Loading...
HomeMy WebLinkAbout310353_Application_20240308State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non -Discharge General Permit On September 30, 2024, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State Non -Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications must be received by the Division of Water Resources by no later than April 3, 2024. Please do not leave any question unanswered Please verify all information and make any necessary corrections below. Application must be signed and dated by the Permittee. 1. Certificate Of Coverage Number: AWS310353 2. Facility Name: Korneg_ay Brothers 3. Permittee's Name (same as on the Waste Management Plan): Donnell E Komeeav 4. Permittee's Mailing Address: 320 Scott Store Rd City: Mount Olive State: NC Zip: 28365-5901 Telephone Number: 919-658-0156 Ext. E-mail: 5. Facility's Physical Address: 244 Will V Barwick Rd City: Albertson State: NC Zip: 28508 6. County where Facility is located: Duplin 7. Farm Manager's Name (if different from Landowner): Donnell E Komegay, Jr 8. Farm Manager's telephone number (include area code): 919-658-0156 Ext. 9. Integrator's Name (if there is not an Integrator, write "None"): Smithfield Farmland Corporation 10. Operator Name (OIC): Donnell E. Kornegay Jr. Phone No.: 919-658-0156 OIC #: 19663 L C l t — 4 <q" 11. Lessee's Name (if there is not a Lessee, write "None"): 12. Indicate animal operation type and number: Current Permit: Operations Type Swine - Feeder to Finish Operation Types: Swine Wean to Finish Wean to Feeder Farrow to Finish Feeder to Finish Farrow to Wean Farrow to Feeder Boar/Stud Gilts Other Cattle Dairy Calf Dairy Heifer Milk Cow Dry Cow Beef Stocker Calf Beef Feeder Beef Broad Cow Other Allowable Count 2,448 Dry Poultry Non Laying Chickens Laying Chickens Pullets Turkeys Turkey Pullet Wet Poultry Non Laying Pullet Layers Other Types Horses - Horses Horses - Other Sheep- Sheep Sheep - Other 13. Waste Treatment Lagoons, Digesters and Waste Storage Ponds (WSP): (Fill/Verify the following information. Make all necessary corrections and provide missing data.) Structure Name Structure Type (Lagoon/Digester/ WSP) Estimated Date Built Liner Type (Clay, Synthetic, Unknown) Capacity (Cubic Feet) Estimated Surface Area (Square Feet) Design Freeboard "Redline" (Inches) 1 Lagoon 1/1/1991 Full, clay 497,083.00 62,125.00 19.50 Submit one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.1OC(d), either by mailing to the address below or sending it via email to the email address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan (WUP), signed by the owner and a certified technical specialist, containing: a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) b. A map of every field used for land application (for example: irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP f. The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required MRCS Standard specifications 2. A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (e.g. composting, digesters, solids separators, sludge drying system, waste transfers, etc.) I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both for a similar offense.) Print the Name of the Permittee/Landowner/Signing Official and Sign below. (If multiple Landowners exist, all landowners should sign. If Lando ner is a corporation, signature should be by a principal executive officer of the corporation): Name (Print): v y1 ��� G 10�t4/z4r-S*1 ITL Title: Signature: &U-- G{ 4 JAA Date: 14 Name (Print): Signature: Name (Print): Signature: Title: Date: Title: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: E-mail: animal.operations@deq.nc.gov NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699-1636 ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Donnell E Kornegay Kornegay Brothers 320 Scott Store Rd Mount Olive, NC 28365-5901 NORTH CAROLINA Environmental Quality February 12, 2024 Subject: Application for Renewal of Coverage for Expiring State General Permit Dear Permittee: Your facility is currently approved for operation under one of the Animal Waste Operation State Non -Discharge General Permits, which expire on September 30, 2024. In order to ensure your continued coverage under the State Non -Discharge General Permits, you must submit an application for permit coverage to the Division of Water Resources (DWR) by April 3, 2024. Enclosed you will find a 'Request for Certificate of Coverage for Facility Currently Covered by an Expiring State Non -Discharge General Permit." The application form must be completed, signed by the Permittee, and returned to the DWR by April 3, 2024. Mailing Address: NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699 1636 Email: animal.operations(a),deq.nc.gov phone: (919) 707 9129 Please note that you must include one (1) copv of the Certified Animal Waste Management Plan (CAWMP) with the completed and signed application form. A list of items inclurled in the CAWMP can be found on page 2 of the renewal application form. Failure to request renewal of your coverage unde- vithin the time period specified may result in a civil penalty. Operation of your facility without coverage _ ..::;a general permit would constitute a violation of NC G.S. § 143-215.1 and could result in assessments of civil penalties of up to $25,000 per day. Copies of the animal waste operation State Non -Discharge General_ Permits are available at www.deg.nc.gov/animalpennits2024. General permits can be requested by writing to the address above. If you have any questions about the State Non -Discharge General Permits, the enclosed application, or any related matter please feel free to contact the Animal Feeding Operations Branch staff at 919-707-9129. Sincerely, Michael Pjetraj, Deputy Director Division of Water Resources Enclosures: Request for Certificate of Coverage for Facility Currently Covered by an Expiring State Non -Discharge General Permit ��� 4 IkorthC�rolinoDeparlmentofFnrironmenGlQuoldtr Diddonofw".Resources L 512North Salisbury5trio 1636;1ai1Sen•iceCeut4r Raltiah,North Cprolin27699-1636 919?6'9129 Murphy -Brown, LL C 12/13/2016 2822 Hwy 24 West P 0, Box 856 Warsaw, NC 28398 Grower(s): Farm Name: UTILIZATIONNUTRIENT i Donnell Kornegay Kornegay Brothers Finisher 31-353 County: _ Duplin Farm Capacrt Farrow to Wean _ Farrow to Feeder Farrow to Finish Wean to Feeder Feeder to Finish 2448 Storage Structure: Storage Period. Application Method: Anaerobic Lagoon >180 days Irrigation -The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer, value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4 Do not apply waste on saturated soils, when it is raining, or when the surface is frozen Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. l o maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of 8 This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, W, tons, etc.): Capacity T e Waste Produced per Animal Total Farrow to Wean 3203 gal/yr gal/yr Farrow to Feeder 3861 gallyr gal/yr Farrow to Finish 10478 gal/yr gal/yr Wean to Feeder 191 gallyr gallyr 2448 Feeder to Finish 927 gallyr 2,269,296 gal/yr Total 2,269,296 gallyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (Ibs): Capacity Type Nitrogen Produced per Animal Total Farrow to Wean 3.8436 Ibs/yr Ibsiyr Farrow to Feeder 6.9498 Ibs/yr Ibs/yr Farrow to Finish 18,8604 Ibs/yr Ibs/yr Wean to Feeder 0.3438 Ibs/yr Ibs/yr 2448 Feeder to Finish 1.6686 Ibs/yr 4,085 Ibsiyr Total 4,086 I bslyr Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: 60.66 Total N Required 1st Year: 7290,7536 Total N Required 2nd Year: 3750.155 Average Annual Nitrogen Requirement of Crops: 5,520.45 Total Nitrogen Produced by Farm: 4,084.73 Nitrogen Balance for Crops: (1,435.72) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2 of 8 - - -- -------- N 17, lo —IT --------- — --- ON 0 Flo o o c7 o ova o v inn! - -- --- -- --- Z:2 ti, o a:L z z .... .. ... . ... .. . ... .... o o .................................... . ..... ..... zv ..... ... . .. 'IQ 't ..... ... .. ...... o 0 N "1 4 75, q F cl c, L O o 7,5 o w i t A. a > U) 2 3: Ii I� m > -4-t Li This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will resuit in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop Lbs N utilized / unit yield A Barley 1.6 Ibs N / bushel B Hybrid Bermudagrass - Grazed 50 Ibs N / ton C Hybrid Bermudagrass - Hay 50 Ibs N / ton D Corn - Grain 1.25 Ibs N / bushel E Corn - Silage 12 Ibs N / ton F Cotton 0.12 Ibs N / Ibs lint G Fescue - Grazed 50 lbs N / ton H Fescue- Hay 50 Ibs N / ton I Oats 1.3 Ibs N / bushel J Rye 2.4 Ibs N / bushel K Small Grain - Grazed 50 Ibs N / acre L Small Grain - Hay 50 Ibs N / acre M Grain Sorghum 2.5 Ibs N / cwt N Wheat 2.4 Ibs N / bushel 0 Soybean 4.0 Ibs N / bushel P Pine Trees 40 Ibs N / acre I yr Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4of8 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications PAN/yr/animal Farm Total/yr Farrow to Wean 0.84 Farrow to Feeder 1 Farrow to Finish 4.1 Wean to Feeder 0.072 2448 Feeder to Finish 0.36 881.28 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 881.28 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 4406.4 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 14 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 35.2512 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. *This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5of8 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop inlhr *inches T5504 Pivot AuB D 0.6 1 **Optional*' T5504 sub Pivot AuB D 0.6 Leased sub13 AuB Tobacco 0.6 6 of 8 Additional Comments: The subfield acres shown on this plan are picked up using the honeywagon. Subfield 13 is with a pumping agreement and is optional. Producer may plant Millet for hay or Sorghum instead of soybeans, he also has the option of planting a small grain behind soybeans. 7 of 8 UTILIZATIONNUTRIENT CERTIFICATION Name of Farm: Owner: Manager: OwnerlManager Agreement: Kornegay Brothers Finisher 31-353 Donnell Kornegay I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment andlor storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. I/we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: Donnell Signature: Name of Manager (if different from owner): Signature: Date Date Name of Technical Specialist: Toni W. King Affiliation: Murphy -Brown, LLC. Address: 2822 Hwy 24 West, PO Drawer 856 Warsaw, NC 28398 Telephone: (910) 293-3434 Signature: , 'V�\ �-;� _Z `' io 8 of 8 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recieving crop type, or available land. 3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6 When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). 7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the 1 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular 19 basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. Animal waste can be used in a rotation that includes vegetables and other crops for direct 20 human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be 21 managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining 22 nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 3of3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Wastelnutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. Any new swine facility sited on or after October 1, 1995 shall comply with the following: 11 The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. Animal waste shall not be applied closer than 100 feet to wells. 12 Animal waste shall not be applied closer than 200 feet of dwellings other than those 13 owned by the landowner. Waste shall be applied in a manner not to reach other property and public right-of-ways. 14 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted cropland 15 provided the fields have been approved as a land application site by a "technical specialist Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 2of3 i 1` . b ,����a of s,.• a JM) M O � Z L Q� a Ltka in L A E V c i V C1 y L (V � o � N m e-•i U � � m m lcu 1 v °' C; > Ln c a — (U L rp O v Y 0 O 4- a) _ a _ aj = N E t a Y Ln QJ > Y V N � O 3 v tL Qa Y V) r E v w w v w = v m' E • o u v O v .� c > a ;° ° > H m W dc a L O C V O of u m ;r- O nc. CC v y CL V O U 0 fl = �+ m tA 0-- v O ra z O a' c o o C ?" in ? CD 0 u _ � OG -a .c a -a u O t~it O U } Q Z ? ♦ • • ♦ • O > 0 U (D a u 0 o- o O o v, 41 m Y " m 0L {n 0 'a 7 ..0 = V ii +- t9 fl O = inL, +,' zi Q >` YO = W 0- t t O O -D C = O D II; � 0 O hp y v� C to c Ln L 43) I--• G ac ? 4- Y • • • • o a c C a ` u_ EMELEAMON m > = .a O M Q aj � u CL CL Q �+ d O 3 u {A Y to v 'O O O O C cr cc� cc c GJ E > t9 a Y L O i to O CLC C � N m � c c cu ai 4r M 'L �4- L t d iO m 'a -_ Cba w c N Y c`D O vi N 3 ? A. - tw i .L C 'O a 3 F o c 3 ° °U CL N (� s G N i w O_ 'C C `) o I E u r t0 N = t6 0 � MLn t�0.+•. V w p C am'-' `�° 3 ai = aj v N i U m V i v a. Z cOi W (U �^ " X = 0-" E Q1 a d u O O cu Yv O C ® ❑ ❑ ❑ Z = LU G �Y W m = z Q o c `= CJ O C a CL Q co Q O m N u 1 4- Q a u O Q v c Ln l _u m a v G a0) Z s. w E of a — c N N E O G a +�+ > E a ""bp L u u C m N N N N G a O Z7 O L a •E m m N Y N N .a N aL O a a s a a O c s { m u a r0 u m E m E a N °° ° n ` u kA s s a o n m m m p v �_ a c c µ 4i i C — a N N 'C7 i. a N+ a a 3: 3S eQ Q voi N Y O O N u m -a CtO Q C7 c O +J p N m O C O m 5, u C O a C C m Ncu L C V a p O n O O O � -- 0 Z +� a N o (V a > v ° 4-a yH O°3� a -o0d Cd W> a °- 41 a ° p m LvaaO v vQV 0 1Ca 0 a � a > _ a > L M Ev� ^ O 1 > ui u a m a C _ u OO 0 Q aC uo + + `X N O O O C (A ° CCi p 4—'- a n —p° v 3 u o 3 Y m 'n •� 3 0� a m — Z C tn i7 QD m C — C + u w C am — C .� — C — tL f- u O 0 Z u N C C C — — — ✓> Y _ O ❑❑❑❑❑ ❑ ❑❑❑ ❑ ❑❑❑❑❑❑❑❑ ❑ S� z z I�f WN � 0 O L O % N o O � 3 Y C fN0 LA. �6J N a 2 o 3 Z La LM O Q N c m L +, v- U `0 Q > m t� LL v+ m m= In O c a p c m a N `. 41 C o [O C +- O � D O L C uWi N 3 o i o ;° -p W of C m O .3 v 0 u O a a a Q 0 O _ ♦ • ♦ ♦ ♦ _ tp 0 N a nm m a. u O ¢ a c 3 Ln h k O z L ai a a� Ln Ln c O L � a E c � C V u 07 O to U t6 O to 4- N E w _ 1 a+ 41 16 41 i6 O C y o o 40 tA c O75 c n E c c L C O v UaCCL `o i p L 4= c a v L w M a, o n c v0- D G C O O y 00 G O O O , i aJ pO j 7 7 0 w o c O +' m d u '- O M3 E 'Au m ra t am O +� O a— c o E vim, �^ E G O w -cl. cu E C u u c > O N > C p = ch 0- CU V O C u Ln E O LED O � u M O y ]� O as -0 m(31 �- O C p m C ba t � 'O `� " i 0 'fl i CL q o6 a) 3 = p In C C> O p aJ V O L Ln 4L `� N O� L L U L U N O M v Q1 (V n ♦O. a L� a`, d � a o Q1 O1 1 c O QWatO )1 ul C N Y fl; LU a' c y" y N m w Q) a>i Q. c u aj L o N T m- G aU C w t> N E L a V 4 :a � F ~ C Q m G. E Z7 _ * .E �v, m m c O O. a a L s o a�i v aj ® ❑ ❑ ❑ ❑ ❑ ® ❑ ❑ ❑ ❑ ❑ ❑ W O I. - CA W L 0 3 h LD z a, H O o O O o > g QJ N � � r! (1) O Ca Q No 3 tn Q c > U 3 a o z x cTo Ln c ,-� o 0 m c s O L o > -0U u -0 a W n L R � � � 4 cr o v a a' CL Q • Ln Ln d) aJ ra CY. V u R G � d C N rya u E L c o m o u 0 O m Q i v p '= OL c E Y a m c u 'ai c p d to .� E -0 41 m O O ++ N ra in L O Z' p4` n CL 3 EE ZY (gym a a a ° 41 O 1-- Ln ® ®❑❑ E] El Q M VI d u Ma` u G a Z °' E L Qf CL 13 0 s Y t6 Y QJ a) L E a 0 c •3 � c _ =o ao c c y CL -0 v L ai N a, 0 3 L � C — C m o > u 0 O t/f a, � -0 n M w m • • O t/f H > L O V C C CD s °' V N O o_ w � E _ O "' CL L c m t0 ci O E a c� a > O o—° ,r occ m CL i aJ E i11 Y X O `` fl c 0 E d c O a° O c m> +� o-0 g m °1 `- E0. O c m u $ + c +', ms m cu t o u v O U w H o ❑❑❑ ❑ ❑ � g43) N z, W 3 Eu L L Im 0 LL {n m W G% N O W Y a � '3 m M o u O a > v, _ • • rn d N L, N n LU W 0 a a Q 0o 0 0 a w T-4 L CL L L a a o ,. p n. a CL o L m m m Y vQ 0. _ = fl n c c c c c r�o c.� to z 7 v a a a m v o v v i Y O a m v v M i v 0 0 a• Q c w m v aj +v c T T T O � V • • ♦ • • • m 0. N (ri CL s u 4N c 75 C `- O. w wate+ X a! c u u o a y E o �_ _ d E o L 0 c v L L a � M m u u u ego L N eo +n0 0 v 0 C o o 0 v 3 u m v o ++ Y 0 L m L m L tII o v o'= L N v �n L cu a L 0 o u .O aj -tea a r a� v m m, Q> E a '> n a o y o v v 3 c N v m -o -o y o L M o 0 >, 2 ul 40 a = 4- > O Q a) am +� cv vm �° `m m a eu .E m c -0 v is o .� LL n=) O n n u 0 ❑® ❑❑ ❑❑❑❑❑ ❑ El El ❑ a 0 W z W ui W la. Ln L7 [ L y z c '�9�n Y z W. Ln tea, Ln O m E m E W ++ o a a o a 0 o _ .. . _ .. V) 'II 1� M m L a u O aui Z ,CL ++ ;+ a. In N a c m E H v �7 V L 0 '0 �.+ O N V E 0 O i a O 0 m IA m E u L m O U. G7 y c c 3 � N s W z 0 U L z 4O V ..J ♦L C. a 0 z g L O Q L Q Q t � L Q a Q O c Ln > +' -p 0 a c9 O Q �' N a O a C Cl u c v, O tLD L O L O CL L U c to N ra u C > a v�- Q -u > cu c a a E cu. n L o o E U `n O p 'y o .� c � — _o N a Q O � N N N EL N in +� O C O O !� C `n c O _ +.. -ac fl a c N tY0 O a � O Y L .� f6 a' > u E O 'm `, a a O '- tn m u p> y O E M c C a tv -a a s 3 L f9 3 m n to m w m a 3 u a W 3 m m 3--ow- m ro L L ow T -a m a °1 ro E o m a a0 a a ro Ln c ro i O ro c c u d �� N a L ca 0 a o f a o O on W ou 00 a c = i �'• U m � L C C CL'a E L O lZ. a >�n> a 'A a Co } a c a C to av a N ro N O_ c� W CU7 O' .O .0 O. • CL 0 C- a i m a = N LO O `O a- L C a cu cu a `A >= 7 L t*9 0 c ti aaj " O, 0 O 1:1 El El El 0 (V Ln N i w O a. a Q C m x N bQ O _ c m O o O C c CL 41 41 O > C N- ► O > = u C O a00.9 -0 4' +-' = m aca L a > = w N u o a rr s L Ln Q cn ac 3 M � ro a Y U U C V a O V) a m ro O ` O C 00 U O + O U 0 ro a tU0 q c C a m O O > to c � " U — ro CA. a > a L aj m �, a CLa ">, a > - Q fD a L M m o o� C W a s Q E a u +- ° m c a Q C L a ._ Q ro CL Q O— s 'C O 41 ro a a a+ M _a on c c E w m z a M N 4Fto c °' m E o v, c n , O C O u a a a a O CD Q. y` fl-ty0 m a L U L CL to a ❑❑❑ ❑❑❑ ❑ Vt a O o a. w v O 0 : Q aW � a, o O cc LL W -j m d V) 00 c a a 0 O � +� E CL c +� a m a � � a c mm +, � v ro a LO h c0 ro O J O LA O C ro w a a w a a o h ~ 1 WL Q a 3 m L E O ci o n a m O i1 a O !- u i w Y v a a c a -0 O C a a vi i Y C w m a 0 LL 4t.. Y ro 0. V c e -hvi -Z .. . V a `- c c Q E u a a o Y c a c a m I- m41 o E E`�U, E `a a a a C a bA w L �+ O-0 m ro m 'a 13 O O 0 a I= d p m , c _ a' .� GUJ m +' a a m "j c 0 Y Ln Q a C L L 3 a OD a W a) C C 0 E m m J � ++ c a E o4 �9 E , c 4Y E ccO m o 11 a p M c v Y° j 0 LL LL 0 cn `- c Cl vEi to a +: v a O` t- a m o 0CC � � .E c +• '+� c t3 d.ro rm? O tw d vF- cu 7i=vC E LO m� V c p D o t a +' O c a a l? c _3 m O N N d 0 +� 0 a a iv Ln 00 N c m L m o c_ c U cn a 1 m m c Y :E c°0n 3 3 m c t J to cn a m m m m v c a l l a y E U m .I0 00 L L c c c c c a d 0080 0o cn In ro m m m Y Y Y Y 0 U �.. 1 b Y Y m m 00 of U v V) V) VI V) V) !n to to O a `~ O N N ro m Ln .-1 1-1 c-I ci 4. U U U U wir- tR oC Lnro U c c w w w w w z z z z ° O L2mmmmm000U'=; OL Q d w w w w w z z z z z 0 INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS Source Cause BMP's to Minimize Odor Site Specific Practices Flush GuCers Accumulation of solids Lagoons and Pits Gusted Solids Excessive Vegetative Decaying vegetation Growth Feeders Feed Spillage Feed Storage Accumulations of feed residues —,r Animal Holding Areas Accumulations of animal wastes and fegd wastage AMIC--November 11, 1996 (Liquid S a 1) Flush system is designed and operated sufficiently to remove accumulated soilas from gutters as designed. O Remove bridging of accumulated solids at discharge () Maintain lagoons, settling basins and pits where pest breading is apparent to minimize the crusting of solids to a depth of no more than 6-8 inches over more than 30°/y of surface. ( 'Maintain vegetative control along banks of lagoons and other impoundments to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. (Dry Systems) O Design, operate and maintain feed systems (e.g., bunkers and troughs) to minimize the accumulation of decaying wastage. Clean up spillage on a routine basis (e.g. 7-10 day interval during summer; 1 5.30 day interval during winter) () Reduce moisture accumulation within and around immediate perimeter of feed storage areas by insuring drainage away from site and/or providing adequate containment (e.g., covered bin for brewer's grain and similar high moisture grain products). {) Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. () Eliminate low area that trap moisture along fences and other locations where waste accumulates and and disturbance by animals is minimal. () Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e. inspect for and remove or break up accumulated solics as needed). pry Manure handling Accumulations of animal wastes O Remove spillage on a routine basis (e.g. 7-10 day Sys!ems interval during summer, 15-30 days interval during winter) where manure is loaded for land application or disposal O Provide for adequate drainage around manure stockpiles. O Inspect for and remove or break up accumulated wastes in filter stripes around stockpi as and manure hand!Ing areas as needed. The issues checked ( ) pertain to this operation. The landowner/integrator agrees to use sound judgment in applyigg insect control measures as practical. I certify the aforementioned insect control Best Management Practices have been reviewed with me. For Wore information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh. NC 275957613. AMID -November 1 I., 1996 3�- 3 c Version —November 26, 2018 Mortality Management Methods Indicate which method(s) will be implemented. When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian. Primary Secondary Routine Mortality. Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.106-403). The bottom of the burial pit should beat least one foot above the seasonal high water table. Attach burial location map and plan. a a Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .0200. Rendering at a rendering plant licensed under G.S. 106-168.7. Complete incineration according to 02 NCAC 52C .0102. D A composting system approved and permitted by the NC Department of Agriculture & Con- sumer Services Veterinary Division (attach copy of permit). If compost is distributed off -farm, additional requirements must be met and a permit is required from NC DEQ. In the case of dead poultry only, placing in a disposal pit of a size and design approved by the NC Department of Agriculture & Consumer Services (G.S. 106-549.70). ® Any method which, in the professional opiniontof the State Veterinarian, would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). Mass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm -specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mortality disposal options; contact the Division for guidance. • A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian. • Burial must beAone in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • Mass burial sites are subject to additional permit conditions (refer to facility's animal waste management system permit). • In the event of imminent threat of a disease emergency, the State Veterinarian may enact additional temporary proc$06res or measures for disposal according to G.S. 106-399.4. Signature of Farm Owner/Ma Signature of Technical Specialist Date Date EMERGENCY ACTON PLAN PHONE NUMBERS DIVISION OF WATER QUALITY (DWQ) IQ �ci�1=�1 EMERGENCY MANAGEMENT SERVICES (EMS) SOIL AND WATER CONSERVATION DISTRICT (SWCD) NATURAL RESOURCES CONSERVATION SERVICE (MRCS) `-i I C) COOPERATIVE EXTENSION SERVICE (CES) `, iU )a'�) L 3 This plan will be implemented in the event that wastes from your operation are leaking, overflowing or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow - possible solutions are: a) Add soil to berm to increase elevation of dam. b) Pump wastes to fields at an acceptable rate. c) Stop all flow to the lagoon immediately. d) Call a pumping contractor. e) Make sure no surface water is entering lagoon. B. Runoff from waste application field -actions include: a) Immediately stop waste application. b) Create a temporary diversion to contain waste. c) Incorporate waste to reduce runoff. d) Evaluate and eliminate the reason(s) that cause the runoff. e) Evaluate the application rates for the fields where runoff occurred. C. Leakage from the waste pipes and sprinklers - action include: a) Stop recycle pump. b) Stop irrigation pump. c) Close valves to eliminate further discharge. d) Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses, solid separators - action include: a) Stop recycle pump. b) Stop irrigation pump. c) Make sure siphon occurs. d) Stop all flow in the house, flush systems, or solid separators. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks - possible action: a) Dig a small sump or ditch from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b) If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. The application of sludge will increase the amount of odor at the waste application site. Extra precaution should be used to observe the wind direction and other conditions which could increase the concern of neighbors. Possibie Causes of Lagoon FaHure Lagoon failures result in the unplanned discharge of wastewater from the structure. Types of failures include leakage through the bottom or sides, overtopping, and breach of the dam. Assuming proper design and construction, the owner has the responsibility for ensuring structure safety. Items which may lead to lagoon failures include: o Modification of the lagoon structure -- an example is the placement of a pipe in the dam without proper design and construction. (Consult an expert in lagoon design before placing any pipes in dams.) • Lagoon liquid levels -- high levels are a safety risk. o Failure to inspect and maintain the dam. Excess surface water flowing into the lagoon. Liner integrity -- protect from inlet pipe scouring, damage during sludge removal, or rupture from lowering lagoon liquid level below groundwater table. NOTE: if lagoon water is allowed to overtop the dam, the moving water will soon cause gullies to form in the dam. Once this damage starts, it can quickly cause a large discharge of wastewater and possible dam failure. c) Have a professional evaluate the condition of the side walls and the lagoon bottom as soon as possible. Assess the extent of the spill and note any obvious damages. a. Did the waste reach surface waters? b. Approximately how much was released and for what duration? c. Any damage notes, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off the property)? h. How much reached surface waters? Contact appropriate agencies. a. During normal business hours call your DWQ regional office; Phone #, After hours, emergency number: (919) 733-3942. Your phone call should include: your name, facility number, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of the movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If the spill leaves property or enters surface waters, call local EMS phone number. c. Instruct EMS to contact local Health Department. d. Contact CE's phone number, local SWCD office phone number and the local MRCS office for advice / technical assistance phone number. 4. If none of the above works call 911 or the Sheriff's Department and explain your problem to them and ask the person to contact the proper agencies for you. Contact the contractor of your choice to begin repair or problem to minimize offsite damage. a. Contractors Name: /,it41 MS - b. Contractors Address: 3c= S�i•c _. c . Contractors Phone: Contact the technical specialist who certified the lagoon (MRCS, Consulting Engineer, etc.) a. Name: b. Phone: Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. System Ca�ibraflon Information presented in manufacturer's charts are based on average operation conditions with relatively new equipment. Discharge rates and application rates change over time as equipment gets older and components wear. In particular, pump wear tends to reduce operating pressure and flow. With continued use, nozzle wear results in an increase in the nozzle opening which will increase the discharge rate while decreasing the wetted diameter. You should be aware that operating the system differently than assumed in the design will alter the application rate, diameter of coverage, and subsequently the application uniformity. For example, operating the system with excessive pressure results in smaller droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle. Clogging of nozzles can result in pressure increase. Plugged intakes or crystallization of mainlines will reduce operating pressure. Operating below design pressure greatly reduces the coverage diameter and application uniformity. For the above reason, you should calibrate your equipment on a regular basis to ensure proper application rates and uniformity. Calibration at least once every three years is recommended. Calibration involves collecting and measuring flow at several locations in the application area. Any number of containers can be used to collect flow and determine the application rate. Rain gauges work best because they already have a graduated scale from which to read the application amount without having to perform additional calculations. However, pans, plastic buckets, jars, or anything with a uniform opening and cross-section can be used provided the liquid collected can be easily transferred to a scaled container for measuring. For stationary sprinklers, collection containers should be located randomly throughout the application area at several distances from sprinklers. For traveling guns, sprinklers should be located along a transect perpendicular to the direction of pull. Set out collection containers 25 feet apart along the transect on both sides of the gun cart. You should compute the average application rate for all nonuniformity of the application. On a windless day, variation between containers of more than 30 percent is cause for concern. You should contact your irrigation dealer or technical specialist for assistance. *Reprinted for Certification Training for Operations of Animal Waste Management Systems Manual Oi'f-F �TIC�)ty v nl'v F i �' 221 Proper lagoon management should be a year-round priority. It is especially important to manage levels so that you do not have problems during extended rainy and wet periods. Maximum storage capacity should be available in the lagoon for periods when the receiving crop is dormant (such as wintertime for bermudagrass) or when there are extended rainy spells such as a thunderstorm season in the summertime. This means that at the first sign of plant growth in the later winter / early spring, irrigation according to a farm waste management plan should be done whenever the land in dry enough to receive lagoon liquid. This will make storage space available in the lagoon for future wet periods. In the late summer / early fall the lagoon should be pumped down to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization plan will allow it. Waiting until the lagoon has reached its maximum storage capacity before starting to irrigated does not leave room for storing excess water during extended wet periods. Overflow from the lagoon for any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action. The routine maintenance of a lagoon involves the following: Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass are the most common vegetative covers. The vegetation should be fertilized each year, if needed, to maintain a vigorous stand. The amount of fertilized applied should be based on a soils test, but in the event that it is not practical to obtain a soils test each year, the lagoon embankment and surrounding areas should be fertilized with 800 pounds per acre of 10-10-10, or equivalent. Brush and trees on the embankment must be controlled. This may be done by mowing, spraying, grazing, chopping, or a combination of these practices. This should be done at least once a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth. NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the lagoon water. Such chemicals could harm the bacteria in the lagoon that are treating the waste. Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon and at least monthly and after major rainfall and storm events. Items to be checked should include, as a minimum, the following: Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes -- look for: 1. separation of joints 2. cracks or breaks 3. accumulation of salts or minerals 4. overall condition of pipes Lagoon surface -- look for, 1. undesirable vegetative growth 2. floating or lodged debris Embankment -- iook for: 1. settlement, cracking, or "jug" holes 2. side slope stability -- slumps or bulges 3. wet or damp areas on the back slope 4. erosion due to lack or vegetation or as a result of wave action 5. rodent damage Larger lagoons may be subject to liner damage due to wave action caused by strong winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam. A good stand of vegetation will reduce the potential damage caused by wave action. If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be used to reduce the wave impacts. Any of these features could lead to erosion and weakening of the dam. If your lagoon has any of these features, you should call an appropriate expert familiar with design and construction of waste lagoons. You may need to provide a temporary fix if there is a threat of a waste discharge. However, a permanent solution should be reviewed by the technical expert. Any digging into a lagoon dam with heavy equipment is a serious undertaking with potentially serious consequences and should not be conducted unless recommended by an appropriate technical expert. Transfer Pumps -- check for groper operation of: 1. recycling pumps 2. irrigation pumps Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding noise, or a large amount of vibration, may indicate that the pump is in need of repair or replacement. NOTE: Pumping systems should be inspected and operated frequently enough so that you are not completely "surprised" by equipment failure. You should perform your pumping system maintenance at a time when your lagoon is at its low level. This will allow some safety time should major repairs be required. Having a nearly full lagoon is not the time to think about switching, repairing, or borrowing pumps. Probably, if your lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an inventory of spare parts or pumps. Surface water diversion features are designed to carry all surface drainage waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot runoff) away from your lagoon and other waste treatment or storage structures. The only water that should be coming from your lagoon is that which comes from your flushing (washing) system pipes and the rainfall that hits the lagoon directly. You should inspect your diversion system for the following: 1. adequate vegetation 2. diversion capacity 3. ridge berm height Identified problems should be corrected promptly. It is advisable to inspect your system during or immediately following a heavy rain. If technical assistance is needed to determine proper solutions, consult with appropriate experts. You should record the level of the lagoon just prior to when rain is predicted, and then record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will give you an idea of how much your lagoon level will rise with a certain rainfall amount (you must also be recording your rainfall for this to work). Knowing this should help in planning irrigation applications and storage. If your lagoon rises excessively, you may have an overflow problem from a surface water diversion or there may be seepage into the lagoon from the surrounding land. Lagoon Operation Startup: 1. Immediately after construction establish a complete sod cover on bare soil surfaces to avoid erosion. 2. Fill new lagoon design treatment volume at least half full of water before waste loading begins, taking care not to erode lining or bank slopes. 3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the pipe to discharge near the bottom of the lagoon during initial filling or another means of slowing the incoming water to avoid erosion of the lining. 4. When possible, begin loading new lagoons in the spring to maximize bacterial establishment (due to warmer weather). 5. It is recommended that a new lagoon be seeded with sludge from a healthy working swine lagoon in the amount of 0.25 percent of the full lagoon liquid volume. This seeding should occur at least two weeks prior to the addition of wastewater. 6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0- 7. A dark color, lack of bubbling, and excessive odor signals inadequate biological activity. Consultation with a technical specialist is recommended if these conditions occur for prolonged periods, especially during the warm season. Loading: The more frequently and regularly that wastewater is added to a lagoon, the better the lagoon will function. Flush systems that wash waste into the lagoon several timl es y are optimum for treatment. Pit recharge systems, in which one or more buildings are drained and recharged each day, also work well. 4 Practice water conservation --- minimize building water usage and spillage from leaking waterers, broken pipes and washdown through proper maintenance and water conservation. Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the amount of solids entering the lagoon. Management: • Maintain lagoon liquid level between the permanent storage level and the full temporary storage level. • Place visible markers or stakes on the lagoon bank to show the minimum liquid level and the maximum liquid level. (Figure 2-1). • Start irrigating at the earliest possible date in the spring based on nutrient requirements and soil moisture so that temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer / early fall to provide maximum lagoon storage for the winter. • The lagoon liquid level should never be closer than 1 foot to the lowest point of the dam or embankment. • Don not pump the lagoon liquid level lower than the permanent storage level unless you are removing sludge. o Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away from the drainpipe inlets as possible. • Prevent additions of bedding materials, long-stemmed forage or vegetation, molded feed, plastic syringes, or other foreign materials into the lagoon. o Frequently remove solids from catch basins at end of confinement houses or wherever they are installed. • Maintain strict vegetation, rodent, and varmint control near lagoon edges. • Do not allow trees or large bushes to grow on lagoon dam or embankment. • Remove sludge from the lagoon either when the sludge storage capacity is full or before it fills 50 percent of the permanent storage volume. • If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a pollutant discharge. Siludge Rernovall: Rate of lagoon sludge buildup can be reduced by: 5 o proper lagoon sizing, mechanical solids separation of flushed waste, • gravity settling of flushed waste solids in an appropriately designed basin, or o minimizing feed wastage and spillage. Lagoon sludge that is removed annually rather than stored long term will: o have more nutrients, have more odor, and require more land to properly use the nutrients. Removal techniques: Hire a custom applicator. o Mix the sludge and lagoon liquid with a chopper - agitator impeller pump through large - bore sprinkler irrigation system onto nearby cropland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or forageland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul and spread with manure spreader onto cropland or forageland; and soil incorporate. Regardless of the method, you must have the sludge material analyzed for waste constituents just as you would your lagoon water. The sludge will contain different nutrient and metal values from the liquid. The application of the sludge to fields will be limited by these nutrients as well as any previous waste applications to that field and crop requirement. Waste application rates will be discussed in detail in Chapter 3. When removing sludge, you must also pay attention to the liner to prevent damage - Close attention by the pumper or drag -line operator will ensure that the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed, You should stop the activity immediately and not resume until you are sure that the sludge can be removed without liner injury. If the liner is damaged it must be repaired as soon as possible. Sludge removed from the lagoon has a much higher phosphorus and heavy rnetal content than liquid. Because of this it should probably be applied to land with low phosphorus and metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion. Note that if the sludge is applied to fields with very high soil —test phosphors, it should be applied only at rates equal to the crop removal of phosphorus - As with other wastes, always have your lagoon sludge analyzed for its nutrient value NAME: Donne � { Korneg( `Jr . / PA8E 2 ADDRESS: Mt. O|ive, NC DESI8NEC BY Jimmy V/nson DATE 4/9/91 APPROVED DY Jimmy Vinson DATE 4/11/91 PERMANEm� 2�48 STORA8E Ho8s x 135 |bs per ho3 1 Cu Ft per |b. 330480 Cu Ft TEMPORARY 3�C�O0 STORASE }bs of �er 1000 an/ma! x 1.35 cu. ft. of waste |bs of anima| wt. x 180 uays per day 80307 Cu Ft TOTAL STORA8E AVAILA8LE 497083 Cu Ft AMOUNT OF FILL DIKE 18410 56425 Cu Cu Yds Ft PAD TOTAL 196268 - - - - - - - - - 252693 Cu Cu Ft Ft SETTLEMENT 10% 25269 Cu Ft TOTAL AMOUNT OF FILL --------- 277962 Cu Ft 10295 Cu Yds ` CUT TO FILL RATIO . TOTAL EXCAVAT|�N 486870 Cu Ft'' ` 18032 Cu yds //~ ��^� � - " . �=-~^ ~.=^ ~s������ ��� l~ ��� - - � �� ��) ~~. T�� '`� °~ ���� ~- � ~~- / L This IaSoon is desi3ned for waste treatment with minimum odor cvntrol. Thc ti're raquired for the planned fluid level to be reached may vary due to soil conditions, f}ush'nS operations, and t^c amo'/rt GO frpst onto- added to the system. Land application of waste water is recognized as an acceptab|e method of disposal. IrriSation by using center pivot, gun, or traveler is the preferred and most efficient method to dispose of Cho effluent from the |a800n. Care should be taken when app|yin8 waste to prevent damaSe to the crops and to prevent runoff from the fiems. 4. It is recommendsu that the treatment lagoon be prechar8ed to 1/2 its capacity to prevent excessive odors during beginning stages of the opdration. PrecharSing reduces the concentration of the initial waste enterio3 the |a3oon thereby reducing odors. So! Ids should be iovered w/th water at all times. 5. Keep vegetation on the embankment and areas around the lagoon and buildings mowed. 6. Repair any eroded areas and establish in vegetation. T. The Clean Water Act of 1977 prohibits the discharge of _ pollutants into waters of the United States. The Department of Environment, Health, and Natural Resourcel, Wastewater Management Section, has the responsibility for enforcing this . |aw. 8. All surface water is to be diverted from the lagoon to an adequate and stable outlet. CERTIFICATION- -1 hereby certify that I understand the operation and maintenance requirements stated above. Furthermore, I understand how many acres are required in order to land apply the waste and that !the lagoon may have to be pumped 2 or more times a year. This design has been explained to me and I agree with all provisions stated in the design. I also certify that there are no residence other than mine or my tenants' within 750 feet of this operation. I understand that comp|iance with this design DOES NOT prevent someone f-j(---:j, me because of n isance or other reasons. Si3natureh� Date ' ---��-----�—/-V—~---------- -77'--�r-v-------- BEFORE ANY EFFLUENT lS APPLIED TO THE LAND IT SHOULD 8E ANALYZED TC DETERMINE Tk� EXACT NnTRIENT CONTENT. THE NCDA LABORATORY IN RALEI8H PERFORMS wASTE ANALYSES. YOU SHOULD CONTACT A8RONO�TC SERVICES DIVISION NCDA, 8110 RIDGE ROAD CENTER RALEIEPA N.C. 27611 PHONE: 919-733-2655 WHEN APPLYING THE EFFLUENT TO CROPLAND IT SHOULD BE DISK AND A COVER CROP SEEDED OR A ROW CROP PLANTED TO PREVENT EROSION. SO�E OF THE EFVmmn ZULD BE USED FOR IRRIGATION PURPOSES DURIN8 7HE 8RCWl�G S�ASON. O Lard Avai sow Farrow to Feeder |. Lan� Required operation: 0 0 0.0 ac. 0.0 ac. of of cropland planted to corn coastal bermudaSrass--8razed 0 0.0 ac. of coastal bermuda8rass--hay 0 0.0 ac. of fescue --grazed ERROR percent of land requi red is available, 0 sow Farrow to Finish operation: Land Avai |. Land Required 0 0.0 ac. of cropland planted to corn 0 0.0 ac. uf.coasta| bermudagrass--grazed 0 0.0 ac. of coastal bermudagrass_-hay 0 0.0 A. of fescue --grazed -RROR percent of |and required is avai|ab|e BEGIN PUMPING THE EFFLUENT WHEN THE FLUID LEVEL REACHES outlet pipe - e|. 49.5' ------------------------------ DO NOT LOWER THE FLUID ANY LOWER THAN 3.0'- e|. 46.5' ------------------------------ THE EFFLUENT SHOULD DE APPLIED AT A RATE THAT WILL NOT CAUSE ANY RUNOFF ONTO SURROUNDIN8 AREAS OR LEACHING INTO THE GROUND WATER RECOMMENDED APPPLICATlON RATE IS 0.5 INCHES PER HOUR AND TH� MAXIMUM RECOMMENDED APPLICATION AMOUNT 15 1 INCH PER IRR8ATION ELEVATION DESCRIPTION Nai| in 12" p/ne 50 ft. N. of A VERY IMPORTANT - PLEASE READ CAREFULLY THE LAGOON -------------------------------------- AND THE AREA AROUN�,THE HOG HOUSES MUST BE SEEDED WITH EITHER A TEMPORARY OR PERMANENT GRASS, DEPENDING ON THE TIME OF THE YEAR, WITHIN THIRTY (30) DAYS FROM THE TIME THE BUILDINGS ARE COM- PLETED AND READY FOR USE. (WE RECOMMEND THAT THE LAGOON AREA, SIDE SLOPES, DRAINS AND ETC.. AS WELL AS THE SIDE SLOPES OF THE PAD BE SEEDED WITHIN FIFTEEN (15) DAYS AFTER CONSTRUCTION. THE SOIL WILL NOT DRY OUT AS MUCH IF SEEDED WITHIN THIS TIME FRAME WHICH WILL RESULT IN A MUCH BETTER STAND OF GRASS.) SHAPE AREA TO BE SEEDED. INCORPORATE LIME AND FERTILIZER AND PREPARE A 3" SEEDBED. SECURE MULCH ` AND FIRM SEEDBED WITH A DISK, CULTIPACKER, OR SIMILAR EQUIP. f +I1 I I I i-1- GT N In --; /�/�`-?<�� G/> L.,i�Gl-r; / .�j�%� � �'` Y� /'�// �l� f /' /�/S�^;�. �" �'v�v�'�o�i� �i✓fNiS D�.sic_'���.G��'�ll/3'I�^'✓%✓l�.v'