FRAC-OUT CONTINGENCY PLAN
FOR
DIRECTIONAL DRILLING
1-0 Inlroduction and Purpose 3
2.0
Description of
Supervisor/Foremen3.0; Site Responsibilities
Response6.0 Drilling Procedures 5
6.3 Response Procedures
6.4 Construction Re -start 7
6.5 Bore Abandonment
7.0 a
71 Communicating with egutatory Agency
FRAC -OUT CONTINGENCY PLAN (FCP)
Purpose
Directional bore operations have a potential to release dMnq fluids into the surface
W.
i ! •
a a • Y r N it
The specAfic objectives of this plan are to:
o Minimize t4a potential W a frac associated `nth directional 4 ding activities;
. Pravide for the timely demotion of rac-tests;
. Protect the environmentally sensRWe riverbed and associated riparian vegetation;
4€ nsure an organized, firrwly, and ' ffflnimurn4mact" r i n the event of a
frac-out and release of drilling bentonite. and
. Ensure that all a pproptiatee notificMions are made krwrt0diately to the customer,
manneffent and safes personnel.
0411iaig operations will be haUd by the drill rig operators immediately upon detection of
a drop in drilling pressure or other evince of a frac-out_ .the clean-up of all spills shalt
beginimmediately. Management & safety deparanartt shall be rtotftd Ovntety of
any spills and shall be comwitedregarding clean-up procedures. A sf l kit shall be ors -
site
and used if a frac-out occurs. A vacuum truck and containment Materials, such as
straw bad. shall also be oo-site prior to and during all operations. The Site Supervisor
wilt be imrnediately ratified, to the evert of a ac-out theon-site foremardsupervisor
wiV conduct an evaluation of the situation and direct recommended mifigation actions,
based on the fol g guidelines.
a. if the firac-out is minor, easily contained. has not reached the surface and is not
threatening sensitive resource, drilling operations may resume air use of a
leak -stopping compound jor reditedion of the ire.
4.0 Equipment
The Site Supervisor shall maws that:
All equipment and vehicles are be chocks and mild daily to prevent leaks
of hazardous ous materials -
Spill kits and split containment materials are available on-ske at all times: and that
the equiproent is in 9oW working order,
Equiprmot requited to contain and clean up a frao-out release will either be
available- at the work site or rely avwWbte at an rants Lion within 15-
minutes of the bore site,
' If equipment is required 'to be gated rear a riverbed, absorbent pads and
plastic sheeting for placement beneath motorized equipment shall to a to
protect the riverbed from engine fluids.
;t, At Ons time the Site Scig r rl n shall be informed of the potential c t..
The SiLe Svpervisor/Forernen and the drill rig operator( shall work to c6ordinate the
likely kmation of the l c ut. The tocation of the -out small be recorded and note-s
made* on the locaWn and r taken to address the concern. Tfte following
subsections shall be adhered to when iaddressft a fret €rt t€� .
GA Vac-Truok
A vacuum truck shall be staged at a focation fmm which it can be rmbitized and
a , t tt a s