HomeMy WebLinkAboutNCC241558_ESC Approval Submitted_20240522 From: SVC_DoNotReply-DEQPermits DoNotReply-DEQPermits@deq.nc.gov
Subject: NC DEMLR - FROF Application Approval with Modifications Needed
CRM:0104206
Date: May 10, 2024 at 10:23:51 AM
To: Siena Signature Homes, Inc. jhersome@gmail.com
1,
c ''S'cc:: i''''
5 -dvie idf\ h:
..„,. , :i.„1,, ..,,
- ::,7:, .‘‹,
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
05-10-2024
Siena Signature Homes, Inc.
195 Burkeview Court
Lexington, NC 27295
RE: Project Name: Wynnfall Lot 11
Acres Approved: 0.5
Application ID: PA-004389
Permit Number: DAVID-2024-0140
Address:301 Wynnfall Drive
City:Lexington
County: Davidson
River Basin:Yadkin-Pee Dee
Stream Classification:C:Aquatic Life,Secondary Contact Recreation,Fresh water
Plan Type: New Plan
Dear Siena Signature Homes, Inc. ,
This office has reviewed the subject erosion and sedimentation control plan. We
find the plan to be acceptable with modifications and hereby issue this Letter of
Approval with Modifications. The Modifications Required for Approval are listed on
the attached page. The Certificate of Approval must be posted at the job site. This
plan approval shall expire three(3)years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and
submit an electronic Notice of Intent (eNOI) form requesting a Certificate
of Coverage (COC) under the NCG010000 Construction General Permit.After the
form is reviewed and found to be complete, you will receive a link with payment
instructions for the $120 annual permit fee. After the fee is processed, you will
receive the COC
via email. As the Financially Responsible Party shown on the FRO form submitted
for this project,you MUST obtain the COC prior to commencement of any land
disturbing activity.The eNOl form may be accessed at deq n c gov/NCG01. Please
direct questions about the eNOl form tothe Stormwater Program staff in the Raleigh
central office. If the owner/operator
of this project changes in the future, the new responsible party must obtain a
new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved EBSC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,
requiring protection of existing natural resources and adjoining properties. If,
following the commencement of this project, the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control
Act of 1973(North Carolina General Statute 113A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to insure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with
Federal and State water quality laws, regulations, and rules. In addition, local city or
county ordinances or rules may also apply to this land-disturbing activity. This
approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information
provided in the Financial Responsibility/Ownership Form, which you provided. You
are requested to file an amended form if there is any change in the Information
included on the form. This permit allows for a land-disturbance,as called for on the
application and plan, not to exceed the approved acres. Exceeding the acreage can
be a violation of this permit and may require a revised plan and additional
application fee.
In addition, it would be helpful if you notify this office of the proposed starting date
for this project.
Modifications Required for Approval:
1. Please mail in the hardcopy wet signature FRO form before beginning
work on the Lot.
General Comments:
1. Please print this email as your Letter of Approval for your NCG010000 Certificate
of Coverage application.
2.Please notify this office prior to your pre-construction conference for this project by
calling (336) 776-980C and asking to speak with the Land Quality inspector for your
county. Permission must be obtained and granted from NC DEQ DEMLR prior to the
removal of any ESC measures. All additional permits should be obtained, as
necessary, prior to beginning construction. [GS 113A-51, 15A NCAC 4B .0120]
3. Any off-site borrow and waste required for this project must come from a site with
an approved erosion control plan, a site regulated under the Mining Act of 1971, or a
landfill regulated by the Division of Solid Waste Management. Trash/debris from
demolition activities or generated by any activities on site must be disposed of at a
facility regulated by the Division of Solid Waste Management or per Division of Solid
Waste Management or Division of Water Resources rules and regulations. [15A
NCAC 4B .0110]
4. Additional measures may be required -The applicant is responsible for the control
of sediment on-site. If the approved erosion and sedimentation control measures
prove insufficient, the applicant must take those additional steps necessary to stop
sediment from leaving this site. [15A NCAC 4B .0115]
5. The NCG01 has a$120 yearly fee and our office often receives closure inspection
requests days prior to yearly NCGO1 fee payment due dates. Be advised the project
requires a closure inspection report by DEMLR prior to filing the Notice of
Termination (NOT)to terminate NCG01 coverage. The closure inspection should not
be requested until after the site has achieved full vegetative stabilization and
measures have been removed. The removal of temporary ESC measures, including
basins, requires prior approval. Often, a full growing season is necessary between
initial seeding/mulching and removal of measures. Please plan your construction
accordingly to avoid contacting our office prematurely for a closure inspection. Also
be advised you may be asked for representative site pictures prior to a closure
inspection. [General Comment]
Your cooperation is appreciated.
Sincerely,
Nicole Chiles, PE - Assistant Regional Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Attachments: Certificate of Approval
FRO Application Report
North Carolina Department of Enironmentel Oual,ty I &vision of Energy.Mineral end Land Resources
Q Walston-Seem Regional Office 1450 West Hanes Mill Road.Suite 300 I Wnston-Salem NC,27105
336 776-9800
Application Report - Friday,
pdf May 10, 2024 915 AM.pdf