HomeMy WebLinkAboutNCC241586_ESC Approval Submitted_20240528 David Varghese
From: Landers, Stephanie <stephanie.landers@deq.nc.gov>
Sent: Tuesday, May 14, 2024 7:04 AM
To: David Varghese
Subject: FW: NC DEMLR - FROF Application Approval with Modifications Needed CRM:0225035
Attachments: Certificate of Approval - Monday, May 13, 2024 317 PM.docx; Application Report -
Monday, May 13, 2024 317 PM.pdf; 1 - NCG01-Fact-Sheet.pdf
Just FYI—wanted to copy you on this.
Stephanie
From: SVC_DoNotReply-DEQPermits<DoNotReply-DEQPermits@deq.nc.gov>
Sent: Monday, May 13, 2024 3:28 PM
To: Robbie Sovie<rsovie@t5datacenters.com>
Cc: Landers, Stephanie<stephanie.landers@deq.nc.gov>; Reid Irwin <reid.irwin@kimley-horn.com>
Subject: NC DEMLR- FROF Application Approval with Modifications Needed CRM:0225035
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
May 13, 2024
1
Robbie Sovie
3344 Peachtree Rd NE
Atlanta, GA 30326
RE: Project Name:T5@Charlotte II
Acres Approved:4.32
Application ID: PA-003957
Permit Number: CLEVE-2024-0118
Address: 121 Riverside Court
City: Kings Mountain
County:Cleveland
River Basin: Broad
Stream Classification: C:Aquatic Life,Secondary Contact Recreation, Fresh water
Plan Type: New Plan(Express)
Dear Robbie Sovie,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with
modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are
listed on the attached page.The Certificate of Approval must be posted at the job site. This plan approval shall expire
three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title
15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNO1)
form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit.After the form is
reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After
the fee is processed, you will receive the COC via email.As the Financially Responsible Party shown on the FRO form
submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity.The eNOl form
may be accessed atdeq.nc.gov/NCG01. Please direct questions about the eNOl form totheStormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a
new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to
2
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan,
not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan
and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this
project.
Modifications Required for Approval:
1.The plans notes to the contractor state that the river basin is the Yadkin—Pee Dee River basin and it is the Broad
River basin. Please update notes accordingly.
2. The skimmer basins have drainage going through 1 baffle and NC Erosion and Sediment Control Manual
requires 3 baffles. Please update plans accordingly.
3. North Carolina recently issued a new NCG01 General Construction Stormwater Permit. Ensure the
NCG01 Ground Stabilization and Materials Handling and Self-Inspection, Recordkeeping and Reporting
requirements are on your plans. The NCG01 compliance plan sheets for these can be found at
https://deq.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-
permits/stormwater-permits/construction-sw Printing these sheets out and adding them to your
plans is a requirement of the NCG01 permit, or their entire contents must be included in your plans
with reference for each requirement provided to this office, prior to construction.
4.Additional measures may be required -The applicant is responsible for the control of sediment on-site. If the
approved erosion and sedimentation control measures prove insufficient,the applicant must take those
additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115]
Your cooperation is appreciated.
Sincerely,
Stephanie Landers
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Enclosures: Certificate of Approval, NCG01 Fact Sheet,
Modifications Required for Approval
3
"❑ .._______� __._ North Carolina Department of Environmental Quality I Division of Energy,
Mineral and Land Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville
NC,28115
704-663-1699
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
4