135 0.00 0
Farrow to weanling 0 433 0.00 0
Farrow to feeder 1,200 522 0.00 0
Farrow to finish 0 1,417 0.00 0
Boars 0 400 0.000 0
Total Required Sludge Storage Volume (cu,ft.)= 0
Temporary Storage Volume:
Manure Production:
Animal Type a acity Sto. Period d./da )=Total
Nursery 0 180 0.30 0
Wean to Finish 0 180 1.17 0
Finishing 0 180 1.37 0
Farrow to weaning 0 180 4.39 0
Farrow to feeder 1,200 180 5.30 1,144,224
Farrow to finish 0 180 14,38 0
Boars 0 180 4,06 0
Total Manure Production (gals.)= 1,144,224
Total Manure Production (cu.ft.)= 152,971
Excess Fresh Water:
lAnimalType Capacity' Sto. Period d./day)=Total
Nursery 0 180 0.00 0
Wean to Finish 0 180 0.00 0
Finishing 0 180 0.00 0
Farrow to weanling 0 180 0.00 0
Farrow to feeder 1,200 1 180 0.00 0
Farrow to finish 0 180 0.00 0
Boars 0 180 0.00 0
Total Fresh Water Excess (gals.)= 0
Total Fresh Water Excess (cu.ft.)= 0
Murphy-Brown, LLC Engineering P.O. Sox 856, Warsaw NC 28398 (910) 293-3434
Grower: 31021 Designed By: 0
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: 12/17/08
County: Duplin Sheet 4 of 7
Temporary Storage Volume: (Cont.)
Rainfall in Excess of Evaporation:
Vol.=(Lagoon Surface Area +Additional Drainage Area)*Rainfall /12in./ft
Vol.= (102950 sq.ft. + 0 sq.ft.) * 7 in, /12 in./ft.
Total Required Volume for Rainfall in Excess of Evap,(cu.ft.)= 60,054
Storm Storage:
Vol.=(Lagoon Surf. Area +Addt'I Drainage Area)*25Yr./24Hr. Storm(in)/ 12in./ft.
Vol.= (102950 sq.ft + 0 sq.ft.) * 7.5 in. /12 in./ft.
Total Required Volume for 25Yr./24Hr. Storm Event(cu.ft)= 64,344
"Heavy Rain"Storage:
Vol.=(Lagoon Surf, Area +Addt'I Drainage Area)*"Heavy Rain" Factor(in)/12in./ft.
Val.= (102950 sq,ft + 0 sq.ft.) * 0.0 in. /12 in./ft.
Total Required Volume for"Heavy Rain"(cu.ft.)= 0
(for Extended Periods of Chronic Rainfall)
Additional Water Storage:
No Additional Water Storage is Required
0 0
Total Required Storm Storage
(25Yr. /24Hr. Storm + 'Heavy Rain') 64,344 (CU.FT)
Total Required Temporary Storage
(Manure Prod. + Excess Fr.Water+ Rainfall Excess+Additional Water Storage)= 213,025 (CU.FT)
Total Required Permanent Storage
(Treatment+Sludge) = 626,400 (CU.FT)
TOTAL REQUIRED VOLUME = 903769(CU.FT.)
Murphy-Brawn, LLC Engineering P,O. Box 856, Warsaw NC 26398 (910)293-3434
Grower: 31021 Designed By: p
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: 12/17/08
County: Du lin Sheet 5 of 7
LAGOON DESIGN SUMMARY
Top of Dike Elevation ------------------- 58.10 FT,
Emergency Spillway Crest Elevation ------------------- Not Al Applicable
Top of 25Yr.124Hr. Storm Storage ------------------- 57.10 FT.
Top of"Heavy Rain"Storage ------------------- Not Applicable
Start Pump Elevation ------------------- 56.43 FT.
End Pump Elevation ------------------- 53,05 FT.
Top of Sludge Storage ------------------- Not Applicable
Seasonal High Watertable Elev. ------------------- 50.00 FT.
Finished Bottom Elevation ------------------- 44.00 FT.
Inside Top Length ------------------- 290.00 FT.
Inside Top Width ------------------- 355.00 FT.
Side Slopes ------------------ 3:1 H:V
Lagoon Surface Area ------------------- 102,950 SF
Min. Liner Thickness(if required) ------------------- 2.1 FT.
Freeboard Depth ------------------- 1.00 FT.
Temporary Storage Period ------------------- 180 Days
TOTAL DESIGN VOLUME=999760 (CU.FT.)
Zone Deaths:
Treatment/Sludge Storage Zone Depth----------- 9.1 FT.
Temporary Storage Zone Depth ----------- 3.4 FT.
Freeboard/Storm Storage Zone Depth ----------- 1.7 FT.
Total Lagoon Depth ----------- 14.1 FT.
Murphy-Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434
o 00
0
r`
wr ~
❑ o
(0 -
t�U ` tco
M
00 ❑ co N
� N o
—
COIt
CD
uO
0 o II LO O
o
M w cr;
it " w jj II
w CQw7 w w °C0'
W W ()_ W W N
a Y o W o z
a LL °- 0
O IL W LL 0°
w p a w a o
LLI O p O co
z ~ d ado
z_
N IL m
,I a
0
0
04 00 M
M
O CO C C4
M C
LLO
C. L
rL Q O J II
_
U
p Lo cy- ❑ J
C7 Q U (A w 3
0
ro
Grower: 31021 Designed By: p
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date; 12/17/08
County: Duplin Sheet 7 of 7
This livestock waste treatment lagoon is designed in accordance with the United States
Natural Resources Conservation Service PRACTICE STANDARD 359-WASTE TREATMENT
LAGOON, revised prior to June, 1996,
Emergency Spillway:
An Emergency Spillway is not required.
\,CA%'-
4 •oFT--ssio . .
NOTE: See attached Waste Utilization Plan
SEAL
023994
DESIGNED: t- = '
a�v ;p9•.FtiG, P,
DATE:
COMMENTS:
This design is update of start and stop pump elevations and to show the 1/2
treatment volume level for sludge storage, This design does not suporcede the
original certification of the farm.
Murphy-brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910)293-3434
Grower: 3501 Designeay: RBW
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: 02/25/09
County: Du lin Sheet 1 of 7
ANAEROBIC WASTE LAGOON DESIGN
FARM INFORMATION
Farm Population:
Nursery: ------------------- 0
Wean to Finish: ------------------- 0
Finishing: ................... 0
Farrow to weanling: ------------------- 0
Farrow to feeder: ------------------- 0
Farrow to finish: ------------------- 1000 Hd.
Boars: ------------------- 0
Storage Period: ------------------- 180 Days
25 Yr,124 Hr Storm Event ------------------- 7.5 In.
"Heavy Rain" Factor
Rainfall in Excess of Evaporation ......------------- 7.0 In.
Additional Water Usage: ................... 0
Additional Drainage Area: ------------------- 0
LAGOON INFORMATION
Is Lagoon Designed as an Irregular Shape? (YIN)------------ Y
Does Operator Want Emergency Spillway? (YIN) ............ N
Was This Design Built Prior to Sept. 1996? (YIN)------------ Y
Is Drain Tile Req'd to Lower SHWT? (YIN)------------ N
Seasonal High Water Table Elev: ------------------- 0.00
Freeboard: ------------------- 1.0 Ft.
Emergency Spillway Flow Depth:
Side Slopes: ------------------- 3 :1 (H:V)
0.0
0.0
Top of Dike Elevation: ---------------• Depth 98.79 Ft.
Finished Bottom Elevation: BOTTOM E 12.79 Ft. 86.00 Ft.
Start Pump Elevation: ---------------• 20.16 In. 97.11 Ft.
Stop Pump Elevation: -------------- 51.72 In. 94.48 Ft,
LAGOON VOLUME REQUIRED VOL. DESIGN VOLUMES % REQ'D.
Storm Stor= 134391 (Cu.Ft.) 135,779 (Cu.Ft.) 101.03%
Temporary= 471472 (Cu.Ft.) 499,540 (Cu.Ft.) 105.95%
Permanent= 1417000 (Cu.Ft.) 1,417,953 (Cu.Ft.) 100.07%
Total Volume= 2,022,863 (Cu.Ft.) 2,053,272 (Cu.Ft.) 101.50%
112 Treatment Volume= 708,500 (Cu.Ft.)
1/2 Treatment Volume Elevation= 90.38 Ft. 100.90 In.
90 Temporary Storage Volume Elevation= 95.57 Ft. 38.65 In.
Min. Required Liner Thickness ------------------- 1.9 Ft.
Lagoon Surface Area: (Inside TOD) ------------------- 215.025 S.F.
Murphy-Brown,LLC Engineering P.O.Box 856,Warsaw,NC 28398 (910)293-3434
Mower: 350 1 Designecly: KBW
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: 02/25/09
County: Duplin Sheet 2 of 7
ACTUAL DESIGN VOLUME CALCULATIONS
BASE VOLUME: Cu. Ft.
LAGOON STAGE-AREA VOLUMES
Contour
Elevation FT. Area SF Incr. Vol. Cu. FT Cumul. Vol. (Cu. FT_)
87.00 143,300 190,593
88.00 149,611 146,456 337,049
89.00 155,100 152,356 489,404
90.00 160,503 157,802 647,206
91.00 165,932 163,218 810,423
92.00 170,793 168,363 978,786
93.00 175,603 173,198 1,151,984
94.00 180,581 178,092 1,330,076
95.00 185,576 183,079 1,513,154
96.00 191,178 188,377 1,701,531
97.00 196,818 193,998 1,895,529
98.00 202,531 199,675 2,095,204
98.79 215,025 164,935 2,260,138
These volumes were calculated using the vertical average end area method.
TOTAL REQD VOL 2,022,863 CF CUMULATIVE VOL. ZONE VOL. 101.50%
END PUMP = = = = 94.48 FT 1,417,953 CF TR'MT 1,417,953 100.07%
START PUMP = = ! 97.11 FT 1,917,493 CF TEMP 499,540 105.95%
MAX STORAGE = 97.79 FT 2,053,272 CF STORM 135,779 101.03%
Murphy-Brown,LLC Engineering P.O.Box 856,Warsaw,NC 28398 (910)293-3434
Grower: 3501 Designed By: KBW
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: 02/25/09
County: Duplin Sheet 3 of 7
MINIMUM REQUIRED VOLUME CALCULATIONS
Permanent Storage.
Required Treatment Volume:
lAnimal Type Capacity cu. ./lb) Total
Nursery 0 30 1.00 0
Wean to Finish 0 115 1.00 0
Finishing 0 135 1.00 0
Farrow to weanling 0 433 1.00 0
Farrow to feeder 0 522 1.00 0
Farrow to finish 1,000 1,417 1.00 1,417,000
Boars 0 400 1.00 0
Total Required Treatment Volume(cu.ft.)= 1,417,000
Sludge Storage Volume:
jAnirnal Type Capacity cu. t./lb) Total
Nursery 0 30 0.00 0
Wean to Finish 0 115 0.00 0
Finishing 0 135 0.00 0
Farrow to weanling 0 433 &Q0 0
Farrow to feeder 0 522 1 0.00 0
Farrow to finish 1,000 t,417 0.00 0
Boars 0 400 1 0.000 0
Total Required Sludge Storage Volume(cu.ft.)= 0
Temporary Storacte Volume:
Manure Production:
AnimalTyp6 Capacity Sto. Period d./day)-Total
Nursery 0 180 0.30 0
Wean to Finish 0 180 1.17 0
Finishing 0 180 1.37 0
Farrow to weanling 0 180 4.39 0
Farrow to feeder 0 180 5.30 0
Farrow to finish 1,000 180 14.38 2,588,387
Boars 0 180 4.06 0
Total Manure Production(gals,)= 2,588,387
Total Manure Production(cu.ft.)= 346,041
Excess Fresh Water.
Animal a Capacity Sto. Period d./day)=Total
Nursery 0 180 0.00 0
Wean to Finish 0 180 0.00 0
Finishing 0 180 0.00 0
Farrow to weanling 0 180 0.00 0
Farrow to feeder i 0 180 0.00 0
Farrow to finish 1,000 180 0.00 0
Boars 1 0 180 0.00 0
Total Fresh Water Excess(gals.)= 0
Total Fresh Water Excess(cu.ft.)= 0
Murphy-Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434
Grower: 3501 Designed By: KBW
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: 02/25109
County: Duplin Sheet 4 of 7
Temporary Storaae Volume: (Cont.)
Rainfall in Excess of Evaporation:
Vol.�(Lagoon Surface Area +Additional Drainage Area)*Rainfall/12in./ft
Vol.= (215025 sq.ft. + 0 sq.ft.) * 7 in. /12 in./ft.
Total Required Volume for Rainfall in Excess of Evap. (cu.ft.)= 125,431
Storm Storage:
Vol.=(Lagoon Surf. Area +Addt'I Drainage Area)*25Yr./24Hr. Storm(in)/12in./it.
Vol.= (215026 sq.ft + 0 sq.ft.) * 7.5 in. /12 in./ft.
Total Required Volume for 25Yr.124Hr. Storm Event(cu.ft)= 134,391
"Heavy Rain"Storage:
Vol.=(Lagoon Surf. Area +Addi'I Drainage Area)*"Heavy Rain"Factor(in)/ 12in./ft.
Vol.= (215025 sq.ft + 0 sq.ft.) * 0.0 in. /12 in./ft.
Total Required Volume for"Heavy Rain"(cu.ft.) = 0
(for Extended Periods of Chronic Rainfall)
Additional Water Storage:
No Additional Water Storage is Required
0 0
Total Required Storm Storage
(25Yr./24Hr.Storm + 'Heavy Rain')= 134,391 (CU.FT)
Total Required Temporary Storage
(Manure Prod. + Excess Fr. Water+ Rainfall Excess +Additional Water Storage)= 471,472 (CU.FT)
Total Required Permanent Storage
(Treatment+Sludge)= 1,417,000 (CU.FT)
TOTAL REQUIRED VOLUME=2022863(CU.FT.)
Murphy-Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910)293-3434
Grower: 3501 Designed By: KBW
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: 02/25/09
County: Duplin Sheet 5 of 7
LAGOON DESIGN SUMMARY
Top of Dike Elevation ------------------- 98.79 FT.
Emergency Spillway Crest Elevation ------------------- Not Al Applicable
Top of 25Yr./24Hr. Storm Storage ------------------- 97.79 FT.
Top of"Heavy Rain"Storage ------------------- Not Applicable
Start Pump Elevation ------------------ 97.11 FT.
End Pump Elevation ------------------- 94.48 FT.
Top of Sludge Storage ------------------- Not Applicable
Seasonal High Watertable Elev. ------------------- 0.00
Finished Bottom Elevation ------------------- 86.00 FT.
Inside Top Length ------------------- Not Applicable
Inside Top Width ------------------ Not Applicable
Side Slopes ------------------- 3:1 H•V
Lagoon Surface Area ------------------- 215,025 SF
Min. Liner Thickness(if required) ------------------ 1.9 FT.
Freeboard Depth ----------------- 1.00 FT.
Temporary Storage Period ------------...... 180 Days
TOTAL DESIGN VOLUME=2053272 (CU.FT.)
Zone Deaths:
Treatment/Sludge Storage Zone Depth---------- 8.5 FT.
Temporary Storage Zone Depth ----------- 2.6 FT.
Freeboard/Storm Storage Zone Depth ----------- 1.7 FT.
Total Lagoon Depth ----------- 12.8 FT.
Murphy-Brown, L C Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434
o�
0
LO
mL.Li0 ~
Y o
O M
N
0 C) U)
M
N
Y- I
r
co R II 03 O
� Vt O
0) It W Q) co
> w w >
W J CD w w Ch
CM
rA 2 w w co
04
N
z w O 2 U
O o O 0 � � �
LL a
W O w w � m '
w p a LL a LU (a
z co
N L p
O
a
r
-
i
-
i
0
O)
M
00
Nr.
� � z
Ch O c00
9
w W
d
N0. W
U
o a —�
co w
ca
a
g
Grower: 3501 Designed By: KBW
Address: PO Box 856 Checked By: DSE
Warsaw, NC 28398 Date: 02/25/09
County: Duplin Sheet 7 of 7
This livestock waste treatment lagoon is designed in accordance with the United States
Natural Resources Conservation Service PRACTICE STANDARD 359-WASTE TREATMENT
LAGOON, revised prior to June, 1996.
Emergency Spillway:
An Emergency Spillway is not required.
NOTE: See attached Waste Utilization PlanSEAL
n = 023994
DESIGNED. ��� Q N
DATE; '�, /D S ��• �•
rrirrrj�```
COMMENTS; The lagoon has been designed as an irregular shape.
This design is update of start and stop pump elevations and to show the 1/2
treatment volume level for sludge storage. This design does not supersede the
original certification of the farm.
Murphy-Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910)293-3434
Murphy-Brown, LLC 10/6/2023 2822 Hwy 24 West
P.O. Box 856
Warsaw, NC 28398
NUTRIENT UTILIZATION PLAN
Grower(s): Murphy-Brown, LLC
Farm Name: 3501-3102; AWS310514
County, Du lin
Permit Capacity:
Farrow to Wean 4719
Farrow to Feeder
Farrow to Finish
Wean to Feeder
Wean to Finish
Feeder to Finish
Gilts
Boars
Storage Structure: Anaerobic Lagoon
Storage Period: >180 days
Application Method: Irrigation
The waste from your animal facility must be land applied at a specified rate to prevent pollution
of surface water and/or groundwater. The plant nutrients in the animal waste should be used
to reduce the amount of commercial fertilizer required for the crops in the fields where the waste
is to be applied.
This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed
before each application cycle. Annual soil tests are strongly encouraged so that all plant
nutrients can be balanced for realistic yields of the crop to be grown.
Several factors are important in implementing your waste utilization plan in order to maximize
the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner
1. Always apply waste based on the needs of the crop to be grown and the nutrient
content of the waste. Do not apply more nitrogen than the crop can utilize.
2. Soil types are important as they have different infiltration rates, leaching potentials,
cation exchange capacities, and available water holding capacities.
3. Normally waste shall be applied to land eroding at less than 5 tons per acre per
year. Waste may be applied to land eroding at 5 or more tons per acre annually, but
less than 10 tons per acre per year providing that adequate filter strips are established.
4. Do not apply waste on saturated soils,when it is raining, or when the surface is frozen.
Either of these conditions may result in runoff to surface waters which is not allowed
under DWR regulations.
5. Wind conditions should also be considered to avoid drift and downwind odor
problems.
6. To maximize the value of the nutrients for crop production and to reduce the potential
for pollution, the waste should be applied to a growing crop or applied not more than
30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or
disking will conserve nutrients and reduce odor problems.
1 of 11
This plan is based on the waste application method shown above. If you choose to change
methods in the future,you need to revise this plan. Nutrient levels for different application
methods are not the same.
The estimated acres needed to apply the animal waste is based on typical nutrient content
for this type of facility. In some cases you may want to have plant analysis made,which could
allow additional waste to be applied. Provisions shall be made for the area receiving waste to
be flexible so as to accommodate changing waste analysis content and crop type. Lime must
be applied to maintain pH in the optimum range for specific crop production.
This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC
2H .0217 adopted by the Environmental Management Commission.
AMOUNT OF WASTE PRODUCED PER YEAR (gallons,ft3,tons,etc.):
Capacity Type Waste Produced per Animal Total
4719 Farrow to Wean 3203 gal/yr 15,114,957 gal/yr
Farrow to Feeder 3861 gal/yr gal/yr
Farrow to Finish 10478 gal/yr gal/yr
Wean to Feeder 191 gal/yr gal/yr
Wean to Finish 776 gal/yr gal/yr
Feeder to Finish 927 gal/yr gal/yr
Gilts 1015 gal/yr gal/yr
Boars 2959 gal/yr gal/yr
Total 15,114,957 gal/yr
AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (Ibs):
Capacity Type Nitrogen Produced per Animal Total
4719 Farrow to Wean 3.84 Ibs/yr 18,121 Ibs/yr
Farrow to Feeder 6.95 Ibs/yr Ibs/yr
Farrow to Finish 18.86 Ibs/yr Ibs/yr
Wean to Feeder 0.34 Ibs/yr Ibs/yr
Wean to Finish 1.4 Ibs/yr Ibs/yr
Feeder to Finish 1.67 Ibs/yr Ibs/yr
Gilts 1.83 Ibs/yr Ibs/yr
Boars 5.33 Ibs/yr Ibs/yr
Total 18,121 Ibs/yr
Applying the above amount of waste is a big job. You should plan time and have appropriate
equipment to apply the waste in a timely manner.
LAND UTILIZATION SUMMARY
The following table describes the nutrient balance and land utilization rate for this facility
Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced
on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize
in the normal growing season.
Total Irrigated Acreage: 158.67
Total N Required 1st Year: 42560.07
Total N Required 2nd Year: 33180.79
Average Annual Nitrogen Requirement of Crops: 37,870.43
Total Nitrogen Produced by Farm: 18,120.96
Nitrogen Balance for Crops: (19,749.47)
The following table describes the specifications of the hydrants and fields that contain the crops
designated for utilization of the nitrogen produced on this facility. This chart describes the size,
soil characteristics,and uptake rate for each crop in the specified crop rotation schedule for this
facility.
2of11
w V n N co N M V' m R 7 r m m) m 10 N co w OD n (D of W
y w N V P.- N I---ITN CD(D M O(D M M v r o m 0 7 O N N O(DM N R C C
a N mNn (n m(O(O O O m m m cDm N rM�C��aDOrrO p
_ 4 r ci 4 11 n N N N V r 0 r r 0 7 m 7 N N O O o n N n n r m OJ �
(�— mO(D M MM7 (Om r MN O O M V V N (D (DN O N coN M O O h
j (D O N V O V v r N M V n l0 V 'N*�N V M N c0 m r N c0 O M N
.-mr mrmr co W r r � r N V r Mr •7'
u
Q r m n v r N n v N N v 7 co V O(fl o N(D In R V v r ^m N v M m m(D
16 Z N m N N N N N N O O 6 m, co N N N N M N(D N m m M
pZ (DO(D r (Dr (Orrru'J(O(O lOnnrnrnrnm rrr r(D rr(`I r�00N
y mvm(D M(D M cD ap c0a0 mOO co(D(OM OON O v v m
~M N N N N N N N N M M N N N N M M M M M M N N N N N m N N r N N r
J
N'O It N n m m p N CO N O N(D r o 0 0 N b
a d o W OMON n 1010 W V o (O OlONN 1010N NO(p(4ry r vm e!
N r C r o r o o��N m(O c,(D r o N(n N c,o m M M r r(D m 0
y= cp moncn 4 MNN MN nN W NOD mn 0 V nN,Nr 00 w MO h
(D r I r o V r N r N N Cl) V N coV r M r(O o N m N
7 o v a a m V m d' N co c D m m r r u0 F
Z NNo c? NM(jm MM M� M Md' NNR
y U ((j ((j 0 0 0 O c.O O O O O c)O I(j((j([j o o Lo ((j am
�Q NNN MNm Nm(O (O(O (O(O(O 6 u-)o o In(OMMM N(O(OMOM�N Np
J
I
a;
za
.ad
J
cL
O c
m m m M m M m M M M M m M(D M c o m m(D
U N r N r N 0 0 0 0 0 0 0 0 0 0 0 0 N N N 0 0 N O N m r
Z (n(n(n(n(n(O(n(O(n(O IO(O IO(O r O r
C y
a
m(nmomoMo r
ooM 0000(n In0
V y o 0 o r o r o r r o r r o o 0 o m
c}
N
a- asaaaaaaaaaaaaaa¢a¢aaaaaa¢aaaaaaa
"n a n--Q.-.-...................a.. ......Q«.... ....c,
Q c°n'rnincnc°n'cn(nuiinin(nviunaiv)(°p'in(n(ncninuoiiin(0cocou..coouito
o
o d
V a z z z z z z z z Y Y Y Y Y Y Y Y J J J J z z z z Y Y z z z z z z z
m(j
c
N
7 N N 'cf M V.n m O O(D O O R(D (D (O(D
y V �On of V wN V (D(DMO(Dco V'romm(Ol0 N No co m no
d O (O�O�NN Od'm m(DmN�c(D nNMNm00m oNrOpp�
N cq o7 nnr co�(DMCr n (O r�M W Mm co Qj(D m(O mN n
A— O(D No6OO M(D MIOM (DNn6r 6w mm(D V Nam- V(DO
a0 (n 07 W In V (D n 0 (D O m r
rmr (Dr (DOM V N(D cprNO c, V N Or rm cor OILo N r
V V V V co(D r r M +-N r N N[D(D of r�
O
z n�n �n `1 nvNNvvvv Dm n n n(nvvvr �md
u o rn rn rnoococowao rnrnrn M rnprnroom 1 M
(!!Q M O M �j L-j lyj�j r n m m m m r N
M r M r M M M M M o 0 0 0 0 M M M cq M"M m r (`
`- N N N N N N N N N N N N r r N N r r t0 r c0
y
� Q W
7
O Z'O_ l0 I!J 1(] lfJ 47 In LL7 l0 10(O l0(O In In N In In In In
O y y
y d
m
d O,'E
'C `O co m ao m ao m m m(O(D CO co`D co(O(D m m m-m m m(D m cO N OD
co co rrNNcocowcoNNmmmmrrrrNNrrrr= nrr
V Z o o N N N N 66�' O O
y 0 0 0 0 0 0 0 0� ������� O O O O O O O
O N L
p oa o0000000 0000 c? c3c 00
(n o(n o to n v v (n n(n(n (n v
y (O w o(D(O co n(D D fD(D(O o O(D m m N
•m U m oO o0(O ap(D c0(D(O(O IO(O IO(D(D n0IO m cD w'Do(n(O cOOOm OOM
O N}
l
Q d d m d d m d d d d d d d d d d m d d
c c c c c c c C '-'
G r 7 7 7 7 7 7 7 7 d d d d d d d d d d d d 7 7 7 7 d d 7 7 7 7 7 7 7
d (n(n cn(n c7 (n (n u)(n(n In(n
ami E (� In(n (n v�(�In(� �? `? In I ui ui ui ui u2 ui ui ui ui
mcicl mmmcommm mm
>, FQ aaaaa�sa .o.o�a aaaansn
N d d d d d d d d cG d d d d rG d d d d d d d
m LL LLLL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL
`o a
ol UUUUUU UU
V o 00 00000 UU
QQo0000ommmUUUU0000mm000000�
NU
— d m Q m a m a m a a a m m m m m m m m m m Q a Q m m m a a U a a m
O o o o 0 o 0 o 0 o o 7 7 7 7 o o 7 7 7 7 o o o O 7 o o c 0 0 0 0 7
y (nF zzzc9zC7zC�C7C�a¢aazzaaaaOO(DZ<Z(D 02 z za
c
0
V +d+ (p N(D MNMmm(n n(D OON7 M(O uO r V M(0 U-) mmo, cp
iC m ` mn(D(Om(OrN (D V r O M(n l.(D In(O ocO(D O?rrmm (D (()r b
() U m M(D M(O co r M N 7(O(D(O r N(O y r(D oo r�V r V N N l(!(D r r m
Q =Q
(n m m N m
` N Q m Q m a m a m a m r N m v In(D n m m a r n v a v v a v
a d r N N Cl)M'7 m n O]m 0 0 r r(D r r N N d N N
LL r d D j m LL LL LL LL LL LL
C y m m m
O
co Q vvvvvvvvwwcoowoww vva
V o00(Do m(D mm mm mmm mm MMMMM cM Mm mw to mM w
d mmmmmmmmmmmmmmmmvvvvvvIt m000m O
U O O O O O O O O O O O O O O O O M M M co co Cl)M O O O M ti
0: F r r r n n r r n r n n n n n n n n r r
Z
N a m M t`V I`O O m c0 M O 10 M N �V r O O a0 I`I N c0 N N O r
a d m M N 7 N N h 0 O)I I N O N O 01 r n 1-N N N(0 h �O M O
N W r V 01 V M 10 r CV 1- (11 r m N Uf m O N m V m Cp
m N t I�O O d' V 1� t`o
O)�N V m�M7 mOhMNO OM V V N NO V N O OCO V Ot-Mn ti
H? �nNrNONNM V f`m V ��V V ON V NOO V O)M O)�rr m �
O) N m m m r V W r r r N`- N N t`r N m N tO
O
Q 7 7 N V N V N N N fD m m m m m N N N V(O N M N M m m
ONOm O)mm Lq m qw wN mmmIN v Oq Lc) O0 cO
p Z N m N c0 N N N N m m m m r n O)O)m O)N N co
d - M N N N N N
N m n N O N m m O)
F N M M M V M V M r r N N N N m M M M M M V V M N M V m V co M M O)
- ;m
M r
J
Z I m
N N V m m m m m N m N m
R 0 0 0 0 0 0 o C)M N N c)co N^ N N N wM O O O O N 0 0 0 0 0 0 0
O= r N r N N M V
F-
Z
Q a O O O O O O O O h Lo N.N...N Lo Lo�0 0 0 0 Lo �0 0.. 0 0 0
J
u
za
- m
a:t!
0
Uz 000000000000 00
.a z m mmm to m m m m m m to m m
C N
N
M
oa
U y
r r r r r r r r r r r r r r
C
N
- Q Q Q Q Q Q Q Q Q Q Q Q Q Q
E Q
F- co co co cou)nlncnln(nincnu) ins
a
o „
U a • Y Y Y Y Y Y Y Y J J J J. Y Y
,� O
cU
N
Z N 7 7 N V M N co 7 7 f�O) m m m m c0 co N N(O M N m m
rn a V m M f`7 r O O m m M O m M N a N O N t` d)N m N N O r
a d m M N V N N ti O V m O)(O O)N V CO n N N N N fO (A O M O O O)O Q
N O)- n .O)V vj M M O)m Ch 4 r r m� 1��r m N t• O O)m m O N N 7 N CO
M m M CO r-N m V N N m co N V 1�r M r
O r�r N r N O N 01 r N V N CO O r N 0 M V N O O r h M r O) r h N r
F O) co m O)m r c}CO r r M (- N r N N r n r N O)r N m
O
Z V m 7 co V N 7 N N N 7 7 7 V m m m m m m N N N 7 m N M N(y m m
V W NO1m O)�O)mmNNNNN mm mO)N v OI IOONNm M
O Q N c0 N co N N N N m m m N n r O O)O)O N co N N m r N 0 N m m I
J M M M M M V N N N N N N N N N N N N M N(V m 7 N M M d1
r r r r r r r r r r r r r r r r r
N
Q
O N y
J�
t0 .+
mN NN NN m NN t` N
M O W d1 O W O O)N N N N CO N N N O)O)m W O O O CD N O N D1 01 O O)(A
UZ OONNNN00��*'�
a N MMMM MM MMQ����d. �. MMMM��MMMMMMM
O N M
U.
C G
O :2 O O O O O O O O to m m m m m V�r m m m m 0 0 0 0 m T O O O O O O O
N R N V.N m m m 6 0 m m m m m m m co M co N coV 6 w=m W M m m m
M m M M M M M M M M M M M N M m N
O N
i r
d ter: Lr m N "
L d N m N N N N N N V)w fn w vl to.1(n w 0)fn In N d N o In In N N N N N N N
�Qq. cnlnlncowcoco0 cnwoo wlnlnlnwww
`m (`a (`o m `m (`u `m `m m m `m (`om` `m
N F Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
(C
O O
N U U U U U U U
U O O O O O O O O O moo Y.m m m U U U U 0 0 0 0 mU mU 0 0 0 0 000
U N
m m Q m Q m Q m Q Q Q m m m m m m m m m m Q Q Q mmm Q Q U Q Q m
O o 0 0 0 0 0 0 0 0 0 7 > > 7 O O 7 7 J 7 0 0 0 O 3 O O C O U O O
N NF ZZZOZOZO(7(7QQQQZZ<<<<Ooc9z<ZU' Jf92ZZQ
C
O
mco V M m m V f` V Mmm� W OOO)N co
1`�u Oq m IN N CO It OM qu C mCO ON(O O)n 1�O)O) V CO m r ce
() O)O cOMmMmMhMN V mmmrNm7Ih mN a'in V NNmmrr'im ti
d) mmNm
N M V m m
a QmQmQmQm QmrNM V mcDl� NrnC `'r'3Bavav
rNN MM V m n N000 r (p rr N N N m (U N
Q LL r 7 7 7 7u-LL LLLL li LL
0
�Q
� V NCO m(O(Om mCO m(O tON mm mt0 MMM MMMMtOmmM ,�,
1p rnOo moo omoa mCA mm oo mmm mm mmmm O)m C
c� o000000000000000MMMMMMM000M ti
r- r- r-r- r-r` r-r-r•
M i!J In m M V v t•rn m M �h 'o N m h M
ya �cONN�N t`M mmcoo my ti�rn_MMrn
a N m M rn rn 0 0 O rn rn rn o rn r o rn r r O N p
R- Oa) Pn o r- m cov r-Orv00v cD co
ro
N M c V N N m c o rn I-M N O m m v v N rn N r p
C rn m r-r tr rn o N M V n N V m r V O m V M N N
F r m m r m m r r r- r r N N d' r c`Y
u
Q uJ UJ N In In In to In N N v V v v N N Ifl If)U7 1c7 N N O
(0 N N N N N N N N O ca m m m m ca O 0 0 0
pZ t` rt` �� titilhr cO fn�Nr ai Oi ai W aj ID
F u) V v V v v v v v r m m m m r M M M M m m m
.Q N N N N N N N N c;7 N N N N m m N N N
J
LO N h
y a fmD o V N co N O O lfJ c!) It7 1!) l0 In rn M N
Nrn f- rrn�Orn N Mm V co mN NN NO W C) Iy
�- M tnm m M6OrnMNNMNnNmNmcOjv M
co N m m m co u)r N r N N M V m n v N
F= f`v r-Mr Mm M N�m
Z vvvvvvvv c0 c0 c0
y d O O O O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 m l m
d Q r �UJ In N N to to m O lf1 to In Lo O 1n
J M M (2
Q�
z 3
Z a �N�l0 10 to t0 to
y N
d
J�
cL C
Zz rncrn rnrn rnrnrn O)rn 0)
U O O O O O O O O O O O O O O O O O O O O O O O
Z y NNNNNNNNou,'ocoN ONm mm NNN
N M
C
O.a
o r rn N
-a mco m co mmmm rm co co
N
o
a a
G n n n
�- ¢¢¢aQaaaaa¢¢aaaaaaaaa
cLS«
inininv°'u�mv° inininco0100(nn0wo)u)in
a
a d
U a p Z Z Z Z Z Z Z Z IC Y Y Y Y Y Y Y J J J J Z Z Z
U
c
N
In 1n Lo N M V ct r`m co M N Lo c0 m
N a N(O N O N O co r m m M O(O co r m v m rn v N m p
N Oc�tim 00mO�Ov rnrn(Orn r V(or-.N�O2 C
On O(Oo O M m m M cO M cnO N N n N 7 GoF� t c,2
rn m W aOO� M Nv N(Om V NO �MN(Dm N
v V m r r r r M m r N N N
O
Z N N v V N N lI)lfJ 1!J tf7 N N N m
y V m co m c0 m m m m ca<a m m co cO O m �j
C yQ cDmcDmmm (o ID Ntc]N c0 _mmmmmmM
J M M M co co M M M cfl M M M M ca ca N N N N M M M
r cu N N N N N N N
h d m
� Q 3
d z a n n n
9 N
J 0:
O cL C
O� co
fo NmcO
•I p N N m m m m N N m a�rn rn
rnrnrnrnrnrnrnrn rnrnrn
p U N �.j M M M c l i M 66 N N N N O O O O O
v v v v v v v v
Q ��
`O
u a
oa o0000000Nu�gU�U� �U� Lqu Mu o ID
d U d m In In In In In o mN c0 c0 fn N In c0 c0 1n N In In 1m0 lm0
C y n M M M M M M M
m
C cO OCO c0�to N10 w,`„ t:it .•.. C C C
.O+ .- ....- .-� ...r 75 d d d d d d d N d d N 77d d d d d d d ddwN(nwww (n u)( fn(1)E u)v>0 u)un cnu)v� mmmmmmmmmmmaaa
a Q a a a a a a�����M li li li
J —
Z O d
U p O O O O O O O D U MMMMMMM
U U U U U U U U U U U 0 0
C a U
O
d Y Y Y Y Y Y Y Y `O 2�_ Y Y _� 0 0 0
0 0 0 0 0 0 0 0 9 O O a
O `t 'o'o't'o't
y V)� O O O O O O O O'�o+J 0 o.•.•+• a a a
O Z Z Z Z Z Z Z Z a a a a Z Z a a a a U 0 0
V +d+ Nm MNMrnmcnrmmNVMN c0vrf` v p
i� cl` rnrm Lorn cn nN my r OMco u c Om Om cc! r- "T
() C O mMmM 6M hM N V o(0 u) N wa I-cn W ref V ti
CL Q
U)
M
d -y a m a m a N M M m a m m t•m rn O O N M v N m fr m rn
Q r N V V
LL
C
O
It v v v v v v v
u mmmmmmmmcocomcommmmMMMMMMM m
N rn rn rn rn rn rn rn rn rn rn rn rn rn rn rn rn v v v v v v v
G O O O O O O O co O O CD O O O O O M M M M M M M
r-r- r-1-r-r`r- ti
Q'
M(D (D O m V V n M cD m tD N l0 cD W N
N N N h (D cD m 0 cD m r OD T h O M c0 h M
M CDO M O m O M M M(o M O M r n n N N (o (p
~ O o V n O n(D O N V n O r 0 0 V M V r
N M N N N O 1D M n M N O C0(0 7 V N O M 7
D M(D n n h M N M 7 h U2 V O h V V M O�N O
h r0Or cor W— r� nr r Nr NN n n M
u
{p Q N N N N N N N N'��W c�D c�0 I(M M m o LO')0 o
pZ hn hhn hn nr 6CD(D CD r MMMMOoo6
y V V 7 7 V V 7 V r O O O O r~ 7 7 7 m N N N N N N N N N N N N MmmMr
J
Na O ItV N O N CD V co
a N m n n m h O m Lq co V'o lD �"N n 1Np
n
ip m 47 M M M M O M N N N N�`N O N O O O O O
co o m r N r N N m C
Z V V V V V V V V
y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 co:,
0 0
a Q if/Il)if/ Z m if/o LcD c cS lD lf)O O O
J II
a � 1
Z� c0 c0 t0(D cD cD(O c0
y V!
d
O r
M M M M M M M M 0 0 0 0 0 0 0 O O O O O
U� 00000000
'8 N N N N N N NNN m 10 m m m n m n m u)(D n
N
a
O.0
U-y o0000000r
o00000o0
c}
N
a- a a a aaaaaaaaaaa`aaa¢as
�G a n�G�
ha UUUUUUUU(0UOU U00U0Nu)VJ
a
o y
U o Z Z Z Z Z Z Z Z Y Y Y Y Y Y Y Y
c U
N
Z N(D (D N co V V m m n m to In In O O N co
O O O N O(D (D co co 0(D m r N V h O M O h M ti
a d O h m O O O O V M M to M r to n N N N cc
N
(a N n0 7 M O M(OD O M(o O M ID M N 6O N O M C
C O O of O M r N V N cD cD V N O O m V N O M
h M V �r cD r rmcor r Nr NNn n N
O
Z o n n U)m n m o N V R -T R N N l0 In In Oo[O CO
I^ll V O O O O O O O O("D O O c0 O O O O LL7 Ilo wm M
G y Q cD[D cD cn cD to ID cD (D cn c0 cn M M M M ao m O
J� m2 m2 (ommmco tom mmM(DloNN NN----
.Q r N N N N N N N N
(i1 O W
� Q 7
m za
a d
J Q-'
O C c
O� r (D(n 2 r co co in u�
MM MMM MM MN No000 oo co NN MMMMMM M
O U N M[h(+i('7('�[h('�L'J,It �'NV NV NV'NV V V V V'CT of(�]ci
Q y�
O
t) C
O o 0 0 0 0 0 0 0 0 0
Imp c6 6 c0 cD n W N 6 o w h
N U d co mmmmmm Nco co«i c[i cti(Ci(o cD u'i tti cf1 u'i co co co
mmm
N} co
mmm
N
m
- (D(D(D(D(D w iD„
N .r- n"y y r- N N w N w w o N N N N N n fl
L N— w o N o w N(n U)fn In(0(0 w (0 fn In(n N N N
m £ i (n (n(n(n (n(n (n(n(n
C7 Q' m m m f0 W c9 cc (0 m . . m
a ~ a a a a a a¢a 2 2 2 2 a a a
J
Q
G
UO OOOOOOOOmmmmmmmmUUUU
u O O O
a y
0
Y Y O O y y 0 0 Y Y O y y A? O D 0
Ni O O_
0Y 1 0 Y 0 Y 0 Y 0 Y 0 0 o a a S o o' >
(a In
O O O O D O O O'D +• O O« a
Z Z Z Z Z Z Z Z O O Q Q Q Q Z Z Q¢Q a o o o
Q O U O O U
jp a m c
(.) NO MNm M(o 10n(DON V M LL7 LL7C n V
w 01 i M h (D mM(O h N cD V r O M(D c!7 cD(n O O W O M h F
f.1 ` V (6 cl (o C')(Dm m N V ocoo rN o n(o w -�t'IT !�
a
L1 y Qm Na NO M am�naoMoo N
IL
mv(n cDn NM
Q r V It
G
0
•Q V V V V V V V R 7 V R V C'V V R
U (D co co(o(D co co(D co co(D(D(D to O(D m m m m m c-
m M M M M M M M M M M M M M M M
V O O O O O O O O O O O O O O O O m m m m m m m O
F h h h h h h h h n n h h h h h n ti
This plan does not include commercial fertilizer. The farm should produce adequate plant
available nitrogen to satisfy the requirements of the crops listed above.
The applicator is cautioned that P and K may be over applied while meeting the N requirements.
In the future, regulations may require farmers in some parts of North Carolina to have a nutrient
management plan that addresses all nutrients. This plan only addresses nitrogen.
In interplanted fields( i.e. small grain,etc, interseeded in bermuda),forage must be removed
through grazing, hay, and/or silage. Where grazing, plants should be grazed when they
reach a height of six to nine inches. Cattle should be removed when plants are grazed to a
height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care
should be exercised not to let small grain reach maturity, especially late in the season(i.e.
April or May). Shading may result if small grain gets too high and this will definitely interfere
with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen
being utilized. Rather than cutting small grain for hay or silage just before heading as is
the normal situation,you are encouraged to cut the small grain earlier. You may want to
consider harvesting hay or silage two to three times during the season, depending on the
time small grain is planted in the fall.
The ideal time to interplant small grain, etc, is late September or early October. Drilling is
recommended over broadcasting. Bermudagrass should be grazed or cut to a height of
about two inches before drilling for best results.
CROP CODE LEGEND
Crop Code Crop Description-Harvested As
A Barley Grain Crop
B Grazed Hybrid Bermudagrass Pasture/Grazed
C Hybrid Bermudagrass Hay Hay
B/C Comb. Hybrid Bermudagrass Graze/Hay Combination
D Corn-Grain Grain Crop
E Corn-Silage Silage
F Cotton Cotton Lint
G Grazed Fescue Pasture/Grazed
H Fescue Hay Hay
I Oats Grain Crop
J Rye Grain Crop
K Grazed Overseed Pasture/Grazed(Seeded in Bermudagrass)
L Overseed Hay Hay(Seeded in Bermudagrass)
M Grain Sorghum Grain Crop
N Wheat Grain Crop
O Soybean Grain Crop
P Pine Trees Pine Trees
S Small Grain Grain Crop/Hay(After Grain Crop)
CC Cover Crop Not Harvested; Burned/Disked In
SWG Swithgrass Biomass Crop
Acres shown in the preceding table are considered to be the usable acres excluding
required buffers,filter strips along ditches, odd areas unable to be irrigated, and perimeter areas
not receiving full application rates due to equipment limitations. Actual total acres in the fields
listed may, and most likely will be, more than the acres shown in the tables.
See attached map showing the fields to be used for the utilization of animal waste.
4of11
SLUDGE APPLICATION:
The following table describes the annual nitrogen accumulation rate per animal
in the lagoon sludge
Farm Specifications PAN/yr/animal Farm Total/yr
4719 Farrow to Wean 0.8 3775.2
Farrow to Feeder 0.96
Farrow to Finish 3.9
Wean to Feeder 0.07
Wean to Finish 0.27
Feeder to Finish 0.34
Gilts 0.39
Boars 0.55
The waste utilization plan must contain provisions for periodic land application of sludge at
agronomic rates. The sludge will be nutrient rich and will require precautionary measures to
prevent over application of nutrients or other elements. Your production facility will produce
approximately 3775.2 pounds of plant available nitrogen per year and will accumulate in the lagoon
sludge based on the rates of accumulation listed above.
If you remove the sludge every 5 years,you will have approximately 18876 pounds of plant
available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the
rate of 300 pounds of nitrogen per acre,you will need 62 acreas of land. If you apply the sludge
to corn at a rate of 125 pounds per acre,you will need 151.008 acres of land. Please note that these
are only estimates of the PAN produced and the land required to utilize that PAN. Actual values
may only be determined by sampling the sludge for plant available nitrogen content prior to application
Actual utilization rates will vary with soil type,crop, and realistic yield expectations for the specific
application fields designated for sludge application at time of removal.
APPLICATION OF WASTE BY IRRIGATION:
The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation
such that runoff or ponding occurs. This rate is limited by initial soil moisture content,soil
structure,soil texture,water droplet size,and organic solids. The application amount should not
exceed the available water holding capacity of the soil at the time of irrigation nor should the
plant available nitrogen applied exceed the nitrogen needs of the crop.
If surface irrigation is the method of land application for this plan, it is the responsibility of the
producer and irrigation designer to ensure that an irrigation system is installed to properly
irrigate the acres shown in the preceding table. Failure to apply the recommended rates and
amounts of nitrogen shown in the tables may make this plan invalid.
*This is the maximum application amount allowed for the soil assuming the amount
of nitrogen allowed for the crop is not over applied. In many situations,the application
amount shown cannot be applied because of the nitrogen limitation. The maximum
application amount shown can be applied under optimum soil conditions.
Your facility is designed for>180 days of temporary storage and the temporary storage must
be removed on the average of once every 6 months. In no instance should the volume of the
waste stored in your structure be within the 25 year 24 hour storm storage or one foot of
freeboard except in the event of the 25 year 24 hour storm.
It is the responsibility of the producer and waste applicator to ensure that the spreader equipment
is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply
the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid.
Call your technical specialist after you receive the waste analysis report for assistance in
determining the amount of waste per acre and the proper application prior to applying the waste.
5 of 11
Application Rate Guide
The following is provided as a guide for establishing application rates and amounts.
Soil Application Rate Application Amount
Tract Hydrant Type Crop in/hr * inches
70964 1 A NoB D 0.5 1
70964 1 B NoA D 0.5 1
70964 2A NoB D 0.5 1
70964 2B GoA D 0.4 1
70964 3A NoB D 0.5 1
70964 3B GoA D 0.4 1
70964 4A NoB D 0.5 1
70964 4B GoA D 0.4 1
70964 6 GoA B/C 0.4 1
70964 7 GoA B/C 0.4 1
70964 8 AuB B/C 0.6 1
70964 9 AuB B/C 0.6 1
70964 10A AuB B/C 0.6 1
70964 10B AuB B/C 0.6 1
70964 11 NoB B/C 0.5 1
70964 12 NoB B/C 0.5 1
343 13 AuB C 0.6 1
343 14 AuB C 0.6 1
343 15 AuB C 0.6 1
343 16 AuB C 0.6 1
343 17 GoA D 0.4 1
343 18 GoA D 0.4 1
343 19 GoA D 0.4 1
70964 sub 1A-413 NoB D 0.5 1
70964 sub 6-10B AuB B/C 0.6 1
70964 sub 11-12 NoB B/C 0.5 1
343 sub 17-19 GoA D 0.4 1
Field 1 Ln D 0.5 1
Field 2 GoA D 0.4 1
Field 3 MCC D 0.65 1
Field 4 NoA D 0.5 1
Field 5 NoA D 0.5 1
Field 6 AuB D 0.6 1
6of11
Additional Comments:
This plan revised to show the recalculated wetted acres remaining and added
after the conversion to Farrow-Wean.
OPTIONS:
A cover crop may be planted in any of the row crop fields if desired. This option
allows a maximum application of 30 Ibs N/ac from Sept-April and the amount
applied to the cover crop must be deducted from the following crops starting
PAN rate.
A small grain crop may be planted in any of the row crop fields if desired. This
option allows a maximum application of 100 Ibs N/ac from Sept-April and the
crop must be harvested as a hay crop.
4/6/2020 This revision changes fields 13,14 and 15 from combination hay
and graze to hay only.
2/25/2021 changed pulls 13-16 from grazed overseed to overseed hay.
10/5/2023 added sub field acres and added fields 1-6 to be applied on using
an Aerway or honey wagon. Updated crop rates. No other changes have been
made.
7 of 11
NUTRIENT UTILIZATION PLAN CERTIFICATION
Name of Farm: 3501-3102; AWS310514
Owner: Murphy-Brown, LLC
Manager-
Owner/Manager Agreement:
I/we understand and will follow and implement the specifications and the operation and
maintenance procedures established in the approved animal waste nutrient management
plan for the farm named above. I/we know that any expansion to the existing design capacity
of the waste treatment and/or storage system, or construction of new facilities, will require a
new nutrient management plan and a new certification to be submitted to DW R before the new
animals are stocked.
I/we understand that I must own or have access to equipment, primarily irrigation equipment,
to land apply the animal waste described in this nutrient management plan. This equipment
must be available at the appropriate pumping time such that no discharge occurs from the lagoon
in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land
according to this plan at the appropriate times and at rates which produce no runoff.
This plan will be filed on site at the farm office and at the office of the local Soil and Water
Conservation District and will be available for review by NCDWR upon request.
Name of Facility Owner: Murphy-Brown, LLC
Signature:
Date
Name of Manager(if different from owner):
Signature: _
Date
Name of Technical Specialist: Toni W. King
Affiliation: Murphy-Brown, LLC.
Address: 2822 Hwy 24 West, PO Drawer 856
Warsaw, NC 28398
Telephone: (910) 293-3434
Signature: `Q)`
Date
8of11
NUTRIENT UTILIZATION PLAN
REQUIRED SPECIFICATIONS
1 Animal waste shall not reach surface waters of the state by runoff, drift, manmade
conveyances, direct application, or direct discharge during operation or land application.
Any discharge of waste which reaches surface water is prohibited.
2 There must be documentation in the design folder that the producer either owns or has an
agreement for use of adequate land on which to properly apply the waste. If the producer
does not own adequate land to properly dispose of the waste, he/she shall provide
evidence of an agreement with a landowner, who is within a reasonable proximity,
allowing him/her the use of the land for waste application. It is the responsibility of the
owner of the waste production facility to secure an update of the Nutrient Utilization Plan
when there is a change in the operation, increase in the number of animals, method of
application, recieving crop type, or available land.
3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic
crop yields based upon soil type, available moisture, historical data, climatic conditions,
and level of management, unless there are regulations that restrict the rate of applications
for other nutrients.
4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste
may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons
per acre per year provided grass filter strips are installed where runoff leaves the field
(See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips).
5 Odors can be reduced by injecting the waste or disking after waste application. Waste
should not be applied when there is danger of drift from the land application field.
6 When animal waste is to be applied on acres subject to flooding, waste will be soil
incorporated on conventionally tilled cropland. When waste is applied to conservation tilled
crops or grassland, the waste may be broadcast provided the application does not occur
during a season prone to flooding (See "Weather and Climate in North Carolina" for
guidance).
7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff
does not occur offsite or to surface waters and in a method which does not cause drift
from the site during application. No ponding should occur in order to control odor and
flies.
8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the
surface is frozen.
9of11
NUTRIENT UTILIZATION PLAN
REQUIRED SPECIFICATIONS
9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not
covered with waste to a depth that would inhibit growth. The potential for salt damage from
animal waste should also be considered.
10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a
high potential for leaching. Waste/nutrient loading rates on these soils should be held to a
minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall
not be applied more than 30 days prior to planting of the crop or forages breaking dormancy.
11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The
outer perimeter of the land area onto which waste is applied from a lagoon that is a component of
a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal
waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be
applied closer than 25 feet to perennial waters.
12 Animal waste shall not be applied closer than 100 feet to wells.
13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by
the landowner.
14 Waste shall be applied in a manner not to reach other property and public right-of-ways.
15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge
or by over-spraying. Animal waste may be applied to prior converted cropland provided the fields
have been approved as a land application site by a "technical specialist". Animal waste shall not
be applied on grassed waterways that discharge directly into water courses, and on other grassed
waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift
from the site.
16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be
discharged into the animal waste management system.
10 of 11
NUTRIENT UTILIZATION PLAN
REQUIRED SPECIFICATIONS
17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon
embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the
vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas
where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and
structures should be inspected regularly for evidence of erosion, leakage, or discharge.
18 If animal production at the facility is to be suspended or terminated,the owner is responsible for
obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal
discharge, pollution and erosion.
19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to
prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site.
20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human
consumption. However, if animal waste is used on crops for direct human consumption, it should
only be applied pre-plant with no further applications of animal waste during the crop season.
21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary
storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to
maintain the liquid level between the markers. A marker will be required to mark the maximum
storage volume for waste storage ponds.
22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop
sites where waste products are applied. Nitrogen shall be the rate-determining nutrient, unless
other restrictions require waste to be applied based on other nutrients, resulting in a lower
application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored
and alternative crop sites shall be used when these metals approach excessive levels. pH shall be
adjusted and maintained for optimum crop production. Soil and waste analysis records shall be
kept for a minimum of five years. Poultry dry waste application records shall be maintained for a
minimum of three years. Waste application records for all other waste shall be maintained for a
minimum of five years.
23 Dead animals will be disposed of in a manner that meets North Carolina regulations.
11 of 11
3501 & 3102
AWS310514
Application Fields
Total Fld 6-10B = 30.18 Ac.
Wetted = 25.22 Ac.
Sub 6-108 = 4.96 Ac.
\ Hyd # Acres
1 A 6.92
1 B 3.76
2A 6.61
2B 3.53
3A 6.92
313 3.53
4A 7.79
6 4B 3.26
7 6 2.65
8 108 7 4.47
8 5.16
9 6.08-{J
10A i
10A 5.32
Total Fld 10-4B = 50.05 Ac. 10B 1.54
Wetted = 42.32 Ac. 11 2.53
Sub 1A-48 = 7.73 Ac. 12 5.65
13 4.51
1t 14 7.65
15 6.04
12 16 8.81
17 1.67
18 4.91
1B 19 4.74
48
IA
26 38 Lagoon Total 114.05
2q Total Fld 11-12 = 11.13 Ac.
3A Wetted = 8.18 Ac.
4A 3501 Sub 11-12 = 2.95 Ac.
Total Fld 4
1.59 Ac.
�\ Lagoon 3102 jo
5
o1 . P°
�
Total Fld 1 Total Fld 3 13 �a
= 5.41 Ac. = 1.90 Ac. 14
• 15
_ - Total Fld 6
Total Fid 2 = 6.80 Ac. '1
= 6.69 Ac. . • _ .
17
18
19
Total Fld 17-19 = 13.72 Ac.
Wetted = 11.32 Ac.
=
Sc:,ecifications: Pulls Sub 17-19 2.40 Ac.
Travelers: Ag Rain ST5, Ag Rain E30 &
Cadman 3500 C3
w/Nelson 150 Big Gun Sprinklers 1�EV111(
w/1.18" Nozzle @ 60 PSI P� l
300' WD & 225 GPM
260' Lane Spacing (Pulls 1A-413, 17-18)
250' Lane Spacing (Pulls 6-12) # W o y
''002414 Z
Specifications: Solid Sets GRAPHIC SCALE OESIG"ER
Sennin 7025 N RINY w/#18 Nozzles ® 50 P51 500 ° 250 soo ,000 �
135' WD & 16.3 GPM
80 x80' Spacing
( IN FEET ) 11
1 inch = 500 ft. 10/2023-Added aveages for subflelds/Gelds.ttbwt lrrlgouaa