Loading...
HomeMy WebLinkAboutNCS000597_Compliance Evaluation Inspection_20240509 Compliance Inspection Report Permit:NCS000597 Effective: 06/01/22 Expiration: 05/31/26 Owner: Galvan Industries SOC: Effective: Expiration: Facility: Galvan Industries- Harrisburg County: Cabarrus 7320 Millbrook Rd Region: Mooresville Harrisburg NC 28075 Contact Person:Laurens G Y Willard Title: Phone: 704-455-5102 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 05/09/2024 Entry Time 09:30AM Exit Time: 10:20AM Primary Inspector:Matthew J Gigante Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Stormwater Discharge, Individual Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCS000597 Owner-Facility:GalvanIndustries Inspection Date: 05/09/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: This inspection was conducted as a follow up inspection to the notice of violation (NOV) issued on October 26, 2023. During the inspection a representative with HDR, Mark Filardi, was present to show a copy of a draft Stormwater Pollution Prevention Plan currently being worked on. Additionally,a draft of the Tier III action plan was shown. During this time, tier relief was briefly discussed with the representatives from Galvan Industries including the additional sampling typically required to prove the need for tier relief. Analytical and qualitative monitoring was being conducted per permit requirements. All outfalls on site are noted as points being sampled. However, since the previous inspection, only no-flows have been reported. It should be noted that representative outfall status cannot be granted until the facility is no longer in tier status. This can be achieved by testing under benchmarks for 3 consecutive samples for all parameters at all impacted outfalls or by obtaining tier relief from the Mooresville Regional Office. All outfalls were observed on site with no visible issues at the time of the inspection. With the work completed on site, the compliance deadline has been extended thirty days from the time of this inspection. The facility must: - Produce a Stormwater Pollution Prevention Plan that is up to date for the current permit the facility holds. -Submit an action plan separate from the zinc management plan for the Tier I II benchmark exceedances of copper and zinc. Page 2 of 3 Permit: NCS000597 Owner-Facility:GalvanIndustries Inspection Date: 05/09/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ #Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ #Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: A full and current stormwater pollution prevention plan was not present on site at the time of the inspection. A partial draft was observed during the inspection. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Qualitative monitoring data was present and being conducted per permit requirements. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Analytical monitoring is being conducted at all outfalls, however only no flows have been reported since the previous inspection. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ #Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ #Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑ Comment: All outfalls were observed at the time of the inspection with no visible issues noted at the time of the inspection. Page 3 of 3