Loading...
HomeMy WebLinkAbout20061471 Ver 2_USACE Additional Info_20160120 Strickland, Bev From:Bullard, Teresa R SAW <Teresa.R.Bullard@usace.army.mil> Sent:Wednesday, January 20, 2016 7:25 AM To:Steenhuis, Joanne Cc:Crumbley, Tyler SAW; Moore, Daniel C SAW Subject:NPS Harkers Island SAW-2006-40176 Additional Information (UNCLASSIFIED) CLASSIFICATION: UNCLASSIFIED Joanne, The engineer on our team looked at the plans for what was previously constructed during the 2007 phase: 1.32 acres of stone sill and breakwater were constructed. The total length including the breakwater was 2,285 LF. The previous 401 permitted 1.82 ac of which 1.32 ac was constructed. The current construction would be for impacts to 0.70 ac of open water for the completion of the sill. Sorry this has been confusing. I am hoping this is the info you were looking for. I am in the office all day please don't hesitate to call if you need additional info. Thanks, Teresa Teresa Bullard Environmental Resources Wilmington District Army Corps of Engineers 910-251-4725 CLASSIFICATION: UNCLASSIFIED 1