HomeMy WebLinkAboutNCS000048_Inspection_20230825 t1
ROY COOPER a ¢ C AI\ C
Governor '4 F ' `
J
ELISABETH BISER '.
I� +o
Secretary •Via
DOUGLAS ANSEL ��.'.""" �"
Interim Director NORTH CAROLINA
Environmental Quality
August 25, 2023
Chemol Co. Inc.
Attention: William Newlin
PO Box 16286
Greensboro,NC 27402
Subject: Compliance Evaluation Inspection
Chemol Co. Inc.
NPDES Certificate of Coverage—NCS000048
Guilford County,North Carolina
Dear Mr. Newlin,
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection we conducted at the Chemol Greensboro facility on July 20, 2023. Please note that in
the stormwater inspection report summary we ask that you
The report should be self-explanatory; however, should you have any questions, please do
not hesitate to contact me at(336) 776-9654.
Sincerely,
y G� �� L VL
Tamera Eplin, E
Regional Eng neer
Land Quality Section
Enclosure
c: Laserfiche
Q North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources
ja....in
Winston-Salem Regional Office 1450 W Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105
336-776-9800
a
Compliance Inspection Report
Permit: NCS000048 Effective: 08/01/17 Expiration: 07/31/22 Owner: Chemol Co Inc
SOC: Effective: Expiration: Facility: Chemol Co Incorporated
County: Guilford 2300 Randolph Ave
Region: Winston-Salem
Greensboro NC 27402
Contact Person:William Newlin Title: Phone: 336-333-3055
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 07/20/2023 Entry Time 11:30AM Exit Time: 12:30PM
Primary Inspector:Lily C Kay Phone: 704-663-1699
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Stormwater Discharge, Individual
Facility Status: ill Compliant ❑ Not Compliant
Question Areas:
• Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCS000048 Owner-Facility:Chemol Co Inc
Inspection Date: 07/20/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The Stormwater Pollution Prevention Plan (SWPPP) and related documentation was complete except the annual
certification. The analytical monitoring was incomplete for the lack of Tier responses for benchmark exceedances. The
facility appeared well operated and maintained except where water is bypassing trench drains that feed the wastewater
treatment plant. Two outfalls were noted in the SPPP, but a potential third was observed during the inspection that does not
drain to the other outfalls. This outfall needs to be monitored as well. If you have questions, contact the Winston-Salem
regional office.
Page 2 of 3
Permit: NCS000048 Owner-Facility:Chemol Co Inc
Inspection Date: 07/20/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? ❑ 0 0
#Does the Plan include a General Location (USGS) map? • 0 ❑
#Does the Plan include a "Narrative Description of Practices"? • 0 ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? • 0 ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑
#Has the facility evaluated feasible alternatives to current practices? • ❑ ❑
#Does the facility provide all necessary secondary containment? M ❑
#Does the Plan include a BMP summary? • ❑ 0 ❑
#Does the Plan include a Spill Prevention and Response Plan (SPRP)? • 0 0 0
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? • ❑ 0 ❑
#Does the facility provide and document Employee Training? • ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)?
#Is the Plan reviewed and updated annually? ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? ❑
Has the Stormwater Pollution Prevention Plan been implemented? • CI ❑
Comment: The Stormwater Pollution Prevention Plan (SWPPP) and related documentation was complete
except the annual certification.
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring? • ❑
Comment: Qualitative monitoring records were available and complete.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? • ❑ Cl 0
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? • ❑ ❑ ❑
Comment: Analytical monitoring has been conducted, but Tier response for TSS, COD, and Nitrogen have
not been conducted.
Permit and Outfalls Yes No NA NE
#Is a copy of the Permit and the Certificate of Coverage available at the site? • ❑ ❑ ❑
#Were all outfalls observed during the inspection? 11 0 ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑
#Has the facility evaluated all illicit(non stormwater)discharges? ❑ ❑ II 0
Comment: The facility appeared well operated and maintained except where water is bypassing trench
drains that feed the wastewater treatment plant. Two outfalls were noted in the SPPP, but a
potential third was observed during the inspection that does not drain to the other outfalls.
This outfall needs to be monitored as well.
Page 3 of 3