Loading...
HomeMy WebLinkAboutNCG510324_staff report_19951016Meg-s-/0 3 2 y To: Permits and Engineering Unit Water Quality Section Attn: p 4 K k Qo la%n Date: October 16, 1995 SOC Priority Project: Yes _ No i If "Yes," SOC No. NPDES STAFF REPORT AND RECOMMENDATION County Washington Permit No. NCG510?'!? PART 1 - GENERAL INFORMATION 1. Facility and Address: Woody's Texaco Hwy 64 east Roper, N.C. (correspondence should be sent to:) Eastern Fuels, Inc., PO Drawer 1386, Ahoskie, NC 27910 2. Date of Investigation: 10/13/95 3. Report Prepared by: Roger Thorpe 63--0 1 — S3 1,17T- nsc."T ore, Cxrrx. 4. Contacts and Telephone Number(s): Frank Williams, Eastern Fuels 919-332-5021 5. Directions to Site: Site is located on the South side of Hwy 64 just West of its intersection with SR 1300 in Washington County. 6. Discharge Point(s), List for all discharge points: Latitude: 35^ 55' 25" N Longitude: 76 35' 30" W Attach USGS map extract and indicate treatment facility site and discharge point on map. USGS Quad No. USGS Quad Name: Roper North 7. Site size and expansion area consistent with application? Yes X No _ If "No," explain: 8. Topography (relationship to flood plain included) Flat with elevation of approx. 15 feet 9. Location of nearest dwelling: approximately 60 feet PLOTTED 10. Receiving stream or affected surface waters: Ut to Pleasent Grove Creek a. Classification: C-SWP 03 b. River Basin and Subbasin No.: %-01-53 c. Describe receiving stream features and pertinent downstream uses:drainage PART II - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS 1. a. Volume of Wastewater to be Permitted: 0.015 MGD b. Current permitted capacity: NA New c. Actual Treatment Capacity: New d. Date(s) and construction allowed by Authorizations to Construct issued in past two years: Not issued yet e. Description of existing or substantially constructed wastewater treatment facilities: NA f. Description of proposed wastewater treatment facilities: Oil water separator, air stripper, carbon filters g. Possible toxic impacts to surface waters: Benzene, Toluene, Xylene, MTBE h. Pretreatment Program (POTWs only): In development Approved Should be required Not needed X 2. Residuals Handling and Utilization/Disposal Scheme NA a. If residuals are being land applied, specify DEM permit number: Residuals Contractor: Telephone Number: b. Residuals Stabilization: c. Landfill: PSRP _ PFRP _ Other d. Other disposal/utilization scheme (specify): 3. Treatment Plant Classification (attach completed rating sheet): NPDES Permit Staff Report Version 10/92 Page 2 4. SIC Code(s): 5541 Wastewater Code(s): Primary 66 Main Treatment Unit Code: 56000 Secondary none PART III - OTHER PERTINENT INFORMATION 1. Is this facility being constructed with Construction Grant Funds or are any public monies involved (municipals only)? No 2. Special monitoring or limitations (including toxicity) requests: None 3. Important SOC, JOC, or Compliance Schedule dates (indicate) : ActiviV ate Submission of Plans and Specifications Begin Construction Complete Construction 4. Alternatives Analysis Evaluation: Has the facility evaluated all of the non -discharge options available? Provide Regional perspective for each option evaluated. Spray Irrigation: not enough space Connection to Regional Sewer System: not available Subsurface Disposal: not enough space, high water table 5. Other Special Items: PART IV - EVALUATION AND RECOMMENDATIONS It is recommended that a general permit be issued for this ground water remediation project. NCG510085 is not the correct permit number. Signature of report preparer Water Quality Regional Supervisor NPDES Permit Staff Report Version 10/92 Page 3 PdrickCreek 4 i.-� t (C) ............ .. . .. ................. .. Foul ........................... ......... ............... . .......... ... Foul ...... t '"-j 11 4, 10 AV 2 M so, P17� 'AQ A 6 -Alt aN easan 15 Grove -- -------- ------------ 10"., --5 7 Pipe Ste C1 (E) - ------------ fj- "S 11116 551 Cr if Blount A 7 16 15 '16 6 10 a 17 0 1000 10 -EET .,2 0- 10 Pire Sta 82 (E) 6 04 XI+ 1w X17 --m- 7.