HomeMy WebLinkAbout20160101 Ver 1_Site Plan_20160205CONTACTS
NCDOT District Engineer Electric Utilities
Reid Elmore
919-733-3213
Water & Sewer Utilities
John Cannon
919-249-3412
Time Warner Cable
919-573-7053
Rodney Smith
919-249-3342
Gas Utilities
PSNC
919-367-2713
Phone Utilities
BellSouth
919-785-7774
SHEET INDEX
SHEET 1: TITLE SHEET
SHEET 2: NOTES
SHEET 3: PLAN &PROFILE (12" WATERLINE)
SHEET 4: DETAILS
GENERAL NOTES:
TOWN OF APEX
PUBLIC WORKS AND UTILITIES DEPARTMENT
HIGHWAY 55 WATERLINE EXTENSION PROJECT
LOCATION:
TYPE OF WORK:
HIGHWAY 55 - PUBLIC WORKS ADMINISTRATION TO JAYCEE PARK
12" WATERLINE INSTALLATION (781 LF +/-)
rM VICINITY MAP
cyATygM
ST
PROJECT LOCATION APEX PUBLIC WORKS AND
UTILITIES COMPLEX
v
ticss v�J�
JQ
a
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL ILLUSTRATED KNOWN UNDERGROUND ELEMENTS. ADDITIONALLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXERCISING REASONABLE EFFORTS TO PROTECT ANY UNKNOWN
UNDERGROUND ELEMENTS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF UNKNOWN ELEMENTS ARE DISCOVERED THAT WOULD NECESSITATE MODIFICATION TO THE ILLUSTRATED DESIGN.
2. PROTECT ALL ADJACENT PROPERTIES, THE GENERAL PUBLIC, AND ALL OF THE OWNER'S FACILITIES. SHOULD DAMAGES OCCUR, CONTRACTOR SHALL REPAIR IMMEDIATELY AS DIRECTED BY THE ENGINEER.
3. CONTRACTOR SHALL HOLD HARMLESS THE OWNER AND THE ENGINEER FOR DAMAGES, INJURIES OR OTHER ACCIDENTS WHICH OCCUR DURING THESE CONSTRUCTION ACTIVITIES.
4. TREES AND EXISTING LANDSCAPING NOT DESIGNATED FOR REMOVAL SHALL BE PROTECTED DURING CONSTRUCTION.
5. ALL ELEVATIONS ARE IN REFERENCE TO DESIGNATED BENCHMARKS.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING AND COORDINATION OF ALL ILLUSTRATED CONSTRUCTION ACTIVITIES AT THE JOB SITE.
7. CONTRACTOR SHALL PROVIDE EXCAVATION AND TRAFFIC CONTROL AS REQUIRED BY LOCAL AUTHORITIES AND ALL APPLICABLE OSHA REGULATIONS.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES DURING CONSTRUCTION AND SHALL MAKE REPAIRS AT HIS EXPENSE.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATION ADJUSTMENTS OF ALL EXISTING VAULTS (REGARDLESS OF FUNCTION), METER BOXES, FIRE HYDRANTS, CLEAN OUTS, MANHOLES ETC. TO MATCH FINISHED GRADES AND SITE PLAN. ALL SUCH WORK
SHALL BE COORDINATED WITH THE ENGINEER.
10. UTILIZE SIGNS, BARRICADES, FLAG MEN, OR GUARDS, PER NCDOT STANDARDS, AS REQUIRED TO ENSURE THE SAFETY OF ALL VEHICULAR AND PEDESTRIAN TRAFFIC DURING ALL CONSTRUCTION ACTIVITIES.
11. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER AND ADJACENT PROPERTY OWNERS AS REQUIRED FOR WORK OUTSIDE OF PROPERTY LINES.
12. UNDER ABSOLUTELY NO CIRCUMSTANCES SHALL ANY UNMANNED EXCAVATION BE LEFT OPEN OR UNPROTECTED DURING NON -WORKED HOURS. UTILIZE SIGNS, BARRICADES, ETC. TO ENSURE THE SAFETY OF THE GENERAL PUBLIC.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK AS ILLUSTRATED ON PLANS. IF EXISTING CONDITIONS DIFFER FROM THOSE ILLUSTRATED ON PLANS, NOTIFY ENGINEER PRIOR TO CONSTRUCTION ACTIVITIES.
14. VERIFY ALL DIMENSIONS AND GRADES AT THE JOB SITE. IF DIFFERENCES ARE FOUND, NOTIFY ENGINEER SO THAT MODIFICATIONS TO THESE DRAWINGS CAN BE MADE.
15. ALL WORK TO BE PERFORMED ACCORDING TO OSHA SAFETY REGULATIONS.
16. THE CONTRACTOR SHALL PROVIDE 24 HOURS NOTICE TO THE TOWN OF APEX FOR ALL REQUIRED INSPECTIONS.
17. ALL UTILITIES OR STRUCTURES NOT DESIGNATED FOR REMOVAL OR MODIFICATION ARE TO REMAIN AND BE PROTECTED FROM DAMAGE.
18. ALL DEMOLITION WORK SHALL BE PERFORMED WITH "DUE CARE AND DILIGENCE" SO AS TO PREVENT THE ARBITRARY DESTRUCTION OR INTERRUPTION OF CONCEALED UTILITIES WHICH ARE INTENDED TO REMAIN IN USE, THE ROUTING OF WHICH COULD
NOT BE PREDETERMINED UNTIL DEMOLITION WAS STARTED. ALL SUCH DISCOVERIES OF UTILITIES DURING THE DEMOLITION PROCESS WHICH ARE IN A LOCATION DIFFERENT FROM THAT INDICATED OR ARE UNIDENTIFIED, SHALL BE REPORTED TO THE
ENGINEER AND OWNER BEFORE REMOVAL FOR FINAL DISPOSITION.
19. ALL WASTE MATERIAL GENERATED FROM DEMOLITION WORK SHALL BE DISPOSED OF OFF SITE IN ACCORDANCE WITH TOWN OF APEX REGULATIONS.
20. SALVAGEABLE FILL MATERIALS FROM SITE DEMOLITION DETERMINED TO BE ACCEPTABLE BY AN INDEPENDENT SOILS TESTING LABORATORY SHALL BE UTILIZED FOR FILL MATERIAL WHERE APPROPRIATE.
21. ANY NOTE, OR REFERENCE TO ANY ELEMENT, WHICH DOES NOT SPECIFY ACTION BY THE CONTRACTOR SHALL BE CONSTRUED AS INFORMATION ONLY.
22. ALL STRUCTURES/UTILITIES DESIGNATED FOR MODIFICATION SHALL BE PROTECTED BY THE CONTRACTOR DURING CONSTRUCTION.
23. CONTRACTOR SHALL NOTIFY THE NCDOT DISTRICT ENGINEER, IN ACCORDANCE WITH ALL DRIVEWAY PERMITS & ENCROACHMENT AGREEMENTS, PRIOR TO BEGINNING ANY WORK WITHIN THE STATE MAINTAINED RIGHT OF WAY.
24. ALL UTILITY APPURTENANCES REMOVED DURING CONSTRUCTION SHALL BE RETURNED TO THE TOWN OF APEX.
25. ALL CONSTRUCTION INSTALLATION PROCEDURES SHALL FOLLOW THE TOWN OF APEX CONSTRUCTION SPECIFICATIONS AND DETAILS INCLUDING ALL S&E PROCEDURES.
LEGEND
BOA - BLOW OFF ASSEMBLY
GAS - GAS LINE
BOC -BACK OF CURB
GRV - GRAVEL
C - CUT
GV - GATE VALVE
C&G - CURB AND GUTTER
JB - JUNCTION BOX
CL - CENTER LINE
JLRB -JORDAN LAKE RIPAIRIAN BUFFER
CB - CATCH BASIN
MH - MANHOLE
CONC - CONCRETE
MJ - MECHANICAL JOINT FITTING
CO - CLEANOUT
PP - POWER POLE
DI - DROP INLET
PROP - PROPOSED
DIP -DUCTILE IRON PIPE
RCP -REINFORCED CONCR. PIPE
EIP - EXISTING IRON PIPE
RJDIP - RESTRAINT JOINT DIP
EP - EDGE OF PAVEMENT
ROW - RIGHT OF WAY
EX - EXISTING
S - SILT FENCE
F - FILL
S/T - SILT/ TREE COMBO FENCE
FES - FLARED END SECTION
SS - SANITARY SEWER
FH - FIRE HYDRANT
TCE - TEMP. CONSTR. EASEMENT
FO - FIBER OPTIC LINE
WM - WATER METER
FOM - FIBER OPTIC MARKER
WV - WATER VALVE
* * * CAUTION * * *
N.C. ONE CALL: UTILITY LOCATOR SERVICE
A ONE CALL SYSTEM FOR COMMUNITY AND JOB SAFETY.
BEFORE YOU DIG!
CONTACT ONE -CALL CENTER
1-800-632-4949
***CAUTION***
THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED
FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS.
THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDERGROUND
UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA,
EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES
NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN
THE EXACT LOCATION INDICATED, ALTHOUGH HE DOES CERTIFY THAT
THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION
AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE
UNDERGROUND UTILITIES.
Prepared in the office of:
PUBLIC WORKS AND UTILITIES DEPARTMENT
105 UPCHURCH STREET, APEX, N.C. 27502
PHONE: 919-249-3427 FAX: 919-367-2808
ze 9�
1873
- SEAL -
022795
...... ;i
Ito
fittSdiii 1
tio
C Av
P.E.
Project E glneer
z
O
F_
U
D
F_
L)
z
O
U
O
LL
0
W
Q
Uj
J
LU
i -
O
z
Z
LU
J
Q
z
LL