HomeMy WebLinkAbout20041246 Ver 1_Certification of Completion_20061117letion C~
Cert><~icat><on of Comp
DWQ Project No.: ~ ~~ y ~v~~~ U- ~ County: C'~~)~~ LL
Applicant: /V 1QT~l ~~®G1~11/~- ~vc~~% - c~~',i~ ~~/~./~..5/~~iE'T/5~!/~~!/
Project Name: R-~~37~ ~S ~~~ (~l/~~~%~~
Date of Issuance of Wetland Permit: ~~~~~a Qa~
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality,. 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DR1Q by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Certification
~' ~ 1p5C,i~ ~G ,hereby state that, to the best of my abilities, due c re and diligence was
I, / /(~f~/V~ ~~
used in the observation of the construction such that the construction was observed to be b ilt within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved pl ns and specifications,
and other supporting materials. ® /
Signature: ~ -/"~ Date: / ~' ~'-~ ~ ~~
Agent's Certification
I I'1~, ~, ~~; ~ ~,~ ,hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within 'substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supportingnmaterials.
Signature: • / r
If this project was designed by a Certified Professional
Date: 1 ~~?~~~1 ~
I, as a duly registered Professional (i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, far the Permittee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature:
Registration No.
Date
r"c "'" 7.
I~ ~~
fU~ ~
1 7 200b
.JC!~rv; ~'ui/~i re'f'( L~I~~Li~~
~.vt;T~~n~ns an,~~ s~r~2ntti^.~:a~~R R~;Rr•~cr