HomeMy WebLinkAbout20240607 Ver 1_USACE Correspondence_20230713From: Healy, Shannon CIV USARMY CESAW (USA)
To: Home Life Construction, Inc.
Cc: Moore, Andrew W
Subject: RE: [External] SAW-2023-01204 10543 Greenville Hwy, Cedar Mountain construction activities
Date: Thursday, July 13, 2023 12:07:56 PM
Attachments: imaae001.ona
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the
Report Message button located on your Outlook menu bar on the Home tab.
Hi Mr. Caughey,
I have spoken with Andrew about this project, and we agreed to adjust the total wetland impacts to
0.099 acres. This will place you below the mitigation threshold for both the NCDEQ-DWR and the
USACE. Any future impacts on this property will require mitigation.
Please follow Andrew's instructions to fulfil the 401 requirements. Once a 401 certification has been
issued, the Corps will issue you an after -the -fact Nationwide Permit 29.
Best,
Shannon
From: Moore, Andrew W <andrew.w.moore@deq.nc.gov>
Sent: Wednesday, July 5, 2023 2:57 PM
To: Home Life Construction, Inc. <homeliferenovations@gmail.com>
Cc: Healy, Shannon CIV USARMY CESAW (USA) <Shannon.Healy@usace.army.mil>
Subject: [URL Verdict: Neutral][Non-DoD Source] RE: [External] SAW-2023-01204 10543 Greenville
Hwy, Cedar Mountain construction activities
Mr. Caughey,
Projects that are eligible for coverage under Nationwide Permit 29 from the US Army Corps of
Engineers and meet or exceed 0.1 acre of wetland impact require an Individual Water Quality
Certification from the Division of Water Resources.
To begin the process of applying for the after -the -fact Water Quality Certification, you must submit a
pre -filing meeting request. That may be done by sending an email to 40lPreFile(@deq.nc.gov and
providing the following information in the body of the email: Project Name, County, Applicant Name,
and Applicant Email.
Once 30 days has passed since submittal of the pre -filing meeting request, you may submit your Pre -
Construction Notification (PCN), which serves as the application for the Water Quality Certification.
An electronic version of the PCN may be completed here https://edocs.deq.nc.gov/Forms/Pre-
Construction_ Notification_ Form. You may find the PCN Help Document at this link
https://edocs.deq.nc.gov/WaterResources/DocView.aspx?dbid=0&id=2196924&cr=1.
Feel free to contact me if you have any questions.
Andrew W Moore, P.G.
Environmental Specialist 11, Division of Water Resources
North Carolina Department of Environmental Quality
Office: (828) 296-4684
Andrew.W.Moore(@deq.nc.gov
NORTH CAROLINA
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Healy, Shannon CIV USARMY CESAW (USA) <Shannon.Healy(@usace.arm)l.mil>
Sent: Monday, June 26, 2023 10:54 AM
To: Home Life Construction, Inc.<homeliferenovations(@gmail.com>
Cc: Moore, Andrew W <andrew.w.moore(@deq.nc.gov>
Subject: [External] SAW-2023-01204 10543 Greenville Hwy, Cedar Mountain construction activities
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the
Report Message button located on your Outlook menu bar on the Home tab.
Good Morning,
Thank you for meeting with me last Tuesday. As we discussed, we can move forward with issuing an
after -the -fact Nationwide Permit 29 for Residential Development projects (see attached) for the
work that has already been completed (Parcel number 9502-89-5670-000). This permit would
authorize the 0.1 acres of wetland filling that has been conducted on the property. Any future
wetland impacts would require you to submit a pre -construction notification to the Corps and would
require compensatory mitigation in the form of payment to a mitigation bank for the loss of
wetlands.
Before we can issue the after -the -fact permit, you must receive a water quality certification from the
state. Please work with Mr. Andrew Moore, cc'ed here, with the North Carolina Department of
Water Resources to ensure you receive the necessary certification.
Thank you,
Shannon
Shannon Healy
Regulatory Specialist
USACE Wilmington District -Asheville Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
828-271-7980, ext. 4233
shannon.healyC@usace.army.mil
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third
parties by an authorized state official.