HomeMy WebLinkAboutWQ0045397_Encore_at_Bentley_Manor_Private_FTSSE_Permit_Application_2nd_Submission_20240521_20240521,1
DWR
Division of Water Resources
/ea `'C"le
• `P State of North Carolina
Department of Environmental Quality
Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
FTA 10-23 & SUPPORTING DOCUMENTATION
Application Number: WQM T"!7 (to be completed by DWR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Lucas Contractors and Developers, LLC. (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility
❑ Federal ❑ State/County ❑ Municipal ® Other
3. Signature authority's name: Brian Lucas per 15A NCAC 02T .0106(bl
Title: Owner
4. Applicant's mailing address: P.O. Box 2021
City: Asheboro State: NC Zip: 27204-_
5. Applicant's contact information:
Phone number: (336) 465-0947 Email Address: bllucas13@xmail.com
IL PROJECT INFORMATION:
1. Project name: Encore at Bentley Manor — f "k to
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: W Q00_ and issued date:
For modifications, also attach a detailed narrative description as described in Item G of the checklist.
If new construction, but part of a master plan, provide the existing permit number: W000_
3. County where project is located: Randolph
4. Approximate Coordinates (Decimal Degrees): Latitude: 35.8204570 Longitude:-29.8276130
5. Parcel ID (if applicable): _ (or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: Vince C. Townsend, PE. PLS License Number: 23951
Firm: Green Mountain Eneineering, PLLC
Mailing address: IA Wendy Court
City: Greensboro State: NC Zip: 27409-_
Phone number: (336) 294-9394 Email Address: vince(a)ereenmountaineneineers.com
W. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. FacilityName: City of Randleman wastewater Treatment Plant
Owner Name: City of Randleman
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
1. PermitNumber(s): N/A
2. Downstream (Receiving) Sewer Information: 8 inch
Permit Number: NCO025445
N Gravity ❑ Force Main
3. System Wide Collection System Permit Number(s) (if applicable): WQCS 00099
Owner Name(s): City of Randleman
FORM: FTA 10-23 Page 1 of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑ No ® N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
❑ Yes ❑ No ® N/A
3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and
supplementary documentation as required by 15A NCAC 02T.0115(c) been attached?
❑ Yes ❑ No ® N/A
4. Origin of wastewater: (check all that apply)
❑ Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash
® Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ® Swimming Pool/Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic % Commercial _ % Industrial (See 15A NCAC 02T .0103(20))
If Industrial, is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Hasa flow reduction been approved under 15A NCAC 02T .0114(t)? ❑ Yes ®No
➢ If yes provide a copy of flow reduction anproval letter with this application
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0114(f))
Daily Design Flow
No. of Units
Flow
Residential (1-bedroom)
75 gal/day
144
10,800 GPD
Residential (2-bedroom)
150 gal/day
180
27,000 GPD
Residential (3-bedroom)
225 gal/day
24
5,400 GPD
Clubhouse/Office
25 gal/person/day
1
25 GPD
Pool House
1 gal/min
1
1,440 GPD
gall
i GPD
Total
1 44,665 GPD
a See 15A NCAC 02T 0114(b). (d). (e)(l) and (e)(2) for caveats to wastewater design flow rates (i.e. proposed unknown
non-residential development uses; public access facilities located near high public use areas; and residential property
located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 44665 GPD (per 15A NCAC 02T .0114 and G.S. 143-215.1)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, please indicate why:
❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
❑ Flow has already been allocated in Permit Number: Issuance Date:
❑ Rehabilitation or replacement of existing sewers with no new flow expected
❑ Other (Explain):
FORM: FTA 10-23
Page 2 of 5
VIL GRAVITY SEWER DESIGN CRITERIA (if Applicable) - 02T .0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
8"
2,462
PVC
➢ Section II & UI of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name: 1
2. Approximate Coordinates (Decimal Degrees): Latitude: 35.817841 ° Longitude:-79.826920'
3. Total number of pumps at the pump station: 2
3. Design flow of the pump station: 0.1368 millions gallons per day (firm capacity)
➢ This should reflect the total GPM for the pump station with the largest pump out of service.
4. Operational point(s) per pump(s): 95 gallons per minute (GPM) at 32 feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches)
Length (feet)
Material
4
1126
DIP
If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per
MDCPSFM Section 2.01C.l.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify)
6. Power reliability in accordance with I SA NCAC 02T .0305(h)(1):
® Standby power source or ❑ Standby pump
➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1 XB)_
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility and may not be portable
Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(hxl)(C):
❑ Portable power source with manual activation, quick -connection receptacle and telemetry -
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry:
➢ include documentation that the portable source is owned or contracted by the applicant and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
as part of this permit application in the case of a multiple station power outage.
FORM: FTA 10-23 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)):
1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(f) & (g)? N Yes ❑ No
I ;A NCAC 02T 0105(fl contains minimum senarations that shall be orovided for sewer systems:
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below (vertical)
IS inches
'Water mains (vertical - water over sewer preferred, including in benched trenches)
IS inches
'Water mains (horizontal)
10 feet
Reclaimed water lines (vertical - reclaimed over sewer)
IS inches
Reclaimed water lines (horizontal - reclaimed over sewer)
2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class 1I impounded reservoirs used as a source of drinking water, and associated wetlands.
100 feet
**Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water (or tide elevation) and wetlands associated with these waters (see item IX.2)
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches, as well as wetlands associated with these waters or classified as MIL.
10 feet
Any building foundation (horizontal)
5 feet
Any basement (horizontal)
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade (vertical)
36 inches
➢ If noncompliance with 02T.0305(tl or (a). see Section X.l of this application
*15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(fl cannot be achieved. Please check "yes"
above if these alternatives are used and provide narrative information to explain.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webpage
2. Does this project comply with the minimum separation requirements for water mains? N Yes ❑ No ❑ N/A
➢ if no, please refer to 15A NCAC 1 &C.0906(f) for documentation requirements and submit a separate document,
signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule.
3. Does the project comply with separation requirements for wetlands? N Yes [-]No ❑ N/A
➢ Please provide supplementary information identifying the areas of non-conformance.
➢ See the Division's draft separation requirements for situations where separation cannot be met.
➢ No variance is required if the alternative design criteria specified is utilized in design and construction.
4. Is the project located in a river basin subject to any State buffer rules? N Yes Basin name: Cave Fear ❑ No
If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? N Yes [-]No
➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202
5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑ Yes N No
or 401 Water Quality Certifications?
➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required.
6. Does project comply with 15A NCAC 02T.0105(cX6) (additional permits/certifications)? N Yes ❑ No
Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications must be being prepared,
have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion
and sedimentation control plans, stormwater management plans, etc.).
7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes N No
Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters,
siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer.
Siphons and sewers suspended through interferencelconflict boxes require a variance approval.
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and
inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit.
FORM: FTA 10-23 Page 4 of 5
X. CERTIFICATIONS:
I. Does the submitted system comply with 15A NCAC 02 f, the Minimum Design Criteria for the Permitting of Punip Station,
and Fore Mains (latest version)- and the Gm%in Se"er.Minimum Design Criteria (late tversion) as applicable?
® Yes ❑ No
If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application
(VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued
2. Professional Engineer's Certification:
I, Vinve C. Townsend, PE, PLS. attest that this application tot Encore at Bentley Manor
-- --- 1)
(Professional PAginxer's name from Application Item III I) (I'mjea Name from Application Item III )
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans,
specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further
attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations,
Minimum Drsi'n Criteria for Gravity Sewers (latest version), and the Minimum Desg n Criteria for the Fast- [ rack Permitting
of Pmnp Stations and Force Mains (latest versions. Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE - In accordance with General Statutes 143-215.6A and 143-215.6F3, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a tine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application
information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject
the North Carolina -licensed Professional Engineer to referral to file licensing board. (21 NCAC 56.0701)
North Carolina Professional Engineer's seal, signature, and date:
3. Applicant's Certification per 15A NCAC 02T .0106(b):
I, _ i I to LG (' ¢� ,attest that this application for _ _R t4T b6�y M A tv
(Signature Authonly Name fmm Application Item 1.3.) (Prajeel Name from Application Item II, 1)
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. I understand that any
discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division
or Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application
package are not completed and that if all required supporting information and attachments are not included, this application
package will be returned to me as incomplete.
NOTE - In accordance with General Statutes 143-21 .6A and 143-1i, 5.68, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10.000 as well as civil penalties up to $25,000 per violation.
Signature: Date: l 01 4 /;
FORM: FTA 10-23 Page 5 of 5
Technical Information
AMS434/1-170/5,1 T/C
POMPEN MIT SYSTEM
Opera9ng data Testnoon HI Standard Sect 11.6.5.4
Flow 95 US g.p.m.
Head 32 It
Shaft power P2 2.74 hp
Pump efficiency 44 %
Required pump NPSH
Pumps type Single pump
No. of pumps 1
Fluid Wastewater
Pump
Pump Code AMS434/1-170/5,iT/C
Impeller Single channel impeller
NEEMINE
Impeller size 6"/re'
Solid size 3 inch
Discharge port 4" ANSI
Suction port DN100
Motor
Rated voltage 230 V [
Frequency 60 Flz
Rated power P2 5.1 hp
Rated speed 1750 rpm
Number of poles 4
Efficiency 83 %
Rated current 21.2 A
Degree of protection IP 68 wkt well installation with coupling Mt (r, 140...190)
Dimensionsin mm [inch], lettersses table
i
Materials lij
Motorhousng Cast Iron ASTM A48;CI.40B
Impeller Cast Iron ASTM A48;G.408
Pump housing Cast Imn ASTM A48;CI.408
Wearring Bronze ASTM B505; C93200
Motor shaft AISI 430 F StainlessSteel
Bolts AISI 304 Stainless Steel
Table Dimensions
Elasiomeres Nitdle Rubber
e As (inch)
A 2VIa
A
Mechanical seal on motor side Sic / Sic
Mechanical :eat on medium side Sic/ Sic °=
Lower Bearing Double row angular ball bearing
Upper Bearing Deep Groove Bail Beadng
n
31
n
0
N
0
-
Ry{��1ylyR�1IA��tttttttttttt•I<•t•�t•�t��}}_}}�}���_�_t_t•
■■■■■■■■■■■
i3:TlIIATI•��__�������All�ll�l7.�
Project
Project no.:
Created by:
Page.
Date:
1
413012024
Dimensions
AMS434/1-170/5,1 T/C
I-IVNta
i II MP EN MIT SYSTEM
Wet well installation with coupling Idl (1, 140...190)
Dimenaonein mm [inch], lettersets table
a�
w*n
ljpNMIhN9
$ am Piet
AT
fv
e�na.ee M
mt
Nk rM
a
r+a�
onmrxw
p.o.rx.
mea r m
�nr
r
'4 e
roan ^�
m
kF `era
0
ao f
rm &`
Table Dimensions ( inch)
A 26"/,s
a
s
m'
0
N
min level =Minimum fluid level for imermatent operation (S31 0
n
4
Project Project no.: Created by: 1 Pap:
I Nagte:
Technical Data
AMS434/1-170/5,1 T/C
I�QNA
P U M P E N M I T S Y S T E M
Flow
e'
95 US g.p.nUS g.p.m.
Head
32 ft ft
Shaft power P2
2.7 hp
Static head
24 ft
Pump efficiency
".0 %
Required pump NPSH
ft
Pumps type
Single pump
No. of pumps
1
Fluid
Wastewater
Temperature
88 °F
Density
62.31 Ib/ft
Mn. Viscosity
1.077E-5 ft-/s
Pump Code
AMS434/1-170/5,1T/C
Speed
1750 rpm
Suction port
DN100
Head Max
Min.
39.9 ft
Discharge port
4" ANSI
21.3 ft
Impellertype
Single channel impeller
Flow Max
462.3 US g.p.m.
Solid size
3 inch
Pump efficiency max.
62.8 %
ImpellerO
8.69 inch
Required rated power max P2
4.2 hp
Motordesign
Submersible motor
Insulation dam
H
Motor name
AM173.6,2T/4/1
Degree of protection
IP 88
Frequency
60 Ftz
Temperature claw
T3C
Rated power Pl
SA hp
NEMA code
Rated power P2
5A hp
E>gflosion protection
Rated speed
Rated voltage
1750 rpm
230 V 1^
Efficiency100%
at % rated power 75%
50%
83.0 %
%
Rated anent
21.2 A
%
Starting cunent, direct starting
Starling cunent star -delta
54.9 A
11 A
100%
cos phi
at %rated power 75%
50%
0.97
Starting mode
Directly
Powercable
tOG1,5
Control cable
Type of power cable
H07RN6-F PLUS
Type of control cable
Cable length
32.809 It
Service factor
1.15
Shaft seal
Mechanical seal on motor side Sic / sic
Mechanical mat on medium side Sic / Sic
Bearing
Lower Bead ng Double row angular ball bearing
Upper Bead ng Deep Groove Ball Bearing
Remarle
Start-/ Runwpacitor t00pF / 50pF
Motor housing
Cast Iron ASTM A48;CI.408
Bolts
AISI 304 Stainless Steel
Pump housing
Cast Imn ASTM A48;CI.408
Elastomeres
Nitdle Rubber a
Impeller
Cast Iron ASTM A48;CI.408
m
Wear Ong
Bronze ASTM B505; C932
0
Motor shaft
AISI 430 F Stainless Steel
Q
Weight aggregat
256.73 lb
Project
Project no.:
Crested by:
Page:
Data:
4
4/3012024
State of North Carolina
Department of Environmental Quality
DW i 4k Division of Water Resources
Divtslon of Water Resources Flow Tracking for Sewer Extension Applications
(FTSE 10-23)
Entity Requesting Allocation: Encore at Bentley Manor LLC.
Project Name for which Flow is being requested: Encore at Bentley Manor
Mort than one FTSE maybe required fora single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
1. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: City of Randleman Wastewater Treatment Plant
b. WWTP Facility Permit #: NCO025445
All flows are in MGD
c. WWTP facility's permitted flow 1.745
d. Estimated obligated flow not yet tributary to the WWTP .013
e. WWTP facility's actual avg. flow .454
f. Total flow for this specific request 0.045
g. Total actual and obligated flows to the facility .511
h. Percent of permitted flow used 29.28%
11. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)•(B+C)
(E)=(A-D)
Design
Obligated,
Pump
Pump
Average
Approx.
Not Yet
Total Current
Station
Station
Firm
Daily Flow••
Current
Tributary
Flow Plus
(Name or
Permit
Capacity, •
(Firm / pt),
Avg. Daily
Daily Flow,
Obligated
Available
Number)
No.
MGD
MGD
Flow, MGD
MGD
Flow
Capacity***
Main Ps
WQCS00099
2 MGD
0.8
.500
.057
.557
.243
* The Firm Capacity (design Bow) of any pump station is defined as the maximum pumped now that can be
achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not
less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located between the
project connection point and the WWTP where the Available Capacity is <0.
Downstream Facility Name (Sewer): City of Randleman
Downstream Permit Number: WQCS00099
FTSE 10-21
Ill_ Certification Statement:
1 Michael Glass certify to the best of my knowledge that the addition of
volume
the of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the Flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
Signing Official Signature
Wastewater Director
Title of Signing OIficial
Date
FTSE 10-23
10/11/23, a:33AM
North Camlina Secretary of State Search Results
• File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings • Print a Pre -
Populated Annual Report form • Print an Amended a Annual Report form
Limited Liability Company
Legal Name
ENCORE AT BENTLEY MANOR, LLC
Information
Sosld: 2628243
Status: Current -Active O
Date Formed: 5/9/2023
Citizenship: Domestic
Annual Report Due Date: April 15th
CurrentAnnuat Report Status:
Registered Agent: CR Services, LLC
Addresses
Reg Office
235 N. Edgeworth Street
Greensboro, NC 27401-2217
Company Officials
Reg Malting
235 N. Edgeworth Street
Greensboro, NC 27401-2217
All LLCs are managed by their managers pursuant to N.C.G.S. 57l}3-20.
tdW/www.sosnagov/online wrAces/seardJBusiness Regishation_Results 1f1
10/11/23, 8:48 AM
tv_browse.pl (7409x8874)
1
{
I
`•'
�
SITE
__..
1
- r
t
r
j
htlps:l/ngmdb.mgs.gwRd-tiNty_browse.p191d=7b1 eb41 b29fl b9e4c525a53d4cBfec3 1/1
u-
a
21
Green Mountain Engineering, PLLC
Civil Engineering Consultants
Land Surveyors
Transmittal
To: NCDEQ — Public Water Supply Section
Address: DEQ — PWS Section, 1634 Mail Service Center, Raleigh, NC 27699
From: Vince C. Townsend, PE, PLS
Date: May 2, 2024
Re: Encore at Bentley Manor
Messages
Attached, please find the application package for the private sewer extension off Old
High Point Street and Commonwealth Road, to serve the residential housing proposed by
Encore at Bentley Manor Apartments. Included are one (1) copy of the private
application package.
Please let us know if you have any questions or require additional information. I can be
reached via email vince(r�areenmountainengineers.com or by phone (336)-294-9394 at
your convenience.
Best Regards,
Vince C. Townsend, PE, PLS
1A Wendy Court - Greensboro, NC 27409 - (336) 294-9394
Page 1 of 1
Green Mountain Engineering, PLLC
Civil Engineering Consultants
Land Surveyors
Project Narrative For
Private Sanitary Sewer Collection System Serving
Encore at Bentley Manor
Located in Randleman, NC
May 2, 2024
To Whom It May Concern:
Encore at Bentley Manor is a proposed 348 unit apartment complex with a club house,
pool and pool house. The proposed private sewer system will serve Encore at Bentley
Manor. This private sewer system will tie into a proposed public 8 inch sewer main
that will be permitted simultaneously with this private sewer system. This private
sewer system includes approximately 2,462 linear feet of new 8 inch PVC sewer
main, 16 Sewer Manholes, 15 6" Service Connections, 2 4" Service Connections, one
Duplex Grinder -Pump Station and 1,126 linear feet of 4" Force Main. This private
pump station will discharge effluent into the previously mentioned proposed 8" public
sewer main located along Old High Point Street and Commonwealth Road.
The design and plan review were done in accordance with NCDEQ's Gravity Sewer
Minimum Design Criteria and the City of Graham's standards and specifications.
Work on the sewer installation is planned to begin once the permit has been obtained.
Please contact me if you require additional information. You can reach me via email
vince_,greenmountaineneineers.com or by telephone (336)-294-9394 at your
convenience.
Respectfully submitted,
Vincent C. Townsend, P.E.
Green Mountain Engineering, PLLC
1A Wendy Court - Greensboro, NC 27409 - (336) 294-9394
Page 1 of 1
State of North Carolina
nW Department of Environmental Quality
Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources INSTRUCTIONS FOR FORM: FTA 10-23 & SUPPORTING DOCUMENTATION
This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been
certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's
Minimum Design Criteria (Gravity Sewer & Pump Stations/Force Mains) and that plans, specifications and supporting documents
have been prepared in accordance with 15A NCAC 02T. 15A NCAC 02T.0300. Division policies, and good engineerine practices.
While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design
documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design
calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These
documents shall be immediately available upon request by the Division.
Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02T.0303
Projects not eligible for review via the fast track process (must be submitted for full technical review):
➢ Projects that do not meet any part of the minimum design criteria (MDC) documents;
➢ Projects that involve more than one variance from the requirements of 15A NCAC 02T;
➢ Pressure sewer systems utilizing simplex septic tank -effluent pumps (STEPS) or simplex grinder pumps;
➢ Simplex STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains);
➢ Vacuum sewer systems.
General — When submitting an application, please use the following instructions as a checklist in order to ensure all required items are
submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the
amount of requested additional information. Failure to submit all required items will necessitate additional processing and review
time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of
the application and supporting documentation.
A. One Original and One Copy (second copy maybe digital) of Application and Supporting Documents
® Required unless otherwise noted. Signatures on original must be "wet ink" or secure digital signatures.
Please do not submit engineering design plans with the application unless specifically requested.
B. Cover Letter/Narrative Description (Required for All Application Packages):
® List all items included in the application package, as well as a brief description of the requested permitting action.
➢ Be specific as to the system type, number of homes served, flow allocation required, etc.
➢ Include the permit number/status of any other required sewer permits (downstream/upstream)
➢ If necessary for clarity, include attachments to the application form.
C. Application Fee (All New and Modification Application Packages):
® Submit a check or money order in the amount of $600.00, dated no more than 90 days prior to application submittal.
➢ Payable to North Carolina Department of Environmental Quality (NCDEQ)
D. Fast Track Application (Required for All Application Packages, Form FTA 10-23):
® Submit the completed and appropriately executed application.
➢ If necessary for clarity or due to space restrictions, attachments to the application may be made.
® If the Applicant Type in Item 1.2 is a corporation or company, provide documentation it is registered for business with the
North Carolina Secretary of State.
• If the Applicant Type in Item I.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in
the county of business.
® The Project Name in Item 11.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc.
® The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina
licensed Professional Engineer.
® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106(bl. Per
15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from
a person who meets the criteria in 15A NCAC 02T .0106(b).
INSTRUCTIONS FOR FORM: FTA 10-23 & SUPPORTING DOCUMENTATION Page 1 of 3
E. Flow Tracking/Acceptance Form (Form: FTSE 10-23) (if Applicable):
® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility.
➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different.
➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year
prior to the application date.
➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G S 143-215.67(a).
➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE.
F. Site Maps (All Application Packages):
® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area,
including the closest surface waters.
➢ General location of the project components (gravity sewer, pump stations, & force main)
➢ Downstream connection points and permit number (if known) for the receiving sewer
® Include an aerial location map showing general project area (such as street names or latitude/longitude) so that Division staff
can easily locate it in the field.
G. Existing Permit (Application Packages for Modifications to an Existing Permit):
❑ Submit a copy of the most recently issued existing permit.
❑ Include a descriptive and clear narrative identifying the previously permitted items to remain in the permit, items to be
added, and/or items to be modified (the application form itself should include only include items to be added/modified). The
narrative should also include whether any previously permitted items have been certified.
❑ The narrative should clearly identify the requested permitting action and accurately describe the sewers to be listed in
the final permit.
H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station):
❑ Per 15A NCAC 02T 0305(h)(1), submit documentation of power reliability for pumping stations.
➢ This alternative is only available for average daily flows less than 15,000 gallons per day
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with
the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor,
stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances
and personnel are available for distribution and operation of this pump station"
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations'
storage capacities and the rotation schedule of the portable power source or pump, including travel t►meframes, shall
be provided in the case of a multiple station power outage. (Required at time of certification)
1. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities):
❑ Per 15A NCAC 02T .0115(a)(I) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities
Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer
extension, or
❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application
for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval
is expected.
J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold):
❑ Home/Property Owners' Associations
❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement (FORM: HOA).
❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws.
❑ Developers of lots to be sold
❑ Per 15A NCAC 02T .0115(b). submit the properly executed Operational Agreement (FORM: DEV).
For more information, visit the Division's collection systems website
INSTRUCTIONS FOR FORM: FTA 10-23 & SUPPORTING DOCUMENTATION Page 2 of 3