HomeMy WebLinkAbout310386_Application_20240222 State of North Carolina
Department of Environmental Quality
Division of Water Resources
Animal Waste Management Systems
Request for Certification of Coverage
Facility Currently covered by an Expiring Sate Non-Discharge General Permit
On September 30, 2024,the North Carolina State Non-Discharge General Permits for Animal Waste Management Systems will
expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State
Non-Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore,all applications
must be received by the Division of Water Resources by no later than April 3,2024.
Please do not leave any question unanswered Please verify all information and make any necessary corrections below.
Application must be signed and dated by the Permittee,
1. Certificate Of Coverage Number: AWS310386
2. Facility Name: William Edward Brock Farm
3. Permittee's Name(same as on the Waste Management Plan): Emily Brock
4. Permittee's Mailing Address: 2369 Pasture Branch Rd
City: Beulaville State: NC Zip: 28518
Telephone Number: 910-271-1745 Ext. E-mail:
5. Facility's Physical Address: 2369 Pasture Branch Rd
City: Beulaville State: NC Zip: 28518
6. County where Facility is located: Duplin
7. Farm Manager's Name(if different from Landowner):
S. Farm Manager's telephone number(include area code):
9. Integrator's Name(if there is not an Integrator,write"None"): Murphy-Brown LLC
10. Operator Name(OIC): Melissa B.Wallace Phone No.: 910-296-0366 OIC#: 17319
11. Lessee's Name(if there is not a Lessee,write"None"):
12. Indicate animal operation type and number:
Current Permit: Operations Type Allowable Count
Swine-Feeder to Finish 4,560
Operation Types:
Swine Cattle Dry Poultry Other Types
Wean to Finish Dairy Calf Non Laying Chickens Horses-Horses
Wean to Feeder Dairy Heifer Laying Chickens Horses-Other
Farrow to Finish Milk Cow Pullets Sheep-Sheep
Feeder to Finish Dry Cow Turkeys Sheep-Other
Farrow to Wean Beef Stocker Calf Turkey Pullet
Farrow to Feeder Beef Feeder
Boar/Stud Beef Broad Cow Wet Poultry
Gilts Other Non Laying Pullet
Other Layers
13. Waste Treatment Lagoons,Digesters and Waste Storage Ponds(WSP):(Fill/Verify the following information.
Make all necessary corrections and provide missing data.)
Structure Type Estimated Liner Type Estimated Design Freeboard
Structure (Lagoon/Digester/ Date (Clay,Synthetic, Capacity Surface Area 'Redline"
Name WSP) Built Unknown) (Cubic Feet) (Square Feet) (Inches)
1 Lagoon 1/1/1993 461,943.00 67,650.00 19.00
2 Lagoon 1/1/1996 737,760.00 94,500.00 27.00
Submit one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed
application as required by NC General Statutes 143-215.10C(d), either by mailing to the address below or sending it via
email to the email address below.
The CAWMP must include the following components:
1. The most recent Waste Utilization Plan(WUP),signed by the owner and a certified technical specialist,containing:
a. The method by which waste is applied to the disposal fields(e.g.irrigation,injection,etc.)
b. A map of every field used for land application(for example: irrigation map)
c. The soil series present on every land application field
d. The crops grown on every land application field
e. The Realistic Yield Expectation(RYE)for every crop shown in the WUP
f. The maximum PAN to be applied to every land application field
g. The waste application windows for every crop utilized in the WUP
h. The required NRCS Standard specifications
2. A site map/schematic
3.Emergency Action Plan
4. Insect Control Checklist with chosen best management practices noted
5. Odor Control Checklist with chosen best management practices noted
6.Mortality Control Checklist with selected method noted-Use the enclosed updated Mortality Control Checklist
7.Lagoon/storage pond capacity documentation(design,calculations,etc.) Please be sure the above table is
accurate and complete. Also provide any site evaluations,wetland determinations,or hazard classifications that may be
applicable to your facility.
8.Operation and Maintenance Plan
If your CAWMP includes any components not shown on this list,please include the additional components with your submittal.
(e.g.composting,digesters,solids separators,sludge drying system,waste transfers,etc.)
I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that,
if all required parts of this application are not completed and that if all required supporting information and attachments are not
included,this application package will be returned to me as incomplete.
Note: In accordance with NC General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18
U.S.C. Section 1001 provides a punishment by a fine of not more than$10,000 or imprisonment of not more than 5 years,or both
for a similar offense.)
Print the Name of the Permittee/Landowner/Signing Official and Sign below.(If multiple Landowners exist,all landowners
should sign. If Landowner is a corporation,signature should be by a principal executive officer of the corporation):
Name(Print): Title:
Signature: 14 t / G M Date: -.2 - oZ
Name(Print): Title:
Signature: Date:
Name(Print): Title:
Signature: Date:
THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS:
E-mail: animal.operations@deq.nc.gov
NCDEQ-DWR
Animal Feeding Operations Program
1636 Mail Service Center
Raleigh,North Carolina 27699-1636
Nutrient Management Plan For Animal Waste Utilization
11-20-2019
This plan has been prepared for: This plan has been developed by:
William Edward Brock Farm (31-386) Ronnie G. Kennedy Jr.
Emily Brock Agriment Services, Inc.
2369 Pasture Branch Rd. PO Box 1096
Beulaville, NC 28518 Beulaville, NC 28518
(910) 271-1745 252-568-2648
Develo er Signature
Type of Plan: Nitrogen Only with Manure Only
Owner/Manager/Producer Agreement
I(we)understand and agree to the specifications and the operation and maintenance
procedures established in this nutrient management plan which includes an animal
waste utilization plan for the farm named above. I have read and understand the
Required Specifications concerning animal waste management that are included with
this plan.
&- ,Z4
Signat (owner) Date
Signature(manager or producer) Date
This plan meets the minimum standards and specifications of the U.S. Department of
Agriculture-Natural Resources Conservation Service or the standard of practices
adopted by the Soil and Water Conservation Commission.
f-10
Plan Approved By: //"a° - /9
T hnical Specia ist Signature Date
357914 Database Version 4.1 Date Printed: 11-20-2019 Cover Page 1
Nutrients applied in accordance with this plan will be supplied from the
following source(s):
Commercial Fertilizer is not included in this plan.
S7 Swine Feeder-Finish Lagoon Liquid waste generated 4,227,120 gals/year by a 4,560
animal Swine Finishing Lagoon Liquid operation. This production facility has waste
storage capacities of approximately 180 days.
Estimated Pounds of Plant Available Nitrogen Generated per Year
Broadcast 7619
Incorporated 9143
Injected 9143
Irrigated 7619
Max. Avail. Actual PAN PAN Surplus/ Actual Volume Volume Surplus/
PAN(lbs)* Applied Obs) Deficit(lbs) Applied(Gallons) Deficit(Gallons)
Year 1 7,619 10599 -2,980 5,880,192 -1,653,072
Note: In source ID, S means standard source,U means user defined source.
* Max.Available PAN is calculated on the basis of the actual application method(s)identified in the plan for this source.
357914 Database Version 4.1 Date Printed: 11-20-2019 Source Page 1 of 1
Narrative
11-20-2019
NO MAJOR CHANGES: This plan is to update ownership only. All crop types, crop rates, and
windows remain the same as historical plan. This plan used same acres as in the irrigation design and
historical plan dated 1-26-1998.
357914 Database Version 4.1 Date Printed: 11-20-2019 Narrative Page I of 1
The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic
Yield estimates are also provided for each crop in the plan. In addition,the Leaching Index for each field is shown,
where avai lab le.
Planned Crops Summary
Total Useable Leaching
Tract Field Acres Acres Index(LI) Soil Series Crop Sequence RYE
4776-1 1 2.61 1.76 N/A Pactolus Small Grain Overseed 1.0 Tons
Hybrid Bermudagrass Pasture 5.0 Tons
4776-1 2 3.42 2.31 N/A Pactolus Small Grain Overseed 1.0 Tons
Hybrid Bermudagrass Pasture 5.0 Tons
4776-3 IA 1.93 0.56 N/A Pactolus Small Grain Overseed 1.0 Tons
Hybrid Bermudagrass Pasture 5.0 Tons
47764 11 4.84 3.92 N/A Pactolus Small Grain Overseed 1.0 Tons
Hybrid Bermudagrass Pasture 5.0 Tons
4776-4 12 4.74 3.84 N/A IPactolus Small Grain Overseed 1.0 Tons
Hybrid Bermudagrass Pasture 5.0 Tons
47764 13 3.06 2.48 N/A Pactolus Small Grain Overseed 1.0 Tons
Hybrid Bermudagrass Pasture 5.0 Tons
47764 14 3.62 2.93 N/A Pactolus Small Grain Overseed 1.0 Tons
Hybrid Bermudagrass Pasture 5.0 Tons
47764 15 4.06 3.29 N/A Pactolus Small Grain Overseed 1.0 Tons
Hybrid Bermudagrass Pasture 5.0 Tons
47764 16 0.94 0.75 N/A Pactolus Small Grain Overseed 1.0 Tons
Hybrid Bermudagrass Pasture 5.0 Tons
4787-2 3 3.69 2.49 N/A Pactolus Small Grain Overseed 1.0 Tons
Hybrid Bermudagrass Pasture 5.0 Tons
4787-2 4 3.44 2.32 N/A Pactolus Small Grain Overseed 1.0 Tons
Hybrid Bermudagrass Pasture 5.0 Tons
4787-2 5 1.93 1.30 N/A Pactolus Small Grain Overseed 1.0 Tons
Hybrid Bermudagrass Pasture 5.0 Tons
4787-2 6 1.90 1.28 N/A Pactolus Small Grain Overseed 1.0 Tons
Hybrid Bermudagrass Pasture 5.0 Tons
4787-3 10 2.17 1.72 N/A Pactolus Small Grain Overseed 1.0 Tons
Hybrid Bermudagrass Pasture 5.0 Tons
4787-3 7 2.45 1.94 N/A Pactolus Small Grain Overseed 1.0 Tons
Hybrid Bermudagrass Pasture 5.0 Tons
4787 3 8 1 2.43 1.92 N/A Pactolus Small Grain Overseed 1 1.0 Tons
357914 Database Version 4.1 Date Printed 11/20/2019
PCS Page I of 2
NOTE: Symbol * means user entered data.
Planned Crops Summary
Total Useable Leaching
Tract Field Acres Acres Index(LI) Soil Series Crop Sequence RYE
Hybrid Bermudagrass Pasture 5.0 Tons
4787-3 9 3.01 2.38 N/A Pactolus Small Grain Overseed 1.0 Tons
Hybrid Bermudagrass Pasture 5.0 Tons
PLAN TOTALS: 50.24 37.19
LI Potential Leaching Technical Guidance
<2 Low potential to contribute to soluble None
nutrient leaching below the root zone.
>=2& Moderate potential to contribute to Nutrient Management(590)should be planned.
<_ 10 soluble nutrient leaching below the root
zone.
High potential to contribute to soluble Nutrient Management(590)should be planned. Other conservation practices that improve
nutrient leaching below the root zone. the soils available water holding capacity and improve nutrient use efficiency should be
> 10 considered. Examples are Cover Crops(340)to scavenge nutrients,Sod-Based Rotations
(328),Long-Term No-Til 1(778),and edge-of-field practices such as Fi Iter Strips(393)and
Riparian Forest Buffers(391).
357914 Database Version 4.1 Date Printed 11/20/2019
PCs Page 2 of 2
NOTE: Symbol *means user entered data.
The Waste Utilization table shown below summarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of
cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown,their nutrient requirements,
and proper timing of applications to maximize nutrient uptake.
This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure or
other by-products,commercial fertilizer and residual from previous crops. An estimate of the quantity of solid and liquid waste that will be applied on each field in
order to supply the indicated quantity of nitrogen from each source is also included. A balance of the total manure produced and the total manure applied is
included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation.
Waste Utilization Table Year 1
Nitrogen Comm Res. Manure Liquid Solid Liquid Solid Manur
PA Fert. (Ibs/A) PA ManureA Manure Manure Applied
Nutrient Nutrient NutrientA pplied Applied Applied (Field)
Req'd Applied ppled (acre) (acre) (Field)
(Ibs/A) (lbs/A) (lbs/A)
Source Total Use. Applic. Applic. 1000
Tract Field ID Soil Series Acres Acres Crop RYE Period N N N Method N gal/A Tons 1000 gals tons
4776-1 1 S7 Pactolus 2.61 1.76 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 27.74 0.00 48.82 0.00
4776-1 1 S7 Pactolus 2.61 1.76 Hybrid Bermudagrass Pasture 5.0 Tons *3/1-10/31 *235 0 0 Irrig. 235 130.37 0.00 229.46 0.00
4776-1 2 S7 Pactolus 3.42 2.31 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 27.74 0.00 64.08 0.00
4776-1 2 S7 Pactolus 3.42 2.31 Hybrid Bermudagrass Pasture 5.0 Tons *3/1-10/31 *235 0 0 Irrig. 235 130.37 0.00 301.16 0.00
4776-3 IA S7 Pactolus 1.93 0.56 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 27.74 0.00 15.53 0.00
4776-3 IA S7 Pactolus 1.93 0.56 Hybrid Bermudagrass Pasture 5.0 Tons *3/1-10/31 *235 0 0 Irrig. 235 130.37 0.00 73.01 0.00
4776-4 11 S7 Pactolus 4.84 3.92 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 27.74 0.00 108.74 0.00
147764 11 S7 Pactolus 4.84 3.92 Hybrid Bermudagrass Pasture 5.0 Tons *3/1-10/31 *235 0 0 Irrig. 235 130.37 0.00 511.06 0.00
47764 12 S7 Pactolus 4.74 3.84 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 27.74 0.00 106.52 0.00
47764 12 S7 Pactolus 4.74 3.84 Hybrid Bermudagrass Pasture 5.0 Tons *3/1-10/31 *235 0 0 Irrig. 235 130.37 0.00 500.63 0.00
4776-4 13 S7 Pactolus 3.06 2.48 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 27.74 0.00 68.79 0.00
4776-4 13 S7 Pactolus 3.06 2.48 Hybrid Bermudagrass Pasture 5.0 Tons *3/1-10/31 *235 0 0 Irrig. 235 130.37 0.00 323.33 0.00
4776-4 14 S7 Pactolus 3.62 2.93 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 27.74 0.00 81.28 0.00
4776-4 14 S7 Pactolus 3.62 2.93 Hybrid Bermudagrass Pasture 5.0 Tons *3/1-10/31 *235 0 0 Irrig. 235 130.37 0.00 381.99 0.00
4776-4 15 S7 Pactolus 4.06 3.29 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 27.74 0.00 91.26 0.00
4776-4 15 S7 Pactolus 4.06 3.29 Hybrid Bermudagrass Pasture 5.0 Tons *3/1-10/31 *235 0 0 Irrig. 235 130.37 0.00 428.93 0.00
357914 Database Version 4.1 Date Printed: 11/20/2019 WUT Page l of 3
Waste Utilization Table Year 1
Nitrogen Comm Res. Manure Liquid Solid Liquid Solid Manui
PA Fert. (Ibs/A) PA Manurefi Manure Manure Applied
Nutrient Nutrient NutrientA pplied Applied Applied (Field)
Req'd Applied pplied (acre) (acre) (Field)
(Ibs/A) (Ibs/A) (lbs/A)
Source Total Use. Applic. Applic. 1000
Tract Field ID Soil Series Acres Acres Crop RYE Period N N N Method N gal/A Tons 1000 gals tons
4776-4 16 S7 Pactolus 0.94 0.75 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 27.74 0.00 20.80 0.00
4776-4 16 S7 Pactolus 0.94 0.75 Hybrid Bermudagrass Pasture 5.0 Tons *3/1-10/31 *235 0 0 Irrig. 235 130.37 0.00 97.78 0.00
4787-2 3 S7 Pactolus 3.69 2.49 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 27.74 0.00 69.07 0.00
4787-2 3 S7 Pactolus 3.69 2.49 Hybrid Bermudagrass Pasture 5.0 Tons *3/1-10/31 *235 0 0 Irrig. 235 130.37 0.00 324.63 0.00
4787-2 4 S7 Pactolus 3.44 2.32 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 27.74 0.00 64.35 0.00
4787-2 4 S7 Pactolus 3.44 2.32 Hybrid Bermudagrass Pasture 5.0 Tons *3/1-10/31 *235 0 0 Irrig. 235 130.37 0.00 302.47 0.00
4787-2 5 S7 Pactolus 1.93 1.30 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 27.74 0.00 36.06 0.00
4787-2 5 S7 Pactolus 1.93 1.30 Hybrid Bermudagrass Pasture 5.0 Tons *3/1-10/31 *235 0 0 Irrig. 235 130.37 0.00 169.49 0.00
4787-2 6 S7 Pactolus 1.90 1.28 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 27.74 0.00 35.51 0.00
4787-2 6 S7 Pactolus 1.90 1.28 Hybrid Bermudagrass Pasture 5.0 Tons *3/1-10/31 *235 0 0 Irrig. 235 130.37 0.00 166.88 0.00
4787-3 10 S7 Pactolus 2.17 1.72 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 27.74 0.00 47.71 0.00
4787-3 10 S7 Pactolus 2.17 1.72 Hybrid Bermudagrass Pasture 5.0 Tons *3/1-10/31 *235 0 0 Irrig. 235 130.37 0.00 224.24 0.00
4787-3 7 S7 Pactolus 2.45 1.94 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 27.74 0.00 53.81 0.00
4787-3 7 S7 Pactolus 2.45 1.94 Hybrid Bermudagrass Pasture 5.0 Tons *3/1-10/31 *235 0 0 Irrig. 235 130.37 0.00 252.92 0.00
4787-3 8 S7 Pactolus 2.43 1.92 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 27.74 0.00 53.26 0.00
4787-3 8 S7 Pactolus 2.43 1.92 Hybrid Bermudagrass Pasture 5.0 Tons *3/1-10/31 *235 0 0 Irrig. 235 130.37 0.00 250.32 0.00
4787-3 9 S7 Pactolus 3.01 2.38 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 27.74 0.00 66.02 0.00
4787-3 9 S7 Pactolus 3.01 2.38 Hybrid Bermudagrass Pasture 5.0 Tons *3/1-10/31 *235 0 0 Irrig. 235 130.37 0.00 310.29 0.00
357914 Database Version 4.1 Date Printed: 1 1/20/2019 WUT Page 2 of 3
° � ® # \a . L-
.� \ / / o
u / . . r
e ¥ ,
\ / j § § t t 2
a ¥ a p
CL ^ �
^ ��
k}
#ƒ
) \ ®
)
u 2 < c
2 ] )
§
j � \
� \
@ >
& \
\
� 2
2
u \
.In
d
f
2
ƒ
6 ! �
� k /
) a E
/
.[ J
_ \ \
a � 2 k
/ ƒ 3
§ � �
§ -
/ ƒ ƒj 4
\ /
The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies
with soi Is. If applying waste nutrients through an irrigation system, you must apply at a rate that will not result in
runoff. This table provides the maximum application rate per hour that may be applied to each field selected to
receive wastewater. It also lists the maximum application amount that each field may receive in any one application
event.
Irrigation Application Factors
Application Rate Application Amount
Tract Field Soil Series (inches/hour) (inches)
4776-1 1 Pactolus 0.75 1.0
4776-1 2 Pactolus 0.75 1.0
4776-3 ]A Pactolus 0.75 1.0
4776-4 11 Pactolus 0.75 1.0
4776-4 12 Pactolus 0.75 1.0
4776-4 13 Pactolus 0.75 1.0
4776-4 14 Pactolus 0.75 1.0
4776-4 15 Pactolus 0.75 1.0
4776-4 16 Pactolus 0.75 1.0
4787-2 3 Pactolus 0.75 1.0
4787-2 4 Pactolus 0.75 1.0
4787-2 5 Pactolus 0.75 1.0
4787-2 6 Pactolus 0.75 1.0
4787-3 10 Pactolus 0.75 1.0
4787-3 7 Pactolus 0.75 1.0
4787-3 8 Pactolus 0.75 1.0
4787-3 9 Pactolus 0.75 1.0
357914 Database Version 4.1 Date Printed 11/20/2019 IAF Page 1 of 1
NOTE: Symbol *means user entered data.
The following Lagoon Sludge Nitrogen Utilization table provides an estimate of the number of acres needed for
sludge utilization for the indicated accumulation period. These estimates are based on average nitrogen
concentrations for each source,the number of animals in the facility and the plant available nitrogen application
rates shown in the second column.
Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent. At
clean out,this material must be utilized for crop production and applied at agronomic rates. In most cases, the
priority nutrient is nitrogen but other nutrients including phosphorous,copper and zinc can also be limiting. Since
nutrient levels are generally very high, application of sludge must be carefully applied.
Sites must first be evaluated for their suitability for sludge application. Ideally,effluent spray fields should not be
used for sludge application. If this is not possible,care should betaken not to load effluent application fields with
high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water
moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also
be a concern.
Lagoon Sludge Nitrogen Utilization Table
Maximum Maximum Sludge
Crop PA-N Rate Application Rate Minimum Acres Minimum Acres Minimum Acres
Ib/ac 1000 gal/ac 5 Years Accumulation 10 Years Accumulation 15 Years Accumulation
Swine Feeder-Finish Lagoon Sludge- Standard
Corn 120 bu 150 14.69 51.22 102.45 153.67
Hay 6 ton R.Y.E. 300 29.38 25.61 51.22 76.84
Soybean 40 bu 160 15.67 48.02 96.04 144.07
357914 Database Version 4.1 Date Printed: 11-20-2019 Sludge Page I of 1
The Available Waste Storage Capacity table provides an estimate of the number of days of storage
capacity available at the end of each month of the plan. Available storage capacity is calculated as the
design storage capacity in days minus the number of days of net storage volume accumulated. The start
date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in
the plan at which storage volume in the lagoon or holding pond is equal to zero.
Available storage capacity should be greater than or equal to zero and less than or equal to the design
storage capacity of the facility. If the available storage capacity is greater than the design storage
capacity,this indicates that the plan calls for the application of nutrients that have not yet accumulated.
If available storage capacity is negative, the estimated volume of accumulated waste exceeds the design
storage volume of the structure. Either of these situations indicates that the planned application interval
in the waste utilization plan is inconsistent with the structure's temporary storage capacity.
Available Wastet rCapacity
Source Name Swine Feeder-Finish Lagoon Liquid Design Storage Capacity(Days)
Start Date 9/1 180
Plan Year Month Available Storage Capacity(Days)
1 1 86
1 2 76
1 3 100
1 4 112
1 5 144
1 6 177
1 7 180
1 8 180
1 9 180
1 10 180
1 11 168
1 12 150
*Available Storage Capacity is calculated as of the end of each month.
357914 Database Version 4.1 Date Printed: 11-20-2019 Capacity Page 1 of 1
Required Specifications For Animal Waste Management
1. Animal waste shall not reach surface waters of the state by runoff, drift,
manmade conveyances, direct application, or direct discharge during
operation or land application. Any discharge of waste that reaches surface
water is prohibited.
2. There must be documentation in the design folder that the producer
either owns or has an agreement for use of adequate land on which to
properly apply the waste. If the producer does not own adequate land to
properly dispose of the waste, he/she shall provide evidence of an
agreement with a landowner, who is within a reasonable proximity,
allowing him/her the use of the land for waste application. It is the
responsibility of the owner of the waste production facility to secure an
update of the Nutrient Management Plan when there is a change in the
operation, increase in the number of animals, method of application,
receiving crop type, or available land.
3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs
for realistic crop yields based upon soil type, available moisture, historical
data, climatic conditions, and level of management, unless there are
regulations that restrict the rate of applications for other nutrients.
4. Animal waste shall be applied to land eroding less than 5 tons per acre
per year. Waste may be applied to land eroding at more than 5 tons per
acre per year but less than 10 tons per acre per year provided grass filter
strips are installed where runoff leaves the field (see USDA, NRCS Field
Office Technical Guide Standard 393 - Filter Strips).
5. Odors can be reduced by injecting the waste or by disking after waste
application. Waste should not be applied when there is danger of drift
from the land application field.
6. When animal waste is to be applied on acres subject to flooding, waste
will be soil incorporated on conventionally tilled cropland. When waste is
applied to conservation tilled crops or grassland, the waste may be
broadcast provided the application does not occur during a season prone
to flooding (see "Weather and Climate in North Carolina" for guidance).
357914 Database Version 4.1 Date Printed: 11/20/2019 Specification Page 1
7. Liquid waste shall be applied at rates not to exceed the soil infiltration
rate such that runoff does not occur offsite or to surface waters and in a
method which does not cause drift from the site during application. No
ponding should occur in order to control odor and flies.
8. Animal waste shall not be applied to saturated soils, during rainfall
events, or when the soil surface is frozen.
9. Animal waste shall be applied on actively growing crops in such a manner
that the crop is not covered with waste to a depth that would inhibit
growth. The potential for salt damage from animal waste should also be
considered.
10. Nutrients from waste shall not be applied in fall or winter for spring
planted crops on soils with a high potential for leaching. Waste/nutrient
loading rates on these soils should be held to a minimum and a suitable
winter cover crop planted to take up released nutrients. Waste shall not
be applied more than 30 days prior to planting of the crop or forages
breaking dormancy.
11. Any new swine facility sited on or after October 1, 1995 shall comply with
the following: The outer perimeter of the land area onto which waste is
applied from a lagoon that is a component of a swine farm shall be at least
50 feet from any residential property boundary and canal. Animal waste,
other than swine waste from facilities sited on or after October 1, 1995,
shall not be applied closer that 25 feet to perennial waters.
12. Animal waste shall not be applied closer than 100 feet to wells.
13. Animal waste shall not be applied closer than 200 feet of dwellings other
than those owned by the landowner.
14. Waste shall be applied in a manner not to reach other property and
public right-of-ways.
357914 Database Version 4.1 Date Printed: 11/20/2019 Specification Page 2
15. Animal waste shall not be discharged into surface waters, drainageways,
or wetlands by a discharge or by over-spraying. Animal waste may be
applied to prior converted cropland provided the fields have been
approved as a land application site by a "technical specialist". Animal
waste shall not be applied on grassed waterways that discharge directly
into water courses, and on other grassed waterways, waste shall be
applied at agronomic rates in a manner that causes no runoff or drift
from the site.
16. Domestic and industrial waste from washdown facilities, showers, toilets,
sinks, etc., shall not be discharged into the animal waste management
system.
17. A protective cover of appropriate vegetation will be established on all
disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas
shall be fenced, as necessary, to protect the vegetation. Vegetation such as
trees, shrubs, and other woody species, etc., are limited to areas where
considered appropriate. Lagoon areas should be kept mowed and
accessible. Berms and structures should be inspected regularly for
evidence of erosion, leakage, or discharge.
18. If animal production at the facility is to be suspended or terminated, the
owner is responsible for obtaining and implementing a "closure plan"
which will eliminate the possibility of an illegal discharge, pollution, and
erosion.
19. Waste handling structures, piping, pumps, reels, etc., should be inspected
on a regular basis to prevent breakdowns, leaks, and spills. A regular
maintenance checklist should be kept on site.
20. Animal waste can be used in a rotation that includes vegetables and other
crops for direct human consumption. However, if animal waste is used on
crops for direct human consumption, it should only be applied pre-plant
with no further applications of animal waste during the crop season.
21. Highly visible markers shall be installed to mark the top and bottom
elevations of the temporary storage (pumping volume) of all waste
treatment lagoons. Pumping shall be managed to maintain the liquid level
between the markers. A marker will be required to mark the maximum
storage volume for waste storage ponds.
357914 Database Version 4.1 Date Printed: 11/20/2019 Specification Page 3
22. Waste shall be tested within 60 days of utilization and soil shall be tested
at least annually at crop sites where waste products are applied. Nitrogen
shall be the rate-determining nutrient, unless other restrictions require
waste to be applied based on other nutrients, resulting in a lower
application rate than a nitrogen based rate. Zinc and copper levels in the
soils shall be monitored and alternative crop sites shall be used when
these metals approach excessive levels. pH shall be adjusted and
maintained for optimum crop production. Soil and waste analysis
records shall be kept for a minimum of five years. Poultry dry waste
application records shall be maintained for a minimum of three years.
Waste application records for all other waste shall be maintained for five
(5) years.
23. Dead animals will be disposed of in a manner that meets North Carolina
regulations.
357914 Database Version 4.1 Date Printed: 11/20/2019 Specification Page 4
Crop Notes
The following crop note applies to field(s): 1, 10, 11, 12, 13, 14, 15, 16, IA, 2, 3, 4, 5, 6, 7, 8, 9
Small Grain: CP, Mineral Soil, medium leachable
In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from
October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5%for
each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable
seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the
initial seeding rate by at least 10%when planting no-till. Oats should be planted at 2 bushels/acre and
rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is
essential. Review the NCSU Official Variety"green book" and information from private companies to
select a high yielding variety with the characteristics needed for your area and conditions. Apply no more
than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at
this time. The remaining N should be applied during the months of February-March.
The following crop note applies to field(s): 1, 10, 11, 12, 13, 14, 15, 16, IA, 2, 3, 4, 5, 6, 7, 8, 9
Bermudagrass: CP, Mineral Soil, Moderately Well Drained.
Adaptation: Well-adapted.
In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs I"to 3"
deep(1.5"optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and
wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a
rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing
conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced V to 1.5' in row.
For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus,
potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 1001b/ac N in
the establishment year in split applications in April and July. For established stands apply 180 to 240
lb/ac N annually in split applications, usually in April and following the first and second hay cuts.
Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization
of Pastures and Forages in North Carolina for more information or consult your regional agronomist or
extension agent for assistance.
357914 Database Version 4.1 Date Printed: 11-20-2019 Crop Note Page 1 of 1
i
f ! t l I. I
jo
Alp
_. .2
r
RoQ
_ A �, �..: � y � 1 � � -_aE,� ,,:. *� � �l� �i:;� � � t:� .�. n.� as �z - ,•a! f a y� � '�y.�v:
E
Ey
od�
J
°t7 '^e `
• a / of y 1nps.4s
I
• — _� der
!fir-es✓ , `7� � � r ��,.
f .FOR
r
euP was
,
Aid
-
Q" � ��'L�•B.ACir � 14rs
Y Nr 900 �� { '' � �y P Ir'art? .LP�sxOYj- A�i
�,.,,rov /�-erg- Q. '�i":t�' `� ,( t P,`eaC, �.;'�+�..�► '�
_ •e• ._ � =� D�ri�,e�'j4tr I�i�QyL}�!G'� SLeI�� .. �.�e.,
z
IRRIGATION SYSTEM DESIGN PARAMETERS -
x
r/ 1 County: -�
Landowner/Operator Name:
Address: 3�/a a ST/ur r L�yr��yGo� R�• 1--Zle-�8
Telephone:
TABLE i e Fiala Bpecificathins
Maximum }
Approximat® Maximum Application
Maximum Applicatlon per Irrigation
Useablo Size Rate Cyc104
Field of Field' Slop® p Comments
(Inlhr) (Inches)
Number (acres) Soli Type (%) Crop(s)(s) I . 7 5^ I 15�
-Z I I •��� I 5_ I
, _
7
I . I ' I I -75 I ' y
7,2-1 o'er �,-Z I 7ti I • >
I I
71 r I I I I
I i I I I
I I I i
'Table to be completed ides entirety
by M Field id Ofdcoeffor field tonneil and forwarded to the Irrigation system designer.
See attached map p Y e
'Total field acreage minus required buffer areas.
hnical Guide.Section II G. 'Annual application must not exceed the agronomic rates for the soil and crop used.
"Refer to N. C. Irrigation Guide, Field Office Tec
USDA-HRCS
O
North Carottna
irrigation Parameters page-1
O "``4er 199ti c
p
TABL ' _ Traveling Irrigation Gun Settings
S sff �,5`l e a 7—
Make,Model and Type of Equipment: o —u�ni rt-r �C v�` §e Lc r•^- P
EQUIPMENT SETTINGS
Travel Application TRAVEL LANE ANE
Wetted Nozzle Operating Operating
Field No Pressure Arc
and Speed Rate Effective Effective Diameter Diameter P Gun(psi) Reel(psi) Pattern' Cornmonts
Fi drad 2 (ft/mtn) lkhr Width(it) Length(it) (feet) (Inches( I I
tlmu
I I t5-G r7 G I o l8 I �3oxs o
Nd i 5`v t 3� �9v pj Sao I lSyX si = .3 Y'G 3ay..
�s Ca I I I
I i I I i I
File I I I I d l / y szo Y
3 12-3 I ,3
I Lv 'S U O OU
s3 q = 0
�7� r1
I ,o I •Sv r 30 ( �lZ� �7ra ` r is5+71
/�; x 1i
7 I ,23 I I �U I /o G I � I /Xd 6 s
#-S5 12 I .� I 'o I h'G�` I a-G� I :87 �.I Go I Jo G
1 23 I , 3y /bo 5 V7 i Ga ASS Ga I /BG I 3.. I / fG 1�,R. 7.9G --
#�
'See attached map provided by the SWCD Field office for field location(s).
'Show separate entries for each hydrant location In each field.
circle),TQ (three quarters),TT(two thirds). N (half circle),T (one third),Q (one quarter).
'Use the following abbreviations for various ace patterns: F (full
May also use degree of arc In degrees.
USDA-NRCS
D North Carolina
irtigation Parameters ., page-2
October 1995
TAB _ Traveling irrigation Gun Settings .
r l— <—
Make,Model and Type of EqulpmenV 141a 1,9
EQUIPMENT SETTINGS e
Field Net Tavel Etfectivo Application TRAVEL LANE
Wetted Nozzle Operating operating
Diameter Diameter Pressure Pressure
s
and Speed irate Etfeettve l Pattern' Comments
Brant Noa {turnin inlhr Width(ft Length it) feet (Inches Gun IPA)
( I
�S'v I v ASS 0 l /o 00 !9 y�c s v = 3• z
�� '�-2 I I •SS 7 G� G ojw 9 0 - 1,9V
_�y ,Z 35► 18'v 4 o I aGo to G o0 o Go =
, .8s �v I t
o9 I I -
,3y
I I � 314
t -
............
1
I I I I I i I
1
,See attached map provided by the SWCO Field office for field location(s).
'Show separate entries for each hydrant location in each field.
Use the following abbreviations for various are patterns: F(full Bide).TQ(three quarters),TT(two thirds).H(half circle),T(one third),Q(one quarter).
May also use degree of arc in degrees.
USDA-NRCS
Irrtga*m Parameters page-2 North Carotins
October 1995
TABLE 3 - Solid Set Irrigation Gun Settings
Make,Mode!and Type of Equipment:
OPERATINO PARAMETERS LrS
Field Not Wetted . Hydtetit Spicing(ft) Application Nozzle Operating Operating �T y _ �y7
and Number of Diameter Along Between ' Rate Diameter Pressure Time
Line No= Hydrants (feet) plpellne pipelihea (INhr)' (inches) @ Gun(psi) Hydrant(hr) Comments
'See attached map provided by the Field Office tot field location(s)..
2Show separate entries for each pipeline with hydrants in'each field.
Irrigation parameters USDA•NRCS
vber 1998 page North Carolina
�-3Yv �a.5 Tug e
..
,l,�5 ,�.'•v 2 /,Ss 7
-- — 9!•3 X- t'LS� _ /2037. 5 0� _ •Z$ x. 3Gu c1,2 _ .3y ��. ,
3,iy i3o�Z ya953.yL 7av
x /Zs� /2o37• y�" — .z�.. ��}l�o 1;93sr': ,�f'��
3•!Y q ;��z YO$13•Y6 �86
Pr 3 _ 5G,3 . �ty� _ /Za v .'L� pc 340— = / g' = •✓�"D/�f^
Z S xdP r� •
G�
3y ��/�t-
Ito 7;L
SiM
#
(t �I,5�7 H,o7�� `r.Sy7 tiy�87
�pU
- ..:!/;��oG,' Ti .:�.,, 3 � ,0•SSG ._ �6��
T/�
f� h G i �17r •!a _
Pr
T9, 4 = -
$$o 4� -e
5enjt�� 4?f-op4-
�-yao �r y<r4JvC 1$�y�l S y2
7�6 � �•'11%'�S ly•32
...�� _ /ZS'X 300.7� � � 37��7.5 v _ 9�y ; ls� - �?= ��•G/ 'J°
3 SGa _ �t Go P�Gv • 70
.JAII A�P
.00
N r 3vo•7$' /�T'
�v
... 74 {7 x 3, AP fT�`
TABLE 4 - Irrigation System Specifications
b
•Traveling Solid Set
hri ation Qun Ini anon
Flow Rats of Sprinkler(gpm) �
Operating Pressure at Pump(psf)
Design Precipitation Rats(Inthr) , .3
Hose Length(feet) g p )CX)()U(XXX
Type of Speed Compensation y xxx�cxxxx
Pump Type(PTO.Engine.Electric)
Pump Power Requirement(lap) ( /1 I
TABLES - Thrust Block Specifications'
De$igner may,provide thrust block details on separate sheet.
THRUST BLOCK
LOCATION AREA (sq.%)
9v Bead l " ' y
Dad End y 1 N v
Tee ! r/!r '.
•ISee USDA-NRCS Field Ofnee Technical Gold-.Section IV,pmctice Code 430-DD.
'a
USDA-NRCB
irrigation Parameters -• pag" North Caroltrta
dcttStler 1993 •
IRRIGATION SYSTEM DESIGNER
Name:
Company: aa-,
Address: '� o . 6.3.->� Y S'� w�Lle.�.• �• r• S Y
Phone:
REQUIRED DOCUMENTATION
The following details of design and materials must accompany all irrigation designs:
1. - A scale drawing of the proposed irrigation system which includes hydrant locations,travel lanes, pipeline routes,thrust block
locations and buffer areas where applicable.
2. Assumptions and computations for determining total dynamic head and horsepower requirements.
3. Computations used to determine all mainline and lateral pipe sizes.
4. Sources and/or calculations used for determining application rates.
5. Computations used to determine the size of thrust blocks and illustrations of all thrust block configurations required in the system.
6. Manufacturer's specifications for the irrigation pump,traveler and sprinkler(s).
7. Manufacturer's specifications for the irrigation pipe and/or USDA-NRCS standard for Irrigation Water Conveyance,
N.C.Field Office Technical Guide, Section IV,Practice Code 430-171).
NOTE: A buffer strip y 0_feet wide or wider must be maintained between the limits of the irrigation system and all perennial
streams and surface waters per DEHNR DEM Code Section 15A NCAC 2B .0200-Waste Not Discharged to Surface
Watefs.
usor►-NRcs
Irrigation Parameters page-5 North caroling
oetdwr 1996
+. rY
Narrative of Irrigation System Operation
Describe the operation of the system in the space provided below or on a similar sheet most convinient to the designer/supplier.
Include procedures such as start-up, shut-down, winterization and regular maintenance of all equipment.
/H � L
�L /� �r /cc rrs� � �
-ri e �er- i`S cc. i`� -, tw.-L_ Q Pi� o� 5 r o S e p z .a-
r i t
/L t(- 1 / A,"
Ale G � -
a o,' lz/ a c W.z r77
—
e 5 Tc`7`
'er� ' o�e F �-
G o S .tee.' '� o
-�-�. � � •�.- rev
GO Z � o r T p / -e �L
vv it fL
<
L U 2 sri i <
. :� 4 , a,. e ti w,v ,2 Z v
r
Zo-
e rr/ '
USDA-NRCS
lrri tion Parameters North carolina
0 x�nr 199s a . , page 6
IRRIGATION SYSTEM DESIGN PARAMETERS
Landowner/Operator Name: kz rLLiklw, I /4 County: Pe-g
Address:
Date:
Telephone: Id 5 2
TABLE 1 - Field Specifications 1
Approximate Maximum
Maximum Maximum Application
Useable Size Application per Irrigation
Field of Fleid3 Slope Rate Cycie4
Number= (acres) Soil Type (%) Crop(s) (inthr) (Inches) Comments
.s• 7— ReI o- I for I • SD I I
I I I I ! I
I I I I !
I I I I 1 !
I I l I ► 1
I I I ! ! I •
I I I
i I I I I I
I ! 1 ! I !
'Table to be completed In its entirety by SWCD Field Office personnel and forwarded to the irrigation system designer.
Fes•, 'See attached map provided by the SWCD Field Office for field location(s).
3Total field acreage minus required buffer areas.
No 4Refer to N.C.Irrigation Guide,Field Office Technical Guide, Section II G. Annual application must not exceed the agronomic rates for the soil and crop used.
.p
Ln
Irrigation Parameters USDA-NRCS
October 1995 -• page-1 North Carolina
TABLE 2 - Traveling Irrigation Gun Settings
� AM
Make,Model and Type of Equipment~
EQUIPMENT SETnNGS
Field No Travel Application TRAVEL LANE Wetted Noate Operating Operating
and Speed Rate Effective Effective Diameter Diameter Pressure Pressure At,
No= (ftrmin) khr Width(R) Length(ft) (feet) (inches) @ Gun(psi) Reel(psi) Patterns Comments
a- 1,31' sus- ! ��I ���� l -" I /
I a6b I .ss �� 1 0� I rd " I i ,
/ I 1"'We tq e O, u 1 �S� G 36a ` c,tC 38-
I I I I
/Ko Y fps -
I 2�v I .85- 60 I GG 1 i aW,117V ' 1
rr I ,l 1 .!i� 1 /3 v 1 /7v 1 :-WEI 41
I I I o {
# I lr 1 v 1
1 , I , ( / a y9 i I •$ ( d 1 /// 1 o`GD a I/ ,U
9 ( , G ( H I w 1 Cv I I •S I o I /d I '0 I o.Y
o f I ,yy I /Bo I y v i o f •8s7 I I o I 1! o yya = •�/ B',;Z
v I vG I 1 o 9o9 - T,7C
1 0 { Ss ( 1 e G 1 22v I / x V;- = ,�
i 3 I I , y21 Go l
/ I Itu {151
14 1 .1. I. Iry 6a I 37 I /Gv I .7G I a 1 9 1 [Age X 571;(..= -F 17,7/.
'See attached map provided by the SWCO Field Office for field location(s). Q' L
=Show separate entries for each hydrant location in each field.
'Use the foltowing abbreviations for various are patterns: F(full circle),TQ(three quarters),TT(two thirds),H(half circle),T(one third),Q(one quarter).
May also use degree of an:In degrees.
N
Ql
N -
o USDA-MRCS
Irrigation Parameters '
October 1995 page-2 North Carolina
aGe, �i�1�� ��a m v�'�`- �o ��c 70 � /�'�-/�T ��ve ��► ��.eJ /So �
• 7L� �'�`v ESL •fJ,c•�+c�7'r -- ��lo L97_
24)
3,/if ,3o _
3
3GG�yft �S'v
8001012620
I-cl
Operator:Willie BrockM County: Duplin Date: 05/03/93
Distance to nearest residence (other than owner) : 1000.0 feet
1. STEADY STATE LIVE WEIGHT
0 sows (farrow to finish) x 1417 lbs. - 0 lbs
0 sows (farrow to feeder) x 522 lbs. = 0 lbs
2160 head (finishing only) x 135 lbs. = 291600 lbs
0 sows (farrow to wean) x 433 lbs. - 0 lbs
0 head (wean to feeder) x 30 lbs. - 0 lbs
TOTAL STEADY STATE LIVE WEIGHT (SSLW) = 291600 lbs
2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON
Volume = 291600 lbs. SSLW x Treatment Volume(CF) /lb. SSLW
Treatment Volume(CF) /lb. SSLW= 1 CF/lb. SSLW
Volume = 291600 cubic feet
3. STORAGE VOLUME FOR SLUDGE ACCUMULATION
Volume = 0.0 cubic feet ; "Owner requests no sludge storage.
Sludge will be removed as needed."
TOTAL DESIGN VOLUME
Inside top length 330.0 feet ; Inside top width 205. 0 feet
Top of dike at elevation 49.5 feet
Freeboard 1.0 feet ; Side slopes 3 .0 : 1 (Inside lagoon)
Total design lagoon liquid level at elevation 48.5 feet
Bottom of lagoon elevation 39.5 feet
Seasonal high water table elevation 45.0 feet
Total design volume using prismoidal formula
SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH
3 .0 3 .0 3.0 3.0 324.0 199.0 9.0
AREA OF TOP
LENGTH * WIDTH =
324.0 199.0 64476.0 (AREA OF TOP)
AREA OF BOTTOM
LENGTH * WIDTH =
270.0 145.0 39150.0 (AREA OF BOTTOM)
AREA OF MIDSECTION
LENGTH * WIDTH * 4
297.0 172.0 204336.0 (AREA OF MIDSECTION * 4)
CU. FT. _ [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6
64476.0 204336.0 39150.0 1.5
VOLUME OF LAGOON .T TOTAL DESIGN LIQUID LEVEE. = 461943 CU. FT.
5. TEMPORARY STORAGE REQUIRED
DRAINAGE AREA:
Lagoon (top of dike)
Length * Width =
330.0 205.0 67650.0 square feet
Buildings (roof and lot water)
Length * Width =
0.0 0.0 0.0 square feet
TOTAL DA 67650.0 square feet
Design temporary storage period to be 180 days.
5A. Volume of waste produced
Approximate daily production of manure in CF/LB SSLW 0.00136
Volume = 291600 Lbs. SSLW * CF of Waste/Lb. /Day * 180 days
Volume = 71210 cubic feet
5B. Volume of wash water
This is the amount of fresh water used for washing floors or volume
of fresh water used for a flush system. Flush systems that recirculate
the lagoon water are accounted for in 5A.
Volume = 0.0 gallons/day * 180 days storage/7.48 gallons
per CF
Volume = 0.0 cubic feet
5C. Volume of rainfall in excess of evaporation
Use period of time when rainfall exceeds evaporation by largest amount.
180 days excess rainfall = 7.0 inches
Volume = 7.0 in * DA / 12 inches per foot
Volume = 39462.5 cubic feet
5D. Volume of 25 year - 24 hour storm
Volume = 7.5 inches / 12 inches per foot* DA
Volume = 42281.3 cubic feet
TOTAL REQUIRED TEMPORARY STORAGE
5A. 71210 cubic feet
5B. 0 cubic feet
5C. 39463 cubic feet
5D. 42281 cubic feet
TOTAL 152954 cubic feet
6. SUMMARY
Total required volume 444554 cubic feet
Total design volume avail. 461943 cubic feet
Min. req. treatment volume plus sludge accumulation 291600 cubic fe
At elev. 45.5 feet ; Volume is 282312 cubic feet (end pumping)
Total design volume less 25yr-24hr storm is 419662 cubic feet
At elev. 47.8 feet ; Volume is 417574 cubic feet (start pumping)
Seasonal high water table elevation 45.0 feet'
7. DESIGNED BY:.Tt M r,a VkIhSft APPROVED BY:
DATE: DATE: �2 S 3
SCS DOES NOT CERTIFY THAT
EXCAVATION AND FILL VOLUMES
NOTE: SEE ATTACHED WASTE UTILIZATIO ARE CORRECT
OPERATION AND MAINTENANCE PLAN
------------------------------
This lagoon is designed for waste treatment with minimum odor
control. The time required for the planned fluid level to be
reached may vary due to soil conditions,flushing operations, and
the amount of fresh water added to the system.
Land application of waste water is recognized as an acceptable
method of disposal. Methods of application include solid set,
center pivot, guns, and traveling gun irrigation. Care should be
taken when applying waste to prevent runoff from the field or damage
to crops.
The following items are to be carried out:
1. It is strongly recommended that the treatment lagoon be pre-
charged to 1/2 its capacity to prevent excessive odors during
start-up. Pre-charging reduces the concentration of the initial
waste entering the lagoon thereby reducing odors. Solids should be
covered with effluent at all times.
2. The attached waste utilization plan shall be followed. This
plan recommends sampling and testing of waste (see Attachment B)
before land application.
3. Begin pump-out of the lagoon when fluid level reaches eleva-
tion 47.8 as marked by permanent markers. Stop pump-out when
the fluid level reaches elevation 45.5 or before fluid depth is
less than 6 feet deep (this prevents the loss of favorable
bacteria) .
4. The recommended maximum amount to apply per irrigation is
one (1) inch and the recommended maximum application rate is 0.4
inch per hour.
5. Keep vegetation on the embankment and areas adjacent to the
lagoon mowed annually. Vegetation should be fertilized as needed
to maintain a vigorous stand.
6. Repair any eroded areas or areas damaged by rodents and
establish in vegetation.
7. All surface runoff is to be diverted from the lagoon to stable
outlets.
8. The Clean Water Act of 1977 prohibits the discharge of
pollutants into waters of the United States. The Department of
Environment, Health, and Natural Resources, Division of Environ-
mental Management, has the responsibility for enforcing this law.
�b6 s�-�
ti
Operator:Edward Brock R' t, County: Duplin Date: 12/16/96
Has the site evaluation been completed & approved: yes
1. AVERAGE LIVE WEIGHT (ALW)
0 sows (farrow to finish) x 1417 lbs. = 0 lbs
0 sows (farrow to feeder) x 522 lbs. = 0 lbs
2400 head (finishing only) x 135 lbs. - 324000 lbs
0 sows (farrow to wean) x 433 lbs. - 0 lbs
0 head (wean to feeder) x 30 lbs. = 0 lbs
Describe other : 0 lbs
Total Average Live Weight = 324000 lbs
2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON
Volume = 324000 cubic ft (includes 0 cu. ft. add. treat. Vol.)
3. STORAGE VOLUME FOR SLUDGE ACCUMULATION
Volume = 81600.0 cubic feet
TOTAL DESIGNED VOLUME
Inside top length (feet)--------------------- 350.0
Inside top width (feet)---------------------- 270. 0
Top of dike elevation (feet)----------------- 52. 00
Bottom of lagoon elevation (feet)------------ 41.00
Freeboard (feet)----------------------------- 1. 00
Emergency spillway depth of flow(feet) ------- 0.00
Side slopes (inside lagoon)------------------ 3 .0 1
Total design volume using prismoidal formula
SS/ENbl SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH
3.0 3.0 3.0 3 .0 344 .0 264. 0 10.00
AREA OF TOP
LENGTH * WIDTH =
344.0 264.0 90816 (AREA OF TOP)
AREA OF BOTTOM
LENGTH * WIDTH =
284.0 204.0 57936 (AREA OF BOTTOM)
AREA OF MIDSECTION
LENGTH * WIDTH * 4
314.0 234.0 293904 (AREA OF MIDSECTION * 4)
CU. FT. _ [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6
90816 293904 57936 1.67
r%
5. TEMPORARY STORAGE REQUIRED
DRAINAGE AREA:
Lagoon (top of dike)
( Length * Width ) + Surface area of connecting waste facility
350.0 270.0 0.0
94500.0 square feet
Buildings (roof and lot water) or impervious area
0.0 square feet Describe this area.
TOTAL DA 94500.0 square feet
Design temporary storage period to be 180 days.
5A. Volume of waste produced
Feces & urine production in gal./day per 135 lb. ALW 1.37
Volume = 324000 lbs. ALW/135 lbs. ALW * 1.37 gal/day 180 days
Volume = 591840 gals. or 79123.0 cubic feet
5B. Volume of excess water
Volume = 2172.2 gallons/day * 180 days storage/7.48 gallons
per CF
Volume = 52272.0 cubic feet
5C. Volume of rainfall in excess of evaporation
Use period of time when rainfall exceeds evaporation by largest amount.
180 days evaporation = 0.0 inches
180 days rainfall 8.5 inches
Owl Volume = 8.5 in * DA / 12 in. per ft. = 67095 cubic feet runoff
Volume = 0.* 0 in * lagoon DA/12 in. /ft = 0 cubic feet evap.
Volume = 67095 cubic feet
4993 00'St <______===='nata SMHS aug og = ao < aq gsnx
------�•AaTa buTdmnd dogg
4993 SO•LV
4993 OO'SV <===(S,MHS) uoTgenata atgegaageA gbTq TeuoseaS
'43 *no 09LL£G ______________ amnToA UBTsap Tengoy 1
*no StZZZL <_________________=_.._amnToA peaTnbea Tegoy
4993 <=================- -uotgeAaTa abpnTs 3o doy
4aa3 00•tv <==================uoTgenaTa uoobeT 30 moggofl
4693 00'ZSuoTgenaTa aXTp 30 doy
gaa3 00'tS <====(PauueTd 3T)uoT4en9T9 A2ATTTds Aousbaamm
4993 0 OLZ <_____________________ ggPTA dog apTsul
4993 0'098 <___________________ ===q4bu6T dog epTsuz
t : 0•£ <___________________ ==--==========s9dojs apTS
4993 00 't <____________________-- paeog89,z3
sagouT S•L <___________________w- _--uTE.I AAeaH
sagouT S•L <==================TTe3uTea anoq tZ - .zeal 5Z
sagouT 0 .0 <===========poTaad abeaogs buTanp uoTgeiodeAfl
Esqqoui S• 8 <===abeaogs ;o poTaad gsaggaM buTanp TTe3uT2H
sAep 08Z <___________________poTaad ebeaogs daeaodmej
AHKMS '9
4993 oTgno St99t6 WWI
49a3 oTgno 0 'H5
4903 oTgno SZtett 'aS
49a3 oTgno 960L9
gaa3 oTgno ZLZZS 'fly
g993 oTgno £ZT6L 'rdS
SOMIS AM0dj IL clauirlibau WWI
:SMoTTo3 se amnToA TeuoTgTppti •'
gaa3 oTgno SZt8tt = amnTOA
VQ goo; aad SauouT Zt / sagouT 0•ST = aumToA
WE 5•L 16WER i AAeaHu 3o emnTOA
'UT G•L maogs anoq V Z aeeA SZ 3o amnToA •QS
Must be > or = to min. req. treatment el.=> 47.00 feet
Min. Required treatment volume---===========> 324000 cu. ft.
Volume at stop pumping elevation==—========> 324605 cu. ft.
Start pumping elev. --------------> 49.50 feet
" Must be at bottom of F.B. & 25 yr. rainfall & heavy rain
Act. vol. less 25 yr. and heavy rainfall====> 619635 cu. ft.
Volume at start pumping elevation===========> 605600 cu. ft.
Required volume to be pumped================> 198490 cu. f t.
Actual volume planned to be pumped==========> 198843 cu. ft.
Min. thickness of soil liner when required==> 1.5 feet
7. DESIGNED BY. APPROVED BY: See �ollew ^9
d
DATE: lam S Z DATE: ��
N,� v
UAL
164i5A
N �.
7, DESIGNED BY: APPROVED BY:'�. E��RY S��'�,
��� �4/1111H1��,
DATE: DATE: l XA6
NOTE: SEE ATTACHED WASTE UTILIZATION PLAN
COMMENTS: �..9�%ie¢rl,a a..cnrn y.;,Ir� iI I.. a 1� e Xp�r..�-.% o+ ,,J •i wr o
�fD6� �ni •+� S.�le,«Gt S�7'GwG.f�_
ENGINEER'S NOTES: Engineering approval is for minimum design standards and is based on pre-
construction site and soils investigations by Brown's of Carolina Technical Specialist. Engineer shall be
notified of any changes and/or site discrepancies found during construction before proceeding. Brown's of
Carolina is responsible for site layout,and shall verify all required setbacks and absence of subsurface tile
drains. Owner and/or Brown's of Carolina personnel is responsible for contacting engineer for construction
inspections as deemed necessary,and for arranging final inspection of lagoon. Final inspection must be
performed by the engineer or by a certified technical specialist. Brown's of Carolina technical specialist is
responsible for excavation and fill calculations and for nutrient management plan.
OTHER SITE-SPECIFIC NOTES: &-, ,te-ar l co►.su/het !••+ ►•+s�-�ee-`a
'•SSo %"4 el c!"t'a 0.,.—s.`k-
SHEET 1 OF 3
SPECIFICATIONS FOR CONSTRUCTION OF WASTE TREATMENT LAGOONS
----------------------------------------------------------
FOUNDATION PREPARATION:
-----------------------
The foundation area of the lagoon embankment and building pad shall be
cleared of trees, logs, stumps, roots, brush, boulders,sod and rubbish.
Satisfactory disposition will be made of all debris. The topsoil from
the lagoon and pad area should be stripped and stockpiled for use on
the dike and pad areas. After stripping, the foundation area of the
lagoon embankment and building pad shall be thoroughly loosened prior
to placing the first lift of fill material to get a good bond.
EXCAVATION AND EARTHFILL PLACEMENT:
-----------------------------------
The completed excavation and earthfill shall conform to the lines,
grades, and elevations shown on the plans. Earthfill material shall
be free of material such as sod, roots, frozen soil, stones over
6 inches in diameter, and other objectionable material. To the extent
they are suitable, excavated materials can be used as fill. The fill
shall be brought up in approximately horizontal layers not to exceed 9
inches in thickness when loose and prior to compaction. Each layer
will be compacted by complete coverage with the hauling and spreading
equipment or standard tamping roller or other equivalent method.
Compaction equipment shall travel in a direction parallel to the main
axis of the fill. Clayey soils shall be compacted with a "sheepsfoot"
or tamping roller. Compaction of the fill material shall be in accord-
ance with the specified requirements for compaction and moisture.
For the embankment, use the more impervious materials from the required
excavations. Construction of fill heights shall include 5 percent for
settlement. Dikes over 15 feet in height and with an impoundment
capacity of 10 acre-feet or more fall under the jurisdiction of the NC
Dam Safety Law. The height is defined as the difference in elevation
from the constructed height to the downstream toe of the dike.
Precautions shall be taken during construction to prevent excessive
erosion and sedimentation.
LINER: THE MINIMUM REQUIRED THICKNESS SHALL BE 1.5 ft.
------ -------------------------------------------------
NOTE: LINERS (PARTIAL OR FULL) ARE REQUIRED WHEN THE ATTACHED SOILS
INVESTIGATION REPORT SO INDICATES OR WHEN UNSUITABLE MATERIAL IS
ENCOUNTERED DURING CONSTRUCTION. A TYPICAL CROSS SECTION OF THE LINER
IS INCLUDED IN THE DESIGN WHEN LINERS ARE REQUIRED BY THE SOILS REPORT.
When areas of unsuitable material are encountered, they will be over-
excavated below finish grade to the specified depth as measured
perpendicular to the finish grade. The foundation shall be backfilled
as specified to grade with a NRCS approved material (ie - CL,SC,CH) .
REFER TO THE SOILS INVESTIGATION INFORMATION IN THE PLANS FOR SPECIAL
CONSIDERATIONS.
SHEET 2 OF 3
Soil liner material shall come from an approved borrow area. The
minimum water content of the liner material shall be optimum moisture
content which relates to that moisture content when the soil is kneaded
in the hand it will form a ball which does not readily separate. Water
shall be added to borrow as necessary to insure proper moisture content
during placement of the liner. The moisture content of the liner
material shall not be less than optimum water content during placement.
The maximum water content relates to the soil material being too wet.
for efficient use of hauling equipment and proper compaction. Proper
compaction of the liner includes placement in 9 inch lifts and
compacted to at least 90 percent of the maximum ASTM D698 Dry Unit
Weight of the liner material unless otherwise specified. When smooth
or hard, the previous lift shall be scarified and moistened as needed
before placement of the next lift.
The single most important factor affecting the overall compacted perme-
ability of a clay liner, other than the type of clay used for the
liner, is the efficient construction processing of the compacted liner.
The sequence of equipment use and the routing of equipment in an estab-
lished pattern helps assure uniformity in the whole placement and
compaction process. For most clay soils, a tamping or sheepsfoot
roller is the preferable type of compaction equipment.
The soil liner shall be protected from the discharge of waste outlet
pipes. This can be done by using some type of energy dissipator(rocks)
or using flexible outlets on waste pipes.
Alternatives to soil liners are synthetic liners and bentonite sealant.
When these are specified, additional construction specifications are
included with this Construction Specification.
CUTOFF TRENCH:
--------------
A cutoff trench shall be constructed under the embankment area when
shown on a typical cross section in the plans. The final depth of the
cutoff trench shall be determined by observation of the foundation
materials.
VEGETATION:
All exposed embankment and other bare constructed areas shall be seeded
to the planned type of vegetation as soon as possible after construc-
tion according to the seeding specifications. Topsoil should be placed
on areas of the dike and pad to be seeded. Temporary seeding or mulch
shall be used if the recommended permanent vegetation is out of season
dates for seeding. Permanent vegetation should be established as soon
as possible during the next period of approved seeding dates.
REMOVAL OF EXISTING TILE DRAINS
SHEET 1 OF 2
OPERATION AND MAINTENANCE PLAN
------------------------------
This lagoon is designed for waste treatment (permanent storage) and
180 days of temporary storage. The time required for the planned
fluid level (permanent and temporary storage) to be reached may vary
due to site conditions, weather, flushing operations, and the amount
of fresh water added to the system.
The designed temporary storage consists of 180 days storage for:
(1) waste from animals and (2) excess rainfall after evaporation. Also
included is storage for the 25 yr - 24 hr storm for the location and a
heavy rain factor. The volume of waste generated from a given number
of animals will be fairly constant throughout the year and from year to
year, but excess rainfall will vary from year to year. The heavy rain
factor and 25 yr rainfall will not be a factor to consider in an annual
pumping cycle, but this storage volume must always be available.
The waste produced by the animals shall be utilized in accordance with
an approved waste utilization plan. Highly visible markers shall be
installed to mark the upper and lower elevations of the temporary
storage (pumping volume) . Pumping shall be done as necessary to
maintain the liquid level between these markers.
Pumping can be started or stopped at any time between these two
elevations for operating convenience as site conditions permit, such as
weather, soils, crop, and equipment in order to apply waste without
runoff or leaching.
Land application of waste water is recognized as an acceptable
method of disposal. Methods of application include solid set,
center pivot, guns, and traveling gun irrigation. Care should be
taken when applying waste to prevent damage to crops.
The following items are to be carried out:
1. Before wastes are introduced, the waste treatment lagoon shall be
charged to 1/2 its treatment volume to prevent excessive odors during
start-up. Pre-charging reduces the concentration of the initial
waste entering the lagoon thereby reducing odors. Solids should be
covered with effluent at all times. When precharging is complete,
flush buildings with recycled lagoon liquid. Fresh water should not
be used for flushing after initial filling.
2. The attached waste utilization plan shall be followed. This
plan recommends sampling and testing of waste (see attachment)
before land application.
3. Begin temporary storage pump-out of the lagoon when fluid level
reaches the elevation 49.50 as marked by permanent marker. Stop pump-
out when the fluid level reaches elevation 47.05 . This temporary
storage less 25 yr and heavy rain contains 198843 cubic feet or
1487348 gallons.
SHEET 2 OF 2
4. The recommended maximum amount to apply per irrigation and
recommended maximum application rate is shown in the waste utilization
plan. Refer to the waste utilization plan for further details.
5. Keep vegetation on the embankment and areas adjacent to the
lagoon mowed annually. Vegetation should be fertilized as needed
to maintain a vigorous stand.
6. Repair any eroded areas or areas damaged by rodents and
establish in vegetation.
7. Repair areas of the embankment that settle below the design settled
height or areas where cracking, sloughing, or "jug" holes develop.
8. Repair waste inlet pipes that develop cracks or separate at the
joints.
9. Remove undesirable vegetative growth and floating or lodged debris.
10. All surface runoff is to be diverted from the lagoon to stable
outlets when not included as part of the design temporary storage.
11. After five years the waste treatment lagoon shall be checked for
sludge accumulation annually. If sludge has encroached into the
treatment volume, the sludge will be removed and applied at agronomic
rates based on analysis of the sludge. Treatment volume must have
a minimum of 4 feet of depth free of sludge at all times.
12. In December 1992, the Environmental Management Commission (EMC)
in North Carolina revised water quality regulations that address
animal operations. These rules became effective on February 1,
1993 (15A NCAC 2H .0200) . This animal operation shall be operated
within the requirements of these rules and regulations.
13. Pipes that are used for recycling effluent to use as flush water
and irrigation intakes must be placed 18 inches below the surface and
as far from the inlet discharge pipes as possible in order to provide
a cleaner effluent for flushing and to reduce odors when irrigating on
land. When these pipes are placed through the embankment, they should
be installed no more than two feet below top of embankment and not in
the highest section of fill. The pipe trench shall be compacted with
clayey material or other material as approved by an engineer.
-------------------------------
When specified, the contractor shall construct an observation trench
along the entire length of the embankment to a minimum of five feet
in depth. The trench shall have a bottom width adequate to accomodate
the equipment used for excavation, backfill, and compaction operations
SHEET 3 OF 3
and the side slopes shall be 1:1 or flatter. When tile drains are
encountered, the tile shall be removed to a minimum of 15 feet beyond
the downstream embankment toe as measured perpendicular to the
embankment. If a tile line exists above the embankment it shall be
rerouted around the lagoon in an approved location. Backfilling
and compaction in the trench shall be in accordance with the EXCAVATION
AND EARTHFILL PLACEMENT requirements.
BOTTOM AND EDGES
---------------
The bottom of all lagoons shall be approximately level. The side
slopes shall be uniform from top to bottom. Scarify the bottom and
side slopes of the lagoon a minimum depth of six inches and compact
with a "sheepsfoot" or tamping roller to decrease the permeability
of the finished bottom and side slopes.
QUALITY ASSURANCE
-----------------
During construction of the earth embankment, a qualified inspector
as designated by the designer must be on site during construction
as necessary to verify proper construction. Testing will be required
as deemed necessary by the inspector and/or designer.
During construction of a clay liner, a qualified construction
inspector as designated by the designer must be on site during con-
struction as necessary to verify the liner is installed in accordance
with NRCS South National Technical Center (SNTC) Technical Note
716 (Revised September 1993) . In the absence of supervision of
construction by a qualified inspector, the liner must be tested to
verify a maximum hydraulic conductivity of 0. 000001.25 cm/sec.
When testing is required, the owner will be responsible for furnish-
ing test results and certification that the construction meets
the design requirements. Any tests and certification should be
performed by a certified laboratory.
Lagoon Marker
77 Paint top Be R�
all
1 -p
i ff lan PV TEE
8'-Qn i" PVC Pipe
PVC Pipe
Li
1
•IYPICAL X—SEC 110N. TOM ELEv, .50,00'
SEE NOTE 3
�R SH NOTE. 2o
CIA
EX
FILL — PA _
CORE TRENCII
DII<I:, los"U e) CY SEE-, SOIL SHEET
�� `fir FOR DEPTH . ,
.3 i"5 "Z tiGp" i
+ 10% NOTES: rJ � ��. b i SITE CONDITION ES NOT._.. ��960o ti � � ��
TOTAL:
/S"3�� cy I) ALL WrAIt Ian crt� Jr�i al�0�t RCUT �� �� •.�•/� �,� ,�',o���
AM) DACKF11,1 0 AND COMPACTED.
1lncicll[s; Dr Lnnai UEp[l,IDS oil OVERALL
DEI111-1. LIM( fi ron mis LAGOON TO UL
COMPUFM IONS BY: z) 011<C DLIVIND IJI_Ll(1, TO 11C )AIN. 0,61"
l�5� '� �UCa J f#�h w•+ HIGHER IER THAN OM ER ER rL.AIRIED EL[v.
4
- 3) Wnl.i< Al-1O l_C)nl)It•iC AlifJl TO L1C [7UIL1 1.5• A(iOVIi LOW ���/�
IHD VMS. I)UII.O G• WIDE COIdTIN., 7' I'IZO1.1 HEAR Of- ULDGS; 9- +
I"II_I_ "fCi (II.11G; Ill:f01"tE L'!"'11' Low-'S *OUI (WOltl< 10 LIE
COC)(ti)Iltnll.l) 5Y� UI.UG [ ' ithCIU115).
140. 3-10-10 DIETZGEN GRAPH PAPER OIETZGEN CORPORATION
10 X 10 PER INCH
_7
-ITF
it
___ __ __ _ ___ ___ .
t
-LE"
17
4-4-
-7
A
r
_T
44-
( j.. 1 1r , I - C I i
-T,
]F LL Ll
'T lo, I I I
-7 -T
7- F
tin
I I Fll!_ I-IT L
T I.
T_
LT.
I -T 1 1
... .......
.........
..........
T rl I I rr -
A........ ....
7
T 1-T
�T
NT
I/L
-T-
1
T�l T
tometers cn feet .
rr
Y -
V
\ 1ro k a t
Ins
• I
..y
J
Levt
I Cl z.
3
1
_......... i „_. 34'52'30"
1
133 55, 134 ( 77'S2'30°
�3�i"aan.E -
ROAD CLASSIFICATION syY
2 Prima y highway. Light-duty road, hard or
t improved surface -._-_._. —.. .-
YOQO hard surface --.. P _-
s Secondary highway,
hard Surface Unimproved road
^0 10 000
Interstate Route U. S. Route ''Skate Route
w.c. r 1 ^NANSWL.LC. N. C.
C!-34 t?752.517.'5 ! � rill
d
This letter is to serve as written permission for William Edward Brock to expand his
existing swine facility which would be at a distance less than the required 1500 feet from my
residence. I understand where the operation is to be located and that it will consist of 3 - 800
head finishing buildings.
downer Date
N Public Date
s Y <y y)tr rY l f,.r 7.{ S rat •>L r ¢' t x ' i•s'a •. xr'',..t;."j'r��
t sti ✓t a e .r+ p :r Y 'w - 1. `` ,A ,4a 8 n• k Mr
t A .: a urC9CM 7 9 % �' Y 7ytt.� W �}'J*, }.s`T� ; Lam"' y_' Ott
{ . •' . t ; 7- >;'• ,y Nr t _ f y4 l y � "3 ,J i 2- �t, ah -• j-
tt,._.s .' ! �t,. r ' _f ''L.,=a •. ..,,' 6'R. t 1 rry,..�z).j t.+{y-+�4i..'sA s,EJ�`�l i
s: _ S s>t �{ar,.1 4 f j, 1t. y, ,� sir, �.:.4�f- ,
M a.. \ f I `.
•' 141,
- , 1- y.
.t t a ;. .••� { ,S `rt t �" ` f1,+y J.. ,z t ,2 >.• r_ t
S
• t F 4 v^ ^� 3 :� 1 r� t Z
t ..a' + _ _ y v x �- 1 r tr } w! �.: y , t ' � ' c !'3
! t _y 4 y. a•r a� �, w_,/tt , r J �\ ( .!., *-{2 +rt+ ' t..
tt ayef.y�a 1 'S >. ,,y t.P. ram•:.-tea �wrr �,y� x,1 c , r- y' _ ' a F k �: s 3,:
t 1. z S Y y :I .!
!1 4. . .1. f s' c- t.
r 5 - gal t ,� ^:;> ,a - ..
1, l... ✓i s t Z.P .t" ,y t., \ f
.: t S F + .a -'7 }w y t L s/.•I: 4 .✓ w.i '•x'i r..r,y" t.
AV,j
1 0, � r>•j t `
t., N. P r ,F t i't �.;+ S ' ,`' • -e +. [f1.`•. t¢ 1 s j''y ' 7 y�' -.t:
r 1,y , r ! ! ,t: 1 ) �.� .� t F ..y
t. + + ,•r t ! x t fi
a. s r. '` i.Axes, , +'.-� r QW tim
11
f �... , t. s r. 2 .t J F +
t _�' r 7 ,p ,r y. ..
'"I&,-�.._-.I�.,�..-,'','�.'!-,.'"f'�?'.!�"'*.;-.-,_4*...'-"..-�"I'-:.�'-N--:q'.:.%I.,_'��..'-�-I.-:�-I,1�:...MI:....-!�..."-IT%.'.C_:.:"....I4'.W.—.*,.I.-�.-';z...�n1.;_-A:j,1''.;-_;-1,,i...--—4I xlt.-t-:'_:-'--1�1.7.;M._q.._....f-''�---1,'�'�I'�..v I._..''Ton"'!.I1...'"f-_4 7-.,-:.�-.,Q'—,'.�:'1.")��..,1.,1�-."1�...;-�.'-�:.`-..X,-"*-.,'.�r!`��,'—�_�"''o.,;;.-'�,..1�.".—z*.I:..;'.i".*.;�qA".I W�
j t:a r 1 : P' it.v" dr t ^t;xi e r
t J ,
3 `' , 1 , .+
t :I{ _ at! 7 S },,,. t f..t_ >`_ i;1 i,}', ` ••'. 1. ; y-✓'-
i t ,t t} } a L.f n:' • z. •t = J s� a +.
y. 8 �! G.'r� ! `ts A. < r HA 3 'i E rt y it_
l -t
r �a. .t J T;`+• t= Y J 't ¢`t.• y ''a Y *+
i f !
t t v .vy,Fy �_ :t ^ IT ry a �.I
/' .:7 y -y
{{ \- a
7 Y
2. a 4�i _ ti 'J
f <, '-} r f t J- s r•,st t.,:.•.'� i " i t+ �.' t' n v f \s.
y7 «• _
r r f > a trr, :t' a t !. 4. -+q�,�„t.A .s.s r `t t.
, t
; G t T >Alt`;Ii 7 t a 4:u. ' }) t t r .+>yw♦ 1'. ✓. z a. t.
0 Z i
it_ a �w
i;• - ', ` t / +: z ' ! , \. 44 t st I. by
t.i > + . t •;v { • b� f'- ! .2 r y+c r.k r n%0"- t tik
S 'f t "''•-`t.Tt,<.,.ce.,, I.
` tts �� tSi.F r y r 2 t ' \ ' `_'+`
ay : r:�, 4 - .."R ^ �r S2 �-- a. L h 1 x s r tr 1}.
a>[ 7
,'t;: f L 4 t 2 843 r 1 • t 't'•atta.�r-ar-cz, .� y } t J -t 3•; r ..
l,' t + J yl •- �� -,< _s r K y"'�.•.••n.. e /`*., .._ i f •r Y'�^.`..
r t<. :t t�,r f r -; d , ^r t """y <:.11 .Rt t y..
f-r .; y Jy L.. ` yy i I S * t t3ZAr•• t `S,,TS'' y>
r_ `' . , t 2 + tt J' ;j" 7 `ij 6f� •t1 �- _ •Y.. i tI. _i +.. '.! w 1 �2; t• Yta v L•
,." u y t 1 t 7�t u, L7 t J CC^.r< x- -+ , r/ y. :i POj t f .7•— •.
.. 4,. rR';.k%.. /s.=gam 1t t rr z _ i . � Mtt• �- t ry ��� ''-:
',S ? ,w w'LS 1 r r i 't
t, ,, r t tllP ro d } ! m �} a ., , ' t .) r - I'j"(+, 'ii-`i
x .. .. .r. ` wA„tr.,}}•. &y .. ! rx C:� .•' ,.+ a . ?f }, `° t• J
t , +' i ``4t s I 4r 1 3 t + c Q2 't , �.i •t
y t vst y ''I S y `_ L ..'a u+`s
t' • .. ... .. , . :.it.. '' .- . .• . . . ..._..a,Iw1. , ..AIi.�.0 t" J••
r !• - t• 1 1 ! +
i. .. •, •
�1A nIr.•�1 �:'' 4T.:.-�a i--4 'of T�:. - , a. n.t. ••' :i r uil.;.4,v�;: ':;i. ').. ..
'' 'y' 9 •'!t�•�r'i `a£".a'�> µt=ri; 1:.;: ,M�w�ii i'' '„ �1r :,::, J••r
v,R, (• A••[ ,,.,• ti Y •'fir t.. J•�;ii ii'•, ., tr,�,'J�;a:�:•l.i.' s- ,a:
.N:� T.a�'r:, •. l'?l �=,.e�•'il• ,!•rj•! ; f : ,t„ � •t•' •Y "1
•, ,,,lam { t:• SR''A 7' .{;•t»t , • ,t 'N•
tf' -r'_^ i ,'j r' {i- �f►�rT,s .`•' i;t.��' •'gwa•'f•:•` �r 1 3d:;:•i
wt�. ,,{{rr.�.� Y t« aR' ; :° i4^..}},�si«�t-�i;s+r G•• r
t,Y^., )•:. 7.1'...j. w .,r,. �+- a: ,• f1� Syr 5:. �`1•irrJ'
�4 r.',.• fM' '! y� I •� S 1 lwii l C+' ::. sI ...
' .A'..r. is`'7.Yr 1�",-•'j�,J 'r �,_,'Sr ,'J� 1 �,f'i tr l \•' � . tV•' -V ja� 'i i�4..,- a -L,••+f'•.I-
0! . ��,,t w cr•' C t „ ao� �2. a ;rpm
' 1" ' �'!'f t .\'s+ 1' '.:l.'•e f•.•J�"�•�'1i"`''► al::1. '•s t••t ], tiCt ti.' '� s v }1
'.0 N,'.w„:• • . C I'�y,sA •1 +•s..ai 4' ! ,r�t+,y� 4`'r+,+�.;,r r, '. TjsLi^5.Y',:SN•:t,•.�r:M;;twFA• i:;:11
j�jtl �' t.•R7::i3; �.f:tih.i;•`►^ r l r3 rJY� ��ljj �, .':>
.I-' . '�: :�. , a •+ `•':•'••, a • •' '�,, V,$��j �{1�j(,�z,, aw_dy as �wii \!�• r� �•� ,�11y,'• f '►v• �RFt.t')dt'Sfru,t:�.r•.
'�ff, 1,9-•1 Sa .t •., ,4r '>G1"`IG,s' � •1D �,'•M ,��' s�A\ICY ts, :y, f
• SI
.. • ,
.•
•i .a t•(
• • 4• �. . 9 �•ri. F' i't. %i.is•,,•{, +• �ir{�ry••/Vw.�•'�j=:...lAl,,,::t
.. ,. ,,. ff.
...
wJ(� �••
t ' n
,..,'•aar-,1a:'..'.., > y:`}',::. fit: ,t,•�� •h. +, t.�L'j :.:�i%i Y�_„{,'"+';ffi':-:sir`•
.:.• r S;;• •�. Y•w •Tr-' ins., .. ssY c�
•.Y`•i"�• , Jr •,-. t t ,f!'•� I •t: •� 1r r .:,.•�• 'I�, ,•-7�:• ••z j:• ':; fir.d?L !': t:
,» wT t FF �L'` JC `i,t
•p,•`'\'itP •. f.r\Trt(...a•i` •�• I ••v�+z�.��'+?'!. r ''j',7�•r ::L"''•r d{` lt�u L� z'+t�4;o...' Szs'[�y�.t p i..rn E{'.,j j•
'fit ''tt t7,:N:i.i,S.. }%'i*\• �`tC!!'}'rK.1�. i JC `li q ;I;r:IX . y 1•: yt; ..y. K:•.. t h.:2{1
P`E f` 1},+"F! o �'1'r a t'a�^.i Q T• ,�$,}« , f .r-1. �l ,/� y ( `•Iwrr^1''W :#' a �a r
•13.1 -. anti/.� [•j.'r�,.•:A1 Lr'�,�', dam.` "•tC�• ?..�••% .p. 'K"'• ,� s ..J�,-��'.1,,,'.•,(,,• :•l9,re{ 'Y.r cf �/ .%
- .'•'.r.,•.7�'fo' Y,_y`
;� il`T.:..�•��•,�'.fp���^.• ';;;;E.,•ti•`;,a �:5a ♦ ter Gl•fM;,,'- ;% nc."irk'. •t°' •j '�:► tt - .r ^ ,nL: .:, j•iR't•}.P: "s4:t :•r,-:..'''..
i:Qrs�At:7: ♦/' .;r.t ,_7•' s'''.-:,�'2:=�i=.Pel ^' �' 2\c �yrtti{"3�L• a J_ ;+1 ;j,, i,; i f:,.+'.�i�t..•iw:' .t',• r•Y „�:ut N:
f i,.T•: 4..f.�4 �•- R 5 -Xt^Mrs-!�:I:rt 'li,s, pQ.fswt:,,• ,N> r'' �tii!•,t "i :�••CL tb �(-r� lr..,. t •!•:..,•y,• J
%1:. ; ..J•M, ,r,•+ b•4^.'�,yr `. /: `•T'ht�'•`; - y S •O'1Yi YID Jrw• told ,e�••f• 'KSN r 7'„J l,. .,Y.:.i;
•+. M� '+7. / ,•�la'f '�.S''tr. f`:."s•�'!'•f.-. j•t r i s',r +��%`s.%' ti a. "}:::•;i' r:
yti:'.'1, i,• :�Lp.' 'F,.•gtifi Jt�;•J,`,�.�•� '�' • .7ir''r::�yi; r• %d '}'ti{�'J:"J•�. t'. �'�Y •,;� ti V.� ,.,r.tr.,�;N:'.i,.
•s' tr f . r;,,. pi r,.,i'fl.".!• •t�. : 1 S�?at •f7 tip't •:¢;,,7:Y' ♦ sr. :
C' �'h `....[La i•• ! .{ r t. 1 •*,_, •SytY. �,y'f,$�, f i T:}• 1hµ�• e N { �; }:s ::ti.;.A•.
5?�l.�-,(� *:. '.- )t,•I. 'Aa'M!r •: (+•' �' ,�,ii_-:1 �r �31.• e!•.,R�.3T1•:'..' ,::•` / �l. >�:-
y�. .1.;'::,j,< ' 3• .,. -{tii;:�t �'•.,. .TtiJ. rr.. .:J .'v--V' / f',,j .s•'+i.;w�.- `.=
:'►3(:"S'��ry.. ?kt. i ..r,G.�t.*• '-• f.-.._awl,_, r iri;} r:i:t-i'. Vw ,,.: d 1. �. A� ...
yea •A.' r•.2'_`F` aVi. '• •s 1`*a'..1-d4,' Fr .�_yla.�b• ,'.r ,r„r• �f'-'�•.ae: a'4j1e ��ry� a t. s it _ -c ti�^:::• L.•. v.;. ':
7� ,� ,r'1Zt,. ,'-.-?i•.-. V:�'�:'x7i�-�t��a•:..rJ,37.:,..Y�•of y, q 'r, ��,r:'.'•~its;:,f,.:s, j.t'r �`��l� :t!.' ��_T: ••W -.•t,,- ,
I •'-ijN Y>, ;,.w Jr s .1:•Co:• ►J•ii'A. Yi6L�' •alt G�.. `'.::. .+:•\"•,:ys/ 1. _ 'w. ... . aa;i� o•
r'�e aw.,. s�./ sS`. ,,"'i�!�'•. t`-:!` .re,.�� •• }'"•• '?» ';`� fit;' "s',Ysa yriis sy ;a* / `�•,« l:;'f:.>f::.f.J.-t �,
.1.0 s.:I—, "I.3 :'~� +•Ir=l ,a��t:p v;l. Tit Sal ..ill; _'i;•• :'y :'':t tr / .� 1: =v ( :.. "ol..
•ra.:,
g�,<• ,.'isr' I.'}dt-: 'f'j-•+'� t r 1i`. •�... � Kti t 4 ',gin ,^.,,sue <:t.,... '�-'/ •` Q �.'�. s' s
Sk r+' ,.�'►.'t.. s•wy..�:,t =r`•. T' „�' r Ll!yrp itit, •J:S;': ti y
ly,L. ' 1� -N.1`.L•-• •tf a Sv:.:•r� !4 .{,',iA t i:�r••�r.yi�M f S': '!f"rt� r'r f+^'��_:. n h�yQ t.'f,.•�I•.:a:a •a •/ {'�L'; :'�+f �` ..
<•..r ,:;•a Jan, l.! x;,'j�n.••�'x ..:tl f_•"t,a:. :•,• .^YC'•:z�•. 'I* � f:.�.' 't•..,,•:w i}':1,.• E.!•.i! .Y.,Ji.; w� i• s.'
j , a,.. .,.V .ia,.:;i. .wryYJ. ,rvr}i�i;. to r:iv.' ./ � .., J� 'y'My\i 2.;fir.t. r r. �,` \tom 'l ,l
n 7 • .'�ry�%1 t:t'r-LY�. .;z •e i w,tq••y sl i• 'iaK••'�w,r 1 I l� s• L'.'• ..'I
y�'t'!.l. 'i:j ', '�
:di�`V.rit':�: S:, •' 'r:: r ^i bti?..... TC sn+''l 4.• "'`'..�,c .J?"' i Nt t•:. t Y:?i i •:z'• .1.
Y i!,''•',•�+"`+4i:r h�•';•it• :�, vfi, i t7lf♦'I•._ S! -,'w s1� ew ss•I ��'t� :>'e'�'K•.,.t".>•W.t•I r" >;•:;.•.j,;.. :f• I
.
_ #.�'•.1`�• ,zr:-..., :.h `�s•T-r...,.r• t;; `,+1' c• fit ro�.a/''4 7 -w.r:.l '�5.::yi,,,: +et,o'C= i
t t' �t r '' y�s 1,.v y�i' .. �'.^� r41 Ic} l �i �-' ..,. 1t•.•. / J .: ;� .e. _1 i:.,1:
/�,tr •r;�`.,4 •'Gsl�' t,f�,+,!• .:`V�'i.•:r ;►, Y. t�.y.}`•�„'!•Y,�' I•� ••t'•V' A` x y r. ��, `''•:..: 7."`. :, ` ; :
E;-• v t\•Y 4l�'!�T':Y:i a i{:" 7•.?.wL_
'`='P;G .tl.: i 'i'•i'�:• '1,z.1�. •�'. ',�• .1- .. '•�• r:.` ,t'.: 'i:.:- I
. 'b .?jr 'S •i 5 1 .i .�,-• .e �• 6''�✓.+/ i•,. Q:r,w• ,• r. 'a_J.?•�n ••y• z�
v - '.114.�., !:�? ;;> 6t3 1,-;..�-a• Ji J.`+iw'::,ay.r/1i�•S.7r i 1 r� L.<:. :1,r.�+.•;.� s f'. ! "r Yo:, rr%� '''
f ,j� .r, ,f=:. F}
• y••�r y'r" •i€.:•'i:. .1,. l';i� a t'''tt •" { ,s-• r ►'t•7.'+ 'iY•• ,gMr+. "t:t L• ''„•• •fir �•,• .. .
ry c Y a.•.iflr ;a;• , }' �,iS , 1 ,•'�! .. zi �::2. :• .t:a r
f , 1: A:, :: b�la' ".�,t'. i't�'I ,}, .l t'1 . -'.' •.•"'1,.r, r Y1.r:�ry�„ ,'•'�:�+.
mr •y, -L �,�t�t '> �Si # ;��i. .T:.�:..,7zz 3,.\' rC 1'. t l:r, ♦fit,'::'�, s• t:•a• �.� �•.... .. •t
Kta �,+.,'tul^�z•'•�7�};:•{.r ••Y!=' �J%'! 'tip ? y:e' r°'�' > r.'CJyr�., f i:s4'�;4 :�t:::�M1 s•;4..t.::'•.y'i-.>ty ;��.*•,,," ''tdi..,
>. t: : ''t �t, ;rti a r' w:.. *«7 6 i a. tt t,4:••C.,.: ,•.. .�s .;••,'�.
a 'ir 1 t:.•4 4. .a7i i tom. .w/�r.a ' '2_N. 1•!►.s.�'f' /� Nt s r>".
�•r re, .,rl't.:tt• :�N:•.1'"I- i,;S Y'4: }��'y�(•�'.!•^1 �3.J •►666J`St1��..er r_ t,jI tt. 7\ :i,. �21..-'."n•,R� 2qh:}&•.:�•:•�• ••' {.'.,r"'M�•{•'�t;`w.••� •i�J,�,-f
.�1C 1' f} C .! :�•!+••`a a:t. 3'y,I,'a •'tT v r,�Ay.at- z(J ♦ r�reJliy,.,�r,` "�-T'::'SSJS J• ��1.. . , yI R.'v i :C:i• ,
r 7:t•, :'`4 .fi •ti: :L{' r1,. l.:f y},►t. .yl.. 7 .?' •,`r- rY, .�••,. •r••t},>,:. ..5`._'a:l••y: ,1,
,:fl.: .a`: .,q;,, S•�„ J ,•„ajt 4,..1 ''.ir• a,, a:••�II"M:w' .r r�. •'..i;; 1•.�Ii.
-,4T':f: , ,-',, •'E s+ �',., r�;�r +•6�'i:r!t J• .t;..f,.,T)'s :; St, ylt.,lLi •,`L.•:,:yj••s•, ' :!�• 'r?•'f=••'+' S ./•..«�' .e p7..•:
!A• '^..t. ••,..•�•'I- wi. w,....J .R�,{. .•"Lh�•:':,,i z.��7+�.f...F.�:��. ;!.,.f .y.:l•• '. :�'::: r••�.• �. :.^.�fjt,'`"..�,{• (' °�.'�
'A . f�. w• :a. '7, f. •:j;:1,. n•',: :�' 4.S.�r�r v.a;� '' , aw..:,{avf•} :'"S4.' ,j,.,i.,r' ��S�i1J �.. •.�:� r':... ir. 'r'';y'
•,��• :-, �'.•:• :'(••V.:tt.i;.t•. `'•:.i'.jf�;,:1t•:a. i' 4r ^/•! :•.•. t.:+ ,a'�:.:�i •'
I. L'• .1 ,,t:T..a. 1 y. ••r. .y {. ,J •1'.•(Sa.+' '�'a. r .w .'.'': i,i:::1' i .ti t ''M:� '♦ y...r: •'t%•�•' ..f4
'!�.;t; �r ;:..r % .w -;4:�;•'•+_•\.;• P', ,*••,t ;}. .t,,; !'� s� -�-., y'' r.: Z:i : Y. " s
as: Y,'¢•t "ri..;h� 1..:'.y1.F•l•s} y.-t 7 f �f,>G•;tr3.. rJt�' ,•_ Cfir..'. .; p7;'•: :+� .Jr:.Jy- '•.Y �,« •s"r ah�• �,n• :.y. :L'...•w,
\ t N �J:�5.-+}^. +f• ,::' ,'•.. •s-'.,_{:y,t}''L, ` •. rSr�Y .�i , :!`.
xjM':z:i7 y:`."!!:.,:J. {.J'�:1;`i.r1;.�.7 I". •altl!•.lydigb+9: ,. �f;ist� a rr :l 1 rL. s 5: i!
t+•' ,�. ,• � i. r it r.; -�
r.-.t:`.'q.;=: :,}::,s, �' Yz a:. Sr: ,� ,+! .,: :....'h:j.r! 'i' .ii`:[<:- �:•i„�fL$w�a i;:.,y] '.v:-' ,r:•• rr 1:..
N' •4� .:;,Y, .,,a..fwtC:' ,L•'...1�'�'ti: L'}fv. ,J�' :.tl :1 44. •:..x F:. -tt'.i' f•t :a:r.T 4�..►•. .r:-
�. :5�. , .y'"' +?'�a.Y:\ .4 ;�• �,'t.. �• �I1 t' Sri �. '-
►vi. �' ;ti.< e+,.�':r.,� •�• •a;• . ' ji�T r•l.'Y":-,1, •y.L::°-Y'':s ;:'S�j�.:J. i' •`.•��,'�.t la{•r.:•IL. : ,i
'•'}1T •.S°s .. eI .. ';i":.. ['�,r',•i%�1 .;_,-••T•- K ws� ?;N.r•. `4�:�r' Ait1.r•,N.,r.•r:..kS:>•.J ,w.y 1(V -j''LY:� :�v" :�•:
�t�"�1L'• }. ,^1 � -jy �y n,:� I'�i._ . I. " s.' �;,•• ,t t.,, ,< r'..+I '••• ;i:: •2a'.••
r •,�,' :,i� ,f a•: 'J;!.i .•ti ......1.;. ,.. > 1:. :y: .t•wf, , .j}',{,,. f.y, •Q, ,t•� ��° .q ;j'•-,
r .M� ;1 :' '.,,t .�F" . :�. :•� .•�.�+ r.v:.,,r•. ::. f,.., a7r:•, =,r r.F- ;,- •:
�lCu►':t�i r�iss4': :,' •.'Kiiir .r. . •I:r..:- �i •r t.�!«i,S:a•isfr..>•:' .•.Q»:s;.!.. - y a 'j' ✓: .. s
«ras•.. i .�ri•., ar•• ".i, .:.`eJ:�'!. '�.': y i:.•.�• I •t . �PAe. ,..S yL. -..zL'.,•'Yi • > ,:.',•t::� > 4'r••S.':' '',,
•,j y. 'It ;.C,r. :ri„+.•s.: . ?t':y-•C =., :i .�'r,..,Y r;`� •'st�'J1:R.{r ' ,`eslrt�.Mi.. �� /-y:,:ri k: c+vi.�Y_t:L.�":tf?.:J• 'a'tCf.
ti.:.S ;.�t.'\ :i iS:':ti•..:I.r- .-Q.�:':���'s -.'C- •,,,••,•:0 . /i'V}.,�{y'1' J•f,i't";r:Y.��`�. z•;:f,'.t,.'r't.C..s.J :^�w't,+:.,: 'r". „ • .. •I
�:yr:r•,.•. -• ,iv',Y. <.:.'1•: •!"• :w:':;s:'•. iil '•t.'. "1 y ,:3%i . ... r.C•;f'::C:' �:♦. ':�• -t
•r.i.'7T
! 1�'1�. =Z:„:2:'s. :is:''°' :`:i :. ";%•a':. ,t _ .'1 � ;t:'s}.•C... �f,: . •ty. .tr,.„fyfk •,,,,t. ',ia• i
•'!•:•: fJ'EG'..j ;µ •-.I, 'a,' ;. w.o �, '� ft, ® )•.t.,.--i• ',,,rI �,r, �;.''!.. "� ".„�r�. r*,.4f. 'a•-'"�t"T.+:r'':
S'. 'saI, .!, t� •'}•,1Y; :I �•.�,� " ,"1 C' ''a' :• .y,,• ::f'y:T�iY�': .t ;tt•. =t%`-+�L .^•+';}i
0 "�.: :f►t:a J «t\i�h)Y.,.'.„ •:•>•h' �' •i'r Y.� 1Fro �'�'t 2,t+XTM'.' fit.:(.•'�:+:%:'J: "�,J►t� ..:t'• 11,,�'k•}1".r it. '}�',,lJ"' ' •(:'.r
r,. :�+-t ••,::•,•t{ •�_ +i 'f' �,� d1 - ..
.... . .I rrL�,•:.1; •� ,�'�}:{t.:;:
.:�::• .; ..'i o:,`}'�: .,1;; .:fi:..L 't1 / :.�.t•ass ,:.,:Cr:•':.\ .. ?.• .. r '.y-4, f,... '.. I :,- t
'i. •1.',Y'.•s:• _' "r '' I. t'a' J f raY-.; ' I'1.-�,�'-1.1'%'• . z, � 1 :•,' r. 'l•
'.afti�:Ykt., f• -,-ts•-,::z�-•(;'i. C�..' it '"',Y ": v?a •tjw!�\tfi�•+� :r..lti t
'• .ir ni» t,: •:SP.. •.:. 4 ! .7(.,� •�- ..T us,!- \'.j.�:'a. 1 it.. .s:!; -j.
+•,- x:�•':''.y1•'•rA : !^•' :?':•'�9'`, ...e:,r .is '' ti•:. r;'r. ':a."1[. ...,
`i.'-aC.• j.3,4.f:+.LL':!;•t....: .'tL. �;:�::r-: '^•w.:i.} ".!':.i'i•.«0 } tt 6! ^•�a:,•.•t:'+7i••�i• • -•J ,j• ► '1::�:,,;.:.% •a•, *, ,.,••
..a'i•,:; iy,•�...)•'3'.•.?6: ..b.w. ,.C'ri, - aIt + 6 'ry,,,t•'?�. :r•• ♦. :,t, ;1: f`.•�s,.. `."1I-.: 1.
'.1�,t•• :.- .. .1/. .1wnt•Y:i••.:"' ...t:'S:i-r- ' iI r.:if'.-�.,•'.:;� ",1•' wil.✓rir f r: ..Iiw ts:•,t.'t•.-%',- % '
t.:;l,;S.'+}''•�•s•. .;''4t ;?'' ,•a' +i'Y �., shsy �' *nr.-ram•' •:i` s• .%._ Ir;t\•. ;�;•�,::.".:,..'. �t2• .i, - .:`..,•:-
tJ:�� `p n ifi:; `i; ;x ir..a, a, '`' j- .:l:.Wi:.J..;, �t r • __ - ''t.ti:.� .'? .: .li�
:.>y�:--``i .• i t_, ♦�'Y''''�.`•j;;; ,• 1.:. 4 ••,: ,,{ {,ar. ei,.Y% 4 ` "s. a " a•w_ ••1'!1* j� 'a• •'•
K+•4's:•'i'}•: kjs.. : :.f„!.j., .l:'.^tK:,; •I. r'j r: ^'►!�.�!.tI, �r y� :4,h i !i.':... ,,: �di�• .i•-�.{.:�s.!. .'�f�;yf"a:' :'li
.K '.r ��.�fq',s�,tt+'la;�•.'et� ll. :.:1t�ti; vaa:. rt,• :}"••N.:A •3�.::•� :� 'i:l':J:"", •.ii:i.•. ;..i:,!-'I:�gc-.J . .
'�' r. ' t"i, •r t:
:•� c:%': - ; : ''�"T.=it ,:a«.;,�'t_.i," .�;:;_�•;r; . •cam �.1-;:' ,.:.E�� :.:. ��*,.. i
,wti L• •Ia.•.1•.ti'•J:' ;�J'•.V 1..�(.:.•,: :r..• ;•1,it. 1 ',(• %•1I .�. ;�• :i.:�� .tn. I•ls,�'J,*1 a•J:1�'..lLr�j ::r,"��'{-•j0 r:q:
��,r r z•i" -" !"is 3 ir' t`�4f:.! so.�tsr;i+., .r. tl: .g r::; .' .I %' { r :wi s r
t !%:a 'Rs,(t r \4»;.1t6r tdz4r,: M'�t: •w- Sm�.� �. ,ram.,. :�•.. ,N...r_ ,I* .-S' ;i,,
. "Ya "�i:,` ,,+".._ ...:'fi'','J,•'b•,4�gx:R G�:i!•.1:~'i�.i'i•li;�;�+tC\•11j•r:�r.5 ,wl.'�,, ..e'',�_.�... :.+:":.r:.. '.,•^ .'Z}..t5-!•�i.�• °•:t+.' \..ti?T. ,L.:..' .'i
r,.,{`": M rr ._ to r`,j7F ! (.. N•f'1 4 ..q,♦• .,`.. •.. ••: , a •'.• ,p.l ?' }'. .', ..
i t1. •iR• I •i!` ,- u at. 4r ,' 1- •, (• f t \:.t ''�,
4rrj' :;:v_1, s� L �. •,,"�:• ,Y-,.fr. ..i'"`,f.K°:.i '1 ' .. _ i1f:.,S:w..�,•(.' '`; .. •e•w.I 1.. .: J•�, t .,,t t.s: r`,_I,-., •',W•q
..w.' . "�`'`af,�"! ';i+;t .t��Y3�:. s; fir.t,�'�� L,:sv:A..�.!1 Qn A t; tz�',fia,•'t,t .Y:..P.'. '.fj v'.4 .: t.a.s, S� ';�9 i .�lY .. ':
':t ti jrt'e~JL,I; '•�+�'r ''.=!dfi %1.�,••• •yr. 'S,.tr.�..Y:' .t,. t•.�;f �:il� :'�' ..r.. ;';!,
s s ue k .•i f' } . i. -L? c, s.';• .i .Mr•: `.,r• 5",a: t.
!\ s°4:j1 V a}rsit' wr'!.'•P�AY.•'r?•7r'.i,_f!� �Qi'K�, :fig 1 !`',:::, .f :.1��rr y: ti:::'..�,'t ;. •L.:.r;-7%• ' ..14 A.r•1Mti�{.._.
�S r' a,'., .J. q,.
6 r.y:.i' S•/'. •}ram r .r.4J {j,�'; JNJ '�y'::, .r,. "�r.r-• .,�« .t' 'I il. tip•i• =:,�''v',::a1:y�•'�`%°'�•'
tr ��; .cc;r'S,i 3:{ ''f4•:.! , i�,qr' -; =51, { _ .p,.. ,
�ja �r ¢: tta,:r t' 'I' t y.. L< .'r-t ;,, tr4 r..•at "• r/�:, ',r', ,t , ,",, i�• ••`.,,•\.•iv': L%'-,,
S'V.' • is :` '.i,i:: •f �i'•t `•�'t. w..7;;'a�i , t' '• ' t`?.i•'• rE:;.,. �f: •p_r.,.� :n :.: w:, t, w '•i.'.;,
a ,�y.41 i�,:igir Sn NYw{};i<: ^rrrl,r::i:.rIC,1'�ti.7a�L,•. zi 1. 4 . �:1i:;: t 7.r J •z e, •Y i,j(f �4.'xz',Y , ' I.ti.. ! P.
' a�4• •-.� :Y• * f? �{.' z1;.:!%., :'L'^I•i:' ri•.R?i{:� �,�•;ij":i. ar r �l.r'Ti N t tr Ln :. `�'th,e ;e.
w„ 5• a'Mw1Y i LM: :.I' eY'� •:..., 'tYJ, 7�•'{" t•.• r.. .Efr Ln•t.?-� w.. 7r«;:
R'�i.'o.,:w:+:. - 't{.`R',l:'.,Yr,.r 1;. I..}`,% :S- •r;.,1 1t�• %�••t:;'Ft''7 I .•�,sh.. ,'". .3„Lj'�;+ : .1;, '.!�.•r., 2';%. .;,,, .�_...5,.,..
•t •1,ti:, -...�' t1�.Y ,' } e• ja,.t t" �• a� "f}, a' .t;.• ; -f1•j'S, •. h it it t'•,- M.;a f{S.�,�.av w:. ,•t••
:.r�p,,,.S.:t :Iri1.:'FZ;" ••.-Y•ii :'SZ'''t.It 3•p'+? ;: ��+t.r.: •'••I p� t`6t W. :S% cs 0',F• .'•��,�t•�re•t••L• , Y+-►`.7.�' wi: rt•i 'i.
. r'+'.::, t; t 1{rf. s. . f •�.• "�. ..,.. :4.• +i,, h- >t .1•T'� J:.• I .a+ M", :;: .
YK. 4. •s i:4w� r„�._ti^ ,,,•, r�, S.y ' ;.i t• ,I',y- .a.. wr:,.: Is: 3 af„ J. -,•,-'# - V4.`:�:j•.y:•' '* i ,�- •1
'Nt,�1,'+ :y.' j'h•,•,. •.j Y.•". ¢i:R• n (�' �k. ''i _ 1 P a:a:.., tr« >s-%•9_ T 1�•t,t, >'• ..;+-�•.:.at a�.,
.:s"s_•cy�';.. ..wr:'jtta'i:.•;::5:`:a r,F=r ,r',., `; , :•2'FS'' 1 1•' '�r.•:: , i•.,.6.- .I,-;, , •:t.
. : +t' ;::y•?a7,{►• r i s•:.�.,.f: tr�:ra '�rl .ewY 4 `'r r. �►t ':. t r' �• '$s .` ' r, 'r. \:I...,'.,':I
t ,a ta,.:t1 .t J t, •$: Y, }t .� V '•1 i7, •� •:} %.•.., y.. .. �ti,
>I'z�i RSr'd.t �j h. .r.,ri q?r,` •ir`.A. { r + �„ .�j .r=,t+ Y•^X: ,�'.,y.Y :7...•` ,:f,
r• `+•t:+ iS,'f • , 'h'JR a, �'••'•t, Y i.•°''• ••� „ >re w• ,jw j�,g, w �•i�t Y.i�4.•y;:.
SZai• :r •.i•,,, ,'st'?•:h iSi•' :.•.�• eK.,,.�•.•`s, �t•,ti''1:.• .� r'' 1:�, :. �r J. .i,•i• .1 ;..t1.j'.•-•'h•"�': z..+.} ',;''•?'�.",;tr,' •:. r'? -r �IF:> ,- 'r^'r::• "ii►!7 J' J6{ssu' ry� n �yi! 6.thbl.rs �•v..C�?- ��,.' ,: r.-ir•.*f,-.. r,. ..{<s::: S
,!I-l;mil•e.`:. z{',,s.'p k'{�• ":c4 R,Y.;-• `� 1 a'r�t .1 ' %' �',w».,'►•• (,..-,I ,t.l. .C.,K....r,r. ..:.,,.'- a•)'.k,:
a •,! r. ��• :';g. c.''14#6�'r`.�...N•.lr t ,,*,-9}� r„rv.a i 7 q..r, .S t'�... 1�.�.,!y `.?.'., ,..�:,:'lej.
y • ..1r.,ry J, r 1"..�ee J ,.••t
0.'�,�... .i,i..q. .:t..^y,, ~-. _"'t'"r•a1 r ir Y 'l{;Ta:' } ��1' +•-+1ja•./t.t�..!!•• : %j•• -1:r'! y iy`. •! .� •.�t,t<i+v,•a1}\ ;:4�-
*' - .1,...�'', '?• ! J:y��.t..., n., �i,,:•}. a. •r • r.•'r::, l,T "s•'�• f� •a,i y, ` . y�11s. •. !'�'iJ: �C• no r a1 ..G't-- . •C: �',. t- > i'•,� .tr1•.',2�1..r' .rT1 ::a.=. •"•':, :it %:��,.f.t}.*t• l •'•,t',2,�(. • ".:.J;'Z4..... .. - �f,�* :};' `*-X- • z. I-•t lL' •�•, q. �tiv ' vp fl w JR..,.:- ::I:,ri;Ja_; -, 'i w .y„-.�,'twit•' 1 s 5:., •..• •� Ctl i - . `.0,� '>•,�" :I +..,•'::-'•f;:-. .if�-•• �,,,�•,•...�s. ia'. s' •• {` �p•'!: . `st Ly t �'S• Y:, 1,.• a.-
• _ .n ":"f.'. :g •S,. '•'r. .5,. A•� . �' i •' 1r.` •a,. •_ y, t•-. .tv 1 .,-. .-
' ,I.•.:� ,.a, ,•. •a..: ♦. �a •tlt�r' y.•a A"ia. 'Ft' .,.t:t't :'+..' •:.•:. It.::.ti,�
{. :Y _k:tii . y �t: Rtt- s f, 1 ^:it f is
t•• JNi:.r J `l li.' J f ti :..1g".ti?t. ..C.�S z. �'�_� .t.t'�ism w'.i �,^ii '„
�+fit`'" -•.!':19. r •••{'�',Y:i•••yA. •C.lV:'Y.�•'w'i.,[� •t. , .,V'•�♦�Ni r 'r,'• y�-'Y:' `•i.:`. ,R.:.w' .'LS- -•I.-,i•:.J:.•!,`•:.
4'1%. ,C., ►,{;ir:da 4 _< •yVY,y+s) �•.. s• �tr<. �L45;r ..�,, s.�,. AF�t' �.
't.. ft'. � .•}•N�•, 7:. •s,.2••.r,� ,ram`.�... :;p �tw' .r:�.-• t .1'�. .. :?., ., .. ,Af. ':w:
• Z: .. •r.•.. .,:Z'•`.. -..�'. 1 to .:.¢!':'I t�r". a.'.. rti.i
!` ;f%i7C. '{•!=•i'f♦•.:.,•1.N:..U,4. :a; .y .),;,•s� L'C4 •A. ,.. 1:`.:ti%sjy h:_ .•.•• 'a• ^,: +'
;- !� �.S-- •�tr .,•.a,.twjk ?:•t.,. t •i!• ;a rt: ':,..••" ,'-.:: ;r•.•�_, J ,�
..j:; y :• .ii?••'�a:'.;S` .:. ?`ais:'�i s, Y: 2'•;is�I� r„ Q� Ill`�. '3'� `._- � hn ,A�.,' •ry, ti '�,J•� ,,
y` •` �' r}!�{:i A:r•.-.�r}�:t :';�•;4rbjj: s•,,.. +1•r:
?.r Ur K'�t,t,L 2�•,• - 4{-;- J y•iyr'(� •Ii • f: `.a 4t2• s. 1 r .r,`;•f..:•C!.:?.-s:•-�i�.t.: ._N
►'+r,•!,-r •;r1 {t`'�dl:A ez, ,•. Y- llla .. `q Ott:tTayr.^�. l: :. ,y ' •.,5..... r. -h ,I
.
":•-. IV. a { id r c��': ,.r;s;.�6,::.J-,�;.7' J�.r L`` y+� }' 'i �.._ i;;�•_?.,•,ri •:' U�r: y l....,ry" ••.: :S
1i. *•'1 J.:::f,•�!L,M,>,r,t •{ 6.�''r' �..�. �• V .7. .V: ty .'t\''t'J!}r�,�i, ai.�, :;"-A. ••r..`.L !t:'.;a . :0.�4�`Q}:r•., -t•. i 1 K• H-;"-;.,: - ...-�' 4�, %I-W} R:t.. �`+�,t•�{ a,�If:7,n•U`�prh ".'i',•'' '!,.•"'•ll :r;:N1v'�":� .• { IRf}Li,. t �1r ,, i. .ti,,.'• r•F' i r*::.la• '1i:,•t�'�,'r•%.' ..'�11T�,�:.�M�.►y 41'r.,�.t;., .T� •'Crtk�i:�;yy..?.••"'N.�':' '� yi1 j` TY.'•'�:'�'%• !''�'.• !�.•,i.vi.w�T -; .-"'..- "t i•i'!'•a.•t.•+it-,- �,•.L11 • •-tc '�.'�' -'�,�i� :•rt�J' ^JYz.'J'•�:•: •II # ! �fh:r: t:�• rt�tr:.,•!7A..". '�'' •f�.ti`'-`Y'f:;f:: 4y,• S '.t•*;�ts`4 1. I�: �I�tK�'7 �•'7Lij lt1777 .r,« , ' _ ,J,- :Wit' L..,s yr,,S•,:f•, a.►, •'a�f'•f�?•►- `,•l'a. .t'.s•:6'�, :tiY 1•:s,�t.'.,<. } ! �'' •-??"''n✓ ,.�'►aa'Q.t•r. s, -°:�^r Y �4t,'i�°�.•i
.•L,'R- at, S:•• ,.gip..,: 1S i�w ,.2'�f•..-�rYri' 1r .�.• y�':' f. ,.. ! .s. r I.•.,.1, ?.
•+' !'•-.J' :t t• {:•..IS. ,,,, I.r •,�s.-, ( t/•..•i✓+:.: - 1'%S• r'a•;.: :.5; -«.it tJ�jfck,rms
�j= Ii:.K r,:_J.r s�iJ•_,::'r,:t:....i sa•:F,' t:,f,.,,, 1 s..Q��y.Yl:�J�.,M a: :f.�,►�•"•,�1,`• .tti.1' i,V„t:!•'ew•Rsl". r'r�<.•G{+ •r if t?!'f �„�•'."`+;`;.\ 'z},,'••`•�V.;,:r '•vi KiR 1 .p { ,Tt j! `F may, st .a:. t' NMI.. II '•�.w s., .•y (�'�,� „ y.,. Y•, t�'1 •a,'••:'(R'�•�•v�V1 S •� r. z� {• .. !I A. w Ni /'a•I�-�r• L'`,:� 'tl`��'7 3n"• J. ��rq�'.Rt„•�, "�Pr�r,Ca • 3A 1 ,�'.'T"�.. .ti;j t, rw:.�v}�'a CQ. 'Cr..:` 'i,. .�I.s�.:`.'l rstia'.••
Cxf;JLllwp -:';.?r:•±.%+� ;; �r.�w^:,rr ?�;rtt,.�'t :eP'r L•,`g t F, ,-_r l�.�' 'r_i' 1�•r� i .1
.. =t�^': ' aT= ,!• N `b►vim'-, ,� . C. : ,`' t� I. "v'1;" ..::-:y..`.,;. s .: ,:i-:,'L.Y. _ryy'�;e. .,
`. r• Sr. :` ': S'4'.r '. r°:C:, ,. r-y„t.•.Y,' :r•r•.•f.. _ 1'Y,:• .'',7:;;:- aK,� ,►'
.A~ z,t r�•,,�,,:• J7:- •r•, p.. ,t., .,T,.'•' ,),.S.r'."4 ',r.;•_C'~}'� ,{:'1: S
I.
.r� ' •j t. •:I '�•r. t. , i,�j 4'`�:•.::'. , a-wl ,:� 1. i
!1l `S •:'-:��,•S.. _i, F%T;.' .•y.•,�•wri !+1: -:'t";s.:� ;'Y;--- _ •`•-.;f..° :'L:.�V,'•�•'j.N.L-?i //•• ,rtJ'..=; L'.i� .rr .--i ",.•'�•'•:r4,•"1�.; :jr a,er ;.
„!►,,,••' , .i?y •..yi;�'�. �s .t• I fy�1 wz •i tail:.•' + }'' . r• .i•.et 3,
{: "�' "Y.'T�z:1:'::::�::•.��::,: ..:i�:::!;'%':•il �' _ c: 'z1�. _-�:" ,..'. ♦..) ^Y•i:Sr.,t..• s,.7'.ti:...l.�'rra:;i� ..-.c' 1.
,. 11. .. �, -!• ice.,-,'.. .. r°r. ,`n
3566
Chape
.,• � poi .G. ° \ � - �._ ::i:•:. .
............ ...........
1961 22. .. ...
24
to !i`.' �• \ ��_ i 23.0•
1141
Kilpatrick • �.. �$ p /
3164
17.
Ar
50
1 O Ni�mon—uto�oac��salwt�.acatoa.vl�a...�—+oo+ e'1--34052'3(Y
234 ,360000E 75 '3(YJ33 55' ,
ROAD CLASSIFICATION � y
p Primary highway, Light-duty road,hard or '.°�vg
hard surface...__.._ improved surface--�
Secondary highway,
hard surface_.... Unimproved road—_------Qaa
10 ow
Interstate Route ! U. S.Route _)State Route
N.C. °''.j
• KENANSVILLE, N. C.
QUADRANGLE LOCATION tIW/4 KENANSVILLC IV QUADRANGLE
".1 �.� �� I : +:•. :`13A52.5-W7752.5/7.5 I
a _�`
i,%
'J
f..
. .
. •t:: ....::-...
-..
�: . :----r:: :F:: : ::
t
ZONE X
e'' ts..
o'
4':
ti'_
:. t .1••.;.•
1'' 1
`:4•:•::`:::;:•::
ft
t: -•t.
.,
P'. w
'\•: `.':A'
0.'
r: M
+(.
i' _
i.'
�:
1•
i'.
r1
:,:
i•.
-t •i' .
.i.:
'i
1•
:ZO NE A
;',:
}::
'{'
r 1
t'
Z' .
t••'l'
:�
1 try` ••'.. _ ..
•�
.i
1
• •t•-
.,�,:
'..1:: ..
�f•':
f �w
-1.i 1
:.�•.
./ .
:A''.
+S••r r� ,
:(
f
i.
::,",
• ..• • ifi•:::::i::•:•:•
!�`• -
J
t' i.
m**'***
L•. y:•;
:'I::• ,ZON
E A' 1' ,i : •
).
'.,'
f1. {
t
.,
ti..
t
�H*, , .. : 1.
IK. I•i.
i,
%•.
'{
i'•'
rw.
I
/ •i
1.
�I.
:f i'
f.
Y• i.,•`•
l
t j.
:jr:
"i i r'•
'•jr+r.
F t
ON
:i
�Z E X ,•,:r:.
. r•I
:::%•:::::.•.:''
.
f.
•j:' .
,:Ir
�'w.
.,y.
r.
it:
i sl•.
r.y�.
• .
:V , i
'J
:.1 . ,S
.,*:.`
f
;.a'. .,,
'i
S
t:'
IS
/
n�
.,
t.
.ems
•1 '1i.
,•. t
tt .J i•.
:,•:::•i:'}::'�i'i:•:
:i1:'.
.•
I-
:'I•::•:• :`
b N E'
::.•..
^•.
i
0
/,
2 C
�•.
e•
/ ,
t' i•
-+i ./ �',-
/'` , .!r.
:p
i, :t
v
/ / ::
'�f:
••J' �t
a''
F
/ f. ,:
't
r•
/• e T`
: ..
t• t'
•:i' .1.14.. •'i
St�:i' r ii
•r'k'•'
•� J
:• J,�
t
�• ]�'_ 1� tit::::::�:::::.
A ,.
�ti
fi.ti si♦: _
:,', •!;ice_' •:`:•:•:•:•..
:c•• �l• if a•
r• - \•..•.P-
•Y
rr, J•.
t 1.rt 'Y� 'J
�r• 't.
Y.
'i
i - '1
/' -•/,'
.
'f•
: :
. TT / . I.4••Y.,4 ,t•�..,••N•;;•• .� ;r.. +� O'
.. : .t:: f...:.. YI
c F ,- i. ., ::ti::• :::: ::•.:
•4
h-
I:
i. :b ,•.! j r.
�' .. tf'':= r a ,�t xt .tk-Rif�%%:6 q 4L•♦•r•.L•.•....•r.
/ ,;..fi r`_ f r_. I. :z! wT� flft 't.%}"•:::. ::: J f
.;;i. 1 // 's, - .r �... '7'•'::•'•}'::}:•'iv:•J'a'C/•r.•:::•:?)•i:}:}+•r.•:'i
f 1:
t,.'•-. :L.
/ w
/♦w �.
l•:'.r•::•:•:.
I• w lIle
,.a
/ 1t -
:lt'
1 / A
•'i :Kr,
�'/ S
f f
�'' _.
/.
,. .r:
/. '/: i=
.r' y=•t
::t. /"it.
"r 'J' it .i i
y
:•i' �.
'i'r
s
i �i' •1
•b:^
:�
it+
J
.y
/•• f f I'JJ i. i.
•I,y �r� •t
�t
, is••. L•%"
/ :{.i •sr�
J( v
r
'f>/• I :jam,I
i �h
y:
1}: •i•r• ••t•i:r !fir'
i a. 'r
�( i!
i
Yh I r.t.'
r• '7 i.'� ,iL'/ i' t'r::
rc d•
•.S
.Z:1
.•t-' 4 'i1. •7
t. s 1 1.t.
'+mot•:. t.. _a+
'ii �t t 9
. i;:
r.' -�it/'
'f• It•' r
0
'•J t
'••r t
`r
• t P rA'- s{�' .i. lIt•. .v
S.
+S• f IY.i�-i.4 •o
•t:':r`
�s• .Y. fit.
:/ {
L•
•r
i.. �_::
i �:�' •r
r• •i''� N 4 ,r
a^
t ;
t .r-
f' { _ ,
"''rtfi'" ,t••iSt Y
x /...
r:'
•i
it .<.
%1!i'
r' .
♦? }' :'
CI• 4. ;�
•t
1. t'i,.
t_.r Y:.
tr. ,
r.:
•. -:
=LR %. .-.•.
/' i
is `s �::
•t1,fsi�••
_ b .s
«;;
3,:n - u
tr•i�i•• it I�.•. i.
:f t
a
I:
•t'
. "i'rt
.w
•f••
r�:
"F 1: :r '
_ 4
.. is
'F
. •P v
i :{
• .•x:�•.
s ..
.� r..
2':
:�� :::::}:ti:�:•
_ f:
i b!
\:-
r..
.r
A'y I.
Y�
4.
r t�.
:v .
`+ .
i
Y
i
.;
••Y• ) ",'. , ,- - ..
r ::• ::•::
. f
t
William Edward Brock Farm AWS310386
System Calibration
Information presented in manufacturer's charts are based on average operation
conditions with relatively new equipment. Discharge rates and application rates change
over time as equipment gets older and components wear. In particular, pump wear
tends to reduce operating pressure and flow. With continued use, nozzle wear results in
an increase in the nozzle opening which will increase the discharge rate while
decreasing the wetted diameter.
You should be aware that operating the system differently than assumed in the design
will alter the application rate, diameter of coverage, and subsequently the application
uniformity. For example, operating the system with excessive pressure results in smaller
droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle.
Clogging of nozzles can result in pressure increase. Plugged intakes or crystallization of
mainlines will reduce operating pressure. Operating below design pressure greatly
reduces the coverage diameter and application uniformity.
For the above reason, you should calibrate your equipment on a regular basis to ensure
proper application rates and uniformity. Calibration at least once every three years is
recommended. Calibration involves collecting and measuring flow at several locations in
the application area. Any number of containers can be used to collect flow and
determine the application rate. Rain gauges work best because they already have a
graduated scale from which to read the application amount without having to perform
additional calculations. However, pans, plastic buckets, jars, or anything with a uniform
opening and cross-section can be used provided the liquid collected can be easily
transferred to a scaled container for measuring.
For stationary sprinklers, collection containers should be located randomly throughout
the application area at several distances from sprinklers. For traveling guns, sprinklers
should be located along a transect perpendicular to the direction of pull. Set out
collection containers 25 feet apart along the transect on both sides of the gun cart. You
should compute the average application rate for all nonuniformity of the application. On
a windless day, variation between containers of more than 30 percent is cause for
concern. You should contact your irrigation dealer or technical specialist for assistance.
*Reprinted for Certification Training for Operations of Animal Waste Management Systems Manual
1
William Edward Brock Farm AWS310386
OPERATION & MAINTENANCE PLAN
Proper lagoon management should be a year-round priority. It is especially important to manage
levels so that you do not have problems during extended rainy and wet periods.
Maximum storage capacity should be available in the lagoon for periods when the receiving crop is
dormant (such as wintertime for bermudagrass) or when there are extended rainy spells such as a
thunderstorm season in the summertime. This means that at the first sign of plant growth in the
later winter / early spring, irrigation according to a farm waste management plan should be done
whenever the land in dry enough to receive lagoon liquid. This will make storage space available
in the lagoon for future wet periods. In the late summer/ early fall the lagoon should be pumped
down to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made
to maintain the lagoon close to the minimum liquid level as long as the weather and waste
utilization plan will allow it.
Waiting until the lagoon has reached its maximum storage capacity before starting to irrigated does
not leave room for storing excess water during extended wet periods. Overflow from the lagoon for
any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty
action.
The routine maintenance of a lagoon involves the following:
• Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass
are the most common vegetative covers. The vegetation should be fertilized each
year, if needed, to maintain a vigorous stand. The amount of fertilized applied
should be based on a soils test, but in the event that it is not practical to obtain a
soils test each year, the lagoon embankment and surrounding areas should be
fertilized with 800 pounds per acre of 10-10-10, or equivalent.
• Brush and trees on the embankment must be controlled. This may be done by
mowing, spraying, grazing, chopping, or a combination of these practices. This
should be done at least once a year and possibly twice in years that weather
conditions are favorable for heavy vegetative growth.
NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the
lagoon water. Such chemicals could harm the bacteria in the lagoon that are treating the waste.
Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon
and at least monthly and after major rainfall and storm events. Items to be checked should
include, as a minimum, the following:
Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes -- look for:
1. separation of joints
2. cracks or breaks
3. accumulation of salts or minerals
4. overall condition of pipes
2
William Edward Brock Farm AWS310386
Lagoon surface -- look for:
1. undesirable vegetative growth
2. floating or lodged debris
Embankment -- look for:
1. settlement, cracking, or"jug" holes
2, side slope stability--slumps or bulges
3. wet or damp areas on the back slope
4. erosion due to lack or vegetation or as a result of wave action
5. rodent damage
Larger lagoons may be subject to liner damage due to wave action caused by strong
winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon
dam. A good stand of vegetation will reduce the potential damage caused by wave
action. If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon
may be used to reduce the wave impacts.
Any of these features could lead to erosion and weakening of the dam. If your lagoon
has any of these features, you should call an appropriate expert familiar with design and
construction of waste lagoons. You may need to provide a temporary fix if there is a
threat of a waste discharge. However, a permanent solution should be reviewed by the
technical expert. Any digging into a lagoon dam with heavy equipment is a serious
undertaking with potentially serious consequences and should not be conducted unless
recommended by an appropriate technical expert.
Transfer Pumps --check for proper operation of:
1. recycling pumps
2. irrigation pumps
Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding
noise, or a large amount of vibration, may indicate that the pump is in need of repair or
replacement.
NOTE: Pumping systems should be inspected and operated frequently enough so that
you are not completely "surprised" by equipment failure. You should perform your
pumping system maintenance at a time when your lagoon is at its low level. This will
allow some safety time should major repairs be required. Having a nearly full lagoon is
not the time to think about switching, repairing, or borrowing pumps. Probably, if your
lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an
inventory of spare parts or pumps.
• Surface water diversion features are designed to carry all surface drainage
waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot
runoff) away from your lagoon and other waste treatment or storage
structures. The only water that should be coming from your lagoon is that
which comes from your flushing (washing) system pipes and the rainfall that
hits the lagoon directly. You should inspect your diversion system for the
following:
1. adequate vegetation
2. diversion capacity
3. ridge berm height
3
William Edward Brock Farm AWS310386
Identified problems should be corrected promptly. It is advisable to inspect your system
during or immediately following a heavy rain. If technical assistance is needed to
determine proper solutions, consult with appropriate experts.
You should record the level of the lagoon just prior to when rain is predicted, and then
record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will
give you an idea of how much your lagoon level will rise with a certain rainfall amount
(you must also be recording your rainfall for this to work). Knowing this should help in
planning irrigation applications and storage. If your lagoon rises excessively, you may
have an overflow problem from a surface water diversion or there may be seepage into
the lagoon from the surrounding land.
Lagoon Operation
Startup:
1. Immediately after construction establish a complete sod cover on bare soil
surfaces to avoid erosion.
2. Fill new lagoon design treatment volume at least half full of water before waste
loading begins, taking care not to erode lining or bank slopes.
3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the
pipe to discharge near the bottom of the lagoon during initial filling or another
means of slowing the incoming water to avoid erosion of the lining.
4. When possible, begin loading new lagoons in the spring to maximize bacterial
establishment (due to warmer weather).
5. It is recommended that a new lagoon be seeded with sludge from a healthy
working swine lagoon in the amount of 0.25 percent of the full lagoon liquid
volume. This seeding should occur at least two weeks prior to the addition of
wastewater.
6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add
agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume
until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0.
7. A dark color, lack of bubbling, and excessive odor signals inadequate biological
activity. Consultation with a technical specialist is recommended if these
conditions occur for prolonged periods, especially during the warm season.
Loading:
The more frequently and regularly that wastewater is added to a lagoon, the better the
lagoon will function. Flush systems that wash waste into the lagoon several times daily
are optimum for treatment. Pit recharge systems, in which one or more buildings are
drained and recharged each day, also work well.
4
William Edward Brock Farm AWS310386
• Practice water conservation --- minimize building water usage and spillage from
leaking waterers, broken pipes and washdown through proper maintenance and
water conservation.
• Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce
the amount of solids entering the lagoon.
Management:
• Maintain lagoon liquid level between the permanent storage level and the full
temporary storage level.
• Place visible markers or stakes on the lagoon bank to show the minimum liquid level
and the maximum liquid level. (Figure 2-1).
• Start irrigating at the earliest possible date in the spring based on nutrient
requirements and soil moisture so that temporary storage will be maximized for the
summer thunderstorm season. Similarly, irrigate in the late summer / early fall to
provide maximum lagoon storage for the winter.
• The lagoon liquid level should never be closer than 1 foot to the lowest point of the
dam or embankment.
• Don not pump the lagoon liquid level lower than the permanent storage level unless
you are removing sludge.
• Locate float pump intakes approximately 18 inches underneath the liquid surface and
as far away from the drainpipe inlets as possible.
• Prevent additions of bedding materials, long-stemmed forage or vegetation, molded
feed, plastic syringes, or other foreign materials into the lagoon.
• Frequently remove solids from catch basins at end of confinement houses or
wherever they are installed.
• Maintain strict vegetation, rodent, and varmint control near lagoon edges.
• Do not allow trees or large bushes to grow on lagoon dam or embankment.
• Remove sludge from the lagoon either when the sludge storage capacity is full or
before it fills 50 percent of the permanent storage volume.
• If animal production is to be terminated, the owner is responsible for obtaining and
implementing a closure plan to eliminate the possibility of a pollutant discharge.
Sludge Removal:
Rate of lagoon sludge buildup can be reduced by:
5
William Edward Brock Farm AWS310386
• proper lagoon sizing,
• mechanical solids separation of flushed waste,
• gravity settling of flushed waste solids in an appropriately designed basin, or
• minimizing feed wastage and spillage.
Lagoon sludge that is removed annually rather than stored long term will:
• have more nutrients,
• have more odor, and
• require more land to properly use the nutrients.
Removal techniques:
• Hire a custom applicator.
• Mix the sludge and lagoon liquid with a chopper- agitator impeller pump through large
- bore sprinkler irrigation system onto nearby cropland; and soil incorporate.
• Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix
remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or
forageland; and soil incorporate.
• Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland;
dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon
to receive the sludge so that liquids can drain back into lagoon; allow sludge to
dewater; haul and spread with manure spreader onto cropland or forageland; and soil
incorporate.
Regardless of the method, you must have the sludge material analyzed for waste
constituents just as you would your lagoon water. The sludge will contain different
nutrient and metal values from the liquid. The application of the sludge to fields will be
limited by these nutrients as well as any previous waste applications to that field and
crop requirement. Waste application rates will be discussed in detail in Chapter 3.
When removing sludge, you must also pay attention to the liner to prevent damage.
Close attention by the pumper or drag-line operator will ensure that the lagoon liner
remains intact. If you see soil material or the synthetic liner material being disturbed, you
should stop the activity immediately and not resume until you are sure that the sludge
can be removed without liner injury. If the liner is damaged it must be repaired as soon
as possible.
Sludge removed from the lagoon has a much higher phosphorus and heavy metal
content than liquid. Because of this it should probably be applied to land with low
phosphorus and metal levels, as indicated by a soil test, and incorporated to reduce the
chance of erosion. Note that if the sludge is applied to fields with very high soil-test
phosphors, it should be applied only at rates equal to the crop removal of phosphorus.
As with other wastes, always have your lagoon sludge analyzed for its nutrient value.
6
William Edward Brock Farm AWS310386
The application of sludge will increase the amount of odor at the waste application site.
Extra precaution should be used to observe the wind direction and other conditions
which could increase the concern of neighbors.
Possible Causes of Lagoon Failure
Lagoon failures result in the unplanned discharge of wastewater from the structure.
Types of failures include leakage through the bottom or sides, overtopping, and breach
of the dam. Assuming proper design and construction, the owner has the responsibility
for ensuring structure safety. Items which may lead to lagoon failures include:
• Modification of the lagoon structure -- an example is the placement of a pipe in the
dam without proper design and construction. (Consult an expert in lagoon design
before placing any pipes in dams.)
• Lagoon liquid levels -- high levels are a safety risk.
• Failure to inspect and maintain the dam.
• Excess surface water flowing into the lagoon.
• Liner integrity -- protect from inlet pipe scouring, damage during sludge removal, or
rupture from lowering lagoon liquid level below groundwater table.
NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause
gullies to form in the dam. Once this damage starts, it can quickly cause a large
discharge of wastewater and possible dam failure.
7
William Edward Brock Farm AWS310386
EMERGENCY ACTION PLAN
PHONE NUMBERS
DIVISION OF WATER QUALITY (DWQ) 910-796-7215
EMERGENCY MANAGEMENT SERVICES (EMS) 910-296-2160
SOIL AND WATER CONSERVATION DISTRICT (SWCD) 910-296-2120
NATURAL RESOURCES CONSERVATION SERVICE (NRCS) 910-296-2121
COOPERATIVE EXTENSION SERVICE (CES) 910-296-2143
This plan will be implemented in the event that wastes from your operation are leaking,
overflowing or running off site. You should not wait until wastes reach surface waters or
leave your property to consider that you have a problem. You should make every effort
to ensure that this does not happen. This plan should be posted in an accessible
location for all employees at the facility. The following are some action items you should
take.
1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested
responses to some possible problems are listed below.
` A. Lagoon overflow-possible solutions are:
a) Add soil to berm to increase elevation of dam.
b) Pump wastes to fields at an acceptable rate.
c) Stop all flow to the lagoon immediately.
d) Call a pumping contractor.
e) Make sure no surface water is entering lagoon.
B. Runoff from waste application field-actions include:
a) Immediately stop waste application.
b) Create a temporary diversion to contain waste.
c) Incorporate waste to reduce runoff.
d) Evaluate and eliminate the reason(s)that cause the runoff.
e) Evaluate the application rates for the fields where runoff occurred.
C. Leakage from the waste pipes and sprinklers-action include:
a) Stop recycle pump.
b) Stop irrigation pump.
c) Close valves to eliminate further discharge.
d) Repair all leaks prior to restarting pumps.
D. Leakage from flush systems, houses, solid separators-action include:
a) Stop recycle pump.
b) Stop irrigation pump.
c) Make sure siphon occurs.
d) Stop all flow in the house,flush systems, or solid separators.
E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks-
possible action:
a) Dig a small sump or ditch from the embankment to catch all seepage, put in a submersible
pump, and pump back to lagoon.
b) If holes are caused by burrowing animals, trap or remove animals and fill holes and
compact with a clay type soil.
8
William Edward Brock Farm AWS310386
c) Have a professional evaluate the condition of the side walls and the lagoon bottom as soon
as possible.
2. Assess the extent of the spill and note any obvious damages.
a. Did the waste reach surface waters?
b. Approximately how much was released and for what duration?
c. Any damage notes, such as employee injury, fish kills, or property damage?
d. Did the spill leave the property?
e. Does the spill have the potential to reach surface waters?
f. Could a future rain event cause the spill to reach surface waters?
g. Are potable water wells in danger(either on or off the property)?
h. How much reached surface waters?
3. Contact appropriate agencies.
a. During normal business hours call your DWQ regional office; Phone #, After hours,
emergency number: (919) 733-3942. Your phone call should include: your name, facility
number, telephone number, the details of the incident from item 2 above, the exact
location of the facility, the location or direction of the movement of the spill, weather and
wind conditions. The corrective measures that have been under taken, and the
seriousness of the situation.
b. If the spill leaves property or enters surface waters, call local EMS phone number.
c. Instruct EMS to contact local Health Department.
d. Contact CE's phone number, local SWCD office phone number and the local NRCS
office for advice/technical assistance phone number.
4. If none of the above works call 911 or the Sheriff's Department and explain your problem to
them and ask the person to contact the proper agencies for you.
5. Contact the contractor of your choice to begin repair or problem to minimize offsite damage.
a. Contractors Name: Agriment services,Inc.
b. Contractors Address: Po Box 1096, Beulaville,NC 28518
c . Contractors Phone: (252)568.2648
6. Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.)
a. Name: Geno Kennedy
b. Phone: (910)289-0395
7. Implement procedures as advised by DWQ and technical assistance agencies to rectify
the damage, repair the system, and reassess the waste management plan to keep
problems with release of wastes from happening again.
9
William Edward Brock Farm AWS310386
INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS
Source Cause BMP's to Minimize Odor Site Specific Practices
(Liquid Systems)
Flush Gutters Accumulation of solids ( )Flush system is designed and operated
sufficiently to remove accumulated
solids from gutters as designed.
( ) Remove bridging of accumulated solids at
discharge
_Lagoons and Pits Crusted Solids ( )Maintain lagoons,settling basins and
pits where pest breeding is apparent to
minimize the crusting of solids to a depth
of no more than 6-8 inches over more than
30%of surface.
Excessive Decaying vegetation(✓)Maintain vegetative control along banks of
Vegetative Growth lagoons and other impoundment's to prevent
accumulation of decaying vegetative matter
along water's edge on impoundment's perimeter.
(Dry Systems)
Feeders Feed Spillage () Design,operate and maintain feed systems(e.g..
bunkers and troughs)to minimize the accumulation
of decaying wastage.
O Clean up spillage on a routine basis(e.g.7-10 day
interval during summer;15-30 day interval during winter).
Feed Storage Accumulation of feed () Reduce moisture accumulation within and around
residues immediate perimeter of feed storage areas by
insuring drainage away from site and/or providing
adequate containment(e.g.,covered bin for
brewer's grain and similar high moisture grain
products).
() Inspect for and remove or break up accumulated
solids in filter strips around feed storage as needed.
Animal Holding Accumulation of animal () Eliminate low area that trap moisture along fences
Areas wastes and feed wastage and other locations where waste accumulates and
disturbance by animals is minimal.
() Maintain fence rows and filter strips around animal
holding areas to minimize accumulations of wastes
(i.e.inspect for and remove or break up accumulated
solids as needed).
MIC—November 11, 1996
10
William Edward Brock Farm AWS310386
Dry Manure Handling Accumulations of animal ()Remove spillage on a routine basis(e.g.7-10 day
Systems wastes interval during summer;15-30 days interval during
winter)where manure is loaded for land application
or disposal.
()Provide for adequate drainage around manure stockpiles
()Inspect for and remove or break up accumulated wastes
in filter strips around stockpiles and manure handling
areas as needed.
The issues checked V pertain to this operation. The landowner/ integrator agrees to
use sound judgment in applying insect control measures as practical.
I certify the aforementioned insect control Best Management Practices have been
reviewed with me.
(L downer Signature)
For more information contact the Cooperative Extension Service, Department of Entomology, Box
7613, North Carolina State University, Raleigh, NC 27695-7613.
AMIC-- November 11, 1996
11
. (/lam
wine Farm Waste Management — Odor Control Checklist Permit No.: 3/-38.6
Date: RA
ISTRUCTIONS FOR USE Owner Signature:
Odor Control Checklist is required by General Statute 143-215.10C(e)(1)
Check any/all the BMPs you will implement on this facility. Items checked/selected become a requirement of the CAWMP
Items in bold or pre-selected are required.
Add any site-specific details related to the selected BMPs
Include any other odor control measures not listed
NOTE: Not all BMPs may be cost-effective for every facility. Evaluate each BMP prior to selecting for your facility.
Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices
IRMSTEAD
Swine Production elm",
vegetative or wooded buffers at or •Traps dust and gases, provides dilution
near property boundary and visual screening
• May require third party input/approval
Improper drainage Grade and landscape so water drains away • Reduce odors and vectors that occur
rom facilities and prevent ponding with stagnant conditions
Maintain farm access roads and prevent traffic • Prevents spillage during transport and
in waste application area tracking of waste onto public roads
❑ Other BMPs—please describe
ORTALITY MANAGEMENT
Carcass Dispose of mortality using method approved • Required by statute and permit
Decomposition by NCDA&CS State Veterinarian. Manage • May require third party input/approval
According to CAWMP(Mortality Management
Checklist) and permit(s).
❑ Put carcasses in refrigerated (or freezer)dead
boxes within 24 hours for short-term mortality
storage.
Incomplete Incineration ❑ Use incinerators with secondary burners for • Reduce odors by complete incineration
complete combustion.
❑ Other BMPs—please describe
vine AMOC Page 1 of 6 PPROVED—7/25/2,
vine Farm Waste Management —Odor Control Checklist Permit No.:
:ause/Source BMP Option to Minimize Odor Comments Site Specific Practices
IUSE/ BARN —WASTE HANDLING
=lush tanks ❑ Install flush tank covers . Pit-flush systems
odorous Gases ❑ F sh pits at least 4 times per day . Pit-flush systems
partial microbial El
pits at least once every 7 days • Pit-recharge or"pull-plug" systems
iecomposition ❑ U derfloor flush with pit ventilation
4gitation of wastes Install/extend fill lines to near bottom of
tanks with anti-siphon vents
❑ Install covers on outside waste collection or
junction box
❑ Install sump tank covers for lift stations
kmmonia ❑ Flush/recharge with treated effluent
❑ Treat waste in pits with proven biological or • Monitor for any solids accumulation in pit
chemical additive
❑ Other BMPs—please describe
$USE/BARN —FLOOR AND INDOOR SURFACES
Manure covered floors ❑ crape manure from alleys into pens daily • Will move with other manure via pits
VI stall fully slotted floor system
stall waterers over slotted floor area
❑ Install feeders at high end of solid floors •Where applicable
)dorous Gases ❑ Scrape manure buildup from floors and walls •Aids in animal cleanliness
FZ"Keep floors dry •Aids in animal cleanliness
❑ Install underfloor ventilation for drying
❑ Replace bedding/scrape at frequency to . Solid floor/bedding systems
keep bedding dry
❑ Other BMPs—please describe
ne AMOC Page 2 of 6 APPROVED—7/25/201
-4a 6&0.016( ,Qk �Ai t
Nine Farm Waste Management —Odor Control Checklist Permit No.:
Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices
RUSE / BARN-VENTILATION
Dust pEfficient
can fans regularly—specify frequency
Volatile/odorous gases air movement
❑ Install temperature and humidity sensors to
control ventilation
❑ Treat barn exhaust • Examples: biofilters, wet scrubbing, windbreaks
* May reduce ventilation rate depending on method
❑ Other BMPs—please describe
RUSE/ BARN-FEED
Dust ❑ Install feed covers
Adsorbed Gases Ceep outdoor feed storage covered except • Required by rule 15A NCAC 02D.1802
When necessary to add/remove feed
❑ linimize free-fall height of dry feed
Install feed delivery downspout extenders
to the feed covers
❑ Remove spoiled/unusable feed on regular basis
❑ Feed pellets instead of dry meal • May require third party input/approval
❑ Use feed additives • May require third party input/approval
Ammonia ❑ Use feed-reduced crude protein diet • May require third party input/approval
❑ Other BMPs—please describe
FUSE / BARN—GENERAL
Dust ❑ Install temperature and humidity sensors • Maintain relative humidity at 40 to 65%
Odorous Gases to control ventilation
❑ Use ultraviolet light to treat indoor air
❑ Use indoor or outdoor electrostatic space • Can be used to treat exhaust air
charge system
❑ Other BMPs-please describe
nine AMOC Paee 3 of 6 pPROVED-7/25/2
A)W� &1'6L �Aekk -
pine Farm Waste Management — Odor Control Checklist Permit No.:
:ause/Source BMP Option to Minimize Odor Comments Site Specific Practices
iOON/WASTE STORAGE STRUCTURE
/olatile Gases Maintain proper lagoon volume •Sufficient liquid volume/depth is required
for proper anaerobic treatment
❑ Minimize free-fall height of waste from
discharge pipe to lagoon surface
❑ Extend discharge point of pipe to below lagoon • Use caution not to scour or damage lagoon liner
squid level
Maintain proper surface area-to-volume ratio
FB<se correct lagoon start-up procedures
❑ A rate for odor control
nage sludge levels based on annual sludge
survey as required by permit
❑ Keep spilled feed or foreign debris out of lagoon
to prevent excess sludge accumulation
❑ Install/use solids separation system
❑ Use proven biological or chemical additives • Monitor for any increase in rate of solids accumulation
❑ Use permeable lagoon covers (not a digester)
❑ Use impermeable lagoon cover or • Methane can be flared if not utilized
anaerobic digester
❑ Other BMPs—please describe
ID APPLICATION
►dorous gases 0_`5erform land application in accordance with
SAWMP
Vind drift ®!Pump intake near lagoon surface •Required by rule 15A NCAC 02D.1802
❑ Pump from second stage lagoon
❑ Follow good neighbor policy •Avoid application on known weekends,
special days,or holidays/eves if possible
�perate at minimum recommended pressure
❑ Increase setbacks beyond those required by
statute, rule,or permit
ne AMOC Page 4 of 6 APPROVED—7/25/20'
wine Farm Waste Management— Odor Control Checklist Permit No.:
Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices
IND APPLICATION(CONTINUED)
2--Apply during favorable wind conditions, a Recommend checking predicted average hourly
(especially for traveling guns or impact wind speed within 24 hours prior to
sprinklers) anticipated start
❑ When practical, apply waste on sunny days a Allows for vertical dissipation of odor
rather than cool,overcast days
❑ When possible, apply waste mid-morning to • Allows for better vertical dissipation of odor
late-afternoon
❑ For traveling guns, use taper-ring or taper-bore • Less odor and drift than ring nozzles
nozzles
❑ For traveling guns, use largest-available nozzle
that provides acceptable application uniformity
❑ Replace impact sprinklers with low-drift nozzles
on center pivots and linear move systems.
❑ Use hose-drag system
❑ Use injection method for waste application
❑ Other BMPs—please describe
.UDGE DISPOSAL
Odorous gases ❑ Transport sludge In covered vehicles or tankers
❑ Apply in thin, uniform layers •Speeds drying and prevents ponding
❑ Incorporate land-applied sludge as soon as • Required within 48 hours or prior to next rain event,
practical after application, and in accordance whichever is first,for conventionally tilled
with permit. bare soils
❑ Use injection method for sludge application
❑ Dewater sludge prior to application
❑ Use alternatives to land application, such as
compost,gasification, energy generation, etc.
❑ Other BMPs— please describe
vine AMOC PaEe 5 of 6 APPROVED—7/25/2
,I)MONAL INFORMATION AVAILABLE FROM:
Management Practices Assessment Tool (AMPAT) www.extension.iastate.edu/ampat/
G-538-A Certification Training for Animal Waste Management Systems:Type A NC Division of Water Resources
4E 103-83—Lagoon Design and Management for Livestock Manure Treatment and Storage www.bae.ncsu.edu
4E 128-88—Swine Production Facility Manure Management: Pit Recharge-Lagoon Treatment www.bae.ncsu.edu
kE 129-88—Swine Production Facility Manure Management: Underfloor Flush-Lagoon Treatment www.bae.ncsu.edu
kE Fact Sheet—Calibration of Manure and Wastewater Application Equipment www.bae.ncsu.edu
4E Fact Sheet—Swine Production Farm Potential Odor Sources and Remedies www.bae.ncsu.edu
NRCS Standard 359—Waste Treatment Lagoon www.nres.udsa.gov
MRCS Standard 380—Windbreak/Shelterbelt Establishment www.nres.udsa.gov
NRCS Standard 422—Hedgerow Planting www.nres.udsa.gov
NRCS Standard 442—Sprinkler System www.nres.udsa.gov
isance Concerns in Animal Manure Management: Odors and Flies; PRO107 1995 Conference Proceedings Florida Cooperative Extension Service
tions for Managing Odor:A Report from the Swine Odor Task Force NC State University
, D
ne AMOC Page 6 of 6 APPROVED—7/25/201
William Edward Brock Farm AWS310386 Version—November 26,2018
Mortality Management Methods
Indicate which method(s) will be implemented.
When selecting multiple methods indicate a primary versus secondary option.
Methods other than those listed must be approved by the State Veterinarian.
Primary Secondary Routine Mortality
Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal
death. The burial must be at least 300 feet from any flowing stream or public body of water
(G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal
high water table.Attach burial location map and plan.
Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC
13B .0200.
Rendering at a rendering plant licensed under G.S. 106-168.7.
aa Complete incineration according to 02 NCAC 52C .0102.
a A composting system approved and permitted by the NC Department of Agriculture& Con-
sumer Services Veterinary Division (attach copy of permit). If compost is distributed off-farm,
additional requirements must be met and a permit is required from NC DEQ.
In the case of dead poultry only, placing in a disposal pit of a size and design approved by the
NC Department of Agriculture &Consumer Services (G.S. 106-549.70).
Any method which, in the professional opinion of the State Veterinarian, would make possible
the salvage of part of a dead animal's value without endangering human or animal health.
(Written approval by the State Veterinarian must be attached).
Mass Mortality Plan
Mass mortality plans are required for farms covered by an NPDES permit. These plans are
also recommended for all animal operations. This plan outlines farm-specific mortality man-
agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup-
ports a variety of emergency mortality disposal options; contact the Division for guidance.
• A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated
when numbers of dead animals exceed normal mortality rates as specified by the State
Veterinarian.
• Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary
Division regulations and guidance.
• Mass burial sites are subject to additional permit conditions (refer to facility's animal
waste management system permit).
• In the event of imminent threat of a disease emergency, the State Veterinarian may enact
additional temporary procedures or measures for disposal according to G.S. 106-399.4.
&,, 2/21 /2024
Signature of Farm Owner/Manager Date
2/21 /2024
Signature of Technical Specialist Date
DEVICES TO AUTOMATICALLY STOP IRRIGATION EVENTS
STATE GENERAL PERMITS
The State of North Carolina has issued State General Permits for animal facilities to operate in North Carolina. These
Permits meet both State and EPA requirements and provide coverage for the following types of facilities.
e AWGI00000-Swine Facilities
a AW0200000-Cattle Facilities
• AWCT300000-Poultry Facilities with a liquid waste management system
You have recently been issued a Certificate of Coverage(COC)to operate your animal facility under one of these General
Permits,
Condition II.24 of each of these Permits reads as follows:
The Permittee shall:
a.install,operate,and maintain devices on all irrigation pumps/equipment designed to automatically stop irrigation
activities during precipitation;or
b.commit to provide for the presence of the OIC,a designated backup OIC,or a person under the supervision of an
OIC or designated backup OIC at all times during the land application of waste so that in case of a precipitation
event,the irrigation activities will be stopped immediately. This commitment must be submitted in writing to the
Division on a form supplied by,or approved by,the Division.[G.S.§90A-47]
Installation of devices or submission of alternate documentation shall be completed within 12 months of the
issuance of the COC for this General Permit. The Permittee shall maintain such devices according to the
manufacturer's instructions and warranties.This Condition does not apply to manure spreaders or other equipment
pulled by manned vehicles.[15A NCAC 02T.0108(b)]
Please check the box below that indicates your commitment to do one of the following.
Within twelve(12)months of the effective date of a COC issued under this permit,I shall install,operate and maintain
devices on all irrigation pumps/equipment designed to automatically stop irrigation activities during precipitation,
This condition does not apply to manure spreaders or other equipment pulled by manned vehicles.
0 I will commit to provide for the presence of the Operator in Charge(OIC),the designated backup OIC,or a person
under the supervision of an OIC or backup OIC at all times during the land application of waste.
"I certify under penalty of law that this document was prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my
inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,
the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are
significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
am EA.W s�&5elk 31- 38ra
Facility Name Permit Number
D
Owner/Permittee ame and Title(type or print)
Signature of GA6,7ormittee Date
71
Signatutfof Operator In Charge(if diffavat from Permince) Date
Mail to: Animal Feeding Operations
1636 MaU Service Center
Raleigh,NC 27699-1636
DTASIE 1-22-2020