Loading...
HomeMy WebLinkAbout20150994 Ver 1_Emails_20160204Strickland, Bev From: Joey Lawler <JLawler@smeinc.com> Sent: Thursday, February 04, 2016 2:38 PM To: 'David.W.Brown@usace.army.mil' Cc: Moore, Andrew W Subject: RE: T-10 Replacement - Sheet Pilings and Temp Bridge at Green River Crossing Attachments: 100_2691jpg; Sheet Pile Notes for Latex 128 2016.pdf Andrew — I realized that I did not copy you on this last week, so please see below. The contractor is planning on installing some temporary sheet pilings around either side of the live gasline to protect it during the open cut of the Green River. There will be no change what -so -ever in the permitted impact footprint, but since this stuff wasn't depicted on the original plan, so we are having them generate a drawing for your record. Their rough notes are attached for additional reference as well. 11 11110 11111:11111ro `I 1751 Southern- Boulevard Charlotte NC 28273 704.523.4726 0 4 / + iG o'o -: 704.604.64 llawler smeinc.com www.smeinc.com 1&999m Inc. moves e2 hrelve spots in 2015 ENR Top 500 to 89. This electronic message is subject to the terms of use set forth at www.smeinc.com/email. If you received this message in error please advise the sender by reply and delete this electronic message and any attachments. Please consider the environment before printing this email. From: Joey Lawler Sent: Monday, February 01, 2016 8:44 AM To: 'David.W.Brown@usace.army.miI' <David.W.Brown@usace.army.mil> Cc: crogers@smeinc.com; Tom Perez <TPerez@smeinc.com> Subject: T-10 Replacement - Sheet Pilings and Temp Bridge at Green River Crossing Hey David thanks for speaking with me today. Per our conversation, the contractor had some concern about exposing the existing live line at the Green River crossing, so are taking some additional precautions. This is a sketch that they provided. The sheet pilings will protect the existing pipe, and the bridge will let them string the new pipe and excavate. All will be conducted within the existing permitted footprint— no additional temp workspace is required — no new impacts, just changing the method of installation slightly. I will be able to get you a better drawing for the record in the next few days. Thanks again for your help -j `I 1751 Southern- Boulevard Charlotte NC 28273 Map 704.523.4726 704.525.3953 Mobile:04•04• llawler smeinc.com www.smeinc.com 5&ME" Inc. o oees up twelve soots in 2015 TNR Top 500 to 89. This electronic message is subject to the terms of use set forth at www.smeinc.com/email. If you received this message in error please advise the sender by reply and delete this electronic message and any attachments. Please consider the environment before printing this email.