HomeMy WebLinkAbout20061471 Ver 2_USACE Additional Info_20160120
Strickland, Bev
From:Bullard, Teresa R SAW <Teresa.R.Bullard@usace.army.mil>
Sent:Wednesday, January 20, 2016 7:25 AM
To:Steenhuis, Joanne
Cc:Crumbley, Tyler SAW; Moore, Daniel C SAW
Subject:NPS Harkers Island SAW-2006-40176 Additional Information (UNCLASSIFIED)
CLASSIFICATION: UNCLASSIFIED
Joanne,
The engineer on our team looked at the plans for what was previously constructed during the 2007 phase:
1.32 acres of stone sill and breakwater were constructed. The total length including the breakwater was 2,285 LF.
The previous 401 permitted 1.82 ac of which 1.32 ac was constructed.
The current construction would be for impacts to 0.70 ac of open water for the completion of the sill.
Sorry this has been confusing. I am hoping this is the info you were looking for. I am in the office all day please don't
hesitate to call if you need additional info.
Thanks,
Teresa
Teresa Bullard
Environmental Resources
Wilmington District Army Corps of Engineers
910-251-4725
CLASSIFICATION: UNCLASSIFIED
1