Hi Rebecca,
See response in Red below. Hopefully the response below will address your concerns. If not, please let me
know. Thanks for your assistance with this project. Have a good week.
Sincerely,
Michael T. Brame
336.708-4620 (c)
336.310.4527 (o)
PO Box 128
Kernersville, NC 27285
www.oilotenviro.com
mbrame(@Dilotenviro.com
From: Chandler, Rebecca D <rebecca.chandler@deq.nc.gov>
Sent: Thursday, May 16, 2024 10:23 PM
To: Michael Brame <mbrame@pilotenviro.com>
Subject: Evolve at Mebane - additional Buffer information required
Hi Michael, I'm through my review of the PCN for Evolve at Mebane but need some clarification and additional
information before finalizing the permit. Please provide a response within 30 days, and please note that the
application will be on hold until a response is received.
1. In reviewing for the Buffer Authorization, the plans showthat total Zone 1 and Zone 2 impacts are 16,476 sq
ft and 9,388 sq ft, respectively. The impact table with the PCN only noted impacts associated with the road
crossing. Please provide back a buffer impact table clearly enumerating total impacts and use.
The total Zone 1 impacts are to 9,388 square feet. All of the Zone 1 impacts are associated with the road
(located within the road and associated slope footprint). The Zone 2 impacts associated with the road and
slope are to 3,202 square feet. These are considered permanent impacts.
SEI, the engineering firm that designed the development plan, also showed temporary impacts to Zone 2 of
the buffers associated with clearing in order to construct a retaining wall (to be located outside the buffer)
and clearing in order to construct an erosion control device (graded areas to be located outside the
buffers). No impervious surfaces are being created and the areas will remain vegetated following
construction.
The buffer impacts have been submitted to the City of Mebane who has delegated authority to review and
approve the buffer impacts in conjunction with their review and approval of the site plan. A buffer
authorization will be issued by the City of Mebane.
Thankyou,
Rebecca Chandler
Environmental Program Consultant
Division of Water Resources
North Carolina Department of Environmental Quality
Winston-Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston-Salem, NC 27105-7401
336-776-9705 office
336-354-2284 cell
336-776-9797 fax
rebecca.chandler0deq.nc.gov "PLEASE NOTE NEW EMAIL ADDRESS"
,::5:-
C' .INAM E
N7RTIi �^
`uepnonw Konmeluel 4uenly
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.