HomeMy WebLinkAboutSW3160904_Compliance Inspection Report Email_20240206 Eplin, Jerry W From: Eplin, Jerry W Sent: Tuesday, February 6, 2024 11:19 AM To: 'Jay Priester'; 'Barrett Blackburn'; 'Stephanie Le' Cc: Leonard, Shannon; Callaway, Ian C Subject: RE: [External] RE: Status update on Cabridge Village Denver SW3160904 Attachments: SW3160904_Compliance Evaluation Inspection Report.pdf Hello Jay: Attached is the compliance evaluation inspection report. The original will go out by US Mail. The report should be self- explanatory, but I wanted to mention a couple of things via email. FYI,the report indicates that the facility is non-compliant with the referenced permit, due to maintenance records and lack of annual reports. However,we did not issue a notice of violation. The report basically says that you need to comply with your permit by performing all required maintenance, keeping the maintenance records, and reporting according to the permit requirements. Regarding the level spreader issue,we are asking that you either install the wall that was proposed but not installed (as we previously discussed), or another appropriate measure at that location to assure that water discharging from the level spreader flows in the desired direction and not toward Baxley Lane. Please let me know if you have questions about any of these issues. As indicated,the Dam Safety group will respond directly related to whether this dam is considered a regulated dam. Regards, Jerry W. Eplin, PE Assistant Regional Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Office: (704) 235-2147 Email:jerry.eplin@deq.nc.gov Physical and Mailing Address: 610 E. Center Ave. Suite 301 Mooresville, NC 28115 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties 1 From: Eplin,Jerry W Sent: Monday, February 5, 2024 3:47 PM To:Jay Priester<jjp@cambridgeprop.com>; Barrett Blackburn <bbb@cambridgeprop.com>; Stephanie Le <sml@cam bridgeprop.com> Cc: Leonard, Shannon <shannon.leonard@deq.nc.gov>; Callaway, Ian C<ian.callaway@deq.nc.gov> Subject: RE: [External] RE: Status update on Cabridge Village Denver SW3160904 Hello Jay: The photo that you sent looks a lot better. Thanks for sending that. I hope to get you something by email tomorrow related to the stormwater inspection. The dam issue is handled out of Dam Safety in Raleigh. It will probably take longer for them to respond. Jerry W. Eplin, PE Assistant Regional Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Office: (704)235-2147 Email: merry.eplina-deg.nc.gov Physical and Mailing Address: 610 E. Center Ave. Suite 301 Mooresville, NC 28115 -.a��D.— E I}rU.eini.-ri<d F nv u .}wr iw I Q..i Ley Email correspondence to and from this address is subject to the North Caro/ina Public Records Law and may be disclosed to third parties From:Jay Priester<jjp@cambridgeprop.com> Sent: Monday, February 5, 2024 9:09 AM To: Eplin,Jerry W<jerry.eplin@deg.nc.gov>; Barrett Blackburn <bbb@cambridgeprop.com>; Stephanie Le <sml@cambridgeprop.com> Cc: Leonard, Shannon <shannon.leonard@deg.nc.gov>; Callaway, Ian C<ian.callaway@deg.nc.gov> Subject: RE: [External] RE: Status update on Cabridge Village Denver SW3160904 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Jerry, The small trees on the back of the berm have been cut and the tall grass at the back of the berm has also been cut. (see picture below) 2 I saw our dam application has been received by DEQ. Can you please advise to status of your offices approval of the compliance with the storm pond? 3 7 « ^x d �• • �/ « /d , - - ¢ m ' � -� - � 4 IL- CAM GRID-GE PROPERTIES John J. Priester,Jr., President CAMBRIDGE PROPERTIES, INC. 831 E. Morehead Street, Suite 245 Charlotte, NC 28202 (0)704.333.2393 x108 (F)704.333.2394 (C)704.577.7100 From:Jay Priester Sent:Tuesday,January 30, 2024 10:00 AM To: Eplin,Jerry W<jerry.eplin@deq.nc.gov>; Barrett Blackburn <bbb@cambridgeprop.com>; Stephanie Le <smI@cam bridgeprop.com> Cc: Leonard, Shannon <shannon.leonard@deg.nc.gov>; Callaway, Ian C<ian.callaway@deg.nc.gov> Subject: RE: [External] RE: Status update on Cabridge Village Denver SW3160904 Jerry, As a follow up to our meeting on site January 25, 2024, we are looking for the additional maintenance records per your request. As previously shared with you we did have the annual inspections. Attached please find the requested as builts, engineers certification, and transmittal to your office from 2018. We are currently having the scrub trees removed on the back side of the berm and will be seeding and straw matting areas on the back of the berm that need additional ground cover. Please send a list of any additional pond work related you need completed for it to be in full compliance with the permit. Lastly,we have attached the dam hazard review form that you provided. Based upon that completion and review of the requested form we have signed a contract with AMT Engineering to do the DBIZ analysis and EAP. The report will be ready and submitted to DEQ within 8 weeks. Jay CAMBRIDGE PROPFRTIFS John J. Priester,Jr., President CAMBRIDGE PROPERTIES, INC. 831 E. Morehead Street, Suite 245 Charlotte, NC 28202 (0)704.333.2393 x108 (F)704.333.2394 (C)704.577.7100 From: Eplin,Jerry W<jerry.eplin@deq.nc.gov> Sent:Thursday,January 18, 2024 3:46 PM To:Jay Priester<jjp@cambridgeprop.com>; Barrett Blackburn <bbb@cambridgeprop.com>; Stephanie Le <smI@cam bridgeprop.com> 5 Cc: Leonard, Shannon <shannon.leonard@deg.nc.gov>; Callaway, Ian C<ian.callaway@deg.nc.gov> Subject: RE: [External] RE: Status update on Cabridge Village Denver SW3160904 Looking at the weather forecast,we are supposed to get a good rain on Wednesday,January 24t", and the morning of Thursday,January 25t". Our current plan is to leave Mooresville around 9:30 AM on the 25t"to visit this site for the inspection. Let us know if one of you can be there. Regards, Jerry W. Eplin, PE Assistant Regional Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Office: (704) 235-2147 Email: merry.eplina-deg.nc.gov Physical and Mailing Address: 610 E. Center Ave. Suite 301 Mooresville, NC 28115 D,E QR&-'-� Dopelnir d of Enwwmn dal Qualify Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From:Jay Priester<jjp@cambridgeprop.com> Sent:Wednesday,January 17, 2024 10:05 AM To: Eplin,Jerry W<jerry.eplin@deg.nc.gov>; Barrett Blackburn <bbb@cambridgeprop.com>; Stephanie Le <smI@cam bridgeprop.com> Cc: Leonard, Shannon <shannon.leonard@deg.nc.gov>; Callaway, Ian C<ian.callaway@deg.nc.gov> Subject: RE: [External] RE: Status update on Cabridge Village Denver SW3160904 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Jerry, Please send the date of the plan that you shared in the snip picture below. This is not consistent with our approved plans. The corrections with pictures were in the reports that I attached on my previous email. When is your earliest availability to meet on site? We are in under contract to sell the center and I want to resolve this prior to the sale. 6 Jay IL- CAM GRID-GE PROPERTIES John J. Priester,Jr., President CAMBRIDGE PROPERTIES, INC. 831 E. Morehead Street, Suite 245 Charlotte, NC 28202 (0)704.333.2393 x108 (F)704.333.2394 (C)704.577.7100 From: Eplin,Jerry W<jerry.eplin@deg.nc. ov> Sent:Tuesday,January 16, 2024 4:11 PM To:Jay Priester<jjp@cambridgeprop.com>; Barrett Blackburn <bbb@cambridgeprop.com>; Stephanie Le <smI@cam bridgeprop.com> Cc: Leonard, Shannon <shannon.leonard@deg.nc.gov>; Callaway, Ian C<ian.callawav@deg.nc.gov> Subject: RE: [External] RE: Status update on Cabridge Village Denver SW3160904 Hello Mr. Priester. Thank you for responding. After reviewing the file, I have questions that were not previously dicussed at the site. I would also like to visit the site while it is raining, or immediately after a rain,just as you have. The last official DEQ compliance inspection was in 2022,therefore we intend to have another compliance inspection as indicated. One question that I have is related to the level spreader/basin design. Based on the drawings that were submitted, it appears there is a retaining wall that is supposed to run from the wall near the level spreader,toward NC16 (seethe part circled in red below). Looking at the level spreader photos(seethe photo below), I do not see that wall. If that wall were installed as designed, it appears that it would help direct water in the desired direction. If that wall was not installed, even with the 57 stone added to the corner of the level spreader,water that spills over at that corner could flow toward the right in the photo below, rather than the desired direction. Can you comment about whether this wall was installed as designed? Regarding repairs that have been made, please just clarify what repairs were made. You can do that by email with photos if you would like. Thank you for understanding. Coming in on the back end of this project as I am, and still receiving complaints, I want to make sure that we address any problems if they exist. If none exist,than that is great-we will document that and move on. The dam issue is something that is separate from the stormwater issues and we will look forward to reviewingyour submittal. Regards, n► 00 M BW M1-22 BIM 750.54 TW 751.80 rn=BW 760 00 p� J `�•°°i " °[Y s� £rem ��` tit - TW 751.80 c zzw �• r TW=BW 748.22x t fi W i V;yti —TW-iW 7�1.1/ Jerry W. Eplin, PE Assistant Regional Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Office: (704)235-2147 Email: merry.eplina-deg.nc.gov Physical and Mailing Address: 610 E. Center Ave. Suite 301 Mooresville, NC 28115 E imelil t�?E n.n� wr iw I q.+L'r Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From:Jay Priester<jjp@cambridgeprop.com> Sent:Tuesday,January 16, 2024 2:01 PM To: Eplin,Jerry W<jerry.eplin@deg.nc.gov>; Barrett Blackburn <bbb@cambridgeprop.com>; Stephanie Le <sml @cambridgeprop.com> Cc: Leonard, Shannon<shannon.leonard@deg.nc.gov>; Callaway, Ian C<ian.callaway@deg.nc.gov> Subject: [External] RE: Status update on Cabridge Village Denver SW3160904 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Jerry, 8 Thank you for your email. It is our understanding the complaints are from 1 local resident,who does not have any qualifications in civil engineering, stormwater ponds, or hydrology. We fixed the non-compliance deficiencies December 17, 2022 and notified your office. There has not been ongoing drainage going down Baxley Road since the fix which is why the algae growth that was noted in your report is gone (for over a year now). In the dropbox link below there is a folder"SWM Pond Pictures 12.17.22",which you will see the corrections to the pond. We met with Ian Callaway on January 3, 2024 at the pond. We reviewed the pond and Ian shared that he and he supervisor looked at the pond in mid-2023 and confirmed it appeared to be incompliance, but he wanted to look at it after a rain event, but it got pushed down to the bottom of his list and didn't get reinspected by your department. At on our site meeting January 3, Ian noted the cattails in the pond,which we have cut(see dropbox"SWM Pond 1.14.24" pictures,the cuttings are scheduled to be removed from the pond once the rain clears up). We told Ian that we would take pictures during the next rain event and a couple days after. The following rain event on January 6t"we took a video during the rain, see "SWM Pond Video 1.6.24" in the dropbox. On January 8t"' in the morning we took pictures showing it was dry("SWM Pond Pictures 1.8.24"). Ian felt that we could obtain a letter from your office confirming compliance once you had these pictures. Please confirm if you have any questions or concerns with the pond. We are happy to meet on site at your earliest opportunity and we bring our civil engineer if needed. We would like to have compliance letter as soon as possible. Denver SW Pond Per your request, I have attached the 2022 and 2023 inspection report. As for the "Jurisdictional Determination/Hazard Classification Request",this is the first I have ever heard about this request. The dam was designed and reviewed 8 years ago. I will review the form and get back to you on it with any questions. Please confirm your acceptance of compliance with the pond and when you can send a letter of compliance. Thank you, Jay { r1_1BR] D it John J. Priester,Jr., President CAMBRIDGE PROPERTIES, INC. 831 E. Morehead Street,Suite 245 Charlotte, NC 28202 (0)704.333.2393 x108 (F)704.333.2394 (C)704.577.7100 From: Eplin,Jerry W<jerry.eplin@deg.nc. ov> Sent:Tuesday,January 16, 2024 10:57 AM To:Jay Priester<jjp@cambridgeprop.com>; Barrett Blackburn <bbb@cambridgeprop.com>; elm@cambridgeprop.com Cc: Leonard, Shannon<shannon.leonard@deg.nc.gov>; Callaway, Ian C<ian.callaway@deg.nc.gov> Subject: Status update on Cabridge Village Denver SW3160904 Cambridge Properties Personnel: 9 Our office has received multiple complaints related to water running into the road nearby the stormwater pond at the referenced site. Upon reviewing our files and database, I found inspection reports from 2021 and 2022 indicating non-compliance issues related to the post construction stormwater permit. AJuly 2022 letter from our office to Cambridge Denver LLC,Attention George Maloomian indicated that repairs to the level spreader were needed, requested an investigation into the seepage hole below the retaining wall west corner, and requested that a plan for repair and maintenance of the basin as well as the BMP inspection and maintenance records be sent to the Mooresville Regional Office by August 30, 2022. Upon reviewing our file, these additional requested records could not be located. Email records after August 20, 2022, appear to indicate that some repairs were being made at the site. The current status of these issues is currently unclear to our office. Someone from our office will be in touch with you within the next month to conduct a Stormwater Inspection at this site. The purpose of this email is to request that someone from your group meet us on site and bring copies of all the BMP operation and maintenance records, as well as copies of any records or Engineering Reports related to the drainage issue. Additionally, upon viewing aerial photographs of the site, it appears the stormwater pond has a dam that is immediately upgradient of a busy road. Please see the attached Jurisdictional Determination/Hazard Classification Request form. Please complete the referenced form and submit as described on the form so that the jurisdictional status of the referenced dam may be determined. With a proximity so close to a major road, it is likely that this dam could be classified as a high-hazard dam. If this form has been previously submitted, please provide a copy. Please let me know if you have any questions. Regards, Jerry W. Eplin, PE Assistant Regional Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Office: (704)235-2147 Email: merry.eplina-deg.nc.gov Physical and Mailing Address: 610 E. Center Ave. Suite 301 Mooresville, NC 28115 Np�+TIi t:Al�7.�hN � 94wro"W alF%Pjr 'nrn la I Wry Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties 10 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 11 ROY COOPER Governor ELIZABETH S.BISER Secretary ' . WILLIAM E.TOBY VINSON,JR. NORTH CAROOKA Interim Director February 6,2024 Cambridge- Denver LLC Attn: Mr. George L. Maloomian,Manager 831 East Morehead Street, Suite 245 Charlotte,North Carolina 28202 Subject: COMPLIANCE EVALUATION INSPECTION Stormwater Permit SW3160904 Lincoln County Dear Mr. Maloomian: On January 25,2024,a site inspection was conducted for the Cambridge-Denver facility located at NC Highway 16 and Baxley Lane, in Denver,Lincoln County,North Carolina.A copy of the Compliance Inspection Report is enclosed for your review.The site visit and file review revealed that the subject facility is covered by NPDES Stormwater Permit SW3160904. As a result of the inspection,the facility was found to be noncompliant with the conditions of the SW3160904 permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty assessment of up to $25,000 per day for each violation. If you or your staff have any questions, comments, or need assistance with understanding any aspect of your permit,please contact me at(704) 235-2100 or via e- mail atjerry.eplin@deq.nc.gov. Sincerely, DocuSigned by: 4A35D6B02802438... Jerry W. Eplin, PE Assistant Regional Engineer DEMLR Enclosure:Compliance Inspection Report c: John J. Priester,Jr.,President, Cambridge Properties,Inc., 831 E.Morehead Street, Suite 245,Charlotte,NC 28202 DEMLR NPDES Stormwater Permit Laserfiche File North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources Mooresville Regional Office 1 610 East Center Avenue,Suite 3011 Mooresville,North Carolina 28115 704-235-2100 Compliance Inspection Report Permit: SW3160904 Effective: 11/01/16 Expiration: Project: Cambridge Village Owner: Cambridge Denver LLC County: Lincoln Adress: NC Hwy 16 And NC Hwy 73 Region: Mooresville City/State/Zip: Denver NC 28037 Contact Person:George Maloomian Title: Phone:704-333-2393 Directions to Project: 500 If north of intersection of hwy 16&hwy 73 and fronting nc hwy 16 for 99 If. Type of Project: State Stormwater-General Permit Drain Areas: 1 -(Forney Creek) (03-08-33)(C) On-Site Representative(s): Related Permits: Inspection Date: 01/25/2024 Entry Time 09:45AM Exit Time:01:OOPM Primary Inspector: Jerry W Eplin Phone:704-663-1699 Secondary Inspector(s): Ian C Callaway Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant 0 Not Compliant Question Areas: State Stormwater (See attachment summary) page 1 Permit: SW3160904 Owner-Project: Cambridge Denver LLC Inspection Date: 01/25/2024 Inspection Type Compliance Evaluation Reason for Visit: Routine Inspection Summary: The pond appears to have been maintained except for a growth of cattails. The cattails have been recently cut. Cattails should be treated when appropriate following Department of Agriculture guidelines. The approved drawings for Wet Pond #1 show a wall close to ground level extending approximately 30 feet to the north from the western edge of the level spreader. The referenced wall was not installed. Installation of the wall as per approved plans should proceed, or an alternative appropriate measure should be provided to assure that water from the level spreader flows in the desired direction and not toward Baxley Lane. The permittee needs to perform and keep records of maintenance as required in Part II of the referenced permit and as per the signed Operation and Maintenance Agreement. Additionally, annual reports as per Part II #4 of the permit are required. page 2 Permit: SW3160904 Owner-Project: Cambridge Denver LLC Inspection Date: 01/25/2024 Inspection Type Compliance Evaluation Reason for Visit: Routine File Review Yes No NA NE Is the permit active? 0 ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? N ❑ ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? 0 000 Copy of the recorded deed restrictions is in the file? 0 ❑ ❑ ❑ Comment: SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ❑ N ❑ ❑ Are the inlets located per the approved plans? 0 ❑ ❑ ❑ Are the outlet structures located per the approved plans? 0 ❑ ❑ ❑ Comment: The approved drawings for Wet Pond 1 show a wall at approximately ground level proceeding to the north approximately 30 feet from the western edge of the level spreader. That wall does not appear to have been installed. Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? 0 ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or ❑ 0 ❑ ❑ provided to DWQ upon request? Comment: Pond appears to be maintained, except for a large growth of cattails. The cattails had been recently cut down at the time of this inspection. The cattails should be treated when appropriate following Department of Agriculture guidelines. Only a portion of the maintenance and inspection records were available. Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? ❑ 0 ❑ ❑ Comment: Annual reports meeting the requirements outlined in the permit have not been submitted. Other WQ Issues Yes No NA NE Is the site compliant with other water quality issues as noted during the inspection? ❑ ❑ 0 ❑ Comment: page 3