Loading...
HomeMy WebLinkAboutR-2828_Permit Drawings_20240508W 0 c a� 0 U) a 3 E L oo T N / N H1 m M o, r7 M co ti L c c L L 0 3 END TIP PROJECT R-2721B BEGIN TIP PROTECT R-2828 BEGIN CONSTRUCTION —L— STA. 500 + 00.00 SITE #13 SITE #11 -Y17- SR 1006 SITE #10 OLD STAGE RD. SITE #9 SITE #8 v Sill E #6 PANTHER � NORFOLK RANCH SOUTHERN 10 RAILROAD M 7 9 \4 5 HOLLY SPRI 6 _ 16_ 1 I--54b c)S 2723 SITE #1 FANNY BROWN RD. SITE #12 SITE #2 SITE #7 SITE #70 SITE #3 SITE #5 SITE #13A / SITE #4 SITE #15 J CLEARING ON THIS PROJECT SHALL BE PERFORMED $ITE #15A - TO THE LIMITS ESTABLISHED BY METHOD III. SITE #17 THIS IS A CONTROLLED ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES. STATE OIL NORTH CAROI INA DIVISION OIL HIGHWAYS WAKE CH JOHNSTON COUNTY LOCATION. TRIANGLE EXPRESSWAY SOUTHEAST EXTENSION FROM EAST OF US 401 TO EAST OF I-40 TYPE OF WORK: DESIGN -BUILD AS SPECIFIED IN THE SCOPE OF WORK CONTAINED IN THE REQUEST FOR PROPOSALS BEGIN CONSTRUCTION -Y22- STA. 382+01.19 SITE #82A WETLAND AND SURFACE WATER IMPACTS PE� SITE#83— SITE #84 — SITE #85 SITE #73 - PAC KAG E R-2 82 8 -Y22B- SITE #57A DATE: NOVEMBER 4 2019 NEW BETHEL SITE #57 I CHURCH RD. SITE #59 SITE #58 - SITE #58A - SITE #55 SITE #56 - SITE #13A oZ SITE 454 SITE #53 SITE #14 SITE #52 SITE #16 SITE #51A SITE #51 SITE #18A SITE #45 SWIFT SITE #1813 SITE #44 -�\ CREEK SITE #18 SITE #19A SITE #19 LITTLE CREEK 13 �?®0 4 15 \ 1 \4 SRo2725 BIt6 HOLLAND CHURCH RD. SITE #21 SITE #22 SITE #23 SITE #40B SITE #24 SITE #25 SITE #31 SITE #26A SITE #32 SITE #27 SITE #28 L- -Y20- JORDAN BUFFALO 8I-540 RD CREEK 19 20 21 22 _ _ SR SAULS P.D. SITE #26 SITE #29 - - SITE #20 SITE #30 GUFFY BRANCH SITE #33 -j SITE #34 SITE #35 8TAT6 STATE PROJECT RBPBRBNCB NO. SIR NOT TOTAL XBBTS N.C. R-2828 I 9TATE PRO! NO. F A PROJ.NO DBOCRIPTION 35516.3.GV1 NHP 0540(043) DESIGN -BUILD 35516.2.3 NHP-0540 043 WW 35516.2.TA7 NHP-0540 043 P1w END TIP PROJECT R-2828 END CONSTRUCTION —L—STA. 968 + 50.00 A Y22- i-40 e SITE #50 -Y21- SITE #49 H �, -Z ' 50 2ro SITE #48 RD SITE #47 0 x I-540 TT—� SEA 53 52 . SITE #82 SITE #78 - SITE #77 SITE #79 SITE #80 SITE #81 SITE #87 SITE #88 END CONSTRUCTION -Y22- STA. 497 + 92.36 srs 25 SITE #76 SITE #75 SITE #42 ` SITE #41 SITE #40 �sr SITE #39 ITE #40A SITE #38 SITE #37 PERMIT DRAWING SITE #36 ) LANE f -a6L!JTHE SHEET 1 OF 171 GRAPHIC SCALES DESIGN DATA PROJECT LENGTH P P° ( ° f" " sul nrs''Brrevu.Le srHBer HYDRAULICS ENGINEER 50 25 100 ADT 2018 = NA LENGTH OF ROADWAY PROJECT R-2828 = 8.055 Miles sua ; F,r6 usoo 1 I L H NC JT601 "q.RJ6.4o40 FA%: 1.919.836.4099 ND•F-0F65 ®0� ,�50 �� ADT 2040 = 53,400 5 ARNRF FOR THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATTON 2018 STANDARD SPECIFICATIONS �, DHV = % PLANS D = 65 % LENGTH OF STRUCTURE PROJECT R-2828 = 0.562 Miles P.E. ® m 50 25 0 50 100 T = 11 % * V = 75 MPH (TTST 4 + DUAL 7) TOTAL LENGTH OF TIP PROJECT R-2828 = 8.617 Miles RIGHT OF WAY DATE. SEPT. 09, 2019 DANIEL BRIDGES, PE SIGNATURE � �� Q� NtQo p ®jpl ROADWAY DESIGN ENGINEER PROJECT ENGINEER PROFILE (HORIZONTAL) HORIZONTAL 10 5 0 10 20 LETTING DATE: RONYELL THIGPEN, PE pA&M PROJECT DESIGN ENGINEER FUNCTIONAL CLASS: FREEWAY NCDOT CONTACT. DESIGN EWER PROJECT ENGINEER - TRAxsPoerarrox PROGRAM MANAGEMENT uxrT DEC. 11, 2019 P.E. SIGNATURE: PROFILE (VERTICAL) III I W/ELB S ITE #41 INSET A CE TEMPORARY R5 RIM PACT U R AQC� GRAPHIC SCALE TEIZffVIP CT DENOTES IMPACTS IN CLEARING I� ►'I� �II►�p ��WETLAND DENOTES TEMPORARY IMPACTS IN SURFACE WAT! Apip PIPE 0 CHANNEL STAg SWIFT CREEK BASIN llu, • III SITE #41 RI II + vW ail II 1 N I - 1 A � v /- :ram f� "J � w iTPE - n Poe oe-� \ a, a ". va ...... zl— EP SE #40A E — TLANP PONDS SHALL BE DRAINED IN ACCORDANCE WITH THE "POND PLANAS APPROVED BIY NAGE THE ENGINE RUIREMENT PERMIT DRAWING / SHEET 90 OF 171 / ioo GRAPHIC SCALE / - ®ITSIJ DENOTES FILL IN I _ ., e e:'NF ?2 FCj `''di-• I WETLAND /g I , °° ?NFTSFF DENOTES IMPACTS IN SURFACE WATER E }� / /�// * 46 T /d o 7 /� /� / / 0 T; 4:" LINE SEE SN16+50.00 \ DENOTES TEMPORARY E�. "� /// // / / /op TSLIPBPp. STA 01 I\ IMPACTS IN SURFACE WATER a WE_K- '/a / ""/ TEMPORARY FILL IN WETLAND / > soon SITE#58 [�SF m,,.. IMP TS "BY OHERS",�TYP. (PROJECT 1-511,1 NOTE: SHADED REA SI N(FI,ES' o° . REVISION TO 41E OF IIVIPA > , o $° u, IN WETLAND. v 0051 AC OF ORIG AJL IMPA _ �� �l NTIFIIED AS FILL T A ILL NOW BE EXCA I I STA,??pCyjNF / e-n PROPOSED GUARDRAIL / �+�a w \ S6*SyU. 'GiPE f�. / /// ��/ / �I{" �" ` C}p� ED �' /c \\\.. DAT_I PROPOSG RAL / PROPOSED GUARDRAIL I:i G / / xc xsTt W m+ PROPOSED GUARDRAIL —/T— — N5 xc 9 930 PE �)] PROPO -A U -1 1s N 66 000'E ' / 91, 950 s0 RRIER'ARDRAIL W GUARDRA25 IL 2 / r' asc 5 die a/ / S �II o AD Qo�� of I °..x, SITE #7 (Av �.�* PONDS SHALL BE DRAINED IN ACCORDANCE WITH SD y�e '?zS1NF / F° ° �* 3 REQUIREMENT" / THE "POND DRAINAGE PLAN REQUIR " AS APPROVED BY THE ENGINEER SN O • F d 1 m SrGE 0.0 sFC? yF SF ' PI A .eE�". U,Eeu µ mix a _„_ 1 \ S4N Q4N sill.® SrAF4yFFT s '$eE PERMIT DRAWING EHEM Br*OSOr9.<?�y` SHEET 128 OF 171 a 4 j9,e�ty MA TC - —g� � B€i "Rv°o> ERs oo �� reeolav crelo Y22 LYCCNES"A. 8 7E 7' q8 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 * 503+27 (RT) RDWY Fill (WCD) 0.161 2 505+24, 505+63 (LT) 9'x8' RCBC (SBP) 0.03 0.002 519.00 20.000 2 505+24, 505+63 (LT) 9'x8' RCBC Pipe Stabil. (SBP) 0.01 95.00 3 506+50 (RT) 42" RCP(WCE(1),WCE(2),SBR) 0.546 0.007 0.00 0.000 90.00 10.000 3 506+50 (RT) 42" RCP Pipe Stabilization (SBR) 0.00 35.00 4 508+50 (LT)- 511+70 (RT) Drain Pond (PM) 1.57 5** 508+60-515+40 (RT) RDWY Fill (WCF) / Stream (SBR) 0.033 0.03 462.00 6 512+15 (LT) RDWY Fill (WCH) / Stream (SBU) 0.018 0.009 0.035 0.02 0.004 173.00 33.000 7 515+32 (LT) - 520+00 (LT) RDWY Fill (WCI) / Stream (SBS) 0.673 0.067 0.054 0.00 27.00 8 529+75 - 531+00 (RT) Roadway Fill (WCJ) 0.118 0.010 9 545+63 - 548+40 Roadway Fill (WCL) 0.220 10 548+68 (LT)-549+40 (RT) 6'x8' RCBC (SBY, WCM) 0.003 0.05 0.002 485.00 18.000 10 548+68 (LT)-549+40 (RT) Culvert Stabilization (SBY) 0.01 77.00 10 548+68 (LT)-549+40 (RT) Bank Stabilization (SBY) 0.00 14.00 11 557+67 (RT)-559+60 (LT) 9'x8' RCBC (WCQ, SBX) 0.077 0.043 0.08 0.004 484.00 22.000 11 557+67 (RT)-559+60 (LT) 9'x8' RCBC Culvert Stabil. (SBX) 0.01 70.00 11 557+67 (RT)-559+60 (LT) Bank Stabilization (SBX) 0.00 7.00 12 558+00 (RT) Roadway Fill (WCR) 0.055 13 Ramp Quad C (-Y17-) Drain Pond (PN) 1.04 13 Ramp Quad C (-Y17-) Roadway Fill (WCV) 0.020 0.005 13** Ramp Quad C (-Y17-) Roadway Fill (WCW) 0.043 13A Ramp Quad A (-Y17-) Drain Pond (PP) 1.01 13A Ramp Quad A (-Y17-) Roadway Fill WCZ(2) 0.400 0.001 SHEET 1 SUBTOTALS***: 2.36 0.00 0.08 0.16 0.00 3.88 0.01 2538 103 0 NOTES: *Represents an isolated wetland impact (also non -riparian) **Represents any non -riparian wetland impact ***Rounded totals are sum of actual impacts Revised 2018 Feb WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 14 609+07 (LT)-610+38 (RT) Roadway Fill (WCZ(1)) 1.284 0.271 14 609+07 (LT)-610+38 (RT) 10'x8' RCBC (SCC) 0.02 0.001 322.00 10.000 14 609+07 (LT)-610+38 (RT) Culvert Stabilization (SCC) 0.01 78.00 14 609+07 (LT)-610+38 (RT) 10'x8' RCBC (SCK) 0.02 0.001 257.00 10.000 14 609+07 (LT)-610+38 (RT) Culvert Stabilization (SCK) 0.00 26.00 15 616+50 (RT) Drain Pond PQ, WCZ(2) 0.35 15A 616+50 (RT) Energy Dissipator (WCZ(2) 0.000 0.002 16 618+00 (RT) Drain Pond (PR) 1.01 17 622+30 - 622+54 (RT) Roadway Fill (WCZ(1)) 0.014 0.005 18 653+75 - 655 + 50 (LT) Roadway Fill (WDB) 0.356 0.037 18A -Y18A- 15+00 - 17+50 Roadway Fill (WDD) 0.196 0.096 18B -Y18A- 19+50 18" RCP (SCF) 0.01 0.001 47.00 10.000 18B -Y18A- 19+50 18" RCP Pipe Stabil. (SCF) 0.01 17.00 19 BRIDGE Bank Stabilization (SCG) 0.00 0.003 10.00 17.000 19A BRIDGE Roadway Fill (WDB) 0.033 0.020 0.853 20 662+00 - 671+00 Roadway Fill (WDB) 2.000 0.117 21 689+00 - 691+00 (LT) Roadway Fill (WDF) 0.186 0.018 0.049 22 690+00 - 691+75 (RT) Drain Pond (PU) 0.87 23 692+20 - 703+00 Roadway Fill (WDG(1)) 2.754 0.375 0.261 24 699+00 - 700+00 (LT) Drain Pond (PW) 0.12 25 703+00 - 705+40 Drain Pond (PV) 0.93 26 697+00-709+00 Roadway Fill (SCL) 0.06 0.001 1047.00 10.000 26 697+00-709+00 Culvert Stabilization (SCL) 0.00 30.00 SHEET 2 SUBTOTALS***: 6.823 0.000 0.394 0.858 0.853 3.404 0.007 1834.000 57.000 0.000 NOTES: *Represents an isolated wetland impact (also non -riparian) ** Represents an isolated wetland impact ***Rounded totals are sum of actual impacts 2018 Feb WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 26A 707+50 Roadway Fill (SCM) 0.01 0.002 266.00 35.000 26A 707+50 Culvert Stabilization (SCM) 0.00 65.00 27 705+75 - 714+00 Roadway Fill (WDH) 2.443 0.030 0.236 28 711+00 - 714+00 (LT) Roadway Fill (SCN) 0.01 0.001 156.00 10.000 29 726+50 - 728+00 (RT) Drain Pond (PY) 1.40 30 728+00 - 734+50 (RT) Channel Change (SCQ) 0.06 673.00 31 736+00 Roadway Fill (WDJ, SCQ) 0.375 0.092 0.03 0.007 130.00 58.000 32 736+70 (LT) - 738+00 (RT) 2 @ 8'x9' RCBC (SCP) 0.07 0.016 379.00 92.000 32 736+70 (LT) - 738+00 (RT) Culvert Stabilization (SCP) 0.01 44.00 32 736+70 (LT) - 738+00 (RT) Bank Stabilization (SCP) 0.00 29.00 33 759+00 (RT) - 759+82 (LT) Roadway Fill (WDM) 0.392 0.030 34 767+65 (RT) Roadway Fill (WDN) 0.001 35 782+00 (LT) 9'x8' RCBC (SCT) 0.05 0.004 441.00 37.000 35 782+00 (LT) Culvert Stabilization (SCT) 0.01 47.00 35 782+00 (LT) Bank Stabilization (SCT) 0.00 18.00 36 782+00 - 787+20 Roadway Fill (WDO) 0.707 0.002 0.060 37 785+90 (RT) - 787+70 (LT) 48" RCP (SCV) 0.03 0.003 394.00 20.000 37 785+90 (RT) - 787+70 (LT) Pipe Stabilization (SCV) 0.00 37.00 38 788+00 (LT) Roadway Fill (WDP) 0.006 39 812+00 - 813+00 (LT) Roadway Fill (WDS) 0.080 40 812+90 - 813+37 (LT) Channel Change (SDB) 0.01 54.00 40 813+50 (LT) Channel Change (SDC) 0.01 93.00 40A* -Y21- 40+00 (LT) Roadway Fill (WDR) 0.091 40B -Y21- 44+40 (RT) Roadway Fill (SCZ) I I I I I 1 0.00 0.001 52.00 13.000 SHEET 3 SUBTOTALS***: 1 4.09 1 0.00 1 0.03 1 0.43 1 0.00 1 1.70 0.03 2878 265 0 NOTES: *Represents an isolated wetland impact (also non -riparian) **Represents any non -riparian wetland impact ***Rounded totals are sum of actual impacts 2018 Feb WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 41 813+50 (LT) - 829+50 (RT) Channel Change (SCY) 0.24 0.03 1689 130 41 -Y21- 44+50 (RT) 18" CSP (SCY) < 0.01 58 41 -Y21- 44+50 (RT) Pipe Stabilization (SCY) < 0.01 21 41 829+50 (LT) - 834+00 (RT) Bank Stabilization (SCY) 0.09 340 42 BRIDGE 832+50 (RT) Work Trestle (WDU) 0.02 44 BRIDGE Bridge**** 0.02 0.02 0.54 0.05 238 44 BRIDGE Bank Stabilization 0.01 44 45 841 +78 - 843+00 (LT) Roadway Fill (W DV) 0.05 0.03 47 856+50 - 861 +50 Roadway Fill (W DV) 0.37 0.05 48 861 +40 - 866+30 Work Trestle (W DV) 0.02 < 0.01 0.65 49 867+50 - 868+50 Work Trestle (WDY) < 0.01 0.17 50 876+00 14'X8' RCBC (SDJ) 0.03 < 0.01 318 46 50 876+00 Culvert Stabilization (SDJ) < 0.01 42 50 876+00 Bank Stabilization (SDJ) < 0.01 48 50A 875+50 - 877+00 Roadway Fill (W DZ) 0.56 0.09 51 890+00 42" RCP (SDK) < 0.01 < 0.01 32 10 51 890+00 Pipe Stabilization (SDK) < 0.01 21 51A 890+00 Roadway Fill (WEA) 0.29 52 895+00 60" RCP (SDL) 0.05 < 0.01 588 20 52 895+00 Pipe Stabilization (SDL) < 0.01 39 53 900+50 (LT) - 906+50 (RT) 42" RCP (SDM) 0.05 < 0.01 948 20 53 900+50 (LT) - 906+50 (RT) Pipe Stabilization (SDM) < 0.01 47 54 1911+00 (LT) - 913+75 (RT) I Roadway Fill (WEC) 1 1.88 1 1 1 0.10 SHEET 4 SUBTOTALS***: 1 3.19 1 0.02 0.27 1.38 1 0.50 1 0.09 4235.00 1 464.00 NOTES: *Represents an isolated wetland impact (also non -riparian) **Represents any non -riparian wetland impact ***Rounded totals are sum of actual impacts ****Impacts are rounded to the nearest hundreds ised 2018 Feb WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 55 914+00 (RT)-918+50 (LT) 2@ 9'x9' RCBC (SDW) 0.12 < 0.01 834 10 55 914+00 (RT)-918+50 (LT) Culvert Stabilization (SDW) < 0.01 18 55 914+00 (RT)-918+50 (LT) Bank Stabilization (SDW) < 0.01 4 56 Y22SLIPRPB 38+50 (LT) Channel Change (SDV) 0.02 < 0.01 518 10 57 -Y22RPB- 25+42 (LT) 54" RCP (SDT) 0.01 < 0.01 113 10 57 -Y22RPB- 25+42 (LT) Pipe Stabilization (SDT) < 0.01 22 57A -Y22RPB- 26+50 (LT) Channel Change (SDS) < 0.01 < 0.01 72 10 58 Y22FLYBD 46+50-47+75 42" RCP (SDT) 0.01 < 0.01 196 20 58 Y22FLYBD 46+50-47+75 Pipe Stabilization (SDT) < 0.01 47 58A Y22FLYCC 123+00-127+0 54" RCP (SDT) 0.05 < 0.01 485 20 58A Y22FLYCC 123+00-127+OC Pipe Stabilization (SDT) < 0.01 57 59 Y22FLYCC 119+00 (RT) 15" CSP (SDX) < 0.01 17 15 59 Y22FLYCC 119+00 (RT) Pipe Stabilization (SDX) < 0.01 < 0.01 75 59A Y22FLYCC 119+00 (RT) Roadway Fill (WEJ) < 0.01 < 0.01 70 -Y17- 28+50 24" Pipe Stabilization SCB(1) < 0.01 < 0.01 20 10 72 REMOVED Non -Jurisdictional Pond (PAB) 73 Y22FLYBD 34+70 (RT) 30" RCP Extension (SDR) < 0.01 < 0.01 10 10 73 Y22FLYBD 34+70 (RT) Pipe Stabilization (SDR) < 0.01 57 75 Y22FLYCC 34+00-41 +00 Bridge (W EC, SDV) 0.03 0.02 1.56 0.01 254 76 Y22FLYCC 143+00 (RT) 42" RCP (WEC, SDO) < 0.01 < 0.01 0.08 < 0.01 1101 10 77 Y22FLYCC 71+00 (615' LT Roadway Fill (WEY) 0.06 78 REMOVED 60" RCP Pipe Removal (SET) 79 Y22FLYBD 83+00 (LT) 54" RCP (SET) 0.04 < 0.01 563 20 79 1 Y22FLYBD 83+00 (LT) Pipe Stabilization (SET) < 0.01 1 44 SHEET 5 SUBTOTALS***: 1 0.09 0.03 1.56 0.36 0.02 4253 399 0 NOTES: *Represents an isolated wetland impact (also non -riparian) **Represents any non -riparian wetland impact ***Rounded totals are sum of actual impacts Revised 2018 Feb WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 80 -Y22FLYBD- 83+50 (RT) Roadway Fill (WEV) 0.03 81 -Y22RPDE- 29+50 (RT) Roadway Fill (WEU) 0.04 82 -Y22FLYBD- 113+30 (RT) HSB Outlet SEH, (WFN(2)) 0.05 < 0.01 10 82 -Y22FLYBD- 113+30 (RT) 12" Pipe Stabil. (SEH) < 0.01 15 82A -Y22SEC2- 382+00 - 386+00 (LT) Channel Change (SEM) 0.04 < 0.01 422 20 83 -Y22SEC2- 396+50 (LT) Channel Change (SEK, WFF) < 0.01 < 0.01 < 0.01 28 13 84 -Y22SEC2- 405+00 (LT) 60" CMP & 72" WSP (SEL) < 0.01 10 84 -Y22SEC2- 405+00 (LT) Pipe Stabilizatoin (SEL) < 0.01 37 85 -Y22SEC2- 416+00 (LT) 30" RCP Pipe Extension (SEV) < 0.01 < 0.01 59 10 85 -Y22SEC2- 416+00 (LT) Pipe Stabilizatoin (SEV) < 0.01 19 87 -Y22SEC2- 474+20 (LT) 42" Pipe (SES) < 0.01 10 87 -Y22SEC2- 474+20 (LT) Pipe Stabilization (SES) < 0.01 10 88 -Y22SEC2 (LT) - 80+00 (LT) 48" RCP (SES) 0.02 < 0.01 244 20 88 -Y22SEC2 (LT) - 80+00 (LT) Pipe Stabilizatoin (SES) < 0.01 30 91 Y22FLYCC 121+30/121+90 (RT) Haul Road (SDQ) 0.01 66 92 Y22RPB 23+65/24+85 (LT) Ex. Piers & Bridge Demolition (WEL, SDS) 0.05 < 0.01 92 93 Y22RPB 26+27 (LT) Ex. Piers & Bridge Demolition (WEK, SDS) < 0.01 < 0.01 35 SHEET 1 SUBTOTALS 2.36 < 0.01 0.08 0.16 3.88 0.01 2538 103 SHEET 2 SUBTOTALS 6.82 0.39 0.86 0.85 3.40 < 0.01 1834 57 SHEET 3 SUBTOTALS 4.09 0.03 0.43 1.70 0.03 2878 265 SHEET 4 SUBTOTALS 3.19 0.02 0.27 1.38 0.50 0.09 4235 464 SHEET 5 SUBTOTALS 1 1 0.09 0.03 1.56 1 0.36 0.02 1 4253 1 399 TOTALS***: 16.62 0.05 0.52 1.79 3.79 9.92 0.19 16602 1574 0 NOTES: *Represents an isolated wetland impact (also non -riparian) **Represents any non -riparian wetland impact ***Rounded totals are sum of actual impacts 2018 Feb