HomeMy WebLinkAboutNCC241593_ESC Approval Submitted_20240523 •
WILSON
NORTH CAROLINA
May 15, 2024
To: Jernigan Oil Company
Attention: Michael Harrell
415 Main St.
Ahoskie, NC 27910
SUBJECT: Local Sedimentation and Erosion Control Program Approval
Duck Thru (EC-040321-01)
Mr. Harrell,
The City of Wilson received a revision for an erosion control plan from Bartlett Engineering &
Surveying, PC for the construction of the Duck Thru on 5/7/24 for the disturbance of
approximately 11.5 acres.
Bartlett Engineering and Surveying, PC has addressed all outstanding comments. Thus, the
plan is approved. This plan approval shall expire three years following the date of approval, if no
land-disturbing activity has been undertaken, as required by 15A NCAC 4B .0129.
This approval was based partially on the accuracy of the information provided in the Financial
Responsibility Form. You are requested to file an amended form if there is any change in the
information included on the form.
The City of Wilson has been granted delegated authority from the North Carolina Division of
Energy, Mineral and Land Resources to regulated land disturbing activities subject to the
Sedimentation Pollution Control Act of 1973. This Act is performance oriented, requiring
protection of existing natural resources and adjoining properties. If the approved sedimentation
and erosion control plan is inadequate to meet the requirements of the Act, this office may
require revisions to the plan and implementation of the revisions to insure compliance with the
Act. Acceptance and approval of this plan is conditioned upon your compliance with all Federal,
State, and City of Wilson's ordinances as applicable to this land disturbing activity.
Please be aware that this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspections to insure compliance with the approved plan.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction Stormwater General Permit. This form shall be submitted prior to the
commencement of any land disturbing activity on this project. The NOI form may be accessed at
deq,nc.govincg0l. Please direct all questions about the NOI form to NC DEQ.
After you submit a complete and correct NOI Form, a COC will be emailed to you within three
business days. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviations/revisions;
2. The NCGO1 permit and COC; and
3. Records of all required inspections made during the previous 30 days.
The General Contractor or delegated agent is required to set up an erosion control pre-
construction meeting (before construction begins) with the City Staff. Please contact John
Bissette (252-399-2228) to schedule the pre-construction meeting. A minimum of 72 hours'
notice is required
Please contact John if you have any questions.
Sincerely,
Brandon Rountree, PE, Civil Engineer II
Cc: John Bissette — Engineering Services Coordinator
Noah Parsons, CFM, CPSWQ, Assistant Director of Public Works
Brandon Galloway, Civil Engineer
Johnnie Webb, Construction Inspector
Thomas Thorne, Construction Inspector
Steve Oliverio, PE, Bartlett Engineering & Surveying
Enclosures included in E-mail