Loading...
HomeMy WebLinkAbout20160101 Ver 1_Site Plan_20160205CONTACTS NCDOT District Engineer Electric Utilities Reid Elmore 919-733-3213 Water & Sewer Utilities John Cannon 919-249-3412 Time Warner Cable 919-573-7053 Rodney Smith 919-249-3342 Gas Utilities PSNC 919-367-2713 Phone Utilities BellSouth 919-785-7774 SHEET INDEX SHEET 1: TITLE SHEET SHEET 2: NOTES SHEET 3: PLAN &PROFILE (12" WATERLINE) SHEET 4: DETAILS GENERAL NOTES: TOWN OF APEX PUBLIC WORKS AND UTILITIES DEPARTMENT HIGHWAY 55 WATERLINE EXTENSION PROJECT LOCATION: TYPE OF WORK: HIGHWAY 55 - PUBLIC WORKS ADMINISTRATION TO JAYCEE PARK 12" WATERLINE INSTALLATION (781 LF +/-) rM VICINITY MAP cyATygM ST PROJECT LOCATION APEX PUBLIC WORKS AND UTILITIES COMPLEX v ticss v�J� JQ a 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL ILLUSTRATED KNOWN UNDERGROUND ELEMENTS. ADDITIONALLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXERCISING REASONABLE EFFORTS TO PROTECT ANY UNKNOWN UNDERGROUND ELEMENTS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF UNKNOWN ELEMENTS ARE DISCOVERED THAT WOULD NECESSITATE MODIFICATION TO THE ILLUSTRATED DESIGN. 2. PROTECT ALL ADJACENT PROPERTIES, THE GENERAL PUBLIC, AND ALL OF THE OWNER'S FACILITIES. SHOULD DAMAGES OCCUR, CONTRACTOR SHALL REPAIR IMMEDIATELY AS DIRECTED BY THE ENGINEER. 3. CONTRACTOR SHALL HOLD HARMLESS THE OWNER AND THE ENGINEER FOR DAMAGES, INJURIES OR OTHER ACCIDENTS WHICH OCCUR DURING THESE CONSTRUCTION ACTIVITIES. 4. TREES AND EXISTING LANDSCAPING NOT DESIGNATED FOR REMOVAL SHALL BE PROTECTED DURING CONSTRUCTION. 5. ALL ELEVATIONS ARE IN REFERENCE TO DESIGNATED BENCHMARKS. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING AND COORDINATION OF ALL ILLUSTRATED CONSTRUCTION ACTIVITIES AT THE JOB SITE. 7. CONTRACTOR SHALL PROVIDE EXCAVATION AND TRAFFIC CONTROL AS REQUIRED BY LOCAL AUTHORITIES AND ALL APPLICABLE OSHA REGULATIONS. 8. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES DURING CONSTRUCTION AND SHALL MAKE REPAIRS AT HIS EXPENSE. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATION ADJUSTMENTS OF ALL EXISTING VAULTS (REGARDLESS OF FUNCTION), METER BOXES, FIRE HYDRANTS, CLEAN OUTS, MANHOLES ETC. TO MATCH FINISHED GRADES AND SITE PLAN. ALL SUCH WORK SHALL BE COORDINATED WITH THE ENGINEER. 10. UTILIZE SIGNS, BARRICADES, FLAG MEN, OR GUARDS, PER NCDOT STANDARDS, AS REQUIRED TO ENSURE THE SAFETY OF ALL VEHICULAR AND PEDESTRIAN TRAFFIC DURING ALL CONSTRUCTION ACTIVITIES. 11. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER AND ADJACENT PROPERTY OWNERS AS REQUIRED FOR WORK OUTSIDE OF PROPERTY LINES. 12. UNDER ABSOLUTELY NO CIRCUMSTANCES SHALL ANY UNMANNED EXCAVATION BE LEFT OPEN OR UNPROTECTED DURING NON -WORKED HOURS. UTILIZE SIGNS, BARRICADES, ETC. TO ENSURE THE SAFETY OF THE GENERAL PUBLIC. 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK AS ILLUSTRATED ON PLANS. IF EXISTING CONDITIONS DIFFER FROM THOSE ILLUSTRATED ON PLANS, NOTIFY ENGINEER PRIOR TO CONSTRUCTION ACTIVITIES. 14. VERIFY ALL DIMENSIONS AND GRADES AT THE JOB SITE. IF DIFFERENCES ARE FOUND, NOTIFY ENGINEER SO THAT MODIFICATIONS TO THESE DRAWINGS CAN BE MADE. 15. ALL WORK TO BE PERFORMED ACCORDING TO OSHA SAFETY REGULATIONS. 16. THE CONTRACTOR SHALL PROVIDE 24 HOURS NOTICE TO THE TOWN OF APEX FOR ALL REQUIRED INSPECTIONS. 17. ALL UTILITIES OR STRUCTURES NOT DESIGNATED FOR REMOVAL OR MODIFICATION ARE TO REMAIN AND BE PROTECTED FROM DAMAGE. 18. ALL DEMOLITION WORK SHALL BE PERFORMED WITH "DUE CARE AND DILIGENCE" SO AS TO PREVENT THE ARBITRARY DESTRUCTION OR INTERRUPTION OF CONCEALED UTILITIES WHICH ARE INTENDED TO REMAIN IN USE, THE ROUTING OF WHICH COULD NOT BE PREDETERMINED UNTIL DEMOLITION WAS STARTED. ALL SUCH DISCOVERIES OF UTILITIES DURING THE DEMOLITION PROCESS WHICH ARE IN A LOCATION DIFFERENT FROM THAT INDICATED OR ARE UNIDENTIFIED, SHALL BE REPORTED TO THE ENGINEER AND OWNER BEFORE REMOVAL FOR FINAL DISPOSITION. 19. ALL WASTE MATERIAL GENERATED FROM DEMOLITION WORK SHALL BE DISPOSED OF OFF SITE IN ACCORDANCE WITH TOWN OF APEX REGULATIONS. 20. SALVAGEABLE FILL MATERIALS FROM SITE DEMOLITION DETERMINED TO BE ACCEPTABLE BY AN INDEPENDENT SOILS TESTING LABORATORY SHALL BE UTILIZED FOR FILL MATERIAL WHERE APPROPRIATE. 21. ANY NOTE, OR REFERENCE TO ANY ELEMENT, WHICH DOES NOT SPECIFY ACTION BY THE CONTRACTOR SHALL BE CONSTRUED AS INFORMATION ONLY. 22. ALL STRUCTURES/UTILITIES DESIGNATED FOR MODIFICATION SHALL BE PROTECTED BY THE CONTRACTOR DURING CONSTRUCTION. 23. CONTRACTOR SHALL NOTIFY THE NCDOT DISTRICT ENGINEER, IN ACCORDANCE WITH ALL DRIVEWAY PERMITS & ENCROACHMENT AGREEMENTS, PRIOR TO BEGINNING ANY WORK WITHIN THE STATE MAINTAINED RIGHT OF WAY. 24. ALL UTILITY APPURTENANCES REMOVED DURING CONSTRUCTION SHALL BE RETURNED TO THE TOWN OF APEX. 25. ALL CONSTRUCTION INSTALLATION PROCEDURES SHALL FOLLOW THE TOWN OF APEX CONSTRUCTION SPECIFICATIONS AND DETAILS INCLUDING ALL S&E PROCEDURES. LEGEND BOA - BLOW OFF ASSEMBLY GAS - GAS LINE BOC -BACK OF CURB GRV - GRAVEL C - CUT GV - GATE VALVE C&G - CURB AND GUTTER JB - JUNCTION BOX CL - CENTER LINE JLRB -JORDAN LAKE RIPAIRIAN BUFFER CB - CATCH BASIN MH - MANHOLE CONC - CONCRETE MJ - MECHANICAL JOINT FITTING CO - CLEANOUT PP - POWER POLE DI - DROP INLET PROP - PROPOSED DIP -DUCTILE IRON PIPE RCP -REINFORCED CONCR. PIPE EIP - EXISTING IRON PIPE RJDIP - RESTRAINT JOINT DIP EP - EDGE OF PAVEMENT ROW - RIGHT OF WAY EX - EXISTING S - SILT FENCE F - FILL S/T - SILT/ TREE COMBO FENCE FES - FLARED END SECTION SS - SANITARY SEWER FH - FIRE HYDRANT TCE - TEMP. CONSTR. EASEMENT FO - FIBER OPTIC LINE WM - WATER METER FOM - FIBER OPTIC MARKER WV - WATER VALVE * * * CAUTION * * * N.C. ONE CALL: UTILITY LOCATOR SERVICE A ONE CALL SYSTEM FOR COMMUNITY AND JOB SAFETY. BEFORE YOU DIG! CONTACT ONE -CALL CENTER 1-800-632-4949 ***CAUTION*** THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED, ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. Prepared in the office of: PUBLIC WORKS AND UTILITIES DEPARTMENT 105 UPCHURCH STREET, APEX, N.C. 27502 PHONE: 919-249-3427 FAX: 919-367-2808 ze 9� 1873 - SEAL - 022795 ...... ;i Ito fittSdiii 1 tio C Av P.E. Project E glneer z O F_ U D F_ L) z O U O LL 0 W Q Uj J LU i - O z Z LU J Q z LL