HomeMy WebLinkAboutSW3160904_Email about Asbuilts and Eng Certification_20240130 Eplin, Jerry W
From: Jay Priester <jjp@cambridgeprop.com>
Sent: Tuesday, January 30, 2024 10:00 AM
To: Eplin, Jerry W; Barrett Blackburn; Stephanie Le
Cc: Leonard, Shannon; Callaway, Ian C
Subject: RE: [External] RE: Status update on Cabridge Village Denver SW3160904
Attachments: Cambridge Village Pond 1 Asbuilt.pdf, Cambridge Village Pond 2 Asbuilt.pdf, Signed
Certification.pdf, 180320 Transmittal NCDEQ NCC162006.pdf
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Jerry,
As a follow up to our meeting on site January 25, 2024, we are looking for the additional maintenance records per your
request. As previously shared with you we did have the annual inspections. Attached please find the requested as
builts, engineers certification, and transmittal to your office from 2018. We are currently having the scrub trees
removed on the back side of the berm and will be seeding and straw matting areas on the back of the berm that need
additional ground cover. Please send a list of any additional pond work related you need completed for it to be in full
compliance with the permit.
Lastly,we have attached the dam hazard review form that you provided. Based upon that completion and review of the
requested form we have signed a contract with AMT Engineering to do the DBIZ analysis and EAP. The report will be
ready and submitted to DEQ within 8 weeks.
Jay
IL-
CAN BRIDGE
PROPERTIES
John J. Priester,Jr., President
CAMBRIDGE PROPERTIES, INC.
831 E. Morehead Street, Suite 245
Charlotte, NC 28202
(0)704.333.2393 x108
(F)704.333.2394
(C)704.577.7100
From: Eplin,Jerry W<jerry.eplin@deq.nc.gov>
Sent:Thursday,January 18, 2024 3:46 PM
To:Jay Priester<jjp@cambridgeprop.com>; Barrett Blackburn <bbb@cambridgeprop.com>; Stephanie Le
<sml@cambridgeprop.com>
Cc: Leonard, Shannon <shannon.leonard@deq.nc.gov>; Callaway, Ian C<ian.callaway@deq.nc.gov>
Subject: RE: [External] RE: Status update on Cabridge Village Denver SW3160904
1
Looking at the weather forecast,we are supposed to get a good rain on Wednesday,January 24t", and the morning
of Thursday,January 25t". Our current plan is to leave Mooresville around 9:30 AM on the 25t"to visit this site for
the inspection.
Let us know if one of you can be there.
Regards,
Jerry W. Eplin, PE
Assistant Regional Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral, and Land Resources
Office: (704)235-2147
Email: merry.eplina-deg.nc.gov
Physical and Mailing Address:
610 E. Center Ave. Suite 301
Mooresville, NC 28115
D�.-.E
I,tU.ei:7i.�i1<?F nv n.}}ir ii.,I{h.i liey
Email correspondence to and from this address is subject to the
North Caro/Ina Public Records Law and may be disclosed to third parties
From:Jay Priester<jjp@cambridgeprop.com>
Sent:Wednesday,January 17, 2024 10:05 AM
To: Eplin,Jerry W<jerry.eplin@deg.nc.gov>; Barrett Blackburn <bbb@cambridgeprop.com>; Stephanie Le
<smI@cam bridgeprop.com>
Cc: Leonard, Shannon <shannon.leonard@deg.nc.gov>; Callaway, Ian C<ian.callaway@deg.nc.gov>
Subject: RE: [External] RE: Status update on Cabridge Village Denver SW3160904
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Jerry,
Please send the date of the plan that you shared in the snip picture below. This is not consistent with our approved
plans.
The corrections with pictures were in the reports that I attached on my previous email.
When is your earliest availability to meet on site? We are in under contract to sell the center and I want to resolve this
prior to the sale.
Jay
2
{;r1_IBR] D(it
John J. Priester,Jr., President
CAMBRIDGE PROPERTIES, INC.
831 E. Morehead Street,Suite 245
Charlotte, NC 28202
(0)704.333.2393 x108
(F)704.333.2394
(C)704.577.7100
From: Eplin,Jerry W<jerry.eplin@deg.nc. ov>
Sent:Tuesday,January 16, 2024 4:11 PM
To:Jay Priester<jjp@cambridgeprop.com>; Barrett Blackburn<bbb@cambridgeprop.com>; Stephanie Le
<sml@cam bridgeprop.com>
Cc: Leonard, Shannon <shannon.leonard@deg.nc.gov>; Callaway, Ian C<ian.callawav@deg.nc.gov>
Subject: RE: [External] RE: Status update on Cabridge Village Denver SW3160904
Hello Mr. Priester. Thank you for responding. After reviewing the file, I have questions that were not previously
dicussed at the site. I would also like to visit the site while it is raining, or immediately after a rain,just as you
have. The last official DEQ compliance inspection was in 2022,therefore we intend to have another compliance
inspection as indicated. One question that I have is related to the level spreader/basin design. Based on the
drawings that were submitted, it appears there is a retaining wall that is supposed to run from the wall near the
level spreader,toward NC16 (seethe part circled in red below). Looking at the level spreader photos(seethe
photo below), I do not see that wall. If that wall were installed as designed, it appears that it would help direct
water in the desired direction. If that wall was not installed, even with the 57 stone added to the corner of the level
spreader,water that spills over at that corner could flow toward the right in the photo below, rather than the
desired direction. Can you comment about whether this wall was installed as designed?
Regarding repairs that have been made, please just clarify what repairs were made. You can do that by email with
photos if you would like.
Thank you for understanding. Coming in on the back end of this project as I am, and still receiving complaints, I
want to make sure that we address any problems if they exist. If none exist,than that is great-we will document
that and move on.
The dam issue is something that is separate from the stormwater issues and we will look forward to reviewing your
submittal.
Regards,
3
M -
9W 75}72 -
8w 750.54
TIN 751.60
TW=BYV 760.00 ;
9W 749.81
r
t� TW=BW 749.00
Jerry W. Eplin, PE
Assistant Regional Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral, and Land Resources
Office: (704)235-2147
Email: merry.eplina-deg.nc.gov
Physical and Mailing Address:
610 E. Center Ave. Suite 301
Mooresville, NC 28115
E
n�a�tr
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From:Jay Priester<Ilp@cambridgeprop.com>
Sent:Tuesday,January 16, 2024 2:01 PM
To: Eplin,Jerry W<jerry.eplin@deg.nc.gov>; Barrett Blackburn <bbb@cambridgeprop.com>; Stephanie Le
<sml @cambridgeprop.com>
Cc: Leonard, Shannon<shannon.leonard@deg.nc.gov>; Callaway, Ian C<ian.callaway@deg.nc.gov>
Subject: [External] RE: Status update on Cabridge Village Denver SW3160904
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Jerry,
4
Thank you for your email. It is our understanding the complaints are from 1 local resident,who does not have any
qualifications in civil engineering, stormwater ponds, or hydrology. We fixed the non-compliance deficiencies December
17, 2022 and notified your office. There has not been ongoing drainage going down Baxley Road since the fix which is
why the algae growth that was noted in your report is gone (for over a year now). In the dropbox link below there is a
folder"SWM Pond Pictures 12.17.22",which you will see the corrections to the pond.
We met with Ian Callaway on January 3, 2024 at the pond. We reviewed the pond and Ian shared that he and he
supervisor looked at the pond in mid-2023 and confirmed it appeared to be incompliance, but he wanted to look at it
after a rain event, but it got pushed down to the bottom of his list and didn't get reinspected by your department. At on
our site meeting January 3, Ian noted the cattails in the pond,which we have cut(see dropbox"SWM Pond 1.14.24"
pictures,the cuttings are scheduled to be removed from the pond once the rain clears up). We told Ian that we would
take pictures during the next rain event and a couple days after. The following rain event on January 6t"we took a video
during the rain, see "SWM Pond Video 1.6.24" in the dropbox. On January 8t"' in the morning we took pictures showing
it was dry("SWM Pond Pictures 1.8.24"). Ian felt that we could obtain a letter from your office confirming compliance
once you had these pictures. Please confirm if you have any questions or concerns with the pond. We are happy to
meet on site at your earliest opportunity and we bring our civil engineer if needed. We would like to have compliance
letter as soon as possible.
Denver SW Pond
Per your request, I have attached the 2022 and 2023 inspection report.
As for the "Jurisdictional Determination/Hazard Classification Request",this is the first I have ever heard about this
request. The dam was designed and reviewed 8 years ago. I will review the form and get back to you on it with any
questions.
Please confirm your acceptance of compliance with the pond and when you can send a letter of compliance.
Thank you,
Jay
{ r1_1BR] D it
John J. Priester,Jr., President
CAMBRIDGE PROPERTIES, INC.
831 E. Morehead Street,Suite 245
Charlotte, NC 28202
(0)704.333.2393 x108
(F)704.333.2394
(C)704.577.7100
From: Eplin,Jerry W<jerry.eplin@deg.nc. ov>
Sent:Tuesday,January 16, 2024 10:57 AM
To:Jay Priester<jjp@cambridgeprop.com>; Barrett Blackburn <bbb@cambridgeprop.com>; elm@cambridgeprop.com
Cc: Leonard, Shannon<shannon.leonard@deg.nc.gov>; Callaway, Ian C<ian.callaway@deg.nc.gov>
Subject: Status update on Cabridge Village Denver SW3160904
Cambridge Properties Personnel:
5
Our office has received multiple complaints related to water running into the road nearby the stormwater pond at
the referenced site. Upon reviewing our files and database, I found inspection reports from 2021 and 2022
indicating non-compliance issues related to the post construction stormwater permit. AJuly 2022 letter from our
office to Cambridge Denver LLC,Attention George Maloomian indicated that repairs to the level spreader were
needed, requested an investigation into the seepage hole below the retaining wall west corner, and requested that
a plan for repair and maintenance of the basin as well as the BMP inspection and maintenance records be sent to
the Mooresville Regional Office by August 30, 2022.
Upon reviewing our file, these additional requested records could not be located. Email records after August 20,
2022, appear to indicate that some repairs were being made at the site. The current status of these issues is
currently unclear to our office.
Someone from our office will be in touch with you within the next month to conduct a Stormwater Inspection at
this site. The purpose of this email is to request that someone from your group meet us on site and bring copies of
all the BMP operation and maintenance records, as well as copies of any records or Engineering Reports related to
the drainage issue.
Additionally, upon viewing aerial photographs of the site, it appears the stormwater pond has a dam that is
immediately upgradient of a busy road. Please see the attached Jurisdictional Determination/Hazard
Classification Request form. Please complete the referenced form and submit as described on the form so that
the jurisdictional status of the referenced dam may be determined. With a proximity so close to a major road, it is
likely that this dam could be classified as a high-hazard dam. If this form has been previously submitted, please
provide a copy.
Please let me know if you have any questions.
Regards,
Jerry W. Eplin, PE
Assistant Regional Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral, and Land Resources
Office: (704)235-2147
Email: merry.eplina-deg.nc.gov
Physical and Mailing Address:
610 E. Center Ave. Suite 301
Mooresville, NC 28115
Np�+TIi t:Al�7.�hN �
94wro"W alF%Pjr 'nrn la I Wry
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
6
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
7
State Stormwater Permit
Permit No. SW3160904
Cambridge-Denver LLC
Lincoln County
Designer's Certification
1, Andrew Moriarty as a duly registered Professional I nginecr in the
State of North Carolina, having been authorized to observe periodically weekly/
fall time) the construction of the project,
Cambridge Village
(Project Name)
for _ Cambridge-Denver,LLC (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
Noted deviations from approved plans and specification: N/A
SEAL
Signature
CAR.O.'
Registration Number 31128 �' F.� E S S Quo
Date
W No.31128 Z
`n,9
cc: NCDEQ-DEMLR Regional Office
Page 1 of 1
z o 3 F. DAV1D E. GRIFFIN, certify that this plot was drawn under 0 o aoM \
my supervision from an actual survey made under my supervision, Il
that the boundaries not surveyed are clearly indicated as drawn Q m CO \N
*ern the information found in odioinem deeds; that the ratio
oP oreclsion as calculated Is 1: 10000+; This property shown hereon Z }i may De subject to easements, restrictions of which the undersignedn w 0 o
0
a has no knowledge of. That this plat is not for recordotio as per Z 0 LJ}
Ld
General Statute 47-30 as amended. VAtness my original signature la.l 41 Zm
this 14TH day of February, 2018 A.D. 3
m a
DAVID E. GRIFFINQ OFESSip� ���,
SEAL
L-3850
L-3850
9` sum• �,,�
REGISTRATION No. nQ`� • r,
oQ •iT�* DEfNL 2 TOP:779.60 z
i F+•1
O c
WEIR: 77923 �, a ~
2.0' t2 ~ H W
4k4 I D. E--4
z pry
LQJ �� Z W r Qw
\ 15• INN776.60
\ W ° W
\\ a Q J a
w
C z U
I \
I \
I \
I \
/ �� \� \ \ �� FES-C2
INV:775.25 00
CO &is
CQ
\\I 0 OCS-Ct � � 04
RIM:779.60 q a"
III \ \ \ \ \ \\ IN:776.70 z c
\ \ \\ OUT:776.60
I I \\ (DETAIL 2)
\ \ pL w w a
Cd
s _ — — — ---7-82
w
I _ /
0 30 60 90
NG
RETAINING
WALL 2
1. DAVID E. GRIFFIN, certify that this plat was drawn under z C) 0 3:: a 00
my supervision from an actual survey mode under my supervision, I
that the boundaries not surveyed are clearly indicated as drawn t,.i
from the information found in ad)olners deeds; that the ratio T > \
of precision as calculated is 1: 10000+; This property shown hereon oEt 1oP757.7z 2 � Z m fn o
may be subject to easements, restrictions of which the undersigned
has no knowledge of. That this plat is not for recordation as per z Y General Statute 47-30 as amended. VAtness m original signature y9►��►►�a,
this 6TH day of March, 2018 A.D. Y ,!!!!�� �i/gq►'rr Y 20 r 3 3 Q 70 3 lU
wox 7ss 2s rl
�.I xx a
�0 Q�QFESS�O., ,salt 1WLL 755 , o V) to o 0 0
Q
:P 1• 77
SEAL �wni:7ss35
6" 75352
15•NN:70M
15•HCP7S305 dJ 15 RIP75]05
1 'RCP.753As
UI_ G����p• �
-3850 fM��p�e
_ REGMTRATION No.
J
CB-A6 Q 0
RIM:763.29
IN:756.29 (A7) Ri
CB-A7 IN:756.19 (A30) a Q � �
W
0UT:756.09 16.41 ' 0 2,25% O O
PER 30" RCP I
a n w�� �
1w 1 a7 1w 77o.a9 lw 767.43 1w:781as lw 7s2.97 � (.-� U W
+760 sa 760.56 76a. + Q Z °
Tw:7e0 es O
7e0.00 I-� n ►•-i
754.50
\ 754 754A4 �- V 1
\ 754.2 + z v
\ ` 7aa,7
+ \ 7s1a OCS-A3 75a13 753 753.69 1 i
LU
RIM:757.72 -
750.49+ IN:753.52 / ` - - - -�' -?' 4e 750.00 + 54.16
\ \ \\ \\ OUT:753.52 749.94
7s296+ ! 760.10 FE5-A5
(DETAIL 1) f I INV:755.72
750.05 19.34' @ 2.43% 7 �°� ::• k, 74390 I ,
15" RCP 14 „ 749.97AX i f I
Jr
` :`�:r x �,,_• x \\ `7� 5 \ l a r3746WIL
742.93
III j
���•'RIPRAP ` - \ 7as.9s+
SPILLWAY 730.40 + MA3 \ \� _ _ 763i7 \ f !!^^� Co
\25'x45' \ '� ' I 1 1 I 1w76o.04 V~� O
\� I O
\+7UM \ 742.99 1 I I r
h 7M.68+ -+\\\\ \ \� ' I+ I r / > r"I
FLOW SPUTTER (MH RIM) 2 7 � \\ \ \\ 7�� fr I 1 A�, Co
\ RIM:758.95 RCA' 7sa.a47�e*
IN:753.05(15 ) \ \ 75Q.S3 + �\ \\ \ \ ` J �•V L) �
IN:753.50 (12' \ \\ \ �6 z
\ OUT:753.05
%Z cD ;-+ a
+ W
` \ 21 .70' @ 0.69% FES
\ 15" RCP INV:752.90 \ + + + + + + + + + \�2s \ \ ...r
nr:760.ar � � •
\ ► .� + + r r 759.8732
in HN
\ r4 E\ + + + + + + r + + 0-4 J
\ r + r •
\ \ + ++ ++ +• + • + r ++ +• r C O
4-4
\ r+ + + + + + + + V + P.
G
7 ,�, ,• + r + + + ,�+ ,r + lYM:760.00 r 7C:745.49
745.43 IL
r v
C+ r •
bL
I D \ + •• + r r ++ + - - - - -
• 1 rl 20 4p 60 + W + + + f
� 7c7
ING
- - - - - - - - - - - - - - - - - \\J� - - - - - - - - - .744.50 LEVEL SPEADER-A� i1C:744.72 fJ'4
INV:751.10 �i7"s' U
1 1 EP:744.20,, ,EP:74&81 Z �V
iEP:743.52
.7-14 EP:744.a7�
TQ-1"37- _ -TC:7Q.89 �7 1M743.13
B OHLER ENGINEERING NC, PLLC
1927 South Tryon Street Suite 310,Charlotte,NC 28203
Professional Engineering Services Telephone: (980)272-3400 Fax: (980)272-3401
LETTER OF TRANSMITTAL
VIA: FedEx
TO: NCDEQ RE: Stormwater Certification
610 E Center Ave
Suite 301
Mooresville,NC
28115
ATTN: Zahid Khan DATE: 03/20/2018
JOB NO: NCC 162006
WE ARE SENDING YOU ❑Shop drawings ❑Copy of letter ®Attached ❑ Prints ❑Change order
COPIES DESCRIPTION
1 Cambridge Village Pond 1 As-Built
1 Cambridge Village Pond 2 As-Built
1 Signed Certification
These Are Transmitted: ❑For approval [-]For your use ®As requested
®For review and comment ❑Approved as submitted ❑Approved as noted
❑Returned for corrections
REMARKS:
If you have any questions or require additional information, please do not hesitate to contact this office at (980)
272-3400.
COPY TO: SIGNED:
I zi
Brian Rosenfeld,Project Manager
� x
a=
M
ew7sia - -
-.` ew 750.51
7W 751,W
TW=BW 760.00
BW 749.8
`� ••`�- -- _ TW 751 .80
TW=BW748.22 `
t
�` 7W=BW 749.00 �-----