FAST TRACK SEWER ENGINEERING CERTIFICATION
PERMITTEE:
Town of Leland
PERMIT#:
WQ0028587
PROJECT:
Brunswick Forest Phase 3 Section 3C
ISSUE DATE:
April 26, 2021
COUNTY:
Brunswick
This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until
the Division has received this Certification and all required supporting documentation, Consequently, it should be
submitted in a manner that documents the Division's receipt, Send the required documentation to the Wilmington
Regional Supervisor, Water Quality Section at the address at the bottom,
The Permittee is responsible for tracking all partial certifications up until a final certification Is received. Certifications
shall Include Phase Section covered line size & lengths installed and listiniz of lots/connections to be served and PumD
station design, If applicable. A Final Certification shall be a complete set of record drawings and design calculations
regardless of whether partials have been submitted.
PERMITTEE'S C RTIFICATIO
I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable
standards & requirements, the Professional Englneer below has provided applicable design/construction information to
the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein
or portions thereof.
ICI Lu11~:SZ , ixc�rrtt i' t/V' ,Z 0 ~ .z
Printed Name, Title j�i2�GT0►2 Signature�t� Date
�,,��j ENGINEER'SCERTIFICATION
P as � duly registered Professional Engineer in the State of North Carolina, having been
authorized to ( periodically, ❑ weekly, [g] full time) observe the construction of the project name and location as
referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used
In the observation of the following construction:
bedroom residences as part of the Phase 3 Section 3C project and the disgbyrae of 13.320 gallons per dov
such that the construction was observed to be built In compliance of this permit; 15A NCAC 2T; the Division of Water
Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's
Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as
applicable; and other supporting materials.
North Carolina Professional Engineer's Seal w/signature & date
N Final ❑ Partial (include description)
Certification Comments/Qualifiers (attach if necessary);
NC DWR —Water Quality ReglonaI Operatlons Section
%A00-1 t— Q-1-1 nFG'.
127 Cardinal Drive Extension Wilmington, NC 28405
ol.,. 41n.70r.119S cnv•oin arn.,jnm
DocuSlgn Envelope 117; 58C)83C96.33FD-4004-B654-4EA1084105Fo
SEWER ENGINEERING CERTIFICATION CHECKLIST
To be completed by the certifying engineer prior to operation of the permitted sewers, per 15A NCAC 02T.0116,
Certifying Engineer: Adam H. Grad
Certification Review Hate: 11.312___ ,1-
Project Name: Brunswick Forest, Phase 3 Section 3C
wQoo 2 587 Project County. Brunswick
1) Has permittee Information changed since the permit was issued (or last modified): change of mall ing address,
change of ownership, transfer from developer to HOA/POA, etc. ® Yes WNo*26.0
• If yes, please provide either a change of ownership form or new contact Information. Note that transfer of
permits from the developer to the HOA/POA must occur with the first certification.
2) Have the as -built drawings have been signed, sealed, and dated by an N.C. PE? ® Yes 0 No
3) Final Engineering certification? W Yes ❑ No
If Partial Engineering certification, provide detailed narrative including what is being certified in the current
phase, what was previously certified (if applicable), and what is left to be certified,
4) Adequate Information related to sewer fines: ® Yes ❑ No ❑ N/A
• Three feet minimum cover has been provided for all sewers unless ferrous pipe was installed.
• Minimum diameters for gravity sewers are 8-Inches for public lines and 6-Inches for private lines.
• Manholes have been installed: At the end of each line, at all changes in grade, size, or alignment, at all
intersections, and at distances not greater than 425 feet; minimum diameter shall be 4 feet (48•Inches).
5) Adequate Information related to pump stations: 50 Yes ❑ No ❑ N/A
• Ensure power reliability option was selected per 15A NCAC 02T,0305(h),
6) Was project construction completed in accordance with all of the following: [, Yes ❑ No ❑ N/A
• 15A NCAC 02T, Minimum Design Criteria (MDQ for the aermittine of Gravity Sewers (latest version), and MDC
for the Permitting of Pump Stations and Force Mains (latest version)?
If not, a variance approval is required In accordance with 15A NCAC 02T.0105fb1, prior to certification and operation.
• Contact the Central Office to discuss the variance to determine a course of action.
• Applicant must submit two copies of the variance request form, plans, specifications, calculations, and any other
pertinent Information to the Central Office (one hard copy, one digital copy).
• The central office will review the variance request, and if approvable, specific language regarding the variance
will be Incorporated into the permit, either via a special condition or a supplementary letter. A copy of the
reissued permit with variance language or the variance letter must be maintained with the original documents.
7) Does the project contains high priority lines (15A NCAC 02T .0402 2))? ❑ Yes ® No
• ](yes, ensure that the permit already contains the necessary condition related to high priority lines 15A NCAC
02T.0403 (a)(5). if the permit does not include this language, the Fast Track reviewer will reissue the permit with
the appropriate language,
8) Are Permit modifications are required for any changes resulting In non-compliance with this permit (Including pipe
.length difference of 10% or greater, change Inflow, pump station design capacity design change of 5% or greater, and
change in the number/type of connections)? ❑ Yes V No
LZX
• If yes, a permit modification request must be submitted to the appropriate Regional Office, and a modified
permit with revised certification must be issued prior to certification and operation.