HomeMy WebLinkAbout20210695 Ver 3_Appendix C - Frac-out Contingency Plan_20240523J 1111T & iW14 FRAC-OUT CONTINGENCY PLAN FOR DIRECTIONAL DRILLING 1-0 Inlroduction and Purpose 3 2.0 Description of Supervisor/Foremen3.0; Site Responsibilities Response6.0 Drilling Procedures 5 6.3 Response Procedures 6.4 Construction Re -start 7 6.5 Bore Abandonment 7.0 a 71 Communicating with egutatory Agency FRAC -OUT CONTINGENCY PLAN (FCP) Purpose Directional bore operations have a potential to release dMnq fluids into the surface W. i ! • a a • Y r N it The specAfic objectives of this plan are to: o Minimize t4a potential W a frac associated `nth directional 4 ding activities; . Pravide for the timely demotion of rac-tests; . Protect the environmentally sensRWe riverbed and associated riparian vegetation; 4€ nsure an organized, firrwly, and ' ffflnimurn4mact" r i n the event of a frac-out and release of drilling bentonite. and . Ensure that all a pproptiatee notificMions are made krwrt0diately to the customer, manneffent and safes personnel. 0411iaig operations will be haUd by the drill rig operators immediately upon detection of a drop in drilling pressure or other evince of a frac-out_ .the clean-up of all spills shalt beginimmediately. Management & safety deparanartt shall be rtotftd Ovntety of any spills and shall be comwitedregarding clean-up procedures. A sf l kit shall be ors - site and used if a frac-out occurs. A vacuum truck and containment Materials, such as straw bad. shall also be oo-site prior to and during all operations. The Site Supervisor wilt be imrnediately ratified, to the evert of a ac-out theon-site foremardsupervisor wiV conduct an evaluation of the situation and direct recommended mifigation actions, based on the fol g guidelines. a. if the firac-out is minor, easily contained. has not reached the surface and is not threatening sensitive resource, drilling operations may resume air use of a leak -stopping compound jor reditedion of the ire. 4.0 Equipment The Site Supervisor shall maws that: All equipment and vehicles are be chocks and mild daily to prevent leaks of hazardous ous materials - Spill kits and split containment materials are available on-ske at all times: and that the equiproent is in 9oW working order, Equiprmot requited to contain and clean up a frao-out release will either be available- at the work site or rely avwWbte at an rants Lion within 15- minutes of the bore site, ' If equipment is required 'to be gated rear a riverbed, absorbent pads and plastic sheeting for placement beneath motorized equipment shall to a to protect the riverbed from engine fluids. ;t, At Ons time the Site Scig r rl n shall be informed of the potential c t.. The SiLe Svpervisor/Forernen and the drill rig operator( shall work to c6ordinate the likely kmation of the l c ut. The tocation of the -out small be recorded and note-s made* on the locaWn and r taken to address the concern. Tfte following subsections shall be adhered to when iaddressft a fret €rt t€� . GA Vac-Truok A vacuum truck shall be staged at a focation fmm which it can be rmbitized and a , t tt a s