HomeMy WebLinkAbout20240254 Ver 2_Appendix A - HDD at CSXT Navassa Bridge & Under the Cape Fear River, Wilmington, NC_20240523HORIZONTAL DIRECTIONAL DRILL (HDD) AT CSXT NAVASSA BRIDGE & UNDER THE CAPE FEAR RIVER, WILMINGTON, NC HDD EXIT PIT ACCESS PATH EXPLANATION Based on experience with similar horizontal directional drilling (HDD) projects, CSXT anticipates the HDD contractor will require a 16' wide, temporary, timber -matted access path from the river's edge to the exit pit drill pad (see Figure 1 from EC-14 below) on the east side of the river. The proposed 16' width of the access path is necessitated by the equipment required to perform the work (see Figures 2 and 3 for typical size of equipment used in HDD operations) and is considered the minimum practical width. The HDD Contractor will access the east side of the river by barge to construct the timber -matted access path from the riverbank to the exit pit area. Following completion of the access path, the HDD equipment and materials will then be transported to the exit pit area from the barge via the access path. Feasibility of Alternative Access Methods Considered: CSXT considered the following alternatives and concluded that the above -described temporary access path is the only practical way to access the exit pit at this location. • Hi -Rail Alternative: o It was determined that it would not be practical to transport HDD equipment and materials to the site on the CSXT mainline via hi -rail equipment due to amount/size of HDD drill rigs, pump truck, pipe racks, excavator and drilling materials. Specifically, this was a concern since accessing the site from either direction would require crossing a bridge with the oversized equipment. Furthermore, due to the variability of HDD work schedules, there is a potential for interference with rail operations since this section of track is only a single mainline (i.e. no alternatives for rail traffic). o HDD contractors typically recycle the bentonite clay, used during drilling operations, by vacuuming it from the exit pit and transporting it back to the entry pit throughout the operation. They also re -use trailing rods (drill pipe that is typ. 20' long segments) and will need to be able to transport these materials from the exit pit to the entry pit at various times. The schedule for which bentonite and trailing rods must be transported from one place to another are not known well in advance as it depends on how drilling operations progress each day. Coordinating hi -rail transportation to transport materials back and forth would be expected to cause delays for the HDD contractor, and possibly for freight traffic. Using Crane from Barge Alternative: o Use of a barge -mounted crane to transfer equipment to the bore site was considered, but determined to be infeasible due to the excessive pick radius required, as well as the weight of the equipment (since it would be sitting on a barge). The crane's radius from a barge to the exit pit area is over 150'resuting in the need for a crane so large that it could not be mounted on a barge in this area. Page 1 of 3 HORIZONTAL DIRECTIONAL DRILL (HDD) AT CSXT NAVASSA BRIDGE & UNDER THE CAPE FEAR RIVER, WILMINGTON, NC :NG SUB -MARINE TJ 8E REMOVEI}I "CSzT NAVA55A (TO BE REMOVED) A I EXISTING E111 SPAN CONTROL HOUSE � IfE 71 AID NEW COW TS RIARIED IN OALLASF OP FQ THE BRIDGE. ATTACNEO IC BRIDGE NO JOKER THAN LOY BRIDGE STEEL. ti.E. NO NET[AND WACFSI NEN JUNCTION E7[[ST1NG MAIN lT/R ELE V.=:5.6'5 ti5F NQ!'N�_�Lr i N 57A 711AY LJ _ _ _ - - - - f TEAiPQRARI' ' _--------' 767'xd0' lf.IVER - - - - - ,MARK k0D 47 S60RE� - - - AfA7iING RAF ,ONS GWERA71LW5 11ETLAN6 IMPACT NDD EXIT Pit A J BERM. = 0.000 AL d'rd' JXN 8UX _-FENOER6 J TEW. ' O.OG2 AC L4CAtIGW ±SP' N: 187.418-T4 BETWEEM 8UA7 ACCESS E. 2.306.711.05 ROX8 I I: 10.00' _--_..—..._ �.. _.. _—..._.. - . - - — - - — 1EAE�' ar f6' HIt1E CCa'17RACTOR 7(1 PLACE NAWR WYEO ACCESS YETLAK - COAPOS7 FIE FER SOCKS PA7i4 FOR HDD E0UiPAEN7 AA%bW 7EAaDRARr �. - TAPAC7S AS NEEDED FIGURE 1. View of Exit Pit Area wNot& FIGURE 2. Typical HDD Exit Pit Equipment Page 2 of 3 HORIZONTAL DIRECTIONAL DRILL (HDD) AT CSXT NAVASSA BRIDGE & UNDER THE CAPE FEAR RIVER, WILMINGTON, NC FIGURE 3. Typical HDD Entry Pit Area and Timber Matting Page 3 of 3