HomeMy WebLinkAboutNC0079481_Compliance Evaluation Inspection_20240220
SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED.
February 20, 2024
Dennis J Whitson, Owner
Harmony Estates
Email: dennisw@whitsonrealty.com
SUBJECT: Compliance Inspection Report
Harmony Estates WWTP
NPDES WW Permit No. NC0079481
McDowell County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Harmony Estates
WWTP on 2/01/2024. This inspection was conducted to verify that the facility is operating in
compliance with the conditions and limitations specified in NPDES WW Permit No. NC0079481. The
findings and comments noted during this inspection are provided in the enclosed copy of the inspection
report entitled "Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact Mara Chamlee with the Water
Quality Regional Operations Section in the Asheville Regional Office at 828-296-4500 or via email at
mara.chamlee@deq.nc.gov.
Sincerely,
Daniel Boss, Assistant Regional Supervisor
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Inspection Report
Ec: Laserfiche, Phillip Pittman (ORC)
DocuSign Envelope ID: B11039EB-7511-482C-A601-7D178ACF89B5
EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NC0079481 24/02/01 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Harmony Estates WWTP
Deer Park Rd
Marion NC 28752
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
10:30AM 24/02/01 20/06/01
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Phillip Charles Pittman/ORC/828-756-4111/
Other Facility Data
11:30AM 24/02/01 24/12/31
Name, Address of Responsible Official/Title/Phone and Fax Number
Dennis J Whitson,3800 Sugarhill Rd Marion NC 28752//828-738-3540/8284384276 Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self-Monitoring Program Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Mara G Chamlee DWR/ARO WQ/828-296-4500/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
DocuSign Envelope ID: B11039EB-7511-482C-A601-7D178ACF89B5
2/20/2024
2/20/2024
NPDES yr/mo/day
24/02/01
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Mara Chamlee, with the Asheville Regional Office, conducted a Compliance Evaluation Inspection of
the Harmony Estates WWTP on February 1, 2024. This inspection was conducted to determine
whether the facility is being operated and maintained in compliance with NPDES Permit No.
NC0079481. Mr. Phillip Pittman (ORC) was present and assisted with the inspection.
The following items were noted during the inspection:
1) Equalization Basin- It is recommended that the phone lines be hooked up at the facility in order to
bring the auto-dialer into operation. A new influent grinder pump was installed in 2023 and has
greatly increased the efficiency of the plant and EQ basin capacity, according to Mr. Pittman.
2) Bar screen- It is recommended that a screen with bars that are closer together still be installed.
There was evidence of some debris present around the bar screen on the ground, and these
screenings should be disposed of along with the remainder of screenings into the landfill.
NC0079481 17 (Cont.)
Page#2
DocuSign Envelope ID: B11039EB-7511-482C-A601-7D178ACF89B5
Permit:NC0079481
Inspection Date:02/01/2024
Owner - Facility:
Inspection Type:
Harmony Estates WWTP
Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
The gates remain locked to the facility, this has been corrected since the previous
inspection that noted the gates were not locked and access was not restricted to the
general public.
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
The grating on the plant was fairly rusted. A new storage shed has been built. Mr.
Pittman noted that he had replaced the grating above the clarifier with wood and was
planning to do so above the EQ basin as well. Process controls analyzed include DO,
pH, temperature, settleable solids, and sludge judge.
Comment:
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain-of-custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Page#3
DocuSign Envelope ID: B11039EB-7511-482C-A601-7D178ACF89B5
Permit:NC0079481
Inspection Date:02/01/2024
Owner - Facility:
Inspection Type:
Harmony Estates WWTP
Compliance Evaluation
Record Keeping Yes No NA NE
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Comment:
Equalization Basins Yes No NA NE
Is the basin aerated?
Is the basin free of bypass lines or structures to the natural environment?
Is the basin free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Are audible and visual alarms operable?
# Is basin size/volume adequate?
Mr. Pittman indicated that the float controls do not trigger a high-level alarm, rather the
high-level float kicks on the influent grinder pump and begins pumping flow into the
aeration basin. See summary for details.
Comment:
Bar Screens Yes No NA NE
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
The bars on the manual screen are spaced too far apart to be effectively screening
debris. There was some debris present on the screen at the time of the inspection.
Additionally, there were screenings present on the ground near the bar screen that
had not been adequately disposed of. Mr. Pittman noted however that he does dispose
of the screenings in the trash which gets hauled to the landfill. See summary for
details.
Comment:
Aeration Basins Yes No NA NE
Page#4
DocuSign Envelope ID: B11039EB-7511-482C-A601-7D178ACF89B5
Permit:NC0079481
Inspection Date:02/01/2024
Owner - Facility:
Inspection Type:
Harmony Estates WWTP
Compliance Evaluation
Aeration Basins Yes No NA NE
Mode of operation Ext. Air
Type of aeration system Diffused
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin’s surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/l)
A settleability test showed that there were very little solids present in the plant at the
time of the inspection. Mr. Pittman indicated that they were in the process of
refurbishing two of the aeration basin blowers. At the time of the inspection he was
working to get the new blower online. The current blower runs continuously. An
additional blower is present as a backup.
Comment:
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately ¼ of the sidewall depth)
Mr. Pittman indicated that a sludge judge test the prior week showed a 6 inch blanket
level.
Comment:
Disinfection-Tablet Yes No NA NE
Are tablet chlorinators operational?
Are the tablets the proper size and type?
Number of tubes in use?1
Is the level of chlorine residual acceptable?
Page#5
DocuSign Envelope ID: B11039EB-7511-482C-A601-7D178ACF89B5
Permit:NC0079481
Inspection Date:02/01/2024
Owner - Facility:
Inspection Type:
Harmony Estates WWTP
Compliance Evaluation
Disinfection-Tablet Yes No NA NE
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de-chlorination?
Comment:
De-chlorination Yes No NA NE
Type of system ?Tablet
Is the feed ratio proportional to chlorine amount (1 to 1)?
Is storage appropriate for cylinders?
# Is de-chlorination substance stored away from chlorine containers?
Comment:
Are the tablets the proper size and type?
Are tablet de-chlorinators operational?
Number of tubes in use?1
Comment:
Flow Measurement - Effluent Yes No NA NE
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
The previous flow meter was destroyed by lightening in a storm one month prior to the
inspection. A new flow meter was ordered and will include a totalizer. At present, the
ORC measures the flow by recording the amount of well water that is used daily and
adds rain fall levels from the McDowell County weather reports.
Comment:
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Page#6
DocuSign Envelope ID: B11039EB-7511-482C-A601-7D178ACF89B5
Permit:NC0079481
Inspection Date:02/01/2024
Owner - Facility:
Inspection Type:
Harmony Estates WWTP
Compliance Evaluation
Effluent Sampling Yes No NA NE
The faclility uses a portable composite sampler for effluent sampling. At present, they
are doing time-composite sampling as the flow meter is not operational. The samples
were taken the morning prior to the inspection, therefore the sampler was not present
to evaluate tubing and temperature.
Comment:
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment:
Standby Power Yes No NA NE
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up
power?
Is the generator fuel level monitored?
Since the community runs on well water, if the facility were to lose power the wells
would go out and the facility would not recieve any influent flow.
Comment:
Page#7
DocuSign Envelope ID: B11039EB-7511-482C-A601-7D178ACF89B5