HomeMy WebLinkAboutNC0026921_Annual Report_20240528ANNUAL WASTEWATER PERFORMANCE REPORT
2023
GENERAL INFORMATION
FACILITY/SYSTEM NAME: TOWN OF PARKTON WASTEWATER TREATMENT PLANT
RESPONSIBLE ENTITY: THE TOWN OF PARKTON
ORC WWTP: TIM LYDE 910-865-2939
APPLICABLE PERMIT:NC0026921
DESCRIPTION OF TREATMENT PLANT: OPERATION OF.2 MGD WASTEWATER TREATMENT FACILITY
CONSISTING OF MECHANICAL BAR SCREEN AND GRIT REMOVAL, 2 OXIDATION DITCHES,
SECONDARY CLARIFIERS, SLUDGE DIGESTER, SLUDGE DRYING BEDS, AND 3 CONTACT
CHAMBERS ONE DOUBLE AND 1 SINGLE WITH POST -AERATION.
PERFORMANCE: 2023
►[o1►kylpaF�
I WASN'T THE ORC AT THIS, BUT IT APPEARS THAT A LOT OF THE NOV'S WHERE FROM HIGH
WATER INTAKE FROM I&I, FOR THOSE THAT DON'T KNOW WHAT I&I IS IT IS INFLOW AND
INFILTRATION OF WATER INTO THE SYSTEM FROM RAIN AND GROUND WATER. THE TOWN HAS AN
ENGINEER WORKING ON THE PROBLEM. IF ANYONE NEEDS OR WOULD LIKE TO REVIEW ANY OF
THESE NOV's THE TOWN HALL HAS A COPY OF EACH ON FILE. I CERTIFY THAT THIS REPORT IS
COMPLETE AND ACCURATE TO THE BEST OF MY KNOWLEDGE. I FURTHER HAVE MADE THIS
REPORT AVAILABLE TO THE PUBLIC OF THE NAMED SYSTEM.
TIM LYDE
TOWN OF PARKTON
WASTEWATER ORC 5/28/2024